,,f ** %
l o
Uni t t o s1 AT.s E '\\"
NUCL L Af t FliGUL AlOftY COr *tal ;SION n
l ', [' '.. E wAca:ncio:e. o. c. nss e
//
s,,
n,e December 5, 1977 i
MDIORANDUlf FOR:
T. J. McTiernan, Director, OIA 1
~
FR031:
E. L. Jordan, XOOS poJOI SUDJECT:
DIABLO CANYON CIIRONOLOGY Al~D RECORDS In response to your Kovember 1, 1977 request, enclosed please find the Office of Inspection and Enforcement's Diablo Canyon chronology and records.
E. L ordan, L:ecutive Officer fo Operations Support
Enclosure:
As stated l
', o ~ %
q s.
()
l l
8309070447 830610 PDR FOIA REYNOLDS3-130 PDR
)<b
OFFICE OF INSP fl0:1 AXD E!;rORCDIE::T DIABLO CAA b i CHR0;10 LOGY 11/28/67 Report by Division of kesctor Licen, sing for the Advisory Committee on Reactor Safeguards (ACKS) 12/20/67 ACRS Report on Diablo Canyon Site to Seaborg, Chairmain. AEC
~
9/7/73
' Summary of 8/21/73 Meeting Regarding Deficiencies in Diablo Canyon, F.;AR 1/29/74 Letter fkom Giachusso to Marth, Regarding Requested Information for Diablo Canyon Nuclear Plant 5/15/74 Summary of Meeting Between, AEC, PG&E, and USGS Re Seismic Issues 7/11/74 Summary of 7/5/74 Meeting Regarding Offshore Faults 12/26/74 Seismic Work Done by Blume and Associates for PG&E 3/5/75 Sumsary of 3/3/75 Meeting with PG&E Regarding Diablo Canyon Geologic and Seismic Issues 3/18/75 Summary of ACRS Subcommittee Meeting of 2/18 and 19/75 Regarding Diablo Canyon Geologic and Seismic Issues 10/20/75 Summary of 8/28/75 Meeting with PG&E on Geology / Seismology Submittal for Diablo Canyon 11/12/75 Letter from PG&E to NRC with Attached Shell Oil Proprietary Seismic Data i
32/1/75 Letter from PG&E to NRC Without Referenced Attachments (not in IE Files) 12/8/75 Let'ter to Congressman Lagomarsino from William Dircks Regarding Citizen Questions on Diablo Canyon 1/7/76 Sumnary of 11/25/75 NRC Meeting with PG6E Regarding Geology, Seismology and Structural Engineering 1/1?/76
? ctrsr fror. PGrE to r"C 1"tt it
- tt.--c' - - i * * (not attac'.cd t o t1 *-
in as 111 s) sic 6CT11*d LI'
..oS r i s..ua t 2.or.e o
l
1 I
2/11/76 Summary of 1/14/76 NRC Meeting with PG&E Regarding Diablo Can; on Scir.mic Design 3/4/76 Summary of 2/5/76 NRC Meeting with PG&E Regarding Geology and Seismology of Diablo Canyon Site 3/9/76 Letter t,o V.
