ML20085H938
| ML20085H938 | |
| Person / Time | |
|---|---|
| Site: | Saxton File:GPU Nuclear icon.png |
| Issue date: | 11/16/1973 |
| From: | Cindy Montgomery SAXTON NUCLEAR EXPERIMENTAL CORP. |
| To: | James O'Reilly US ATOMIC ENERGY COMMISSION (AEC) |
| Shared Package | |
| ML20083L048 | List:
|
| References | |
| FOIA-91-17 NUDOCS 9110290076 | |
| Download: ML20085H938 (1) | |
Text
. - - - - - _ -
SAX'lON NUCLEAR EXPERIMENTAL CORPORATION m
GENERAL P U D LIC U TI LITI E S SYSTEM
/
syg se...
ce=,..iro... Li
,co...
usesi... to.s.
u..,cou..,
Q rs==...~, e 6 s c i 4 c o...=,
N N
Wit.otouta= t enson Coutant
'" Area 215 929 3601 P. O. Boa $42, Rooding, Pa. 19603
^"
P. O. Son 9e
..on, Pa. 16678 November 16, 1973 Docket No. 50-146 License No. DpR-4 Mr. James P. O'Reilly tinited States Atomie Energy Commission Ditectorate of Regulat ory Operations Region 1 631 Park Avenue King of Prussia, PA 19406
Dear Mr. O'Reilly:
This letter is.n response to your letter of October 24, 1973, con-cerning the inspection to verify the survey report submitted by Mr. R. F. Swift for the Saxton Reactor Facility.
In your letter you requested (1) that we provide the reasons for our failure to adequately determine existing radiation IcVels prior to requesting a confirmatory survey and (2) that we provide a description of our corrective action to assuie that the next survey submittal will be representative of ex-isting contamination and radiation IcVels.
In answer to (1) above, it is our understanding that the removable contaminut. ion levels found were within the limits recorded in our survey report.
As for the direct radiation levels fot'nd being significantly higher than those recorded in the survey report 'I can or.ly conclude that personnel did not do a thorough survey of the areas.
In addition, the p;rtable survey meters used for the survey work were of a different type than those used by the inspector for the confirmatory survey.
In answer to (2) above, we have purchased portable survey meters iden-ttcal to those used by the inspector and have had the manufacturer calibrate the meters using a Co-60 source to ensure their accuracy. The people who will do the next survey will be Mr. R. T. Swif t and Mr. K. E. Beale, both of whom are well qualified to conduct such surveys.
l Very t ruly yours,
[t..
A C. R. Montgomery /
I CRHibay President cc Messrs. K. E. Beale R. F. Swif; Q,?