ML20127K717
From kanterella
Jump to navigation
Jump to search
ML20127K717 | |
Person / Time | |
---|---|
Site: | Catawba ![]() |
Issue date: | 06/24/1985 |
From: | Chilk S NRC OFFICE OF THE SECRETARY (SECY) |
To: | NRC COMMISSION (OCM) |
References | |
CON-#285-566 2.206, DD-85-09, DD-85-9, NUDOCS 8506270550 | |
Download: ML20127K717 (1) | |
Similar Documents at Catawba | |
---|---|
Category:LEGAL TRANSCRIPTS & ORDERS & PLEADINGS
MONTHYEARML20212J1651999-10-0101 October 1999
[Table view]Exemption from Requirements of 10CFR54 Re Renewal of Operating License for Npps.Commission Grants Licensee Exemption Which Removes Schedular Requirement Which Prohibit Licensee from Applying to Commission for Renewed License ML20198L0241998-12-29029 December 1998 Exemption from Certain Requirements of 10CFR50,App A,General Design Criterion 57,re Isolation of Main Steam Branch Lines Penetrating Containment for Licenses NPF-35 & NPF-52, Respectively ML20197J2871998-12-11011 December 1998 Initial Decision (Application for Senior Reactor Operator License).* Appeal of R Herring of NRC Denial of Application for SRO License Denied.With Certificate of Svc.Served on 981211 ML20151W5721998-09-11011 September 1998 NRC Staff Presentation in Support of Denial of Senior Reactor Operator License for Dl Herring.* Staff Decision to Fail Dl Herring on Category a of SRO Exam,Clearly Justified. Staff Denial of Herring SRO License Should Be Sustained ML20151W5941998-09-11011 September 1998 Affidavit of Cd Payne.* Affidavit Re NRC Staff Proposed Denial of Rl Herring Application for Senior Reactor Operator License for Use at Catawba Nuclear Station,Units 1 & 2 ML20151Y0601998-09-11011 September 1998 Affidavit of DC Payne.* Supports Denial of Application of Rl Herring for SRO License ML20151W6311998-09-0808 September 1998 Affidavit of ET Beadle.* Affidavit Relates to Denial of Senior Reactor Operator License Application for Rl Herring. with Certificate of Svc ML20151W6131998-09-0808 September 1998 Affidavit of Mn Leach in Support of NRC Staff Response to Rl Herring Written Presentation.* ML20237B6931998-08-13013 August 1998 Rl Herring (Denial of Operator License for Plant).* Rl Herring Submitted Written Presentation Arguments,Data, Info Matl & Other Supporting Evidence,Per Presiding Officer 980630 Order & 10CFR2.1233.W/one Oversize Drawing ML20237B5571998-08-12012 August 1998 NRC Staff Request for Extension of Time to File Response to Rl Herring Written Presentation.* Granted by C Bechhoefer on 980818.W/Certificate of Svc.Served on 980818 ML20237A3831998-08-12012 August 1998 NRC Staff Request for Extension of Time to File Response to Rl Herring Written Presentation.* Staff Respectfully Requests Motion for Extension of Time of 2 Wks to Respond to Herring Presentation Be Granted.W/Certificate of Svc ML20236T8511998-07-21021 July 1998 Specification of Claims.* Rl Herring Claims That Answer Given on Exam Was Correct When TSs Are Considered & When Design Basis Document Considered in Conjunction W/Duke Power Nuclear Sys Div.W/Certificate of Svc.Served on 980727 ML20236F5391998-06-30030 June 1998 Memorandum & Order (Hearing File & Spec of Claim).* Orders That Brief Spec of Claims Should Be Filed by Herring,Telling Why He Believes Staff Erred in Grading Exam.Staff Must Furnish Hearing File.W/Certificate of Svc.Served on 980630 ML20236F5631998-06-30030 June 1998 Notice of Hearing.