Advises That Info Contained in Encl Allegation Appropriate for Board Notification.Notification Submitted for Review & Comments.W/O Encls
ML20085H214
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 06/16/1982
From: Eisenhut D
Office of Nuclear Reactor Regulation
To: Fitzgerald J
NRC OFFICE OF INVESTIGATIONS (OI)
Shared Package
ML20083L446 List:
References
FOIA-83-130 NUDOCS 8309070440
Download: ML20085H214 (2)


Text

.

e

+*

UMTED 8TATES E

NUCLEAR REQULATORYCOMMissioN a

I mAsHtNGToN.D.C35us

  • Q 4dV June 16, 1982 ym:
  • ?

MEMORANDUM FOR:

Jarres Fitzgerald, Acting Director

~

Office of Investigations l

FROM:

Darrell C. Eisenhut, Olrec. tor

' Division of Licensleg

SUBJECT:

BOARD NOTIFICAT10N FOR DIAtto C7JtV0lt I have determined that the information containeo in the attachst allegation is approprf ate for Board Motification.

l This notification is submitted for your revlaw an6 tonnant.L 'Thh ahepat\\on was transmitted to your Office for appropriste scrim $nnr..Mrdr.

to Fitzgerald, June 4,1982). Please provide your ety $s.%4 Williams by COB June 21,1982.

s fm y-Darrell C. E(W., 4(coooer Divisim of Litterrsite

Enclosure:

As Stated cc: J.Sinclair e

e f

~

7.5

9. t j

8309070440 830610 PDR FOIA REYNOLD83-130 PDR a

The Cocaission.

SiO r; -.

Enclosures:

1.

Letter from Concerned Engineer.

dated May 18,1982 2.

Memorandum from H. Denton to J. Fitzgerald and R. DeYoung.

dated June 4.1982 cc: ASLBP A5 LAP SECY OGC OPE Board Service List

Contact:

H. Schierling 49-28423 y

' S.

5 e

O 4

e e,

e 4

9 6

O e

g

't MGt:t *.TO. Y COW.USSMPe

~

~ '

[hg ;r 9

. a..~ t c.
. n. c. ames -

=

\\* s. /l, Q

y

.,y Em?stemt 2 JUN 4 St MEMRANDlM FDR:

'Jamer Fitzgerald Acting Mitctor Office of Investigatices Richard C. DeYoung Director Office of Inspection and F.nforcement i

FROM:

Harold R. Denton,-Director Office of Nuclear Reactor Regulation ANONYMOUS ALLEGATI'0HS C0prnnt* DIABLD120%

Sulk 1ECT:

NUCLEAR POWER PLANT The enclosed letter is forwarded for ' appropriate art 5sw & ysstr WTire The individual alleging deficiencies has indicated correcMye action

(

HRR does plan to hart the.p.tping she that he would find appropriate.

thennal/ deadweight analysis included within the scope of fautse 11ef the Independent Design Vertitcation Program.

.s

//

Harold R.'Denton, Director Office of Nuclear Reactor Regulation

Enclosure:

l As stated O

e G

o

__ y,2-o Gh{5 ;[,y

~

,,w

,---,e,,

---,---,,-,,w-a-wm e

_.,_.-m

,,ae,,

.. ~,wsmw kok r.f,

- 9...cyg.q....f_-ihe 7-

~

c..

....., e-

n. m.

.;- ;.g,: gjf3 yj.{.y.s.-

nac Washington, D. C. '

p, p.

+

....,..;.., y.g.g.

...... n.:.

Dear Mr. Richard DiYoung:

I am currently involved in the DiaMo Cany.on lieview

. effort now in progress.. I must say that this $s ths, worst nuclear power plant that I have ever worked es.

and it is'not SAFE.

I was hoping with the' introduction of Bechtel that a complete re-analysis of Enit I sstuls s

be done.

Alas this is not to be. The PGt@ ssnagvrartf

~ -

l engineers only correct the mistakes that are found

' accidentially or are forced down their throats. If the error is an generic one, they will not revive wwwrytting but just what caused the error and they will only correct

~~

that one mistake.

The latent review is for b@ taly

~

but the real danger.is that:

1) The thermal / dea'dveight analysis does not match u e.

v -

the seimic or currest field support configuration.

Systems are failing when corrected.

2) The so-called ' As-Built" pipe support dnntings are not as-built but instead are the accmnastion of 'all the changes to the support dravig mur %s I

3 past 13 years.

The support be.vs not, bass sal %xi

- down in the field to show thed3stest scr Ipetiton or orientation to the pipe. Also.izierfar.emer arith structure are not show on the drawings.

I only ask that you have R. L. Cloud & Associates review the thermaI/ Deadweight analysis as wa11.1:t tha-Hosgri they are now doing.

This will tuntiTm 's'nat 'l ' nave said.

If action is not taken,I may be.' force to caek a public hearing on this. 'I am pro-nuclear but invalid analysis andincompetence must not be igored. This palnt in ny opinion is bad from the analysis to the supports.

Thank you for your time.

Sincerely A Contered h 12mer 3

~

g g.

p 4

G

..l _;.r:93,\\

. g,.j7 f;;;;. M -M.

a..

t....

~..:... T, %..:

. s.% r. m, y. m.v.w.a. -

-a

..w
.'.
  • l Q,4.,s.'. t,a.,

o 0.?

i;vi^ Q *Mi c';

a..j %.. w.;..

.. m 5 ;,

?fu v

...s ::; -

i[ -

hington,- D. C

-" 4,... h.

.. f.....

,...... y 2

.i. '~y y;g. A;..; J -

![ 3.,.E[.N..h.c.s 'j=. : '..w g5 r.

i

.~." w :r.

1; dMais.::T-!.,. i -

y

Dear Mr. Richard DiYoung:

1

.~..

1 I am currently involved in the Diable Canyes Bedad " #f -

effort now in progress., I must say that this is the worst nuclear power plant that I haF# #Fer Forled an. r and it is not SAFE.

I was hoping with the' introduction of Bechtel that a complete re-analysis of Unit 1 would be done.

Alas this is not to be.

The PGLE managamant/

engineers only correct the mistakes that are ftmne 1

accidentially or~are forced down their throats.

If the error is an generic one, they will not review everything

)-

but just what caused the error and they will only currect that one mistake.

The latest review is for hosgri only g;.

but the real danger.is that:

~

,N -

1) The thermal / deadweight analysis doea et match 1.

the seimie or current field support configarstion.

Systems are failing when correcte6.

T

2) The so-called 'As-Built" pipe supycrt-drarizGE' are not as-built but instead are the accuaulatica A

.~

of all the changes to the support drawing *ser the past 13 years.

The support have not been wa'hed

- down in the field to show theramtest ceaftryct&te or orientation to the pipe. Also interrytenceuvith structure are not show on the drs @

h. '

I only ask that you have*R. L UlouB 1r Assocla'tes review the thermaI/ Deadweight analysis as well as the Hosgri they are now. doing.

This will connzs sis.t I taae said.

If action is not 'aken, I ray be. force to sseh a public hearing on this.. I am pro-nuclear but invalid analysis andincompetence must,not be igored. This palat in my 4 pinion is bad from the analysis to the supports.

Thank you for your time.

Sincerely A Coicered Eng,ines:

e e