Proposed Tech Specs Re Requirement for Accelerated Testing of Div 1 DG
ML20072C125
Person / Time
Site: Clinton Constellation icon.png
Issue date: 08/05/1994
From:
ILLINOIS POWER CO.
To:
Shared Package
ML20072C118 List:
References
NUDOCS 9408170092
Download: ML20072C125 (3)


Text

_ . __

. Attachment 5 to U-602316 AC Sources-Operating Page 2 of 2 3.8.1 Enclosure 2 to U-602it Table 3.8.1-1 (page 1 of 1) Section 3.8 Page 109 of 2:

  • Oiesel Generator Test Schedule fiUMBER OF FAILURES Ifi LAST 25 VALID TESTS (a) FREQUEtiCY s3 31 days a4 7 days (b) (but t 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />) e 1./08 (a) Criteria for determining number of failures and valid tests shall be in

$l accordance with Regulatory Position C.2.i of Regulatory Guide 9, Revision gI where the number of tests and failures is determined on a er DG bas 1 Q ll (b) This test frequency shall be maintained until seven consecutive failure free sta'rts from standby conditions and load and run tests have been g performed. Y m s sviisi;tciit w.u Reguietury Pusitici.[ ] , e f~

7te9elat o ry h i de 1.0, nc . u ;;r, 2. If, subsequent to the 7 failure free tests,1 or more additional failures occur such that there are again 4 or more failures in the last 25 tests, the testing interval shall again be reduced as noted above and maintained until 7 consecutive failure free tests have been perfonned.

'r fivir;~ ~ . - .. - _-

M Ranston 0=&degu.tatorywa-t.9 is not approved, the above

$l table will be modified to istent sivi -dit"=i: Hag-.vtrQon of f Regulatory Guide 1,. , 84-15, or other approved version. )

Q

~

m f

, except dat Oc valid fest failures d,he. Division 1 diesel generaior identi{ied on August 3,1993 ; June 7,1994; and July 12,1994 may be excluded { rom Oe iotal number of failures used io deiermine de diesel generator fest freque.ncy .

BWR/6 5i5 3.8-18 Rev. O,-07/20/02 l

l l

9408170092 940B05 PDR ADOCK 05000461 P PDR

. Attachment 4

' to U-602316 LS-94-012 TABLE 4.8.1.1.2-1 Page 2 of 2 DIESEL GENERATOR TEST SCHEDULE  !

l l

NUMBER OF FAILURES IN NUMBER OF FAILURES IN LAST 20 VALID TESTS

  • LAST 100 VALID TESTS
  • TEST FREQUENCY 5, 1 <4 At least once per 31 days

>2

>5 At least once per 7 days **

  • Criteria for determining number of failures and' number of valid tests shall be in accordance with Regulatory Position C.2.e of Regulatory Guide 1.108, but determined on a per diesel generator basis, except that the valiel l For the purposes of determining the required test frequency, the previous test failure count may be reduced to zero if a complete diesel overhaul to like-new condition is completed, provided that the overhaul, including appro-priate post-maintenance operation and testing, is specifically approved by the manufacturer and if acceptable reliability has been demonstrated. The reliability criterion shall be the successful completion of 14 consecutive tests in a single series. Ten of these tests shall be in accordance with the routine Surveillance Requirements 4.8.1.1.2.a.4 and 4.8.1.1.2.a.S and four tests in accordance with the 184-day testing requirement of Surveillance Requirements 4.8.1.1.2.a.4 and 4.8.1.1.2.a.5. If this criterion is not satis-fied during the first series:of tests, any alternate criterion to be used to transvalue the failure count to zero requires NRC approval.

^^This test frequency shall be maintained until seven consecutive failure free demands have been performed and the number of failures in the last 20 valid demands has'been reduced to less than or equal to one.

test {ailures f the Division i diesel generator idenfified on August 3, 1993 ; June 7,199+ 3 and July 12. , 199 4 m a y be excluded { rom the total number c{ {ailures used fo defermine ihe diesel generator fesi frequency.

CLINTON - UNIT 1 3/4 8-10  ;

i

.=

. Attachment 5

. to U-602316 LS-94-012 l Page 1 of 2 l Proposed Changes to Improved l Technical Specification Conversion Submittal (IP Letter U-602196) l I

l I

l l