Forwards Revs to Section 1.8 of FSAR QA Program. Section Last Submitted to NRC on 950407 & Subsequently Accepted in NRC Ltr
ML20096E689
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 01/18/1996
From: Krieser G
WISCONSIN ELECTRIC POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20096E695 List:
References
NP-96-0016, NP-96-16, NUDOCS 9601220362
Download: ML20096E689 (2)


Text

- 1 VVisumonsin Electnc POWER COMPANY 231 W MicNgon, Po Boi 2046 Mdwoukee WI 53201-2046 (414)221 2345 NP-96-0016 10 CFR 50.54 January 18, 1996 Document Control Desk U.S. NUCLEAR REGULATORY COMMISSION Mail Station P1-137 Washington, D. C. 20555 Gentlemen:

DOCKETS 50-266 AND 50-301 J SUBMITTAL OF OUALITY ASSURANCE PROGRAM DESCRIPTION CHANGES FOR FINAL SAFETY ANALYSIS REPORT SECTION 1.8 POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2 In accordance with the requirements of 10 CFR 50.54 (a) (3), we are submitting proposed revisions to Section 1.8 of the Final Safety Analysis Report (FSAR) for Point Beach Nuclear Plant (PBNP). Section 1.8 of the FSAR describes the current Nuclear Quality Assurance Program implemented for PBNP. This section was last submitted to the NRC on April 7, 1995, and subsequently accepted in NRC letter dated May 15, 1995.

These changes are submitted in accordance with the guidelines of NRC Administrative Letter 95-06, " Relocation of Technical Specification Admiiustrative Controls Related to Quality Assurance". As discussed therein, moving " administrative controls" from the Technical Specifications to the QA Program (FSAR Section 1.8) is acceptable due to the suitable control processes implemented through the QA Program.

Wisconsin Electric relocated audit frequencies from the Technical Specifications to the QA Program as approved by license amendment dated July 5, 1995. In addition to these changes, implementation of a performance-based audit schedule is supported by the Administrative Letter. Implementation of a performance-based audit schedule 4 provides a safety benefit for Point Beach Nuclear Plant through a more effective use of resources by improving the focus on matters i that-have safety significance while reducing unnecessary burdens on  !

staff.

A summary of the proposed revisions to the program descripcion and the revised FSAR pages are attached. As described in the attachment, several changes may be viewed as a reduction in quality assurance  ;

program commitments as previously approved by the NRC. However, we '

believe the proposed changes provide a safety benefit and will l enhance our program, j 9601220362 96011s DR ADOCK 05000266 LA k

PDR

'f 230013 g,Q A p

A subsWwrof Himmsin En,y Goryvance

l' Documsnt Control Desk January 18, 1996 Page 2 l If you have any questions or require additional information please l contact Glenn Adams at (414) 221-4691.  ;

1 Sincerely, 1

l Gary . Krieser Mana r Industry and Regulatory Services l

GDA/ cms Enclosure cc: NRC Regional Administrator, Region III NRC Resident Inspector l