MONTHYEARML20199H2771999-01-20020 January 1999 Proposed Tech Specs Changing Table 3.3.8.1-1 to Revise Allowable Values for Degraded Voltage Relay Reset & Dropout Setpoints as Specified Per Items 1.c,1.d,2.c & 2.d ML20196A0941998-11-20020 November 1998 Proposed Tech Specs Re Div 3 Diesel Generator Droop Issue ML20196A1501998-11-20020 November 1998 Revised Pages Constituting Rev 3 to CPS TS Bases,Consisting of Pages Annotated with Rev Numbers 3-1,3-2,3-3,3-4 & 3-5. Changes to Text Identified with Rev Bars.No Rev Bars Included for Changes to Format ML20155A5631998-10-23023 October 1998 Proposed Tech Specs LCO 3.6.1.9, FW LCS (FWLCS) for Implementation of FWLCS Mode of RHR Sys U-603088, Proposed Tech Specs Section 5.5.13,allowing Next Scheduled Performance of LLRT of Primary Containment Penetration for RPV Head Spray Piping (IMC-042) to Be Deferred Until Seventh Refueling Outage (RF-7)1998-10-0505 October 1998 Proposed Tech Specs Section 5.5.13,allowing Next Scheduled Performance of LLRT of Primary Containment Penetration for RPV Head Spray Piping (IMC-042) to Be Deferred Until Seventh Refueling Outage (RF-7) ML20153F4201998-09-23023 September 1998 Corrected Proposed Tech Specs Bases Page B 3.8-94 Re SVC Protection Sys ML20237E4191998-08-24024 August 1998 Proposed Tech Specs SR 3.8.1.17,revising Acceptance Criteria for Meeting ready-to-load Requirement for Division 3 DG ML20237C3501998-08-17017 August 1998 Proposed Tech Specs Partially Reducing Load at Which DGs Are Required to Be Tested Per Affected SRs in Order to Reduce Stress & Wear on Machines While Still Sufficiently Challenging Machines to Confirm Operability ML20236X0071998-07-31031 July 1998 Proposed Tech Specs,Revising Acceptance Criteria of SRs 3.8.1.7,3.8.1.12,3.8.1.15 & 3.8.1.20 ML20216B1511998-05-0404 May 1998 Proposed Tech Specs Pages,Incorporating Requirements for Static Var Compensator (SVC) Protection Sys Under New TS ML20217M3351998-04-27027 April 1998 Proposed Tech Specs Re Mgt Changes Occurring in Operations Organization at Plant ML20212C6951997-10-23023 October 1997 Proposed Tech Specs,Constituting Rev 2 to CPS TS Bases.Rev Consists of Pages Annotated W/Rev Numbers 2-1 Through 2-14 ML20149J1701997-07-22022 July 1997 Proposed Tech Specs Requesting Exemption to 10CFR50,App a, General Design Criteria to Allow Operation W/Identified Offsite Circuit Condition U-602714, Proposed Tech Specs Table 3.3.8.1-1 Re Loss of Power Instrumentation1997-04-0101 April 1997 Proposed Tech Specs Table 3.3.8.1-1 Re Loss of Power Instrumentation ML20133F2051997-01-0707 January 1997 Proposed Tech Specs 2.0 Re Safety Limits ML20133A5951996-12-13013 December 1996 Proposed TSs Re Transfer of Minority Ownership ML20134M3181996-11-19019 November 1996 Proposed Tech Specs Revising Table 3.3.8.1-1, Loss of Power Instrumentation, by Dividing Function, Degraded Voltage - 4.16 Kv Basis & Degraded Voltage Dropout - 4.16 Kv Basis, re-numbering Items in Table & Revising Associated Notes ML20128K0711996-10-0404 October 1996 Proposed Tech Specs 3.3.8.1,adding Action Statement & Note Requiring Restoration of Inoperable Degraded Voltage Relays, Rev to Table 3.3.8.1-1 ML20134C1631996-09-20020 September 1996 Proposed Tech Specs,Revising TS 3.3.4.1, End of Cycle Recirculation