Text
'Y s
d o
UNITED STATES NUCLEAR REGULATORY COMMISSION i [ b /L '
f;
( (',,n WASHINGT ON, D. C. 20555 "5 *T 'sR }/ ~}E
%ap June 10, 1983 Docket No. 50-275/323 Joel Reynolds, Esquire
~
Center For Law In The Public Interest 10951 West Pico Boulevard, Third Floor IN RESPONSE REFER Los Angeles, CA 90064 TO FOIA-83-130
Dear Mr. Reynolds:
This is in partial response to your letter dated March 14, 1983 in which you requested, pursuant to the Freedom of Information Act, records relating to the Office of Inspector and Auditor's review of the NRC investigation reported in NUREG-0862 and for other files concerning OIA investigations related to the Diablo Canyon Nuclear Power Plants.
The documents listed on Appendix A are being placed in the NRC Public Document Room, 1717 H Street, N.W., Washington, DC.
Access may be obtained to these documents by writing to the NRC Public Document Room (PDR),1717 H Street, N.W., Washington, DC 20555.
The charge for records maintained at the PDR is five cents ($0.05) per page, as specified in 10 CFR9.14(a). Upon your agreement to pay the copying charges, the PDR will arrange for the documents to be copied by a private contractor servicing the PDR.
You will be billed by the contractor for the copying charges plus tax and postage.
Also subject to your request is a July 30, 1982 memorandum transmitting the Ronald Smith draft memorandum with nine (9) attachments which se subject to your request. A copy of the transmittal memo and attachments 1, 2, 3, and 8 are also being placed in the PDR.
These are described respectively as documents 31, 32, 33, 2, and 34 of Appendix A.
Attachments 4, 5, 6, 7, and 9 are analyses of evidence and allegations which were developed as part of the Office of Inspector and Auditor's deliberative proci2s in preparing a report to the Commissioners.
These attachments are described on Appendix B.
These analyses and the Ronald Smith draft memorandum are being withheld from public disclosure pursuant to Exemption 5 of 'he Freedom of Information Act (10 CFR 552(b)(5)) and 10 CFR 9.5(a)(5).
Factual portions in the draft memorandum and analyses are inextricably in'tertwined with the writer's opinions and conclusions.
There are no reasonably segregable factual portions. Most factual portions in the drafts are already in the public domain as part of NUREG-0862 or in records released in response to this request.
Pursuant to 10 CFR 9.15 of the Commission's regulations, it has been determined that the information withheld is exempt from production or disclosure and that its production or disclosure is contrary to the public interest.
The person responsible for this denial is Mr. James J.
l Cummings, Director, Office of Inspector and Auditor.
l 8309070408 830610 PDR FOIA REYNOLD83-130 PDR
~
Joel Reynolds, Esquire.
This denial may be appealed to the Commission within 30 days from the receipt of this letter.
Any such appeal must be in writing, addressed to the Secretary of the Commission, U.S. Nuclear Regulatory Com6ission, Washington, DC 20555, and should clearly state on the envelope ind in the letter that it is an " Appeal from an Initial F0IA Decision".
As soon as releasibility review is made on the remaining documents subject'to your request, we will advise you of our disclosure determination.
Singprely,
/
/t'
'E.
M. Felton, Director Division of Rules and Records Office of Administration 6
i i
9 9
l l
i p. -
R2:
FOI A-83-130
?
Appendix A 1.
4/23/82 Memo for James J. Cumings from Nunzio J. Palladino re: Review of Investigation Reported in NUREG-0862 (File No. 82-14) (2 pages) 2.
3/1/82
, Memo for Chairman Palladino et. al. from Carlton Kammerer
/ re: Meetings with. Congressional Staff Concerning the Diablo C nyon Investigation (3 pages)(Attachment 3 to draft R. Smith memorandur 9
/
3.
7/30/82 femoforChairmanPalladinofromJamesJ.Cummingsre:
L Review of Investiaation Reported in NUREG-0862 (File No.
82-14) (7 paes)
~
~
t.
4.
3/30/83 fiemo for Carl Kammerer from James J. Cummings re: Request Vfor Documents by Congressman Markey (File 82-14) (1 page) 5.
7/15/82 Jtemo for File 82-14 from Harry Boulden re: Unresolved Open i
/ Item (File No. 82-14) (3 pages) 6.
7/14/82 Telephone or Verbal Conversation Record - Person Calling:
Walter Magee - Person Called: Harry Boulden re: Diablo Canyon Review (File No. 82-14) (1 page) 7.
6/17/82 liemo for Alphonse Gauthier from John Sinclair re: Board
\\/ Notification Transmittal (File No. 82-14) (6 pages) i 8.
6/2/82 Nemo for Carl Kamerer from James J. Cummings re: Review of i
i
,'/(nvestigation Reported in NUREG-0682 (File No. 82-14) 1 page) 9.
6/16/78 Memo for Edson G. Case from Thomas J. McTiernan re: Supplemental
/Diablo Canyon Inquiry (File No. 78-5) (2 pages) t 10.
6/9/78 L'etter to Thomas J. McTiernan from Bradford F. Whitman re:
Slide Presentation in 1969 (File No. 78-5) (1 page) ll.