* Presiding Officer Has Granted Request of Rl Herring for Hearing on NRC Denial of Application for Operator License for Plant.W/Certificate of Svc.Served on 980630 ML20149K8221997-07-29029 July 1997 Exemption from Requirements of 10CFR70.24, Criticality Accident Requirements. Exemption Granted ML20140E9711997-06-10010 June 1997 Exemption from Requirement of 10CFR50.71(e)(4) to Submit Updates to Plants UFSARs within 6 Months of Units Refueling Outage TXX-9522, Comment Opposing Proposed GL on Testing of safety-related Logic Circuits.Believes That Complete Technical Review of All Surveillance Procedures Would Be Expensive & Unnecessary Expenditure of Licensee Resources1995-08-26026 August 1995 Comment Opposing Proposed GL on Testing of safety-related Logic Circuits.Believes That Complete Technical Review of All Surveillance Procedures Would Be Expensive & Unnecessary Expenditure of Licensee Resources ML20087K9581995-08-17017 August 1995 Exemption from Requirement of 10CFR50,App J,Re Delay Performance of Type a Leakage Rate Test ML20081C1581995-03-0707 March 1995 Exemption from Requirements of 10CFR50,App J,Re Delay of Next Required Type a Leakage Rate Test for 16 Months ML20065P4491994-04-21021 April 1994 Comment Opposing Proposed Rule 10CFR50.55 Recommendation to Incorporate Proposed Rule to Adopt ASME Code Subsections IWE & Iwl ML20044G7371993-05-25025 May 1993 Comment on Proposed Rules 10CFR170 & 171, FY91 & 92 Proposed Rule Implementing Us Court of Appeals Decision & Rev of Fee Schedules;100% Fee Recovery,FY93. Opposes Rule ML20101R5931992-07-0606 July 1992 Comment on Proposed Rule 10CFR50 Re Loss of All Alternating Current Power & Draft Reg Guide 1.9,task DG-1021.Opposes Rule ML20091Q8661992-01-31031 January 1992 Comment Opposing Draft NUREG-1022,Rev 1, Event Reporting Sys,10CFR50.72 & 50.73,Clarification of NRC Sys & Guidelines for Reporting ML20087F7471992-01-15015 January 1992 Comment Opposing Rev 1 of NUREG-1022, Event Reporting Sys ML15260A1291990-07-0202 July 1990 Order Imposing Civil Monetary Penalty in Amount of $50,000, Per Notice of Violation in Insp Repts ML15222A0331990-01-31031 January 1990 Transcript of 900131 Mgt Meeting W/Util in Clover,Sc Re Proposed Civil Penalty Enforcement Cases EA-89-151 & EA-89-178.Pp 1-56.Supporting Info Encl ML20247J8921989-08-31031 August 1989 Order Imposing Civil Monetary Penalty in Amount of $75,000, Based on Violations Noted in Insp on 881127-890204,including Operation in Modes 1-4 W/One Independent Containment Air Return & Hydrogen Skimmer Sys Inoperable for 42 Days ML20246J6571989-08-31031 August 1989 Order Imposing Civil Monetary Penalty on Licensee in Amount of $75,000 for Violations Noted in Insp on 881127-890204. Payment of Civil Penalty Requested within 30 Days of Order Date.Evaluations & Conclusions Encl ML20205N1471988-10-20020 October 1988 Comment on Petition for Rulemaking PRM-50-50 Re Provision That Authorizes Nuclear Power Plant Operators to Deviate from Tech Specs During Emergency.Request by C Young Should Be Denied ML16138A6481988-10-0707 October 1988 Exemption from Requirements of 10CFR50.54(w)(5)(i), Increasing Amount of Onsite Property Damage Insurance,Until Rule Finalized But No Later than 890401 ML20234D2821987-09-15015 September 1987 Joint Intervenors Emergency Motion to Continue Hearing for 2 Wks & for Immediate Prehearing Conference.* Urges That Hearing Re Offsite Emergency Planning at Plant,Scheduled for 870928,be Continued Until 871013.Certificate of Svc Encl ML20206P6201986-06-30030 June 1986 Order Imposing Civil Monetary Penalty of $20,000,based on 850813 Notice of Violation & Proposed Imposition of Civil Penalty.App Evaluating Util 851001 Response to Notice Encl ML20198C5771986-05-14014 May 1986 Transcript of 860514 Discussion/Possible Vote on Full Power OL for Catawba 2 in Washington,Dc.Pp 1-86.Viewgraphs Encl ML20203N4561986-02-20020 February 1986 Unexecuted Amend 6 to Indemnity Agreement B-100,replacing Item 3 of Attachment to Agreement W/Listed Info ML20151P2231985-12-31031 December 1985 Order Extending Time Until 860110 for Commissioners to Review ALAB-825.Served on 851231 ML20136H7231985-11-21021 November 1985 Decision ALAB-825,affirming Remaining Part of ASLB OL Authorization,Permitting Applicant to Receive & Store Spent Fuel Generated at Duke Power Co Oconee & McGuire Nuclear Power Facilities.Served on 851121 ML20138B3611985-10-11011 October 1985 Order Extending Time Until 851025 for Commission to Act to Review ALAB-813.Served on 851011 ML20137W4311985-10-0202 October 1985 Order Extending Time Until 851011 for Commission to Act to Review ALAB-813.Served on 851003 ML20134N5761985-09-0404 September 1985 Order Extending Time Until 851004 for Commission to Act to Review ALAB-813.Served on 850904 ML20126M2091985-07-30030 July 1985 Order Amending First Paragraph of Footnote 126 Re Need for Power & Financial Qualifications in ALAB-813 . Served on 850731 ML20126K7701985-07-26026 July 1985 Order Extending Time Until 850730 for Commission to Act to Review Directors Decision DD-85-9.Served on 850729 ML20129C2351985-07-26026 July 1985 Decision ALAB-813 Affirming Aslab Authorization of Issuance of Full Power Ol,Except Insofar as Receipt & Storage Onsite of Spent Fuel Generated at Other Facilities.Served on 850729 ML20129K1651985-07-19019 July 1985 Order Extending Time Until 850726 for Commission to Act to Review Directors Decision DD-85-9.Served on 850719 ML20129H9361985-07-10010 July 1985 Unexecuted Amend 5 to Indemnity Agreement B-100,changing Items 1 & 3 of Attachment ML20128K2171985-07-0808 July 1985 Order Extending Time Until 850719 for Commission to Act to Review Directors Decision DD-85-9.Served on 850709 ML20127P0991985-06-28028 June 1985 Transcript of 850628 Supplemental Oral Argument in Bethesda, Md.Pg 99-169 ML20133C5201985-06-26026 June 1985 Undated Testimony of PM Reep Re Welding Inspector Concerns. Rept of Verbal Harassment Encl ML20127K7171985-06-24024 June 1985 Order Extending Time Until 850709 for Commission to Act to Review Directors Decision DD-85-9 ML20126K6391985-06-17017 June 1985 Order Advising That Counsel Be Familiar W/Content of Commission Request for Public Comment on Decision to Exercise Discretionary Price-Anderson Act Authority to Extend Govt Indemnity to Spent.... Served on 850618 ML20126B8101985-06-13013 June 1985 Order Scheduling Supplemental Oral Argument on Pending Appeals on 850628 in Bethesda,Md Re Public Notice of Hearing Concerning Use of Facility for Receipt & Storage of Spent Fuel from Oconee & Mcguire.Served on 850613 1999-10-01 Category:ORDERS MONTHYEARML20236F5391998-06-30030 June 1998
[Table view]Memorandum & Order (Hearing File & Spec of Claim).* Orders That Brief Spec of Claims Should Be Filed by Herring,Telling Why He Believes Staff Erred in Grading Exam.Staff Must Furnish Hearing File.W/Certificate of Svc.Served on 980630 ML15260A1291990-07-0202 July 1990 Order Imposing Civil Monetary Penalty in Amount of $50,000, Per Notice of Violation in Insp Repts ML20246J6571989-08-31031 August 1989 Order Imposing Civil Monetary Penalty on Licensee in Amount of $75,000 for Violations Noted in Insp on 881127-890204. Payment of Civil Penalty Requested within 30 Days of Order Date.Evaluations & Conclusions Encl ML20247J8921989-08-31031 August 1989 Order Imposing Civil Monetary Penalty in Amount of $75,000, Based on Violations Noted in Insp on 881127-890204,including Operation in Modes 1-4 W/One Independent Containment Air Return & Hydrogen Skimmer Sys Inoperable for 42 Days ML20206P6201986-06-30030 June 1986 Order Imposing Civil Monetary Penalty of $20,000,based on 850813 Notice of Violation & Proposed Imposition of Civil Penalty.App Evaluating Util 851001 Response to Notice Encl ML20151P2231985-12-31031 December 1985 Order Extending Time Until 860110 for Commissioners to Review ALAB-825.Served on 851231 ML20138B3611985-10-11011 October 1985 Order Extending Time Until 851025 for Commission to Act to Review ALAB-813.Served on 851011 ML20137W4311985-10-0202 October 1985 Order Extending Time Until 851011 for Commission to Act to Review ALAB-813.Served on 851003 ML20134N5761985-09-0404 September 1985 Order Extending Time