Pump Trip Instrumentation, to Delete SR 3.3.4.1.6 Which Requires RPT Breaker Interruption Time to Be Determined at Least Once Per 60 Months U-602623, Proposed Tech Specs 3.10.10, Single Control Rod Withdrawal- Refueling1996-08-15015 August 1996 Proposed Tech Specs 3.10.10, Single Control Rod Withdrawal- Refueling ML20116N1101996-08-15015 August 1996 Proposed Tech Specs 2.0, Safety Limits, Changing TS to Incorporate Revised SLMCPR as Calculated by GE for CPS Cycle 7 U-602619, Proposed Tech Specs 5.0, Administrative Controls, Deleting Examples Currently Included in Parentheses1996-08-15015 August 1996 Proposed Tech Specs 5.0, Administrative Controls, Deleting Examples Currently Included in Parentheses ML20113E7261996-06-28028 June 1996 Proposed Tech Specs,Allowing Removal of Inclined Fuel Transfer Sys Primary Containment Blind Flange While Primary Containment Required to Be Operable U-602591, Proposed Tech Specs,Allowing Utilization of RWP or Equivalent to Control Entry Into High Radiation Area, Clarifying Example Given in TS of Individuals Qualified in Radiation Protection Procedures1996-06-21021 June 1996 Proposed Tech Specs,Allowing Utilization of RWP or Equivalent to Control Entry Into High Radiation Area, Clarifying Example Given in TS of Individuals Qualified in Radiation Protection Procedures ML20108C9431996-05-0101 May 1996 Proposed Tech Specs,Implementing 10CFR50,App J - Option B ML20107L0011996-04-19019 April 1996 Proposed Tech Specs,Revising Listed TS to Eliminate Core Alterations as Applicable Condition for Which Associated LCO Must Be Met ML20100H7741996-02-22022 February 1996 Proposed Tech Specs,Proposing to Revise TS 3.6.5.1, Drywell, to Allow Drywell Bypass Leakage Tests to Be Performed at Intervals of Up to Ten Yrs Based on Demonstrated Performance of Drywell Barrier ML20100H7901996-02-22022 February 1996 Proposed Tech Specs,Deleting SR 3.3.8.1.1 Which Requires Channel Check for Loss of Power Instrumentation & Changing TS Table 3.3.8.1-1 to Change Allowable Value for Degraded Voltage Function from 3762V & 3832V to 3876V ML20100H8171996-02-22022 February 1996 Proposed Tech Specs,Changing TS 3.4.11, RCS P/T Limits, to Incorporate Specific P/T Limits for Bottom Head Region of Rv Separate & Apart from Core Beltline Region of Rv ML20100H8411996-02-22022 February 1996 Proposed Tech Specs,Changing TS 3.3.4.1, End of Cycle Recirculation Pump Trip Instrumentation, to Delete SR 3.3.4.1.6 Which Requires RPT Breaker Interruption Time to Be Determined at Least Once Per 60 Months ML20095G4791995-12-14014 December 1995 Proposed Tech Specs 3.4.2, Flow Control Valves Re Proposed Deletion of Average Rate of Movement Verification Requirement ML20095G5141995-12-14014 December 1995 Proposed Tech Specs 3.3.1.1, RPS Instrumentation & TS 3.3.6.1, Primary Containment Dwl Isolation Instrumentation to Eliminate Periodic Response Time Testing of Analog Trip Modules ML20095G6401995-12-14014 December 1995 Proposed Tech Specs Instrumentation Associated W/High Pressure Core Spray Sys,Reactor Core Isolation Cooling Sys & Residual Heat Removal Sys ML20094D2141995-10-27027 October 1995 Proposed Tech Specs,Consisting of Changes to TS 5.2.2.e to Revise Requirements for Controls on Working Hs of Unit Staff That Perform SR