ML20087N605

From kanterella
Jump to navigation Jump to search
Testimony of L Harris Re Langley Allegation Concerning Prenotification of NRC Insp
ML20087N605
Person / Time
Site: Catawba  Duke Energy icon.png
Issue date: 02/22/1984
From: Harris L
DUKE POWER CO.
To:
Shared Package
ML20087N559 List:
References
FOIA-84-48 NUDOCS 8404040076
Download: ML20087N605 (2)


Text

r

' .3 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of )

}

DUKE POWER COMPANY, et al. ) Docket Nos. 50-413 (Catawba Nuclear Station,

-~)) 50-414 Units I and 2) )

TESTIMONY OF LINDSAY HARRIS PERTAINING TO MR. LANGLEY'S

ALLEGATION OF PRENOTIFICATION OF NRC INSPECTIONS 1 Q. STATE YOUR NAME AND BUSINESS ADDRESS.

2 A. My name is Lindsay Harris, and my business address is Catawba 3 Nuclear Station , P.O. Box 223, Clover, South Carolina 29710.

4 5 Q. STATE YOUR PRESENT JOB POSITION WITH DUKE POWER.

6 A. I am a welding inspector at Catawba. A description of my 7 experience and qualifications is set forth in my previously filed 8 testimony.

9 10 Q. ARE YOU FAMILIAR WITH MR. LANGLEY'S ALLEGATION THAT

. 11 INSPECTORS RECEIVED NOTIFICATION PRIOR TO NRC 12 INSPECTIONS?

e 13 A. Yes. I am familiar ~ with Mr. Langley's ' allegations by reading his

. 14 testimony, i

3 8404f0076840222

^ PDR PMDE84-40 -

l L'

r, - 1

,;n

  • g~ y o ,

l.l4 \

bt-1 Q. HAVE YOU EVER RECEIVED NOTIFICATION OF NRC INSPECTIONS 2 AS DESCRIBED BY MR. LANGLEY?

3 A. No. I have never received any prenotification. I have never 4 received a note in my message box at the site dealing with NRC 5 inspections. Based on my experience at the site, we find out about 6 NRC being on the job by word-of-mouth after they get there.

7 8 Q. DESCRIBE YOUR INVOLVEMENT WITH 'NRC AND ANI INSPECTORS.

9 A. On the Catawba project the NRC inspectors are normally in 10 different areas on different jobs all the time. I see the NRC 11 inspectors regularly only because they are in the area I am 12 working. Also I know if I would like to talk with them, I am fret 13 to at any time.

14 15 The ANI inspectors put hold points on the appropriate paperwork 16 and the craft notifies us and the ANI inspectors when the work is 17 ready. These hold points consist of cleanups, fitups , preheats ,

18 final vis'ual inspection of welds, NDE, etc. It is normal for the ANI 19 inspectors to accompany a welding inspector on his inspections .

l l

l

-l