ML20151P223

From kanterella
Jump to navigation Jump to search
Order Extending Time Until 860110 for Commissioners to Review ALAB-825.Served on 851231
ML20151P223
Person / Time
Site: Catawba  Duke Energy icon.png
Issue date: 12/31/1985
From: Chilk S
NRC OFFICE OF THE SECRETARY (SECY)
To: Palladino N
NRC COMMISSION (OCM)
References
CON-#186-659 ALAB-825, OL, NUDOCS 8601030333
Download: ML20151P223 (1)


Text

r J

)s t

UNITED STATES OF AMERICA

gra.- -

NUCLEAR REGULATORY COMMISSION MJ, COMMISSIONERS:

DEC 31 A10:21 Nunzio J. Palladino, Chairman cre,,

Thomas M. Roberts DCCIf*ito 4 ic..

James K. Asselstine 6C.Uf"

  • Frederick M. Bernthal Lando W. Zech, Jr.

In the Matter of l

DUKE POWER COMPANEY, ET AL.

)

Docket Nos. 50-413 OL

)

50-414 OL (Catawba Nuclear Station.

)

Units 1 and 2)

)

)

l ORDER Pursuant to 10 CFR 2.772(g), the time for the Commission to consideration of ALAB-825 in this matter is hereby extended to January 10, 1986.

It is so ORDERED.

c' ~ x For the Commission r.

y,f

~

i

,a 0W%.

f SAMUEL dl. THILK Secretary of the Commission Dated at Washington, DC this 3/.s783y of December,1985.

f B601030333 851231

~

i PDR ADOCM 05000413 l

g PDR c.