Functions ML20094D2031995-10-27027 October 1995 Proposed Tech Specs,Consiting of Changes to TS 3.1.3 to Include 25% Surveillance Overrun Allowed by LCO 3.0.2 Into Allowances of Surveillance Notes for Control Rod Notch Testing Per SR 3.1.3.2 & SR 3.1.3.3 ML20085N0621995-06-23023 June 1995 Proposed Tech Specs Bases,Per TS 5.5.11, TS Bases Control Program ML20085F5961995-06-0909 June 1995 Proposed Tech Specs,Incorporating Description of Exclusion Area Boundary ML20085J9701995-02-16016 February 1995 Proposed Tech Specs Reflecting Enforcement Discretion Re TS LCO for Div 2 DC Electrical Power Sources ML20078Q2931995-02-14014 February 1995 Proposed Tech Specs 3.8.2, AC Sources-Shutdown, 3.8.5, DC Sources-Shutdown & 3.8.8, Inverters-Shutdown ML20078N2701995-02-10010 February 1995 Proposed TS 3.3.2.1, Control Rod Block Instrumentation ML20078E9701995-01-27027 January 1995 Proposed Tech Specs,Eliminating Selected Response Time Testing Requirements U-602372, Proposed Tech Specs Requesting Complete Rev of CPS TS for Conversion to Improved TS Per Guidance Provided by NUREG-1434, Improved BWR-6 TS, Rev 0,dated Sept 19921994-11-18018 November 1994 Proposed Tech Specs Requesting Complete Rev of CPS TS for Conversion to Improved TS Per Guidance Provided by NUREG-1434, Improved BWR-6 TS, Rev 0,dated Sept 1992 ML20076G2721994-10-14014 October 1994 Proposed Tech Specs,Allowing Drywell Bypass Leakage Test to Be Performed at five-yr Interval ML20072E6701994-08-12012 August 1994 Proposed Tech Specs Eliminating Requirement to Perform Manual Testing of solid-state Logic Independently from self-test Sys ML20072E6191994-08-12012 August 1994 Proposed Tech Specs Allowing Drywell Bypass Leakage Rate Tests to Be Performed at Intervals as Long as Ten Years ML20072C1251994-08-0505 August 1994 Proposed Tech Specs Re Requirement for Accelerated Testing of Div 1 DG ML20069Q3851994-06-27027 June 1994 Proposed Tech Specs 3/4.4.3.1, Reactor Coolant Sys Leakage- Leakage Detection Sys ML20069N3201994-06-16016 June 1994 Proposed Tech Specs Adding -89 After ASTM D3803 in Testing Requirements Specified for SGTS & MCR Filter Sys Charcoal & Changing Test Temp for Testing SGTS Charcoal from 80 C to 30 C ML20069K8191994-06-13013 June 1994 Proposed Tech Specs to Allow 36-inch Isolation Valve Leak Measurement Be Performed at Least Once Per 18 Months, Providing Valves Remain Closed During Period ML20070N6951994-04-26026 April 1994 Proposed Tech Specs Adopting Changes Recommended in NRC Re NUREG-1434 1999-01-20
[Table view] Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML20209E0551999-07-0606 July 1999 1999 Business Plan ML20206F2231999-04-27027 April 1999 NRC Manual Chapter 0350 Restart Action Plan for Clinton Power Station ML20199H2771999-01-20020 January 1999 Proposed Tech Specs Changing Table 3.3.8.1-1 to Revise Allowable Values for Degraded Voltage Relay Reset & Dropout Setpoints as Specified Per Items 1.c,1.d,2.c & 2.d ML20206E6281998-12-31031 December 1998 Rev 17 to ODCM for Clinton Power Station ML20196A0941998-11-20020 November 1998 Proposed Tech Specs Re Div 3 Diesel Generator Droop Issue ML20196A1501998-11-20020 November 1998 Revised Pages Constituting Rev 3 to CPS TS Bases,Consisting of Pages Annotated with Rev Numbers 3-1,3-2,3-3,3-4 & 3-5. Changes to Text Identified with Rev Bars.No Rev Bars Included for Changes to Format ML20155A5631998-10-23023 October 1998 Proposed Tech Specs LCO 3.6.1.9, FW LCS (FWLCS) for Implementation of FWLCS Mode of RHR Sys U-603088, Proposed Tech Specs Section 5.5.13,allowing Next Scheduled Performance of LLRT of Primary Containment Penetration for RPV Head Spray Piping (IMC-042) to Be Deferred Until Seventh Refueling Outage (RF-7)1998-10-0505 October 1998 Proposed Tech Specs Section 5.5.13,allowing Next Scheduled Performance of LLRT of Primary Containment Penetration for RPV Head Spray Piping (IMC-042) to Be Deferred Until Seventh Refueling Outage (RF-7) ML20153F4201998-09-23023 September 1998 Corrected Proposed Tech Specs Bases Page B 3.8-94 Re SVC Protection Sys ML20237E4191998-08-24024 August 1998 Proposed Tech Specs SR 3.8.1.17,revising Acceptance Criteria for Meeting ready-to-load Requirement for Division 3 DG ML20237C3501998-08-17017 August 1998 Proposed Tech Specs Partially Reducing Load at Which DGs Are Required to Be Tested Per Affected SRs in Order to Reduce Stress & Wear on Machines While Still Sufficiently Challenging Machines to Confirm Operability ML20236X0071998-07-31031 July 1998 Proposed Tech Specs,Revising Acceptance Criteria of SRs 3.8.1.7,3.8.1.12,3.8.1.15 & 3.8.1.20 ML20236Q4661998-07-17017 July 1998 Rev 0 to Procedure 2800.93, Emergency Reserve Auxiliary Transformer Integrated Test ML20236Q4651998-07-17017 July 1998 Rev 0 to Procedure 2800.92, Emergency Reserve Auxiliary Transformer Integrated Test ML20236Q4571998-07-17017 July 1998 Rev 0 to Procedure 2800.91, Emergency Reserve Auxiliary Transformer Test ML20216B1511998-05-0404 May 1998 Proposed Tech Specs Pages,Incorporating Requirements for Static Var Compensator (SVC) Protection Sys Under New TS ML20217M3351998-04-27027 April 1998 Proposed Tech Specs Re Mgt Changes Occurring in Operations Organization at Plant ML20203D5651998-02-19019 February 1998 Plan for Excellence ML20212C6951997-10-23023 October 1997 Proposed Tech Specs,Constituting Rev 2 to CPS TS Bases.Rev Consists of Pages Annotated W/Rev Numbers 2-1 Through 2-14 ML20149J1701997-07-22022 July 1997 Proposed Tech Specs Requesting Exemption to 10CFR50,App a, General Design Criteria to Allow Operation W/Identified Offsite Circuit Condition ML20149H8991997-06-30030 June 1997 CPS Long Term Improvement Plan U-602714, Proposed Tech Specs Table 3.3.8.1-1 Re Loss of Power Instrumentation1997-04-0101 April 1997 Proposed Tech Specs Table 3.3.8.1-1 Re Loss of Power Instrumentation ML20133F2051997-01-0707 January 1997 Proposed Tech Specs 2.0 Re Safety Limits ML20133A5951996-12-13013 December 1996 Proposed TSs Re Transfer of Minority Ownership ML20134M3181996-11-19019 November 1996 Proposed Tech Specs Revising Table 3.3.8.1-1, Loss of Power Instrumentation, by Dividing Function, Degraded Voltage - 4.16 Kv Basis & Degraded Voltage Dropout - 4.16 Kv Basis, re-numbering Items in Table & Revising Associated Notes ML20128K0711996-10-0404 October 1996 Proposed Tech Specs 3.3.8.1,adding Action Statement & Note Requiring Restoration of Inoperable Degraded Voltage Relays, Rev to Table 3.3.8.1-1 ML20134C1631996-09-20020 September 1996 Proposed Tech Specs,Revising TS 3.3.4.1, End of Cycle