6/7/78
, Letter to Bradford F. Whitman from Thomas J. McTiernan re:
t/ Hosgri Fault (File No. 78-5) (4 pages) 12.
6/2/78,,MemoforFile78-5fromFredHerr're: Meeting with Justice Regarding Diablo Canyon (File No. 78-5) (2 pages)
/
13.
5/25/78 mo for Thomas McTiernan from Edson G. Case re: Results of Staff Interviews Regarding Diablo Canyon Review Requested by Department of Justice (3 pages) 14.
5/8/78 Letter to Thomas McTiernan from Bradford F. Whitman re: Diablo l
Canyon Plant (File No. 78-5) (1 page) l 1
l
4 R2:
Appendix A 15.
3/10/78 Letter to Brad Whitman from Philip A. Crane, Jr., re:
.Hosgri Fault (File No. 78-5) (1 page)
Diabl' Canyon lTFile No. 78-5) (1 page)
Memo for File 78-5 from O. Gene Abston re:
16.
1/3/78 o
17.
12/12/77 Letter to Brad Whitman from Thomas J. McTiernan re: Diablo Canyon (File No. 78-5) (1 page) 18.
12/5/77 Memo for T. J. McTiernan from E. L. Jordan re: Diablo Canyon Chronology and Records (file No. 78-5) (6 pages) 19.
11/9/77 Memo for File 78-5 from Thomas J. McTiernan re: Diablo Canyon
/ (File No. 78-5) (1 page) l 4
20.
11/1/77 / Memo,for Lee V. Gossick from Thomas J. McTiernan re: Justice Request Regarding Diablo Canyon (File No. 78-5) (1 page) 21.
11/1/77 Memo for Lee V. Gossick from Thomas J. McTiernan re: Justice Request Regarding Diablo Canyon (File No. 78-5) (1 page) 22.
10/31/777 Note to Ed Case from Thon.as J. McTiernan re: Meeting with
/ ossick (File No. 78-5) (5 pages)
G 23.
11/13/75 Medo for Thomas J. McTiernan from Harold D. Thornburg re:
je: Cracks at Diablo (File No. 78-5)' (4 pages)
- 24.
11/23/82 Letter from Chairman Palladino to Congressman Udall with attachments (PDRAccessionNo. 8212060155)
(File 82-14)_
- 25.
11/04/82 Letter from Chairman Palladino to Dr. Robert Cloud (PDR Accession No. 8211290025)
(File 82-14)
- 26.
4/23/82 Letter from Chairman P.lladino to Congressman Udall with attachments (PDR Accession No. 8205190376)
(File 82-14)
- 27.
3/1/82 Memo from C. Kammerer to Comissioners with attachments. Re:
meetings with Congressional staff concerning Diablo Canyon investigation (File 82-14) j
(
(PDR Accession No. 87.03150314)
- 28.
2/5/82 Transcript of Closed Commisssion Meeting: Discussion of Phase 11 of the Diablo Canyon Report (File 82-14)
(PDR Accession No. 8203190472)
- 29.
2/9/82 Transcript of Closed Commission Meeting: Discussion of Phase I of the Diablo Canyon Report (file 82-14)
(PDR Accession No. 8203240004)
- 30.
2/17/82 Memo from S. Chilk to W. Dircks re staff requirements of Phase II (PDRAccessionNo. 8203040280)
(File 82-14)
- Document in PDR can be located by the designated POR Accession No.
F0IA 83-130 t
Appendix A 31.
7/30/82 morandum For File 82-14 from Ronald Smith re Review of
/ Nureg 0862 (~l page) 32.
2/8/82 Letter from Congressman Udall to Chairman Nunzio Palladino I
(Attachment 1 to draft Ronald Smith memorandum) (1 page) 33.
4'/29/82 Memorandum for Chairman Palladino et. als. from Carlton Kammerer
. vm Draft Udall Background Paper on NUREG 0862 (Attachment 2
/ to, R. Smith draft memorandum (1 page) 34.
4/26/82
,l'etter from Congressman Morris Udall to Nunzio Palladino transmitting Background paper on NUREG 0862 (Part of Attachment 2 to R. Smith f
V draft memorandum)
(32 pages) 35.
5/12/82 Memorandum For Chairman Palladino from James J. Cummings re Review of Investigation Reported in NUREG 0862. (Attachment 8 to R. Smith draft memorandum) (I Page) e.
W
Rs:
F01A-83-130 APPENDIX B 1.
Undated Draft Memorandum from Ronald Smith to J. Cumminds.
Subject:
Review of NUREG 0862, Issue 2.
2.
Undated Analyses of NUREG 0862 (Attachment 4 to draft memorandum) 3.
Undated Analyses of Issues Raised by Udall (Attachment 5 to draft memorandum) 4.
Undated Review of January 5, February 5 and 9 Transcripts (Attachment 6 to draft memorandum) 5.
Undated Review of November 3 Transcript (Attachment 7 to draft memorandum) 6.
Undated Pranosed Plan to C6mplete The Review of NUREG 0862, Issue 2 (Attachment 9 to draft memorandum) l I
e
- e m
,