ML20151W613

From kanterella
Jump to navigation Jump to search
Affidavit of Mn Leach in Support of NRC Staff Response to Rl Herring Written Presentation.*
ML20151W613
Person / Time
Site: Catawba, 05522234  
Issue date: 09/08/1998
From: Leach M
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
Shared Package
ML20151W574 List:
References
98-745-01-SP, 98-745-1-SP, SP, NUDOCS 9809160046
Download: ML20151W613 (2)


Text

I

\\

i g

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE TIIE PRESIDING OFFICER In the Matter of

)

)

Docket No. 55-22234-SP RANDALL L. IIERRING

)

)

ASLBP No. 98-745-01-SP (Denial of Reactor Operator's

)

License Application)

)

AFFIDAVIT OF MELVYN N. LEACII IN SUPPORT OF NRC STAFF'S RESPONSE TO RANDALL L. HERRING'S WRITTEN PRESENTATION

!, Melvyn N. Leach, being duly sworn, do depose and say:

1. I am employed as the Chief, Operator Licensing Branch, in the NRC Region III Office in Lisle, Illinois, and have held that position since August 1996. My prior employment in the NRC includes two years as a licensed operator examiner and almost three years as a senior resident inspector. I have completed the NRC's training programs for examiner and inspector and I was a certified examiner on both Westinghouse and General Electric reactor types.
2. Prior to my employment with the NRC, I had fifteen years experience in both military and commercial nuclear power, including holding a senior reactor operator's license.
3. I have a Bachelor of Science degree in electrical engineering and a Master of Science degree in nuclear engineering. In addition I hold a Professional Engineer's license in the State of Minnesota.
4. In March 1998, I was appointed as Chairman of an appeal panel for Mr. Randall Herring's application for a reactor operator's license. In early April 1998, I contacted Mr. Garmon Clements of the licensee's staff at the Catawba facility. Mr. Garmon was a shift manager and the manager of human performance improvement at the Catawba station. I asked Mr. Garmon the licensee's expectations with respect to reference to the design basis document to determine system operability. Mr. Garmon stated that operators are trained and expected to review the design basis document to determine operability.

9809160046 980911 PDR ADOCK 05000413 PN I

G

e

  • 9
5. The matters stated tbove are true and correct to the best of my knowledge, information and belief Signature Sworn and subscribed to Rowlene Wendoll before me this Eighth day of September 1998 Notary

(:::::-------

ll "O F F Clh[5 E A5' lI ROWLENE WENDOLL ll l

l NOTARY PUBLIC, STATE OF ILLINOIS l ll MYCOMMISSIONEXPIRES3/28/2002 l

e:::::::::::::: _

j