Recirculation Pump Trip Instrumentation, to Delete SR 3.3.4.1.6 Which Requires RPT Breaker Interruption Time to Be Determined at Least Once Per 60 Months ML20116N1101996-08-15015 August 1996 Proposed Tech Specs 2.0, Safety Limits, Changing TS to Incorporate Revised SLMCPR as Calculated by GE for CPS Cycle 7 U-602619, Proposed Tech Specs 5.0, Administrative Controls, Deleting Examples Currently Included in Parentheses1996-08-15015 August 1996 Proposed Tech Specs 5.0, Administrative Controls, Deleting Examples Currently Included in Parentheses U-602623, Proposed Tech Specs 3.10.10, Single Control Rod Withdrawal- Refueling1996-08-15015 August 1996 Proposed Tech Specs 3.10.10, Single Control Rod Withdrawal- Refueling ML20137A1101996-08-14014 August 1996 Rev 19 to App V Second 10-Yr Interval Pump & Valve Testing Program Plan ML20137A1021996-07-10010 July 1996 Rev 5 to App IV Second 10-Yr Interval Inservice Exam Plan ML20113E7261996-06-28028 June 1996 Proposed Tech Specs,Allowing Removal of Inclined Fuel Transfer Sys Primary Containment Blind Flange While Primary Containment Required to Be Operable U-602591, Proposed Tech Specs,Allowing Utilization of RWP or Equivalent to Control Entry Into High Radiation Area, Clarifying Example Given in TS of Individuals Qualified in Radiation Protection Procedures1996-06-21021 June 1996 Proposed Tech Specs,Allowing Utilization of RWP or Equivalent to Control Entry Into High Radiation Area, Clarifying Example Given in TS of Individuals Qualified in Radiation Protection Procedures ML20108C9431996-05-0101 May 1996 Proposed Tech Specs,Implementing 10CFR50,App J - Option B ML20107L0011996-04-19019 April 1996 Proposed Tech Specs,Revising Listed TS to Eliminate Core Alterations as Applicable Condition for Which Associated LCO Must Be Met ML20100H8411996-02-22022 February 1996 Proposed Tech Specs,Changing TS 3.3.4.1, End of Cycle Recirculation Pump Trip Instrumentation, to Delete SR 3.3.4.1.6 Which Requires RPT Breaker Interruption Time to Be Determined at Least Once Per 60 Months ML20100H7901996-02-22022 February 1996 Proposed Tech Specs,Deleting SR 3.3.8.1.1 Which Requires Channel Check for Loss of Power Instrumentation & Changing TS Table 3.3.8.1-1 to Change Allowable Value for Degraded Voltage Function from 3762V & 3832V to 3876V ML20100H8171996-02-22022 February 1996 Proposed Tech Specs,Changing TS 3.4.11, RCS P/T Limits, to Incorporate Specific P/T Limits for Bottom Head Region of Rv Separate & Apart from Core Beltline Region of Rv ML20100H7741996-02-22022 February 1996 Proposed Tech Specs,Proposing to Revise TS 3.6.5.1, Drywell, to Allow Drywell Bypass Leakage Tests to Be Performed at Intervals of Up to Ten Yrs Based on Demonstrated Performance of Drywell Barrier ML20095G5141995-12-14014 December 1995 Proposed Tech Specs 3.3.1.1, RPS Instrumentation & TS 3.3.6.1, Primary Containment Dwl Isolation Instrumentation to Eliminate Periodic Response Time Testing of Analog Trip Modules ML20095G6401995-12-14014 December 1995 Proposed Tech Specs Instrumentation Associated W/High Pressure Core Spray Sys,Reactor Core Isolation Cooling Sys & Residual Heat Removal Sys ML20095G4791995-12-14014 December 1995 Proposed Tech Specs 3.4.2, Flow Control Valves Re Proposed Deletion of Average Rate