Until 851004 for Commission to Act to Review ALAB-813.Served on 850904 ML20126M2091985-07-30030 July 1985 Order Amending First Paragraph of Footnote 126 Re Need for Power & Financial Qualifications in ALAB-813 . Served on 850731 ML20126K7701985-07-26026 July 1985 Order Extending Time Until 850730 for Commission to Act to Review Directors Decision DD-85-9.Served on 850729 ML20129K1651985-07-19019 July 1985 Order Extending Time Until 850726 for Commission to Act to Review Directors Decision DD-85-9.Served on 850719 ML20128K2171985-07-0808 July 1985 Order Extending Time Until 850719 for Commission to Act to Review Directors Decision DD-85-9.Served on 850709 ML20127K7171985-06-24024 June 1985 Order Extending Time Until 850709 for Commission to Act to Review Directors Decision DD-85-9 ML20126K6391985-06-17017 June 1985 Order Advising That Counsel Be Familiar W/Content of Commission Request for Public Comment on Decision to Exercise Discretionary Price-Anderson Act Authority to Extend Govt Indemnity to Spent.... Served on 850618 ML20126B8101985-06-13013 June 1985 Order Scheduling Supplemental Oral Argument on Pending Appeals on 850628 in Bethesda,Md Re Public Notice of Hearing Concerning Use of Facility for Receipt & Storage of Spent Fuel from Oconee & Mcguire.Served on 850613 ML20129A6381985-06-0303 June 1985 Order Allowing Applicant to File & Serve Response to NRC 850529 Assertion Re Storage of Spent Fuel Generated at Another Facility Constituting Use of Commercial Utilization Facility No Later than 850607.Served on 850604 ML20127K0231985-05-20020 May 1985 Order Extending Time Until 850529 for Aslab to Act to File & Svc Reply Memoranda.Served on 850521 ML20205A7511985-04-25025 April 1985 Order Requiring Parties to File Supplemental Memoranda on Intervenor Appeal Re Proposed Transportation to & Storage at Oconee & Mcguire.Necessity to Treat Jurisdictional Question in Decision Not Yet Determined.Served on 850425 ML20024E9881983-09-0606 September 1983 Memorandum & Order Ruling on Util & NRC Motions for Summary Disposition of Contentions 16 & 19 & on Palmetto Alliance Motion for Sanctions.Motions Granted & Denied as Noted. Palmetto Should Avoid Inflammatory Rhetoric ML20024A6901983-06-20020 June 1983 Memorandum & Order Ruling on NRC 830603 Motion for Sanctions Based on Palmetto Alliance (PA) Failure to Make Discovery on Contentions 7 & 44 & Util 830606 Motion for Sanctions Requesting Dismissal of PA Contentions 6,7,8,16 & 44 ML20023C6041983-05-13013 May 1983 Memorandum & Order Ruling on Util 830429 Motion to Compel Palmetto Alliance Further Responses to Util Interrogatories & Requests to Produce Re Palmetto Contentions 6,7,8,16 & 44. Listed Requests Granted ML20028G2521983-02-0202 February 1983 Memorandum & Order Denying Palmetto Alliance & Carolina Environ Study Group 821220 Joint Motion for Reconsideration, or Alternatively,For Certification.Adopts Applicant Proposed Schedule as Revised ML20028A0531982-11-12012 November 1982 Order Extending Time Until 821203 for Commission to Act to Review ALAB-687 ML20027C5711982-10-14014 October 1982 Order Extending Time Until 821112 for Commission to Act to Review ALAB-687 ML20027B8941982-09-28028 September 1982 Order Extending Time Until 821014 for Commission to Act to Review ALAB-687 ML20054M1951982-07-0808 July 1982 Memorandum & Order Overruling Applicant & Intervenor Objections Following Prehearing Conference,Denying Requests for Referral to Aslab & Addressing Related Questions ML20054K4601982-07-0101 July 1982 Memorandum & Order Directing Parties to File,By 820716, Memorandum on Existence of Extraordinary Cause for Acceptance of Referral Re ASLB Conditional Admission of Contentions ML20054K6291982-06-30030 June 1982 Memorandum & Order Overruling Certain Objections to Prehearing Conference Order & Referring Certain Questions to Aslab ML20054L8401982-06-30030 