of Movement Verification Requirement ML20117E3001995-11-0606 November 1995 Rev 18 to App V Pump & Valve Testing Program Plan ML20094D2031995-10-27027 October 1995 Proposed Tech Specs,Consiting of Changes to TS 3.1.3 to Include 25% Surveillance Overrun Allowed by LCO 3.0.2 Into Allowances of Surveillance Notes for Control Rod Notch Testing Per SR 3.1.3.2 & SR 3.1.3.3 ML20094D2141995-10-27027 October 1995 Proposed Tech Specs,Consisting of Changes to TS 5.2.2.e to Revise Requirements for Controls on Working Hs of Unit Staff That Perform SR Functions ML20085N0621995-06-23023 June 1995 Proposed Tech Specs Bases,Per TS 5.5.11, TS Bases Control Program ML20085F5961995-06-0909 June 1995 Proposed Tech Specs,Incorporating Description of Exclusion Area Boundary ML20087J5691995-05-17017 May 1995 Rev 17 to App V, Pump & Valve Testing Program Plan of CPS ISI Program Manual ML20085J9701995-02-16016 February 1995 Proposed Tech Specs Reflecting Enforcement Discretion Re TS LCO for Div 2 DC Electrical Power Sources 1999-07-06
[Table view] |
Text
_
Attachment 2, to U-601916 LS-91-007
, Page o of 9 PLANT SYSTEMS 3/4. 7.2 CONTROL RDOM VENTILATION SYSTEM LIMITING CONDITION FOR OPERATION 3.7.2 Two independent Control Room Veatilation Systems shall be OPERABLE.1 APPLICABIllTY: All OPERATIONAL CONDITIONS'and *.
ACTION:
- a. In OPERATIONAL CONDITION 1, 2 or 3 with one Control Room Ventilation System inoperable, restore the inoperable system to OPERABLE status within 7 days or be in at least HOT SHUTDOWN within'the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
- b. In OPERATIONAL CONDITION 4, 5, or *: d
- 1. With one Control Room Ventilation System inoperable, estore the inoperable system to OPERABLE status within 7 days.+e nitiate and maintain operation oLth QPERABLE,srst3mJ,the,b1 J t mo.31e_Ef,[uMs nf npergio(for -M Cse /k7xn.471ces, har haL eadiatio of irrdto.t ed cuerA c,w w.% c- W 4 - drain,nn Ae h
- 2. the Wt sacrdL o c<numen+f'Ottfon' Systems ~inops-o tYol^R6BiM/ent r e, Utp *n CORE Q j
, y ALTERATIONS.. handling of irradiated fuel in the secondary containmen and operations with a potential for draining the reactor vessel. Qh>j
- c. The provisions of Specification 3.0.3 are not applicable in OPERATIONAL CONDITION *.,
SURVEILLANCE RE0VIREMENTS 4.7.2 Each Control Room Ventilation System shall be demonstrated OPERABLE:t
- a. At least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> by verifying that the control room air tempera-ture is less than or equal to 86 F.
- b. At least once per 31 days on' a STAGGERED TEST BASIS by initiating, from .
the control room, flow through the HEPA filters and charcoal adsorbers and verifying that the makeup filter system operates continuously for at least 10 hours1.157407e-4 days <br />0.00278 hours <br />1.653439e-5 weeks <br />3.805e-6 months <br /> with the heaters operating; and with flow through the recircula-tion charcoal adsorber for at least 15 minutes,
, TAutomatic transfer to the chlorine mode is not required when chlorine containers I
having a capacity of 150 pounds or less are stored 100 meters or more from the control room or its fresh air inlets.
CLINTON - UNIT 1 3/4 7-3
$ 01070005 911227 t brt ADOCK 050004j l POR
.,-.v~ m. . y -
y e _., ,. - . ,_ Attaehment 2 ...
( .
to U-601916
( ' b;O C W (% . gf 00\/Med Mr Qyi-hg) C')p LS-91-007 bdw.J#bu - % +. -t_%. , g PLANT SYSTEMS CONTROL ROOM VENTILATION SYSTEM i
'URVEllt.ANCE REOUIREMENTS (Continued) 4.7.2 (Continued)
- c. At least once per 18 months or (1) af ter any structural maintenance on the makeup or recirculation HEPA filters or charcoal adsorbar housings, or (2) following painting, fire or chemical release in any ventilation zone communicating with the makeup or recirculaticn filter system by:
- 1. Verifying that the makeup filter s'ystem satisfies the in place penetration and bypass leakage testing acceptance criteria of less than 0.05% and uses the test procedure guidance in Regulatory Positions C.S.a, C.S.c, and C.S.d of Regulatory Guide 1.52, Revision 2 March 1978*, and the system flow rate is 3000 cfm i 10%.
- 2. Verifying that the recirculation filter system satisfies bypass leakage testing acceptance criteria of less than 2% total bypass and
. uses test procedure guidance in Regulatory Positions C.5.a and C.S.d of Regulatory Guide 1.52, Revision 2, March 1978*, and the system flow rate is 64,000 cfm 10%.
- 3. . Verifying, within 31 days after removal, that a laboratory analysis of a representativo carbon sample obtained in accordance with Regula-tory Position C.6.b of Regulatory Guide 1.52, Revision 2, March 1978*, ( ,,
. meets the laboratory testing criteria of Regulatory Position C.6.a of 3
- Regulatory Guide 1.52, Revision 2, March 1978*, for a methyl iodide penetration of less tht.) 0.175% for makeup filter system carbon ad- 1+
so'rber and 6% for recirculation filter system carbon adsorber when
, tested; in accordance with ASTM D3803-79 methods, with the following parameters: _
Make Up Filter System a) Bed Ocpth -
4 inches b) Velocity -
40'fpm .
c)' Temperature -
30 C d)- Relative Humidity - 70%
Recirculation Filter System a) Bed Depth -
2 inches b) Velocity -
80 fpm c)' Temperature . -
30 C d) Relative Humidity -
70%
- 4. Verifying flow rate of 3000 cfm i 10% for the makeup fil~ter system and 64,000 cfm i 10% for the recirculation filter system during opera-.
tion when tnted in accordance with ANSI N510-1980.
- ANSI H510-1980 shall be used in place of ANSI N510-1975 as referenced in (
Regulatory Guide 1.52, Revision 2, March 1978.
CLINTON - UNIT 1 3/4 7-4
. , . - . w . -- .- - ,-+-*3 w- v -.y.
T *
-- 3 y-C W ,.~ v *. -e' p p Attaehment 2 Np h6 6, y
Irt de.d k( Cont O t.J l Q 3] j to U-601916 LS-91-007
<m m ~ v-.- -- + - - - s-I'"E" 8 I9 PLANT SYSTEMS CONTROL ROOM VERTILAi!ON SYSTEM SURVEILLANCE REOUIREMENTS (Continued) 4.7.2 (Continued)
- d. After every 720 hours0.00833 days <br />0.2 hours <br />0.00119 weeks <br />2.7396e-4 months <br /> of charcoal adsorber operation, by verifying within 31 days af ter removal, that a laboratory analysis of a representative carbon sample obtained in accordance with Regulatory Position C;6.'b of Regulatory Guide 1.52 Revision 2. March,1978*,- meets the laboratory test-ing criteria of Regulatory Position C.6.a of Regulatory Guide 1.52, Revi-sion 2, March 1978*, for a methyl iodide penetration of less than 0.175%
for the cateup filter system carbon adsorber and 6% for the recirculation filter system carbon adsorber when tested; in accordance with ASTM D3803-79 eethods, with the following parameters: ,
Make U:> Filter System a)' Bed Depth - 4 inches-
- 6) Velocity -
40 fpm c) Temperature -
30 C-d) Relative Humidity - 70% -
Recirculation Filter System a).BedDepth - 2 inches b) Velocity ~ -- 80 fpm c) Temperature -
30*C d) Relative Humidity 70%
- e. At least once per 18 conths by: -
- 1. Verifying that the pressure drop across the combined HEPA filters and charcoal adsorber banks is less than 6 inches Vater Gauge while operating the makeup filter system at a flow rate of 3000 cfm t 10%.-
- 2. Verifying that on a high chlorine actuation ** and a manual initia-tion test signal, the system automatically ** switches to the chlorine -
mode of operation and the dampers c1,ose within 2 seconds.*** l
- 3. Verifying that the control room leak rate is limited to < 4000 cfm 10% at > 1/8-inch Water Gauge (W.G.) with respect to a3facent areas.