June 1982 Memorandum & Order Overruling Certain Objections to Prehearing Conference Order & Referring Certain Questions to Aslab ML20053D6261982-06-0202 June 1982 Order Soliciting Comments on Encl Draft Order Staying Discovery ML20053B2011982-05-25025 May 1982 Memorandum & Order Denying Applicant 820426 Renewed Motion for Certification.Applicant & NRC Requests for Stay of Discovery Granted on All Admitted Contentions for Which Certification Sought ML20054A1051982-04-13013 April 1982 Order Directing Parties to Proceed on Assumption That 820305 Memorandum & Order Will Remain in Full Force & Effect.Discovery on Palmetto Contention 8 Suspended. Palmetto Alliance Directed to Answer Listed Questions ML20049J7021982-03-17017 March 1982 Order Granting Palmetto Alliance & All Parties,Extension Until 820331 to File Responses Re Spent Fuel Pool & Operator Qualifications.Nrc Deadline Is 820405 ML20041D7621982-03-0505 March 1982 Memorandum & Order on Decision Made Following 820112-13 Prehearing Conference in York,Sc Re Petitions to Intervene & Contentions ML20039D7471981-12-30030 December 1981 Order Rescheduling 820106 Special Prehearing Conference for 820112 ML20033A4401981-11-23023 November 1981 Order Denying Util Request That Petitioners for Intervention Have Contentions in Hands of Util by 811209,instead of Mailing Contentions on 811209.Util Still Has 3 Wks to Respond to Contentions ML20032D8921981-11-13013 November 1981 Order Rejecting Carolina Environ Study Group Comments on Appropriate Dates for Later Prehearing Conference.Filing Untimely & Lacks Adequate Showing of Good Cause ML20032D0291981-11-0505 November 1981 Order Scheduling 820106 Special Prehearing Conference in York,Sc to Rule on Petitions to Intervene & Contentions. Petitions May Be Amended W/O Leave of ASLB Up to 811209. Responses to Amends to Be Served by 811230 ML20031G2961981-10-19019 October 1981 Order Directing Petitioners for Intervention & NRC to Comment by 811028 on Applicant Proposing Certain Filing Dates & Prehearing Conference ML20004D8301981-06-0404 June 1981 Order Extending Const Completion Dates for Units 1 & 2 to 840301 & 850901,respectively ML19345E8111981-02-0404 February 1981 Order Affirming 810113 Order,Denying,W/Prejudice,Hg Ayers Petition for Antitrust Hearing.Amended Petition Not Filed ML20003A6431981-01-30030 January 1981 Order Granting Extension Until 810223 for Commission to Decide Whether to Review Directors Decision Re Facility. Extension Granted to Allow NRC to Fully Explain Basis for Original Decision.Certificate of Svc Encl ML19340F0961981-01-13013 January 1981 Memorandum & Order Denying Hg Ayers 801215 Request for Antitrust Hearing.Also Grants Ayers Leave to File Amended Petition for Leave to Intervene & Request for Antitrust Hearing by 810131.Certificate of Svc Encl ML19291B7081977-08-0808 August 1977 Memorandum & Order ALAB-426 Affirming Decisions Over Last Yr Re U Fuel Cycle Rule.Certificate of Svc Encl ML19291B7101977-04-21021 April 1977 Memorandum & Order ALAB-392 Inviting Submissions within 30 Days Re U Fuel Cycle Environ Effects Consideration in NEPA Cost/Benefit Analyses.Certificate of Svc Encl 1998-06-30 |
Text
fdfo DothETEF USNRC UNITED STATES OF AMERICA Ti JM 24 P.4:34 NUCLEAR REGULATORY COMMISSION gFFiC[IggERVIU OF JLCntiA.-
OCM COMMISSIONERS:
Nunzio J. Palladino, Chairman Thomas M. Roberts' James K. Asselstine y JUN2525 Frederick M. Bernthal Lando W. Zech, Jr.
)
In the Matter of
)
Docket Nos. 50-413
)
50-414 (CatawbaNuclearStation,
)
Units 1 and 2)
)
)
ORDER Pursuant to 10 CFR 2.772(g),'the time for the Commission to consider whether to review DD-85-9 is hereby extended to July 9, 1985.
It is so ORDERED.
For the Commission sysREQu ff\\
! %.w :]g'ip{g g f r N E
SAMUEL J. CHILK
- h";Q i Se tary of the Commission Qhpl o$
1 vi *****
Dated at Washington, DC this 7f day of June,1985.