- 4. Verifying that on a smoke mode actuation test signal, the system automatically switches-to the smoke mode of- operation at a flow rate less than or equal to 64,000 cfm i10% .
L 5. Verifying that on a high radiation actuation test signal, the system automatically switches to the high radiation mode of operation and
' ANSI H510-1980 shall be used in place of ANSI.N510-1975 as referenced in Regulatory Guide 1.52/ Revision 2, March 1978.
- Automatic triasfer to 'the chlorine mode.is not required when chlorine containers having a capacity of 150 pounds or less are stored 100 meters fror. the control room or its fresh air inlets.
- Thh specification is not appitcable after all chlorine containers having a capacity of 100 pounds or greater are removed from the site including the chlorine containers located at the site sewage treatment plant.
CLINTON - UNIT 1 3/4 7-5 Amendment No. 12
~
Attachment 2 to U-601916 LS-91-007 Page 9 of 9 PLAT 1T SYSTEMS CONTROL ROOM VEf4TILAT10N SiSTEM SURVEILLANCE REQUIREMENTS (Continued)
~,~ w .
. , - ~
4.7.2 (Continued) . dh r'2gpec3 -/o Odpcenf CW(;b )
- w .- a the control rcom is maintainec' a 've ressure of at least 1/8-inch W.G. Q 4 K M i E 11'Je-atmos during system operation at a flow ratDess t'han or equal tcI'30 fm.
- 6. Verifying that the makeup filters heaters dissipate at least 14.4 LW when tested in accordance with ANSI H510-1980.
- f. After each complete or partial replacement of a HEPA filter bank in the.,
makeup filter system, by verifying that the HEPA filter bank satisfies the in place penetration and bypass leakage testing acceptance criteria of less than 0.05% in accordance with ANSI N510-1980 while operating the system at a flow rate of 3000 cfm i 10%.
- g. Af ter each complete or partial replacement of a charcoal adsorber bank in the makeup or recirculation filter systems, by verifying that the char-coal adsorber bank satisfies the in place penetration and bypass leakage testing acceptance criteria of less than 0.05% for the makeup filter system and 2% total bypass leakage for the recirculation filter system in accordance with ANSI H510-1980 for a halogenated hydrocarbon refrigerant test gas while operating the makeup system at a flow rate of 3000 cfm 1 10%
and the recircul? tion filter system at a flow rate of 64,000 1 10%.
- h. At least once per 18 months by verifying that the air inleakage rate into the negative pressure portions of the Main Control Room Ventilation System ductwork located outside the Main Control Room habitability boundary between fan OVC04CA(8) and isolation dampers OVC03YA(B) inclusive, and fire dampers OVC042YA(E), 0VC042Y8(F), OVC042YC(G) and OVC042YO(H) to be
< 650 cfm when tested in accordance with an NRC-aporoved test method. In addition, visually verify the integrity of the Recirculation filter Housing flexible connection to fan OVC03CA(B).
CLINTON - UNIT 1 3/4 7-6
.