A. Hill (citizen) from R. C. DeYoung, NRC, Regarding Diablo C'anyon Seismic Design with Enclosures 3/18/76 Letter to J. Rankin (citizen) from R. C. Deyoung, NRC, Regarding Diablo Seismic Design with Enclosure 3/24/76 Letter to Senator Hart from W. Dircks, NRC, Regarding Diablo Canyon Seisn0 De'EOnwithEnclosure 4/16/76 Letter to Senator Percy from W. Dircks, NRC, Regarding Diablo Canyon Siting 4/29/76 Meeting Notice for ACRS Subcommittec Meeting en Diablo Canyon 5/18/76 Summary of 4/20/76 NRC Meeting with PG&E Regarding Seismic Reevaluction of Diablo Canyon 5/25/76 PG&E Petition for Extension of Time to Comp 1,ete Construction of Diablo Canyon Summary of ACRS Subcommittee Meet ng of 5/21/76 Regarding Diablo Canyon 6/7/76 P
6/30/76 Summary of 6/10/76 NRC Meeting with PG&E Regarding the Seismic Design Reevaluation of Diablo Canyon 7/6/76 Summary of 6/23[76 NRC Meeting with PG&E Regarding Seismic Design Reevaluation of Diablo Canyon 7/6/76 NRC Order Extending Construction Completion date on Diablo Canyon Cx a' ttec 'on Atomic Ent.r y irca.,;C with.:.:.:h,ur a 7/7/76 Ltt;er to Joint s
a r
e-
~
r.-,,
y r
i y
8/25/76 Summary of 8/11/76 NRC Meeting with PG&E Regarding Scirmic Design l
Reevaluation of Diablo Canyon 9/14/76 Summary of 8/27/76 NRC Meeting with PG&E Regarding Seismic Design Reevaluation of Diablo Canyon 9/17/76 Summary of 9/7/76 NRC Meeting with PG6E Regarding Seismic Design Reevaluapion of Diablo Canyon 9/30/76 Letter to J. S. Surfluh (citizen) from B. C. Rusche, NRC, Regarding
'Diablo Canyon and Hosgri Fault 10/19/76 Summary of 10/16/76 ACRS Subcommittee Meeting Regarding the Diablo Canyon Operating License Application 11/11/76 Letter to C. Hearn (citizen) from B. Rusche, NRC, Regarding Diablo Canyon i
12/30/76 Summary of 11/13/76 ACRS Meeting Regarding the Diablo Canyon Operating License Application 1/12/77 Summary of 1/5/77 NRC Meeting with PG&E On Seismic Design Reevaluation 3/18/77 Letter to R. L. Maullin, Energy Resources and Conservation Developnent Commission, from B. C. Rusche, NRC, Regarding Diablo Canyon 3/18/77 Letter to Senator Hayakawa from L. Gossick Regarding Diablo Canyon 3/23/77 Letter to Chairman, NRC',~ from K. Kempton Regarding Diablo Canyon 3/23/77 Letter to Senator Nelson from L. Gossick Regarding Disblo Canyon with Attachment 3/31/77 Letter to Congressman Udall, Chairman, Subcommittee on Energy and the Environment, Responding to Questions Regarding Diablo Canyon 4/4/77 Note to file Regarding 3/30/77 Meeting with k'estinghouse Regarding Seismic Reevaluation of Diablo Canyon 4/15/77 Letter to Congressman Leggott from T. Reh'n, NRC, with Enclosure Regarding Diablo Canyon e
m m-
_4_
i f
5/18/77 Summary of 2/4/77 NRC Meeting with PG&E Regarding the Seismic Design Reevaluation of Diablo Canycn (with Enclosures) 6/5/77 Letter (without Enclosure, not in IE Files) to NRC from PG&E Transmitting Amend 50 to Licence Applicatien for Diablo Cenren 6/13/77 Letter to Congressman Lagomarsino with Enclosure from W. Dircks, NRC, Regarding Diablo Canyon 6/14/77 Summary of 4/29/77 NRC Meeting with PG&E Regarding Diablo Canyon Seismic Design 6/29/77 Summary of 5/3/77 NRC Meeting with PG&E Regarding Diablo Canyon Seismic Design 7/6/77 Letter to H. Denton, NRC, from F. Hahn, California Energy Resources Conservation and Development Commission, Regarding Proposed Meeting with NRC and PG&E 7/15/77 Summary of ACRS 6/21 and 22/77 Subcommittec Meeting Regarding Diablo Canyon Seismic Design O
7/18/77 NRC Letter to PG6E Regarding Comments on Proposed Seismic Design Criteria for PG&E 8/24/77 NRC Request to PG6E for Additional Information on Diablo Canyon 8/25/77 PG&E Motion for Interim Operating License
'8/25/77 PG&E Memorandum in Support of Motion for Interim Operating License 8/25/77 Sus: nary of PG6E Analyses of Risk to Public from Diablo Canyon Nuclear Power Plant 8/30/77 Letter to Senator Cranston from L. Gossick, NRC, Regarding L. A. Times Article on Diablo Canyon 9/13/77 Letter tn 9. P rl-s? ' N ~ t r-r n, O ~ chf 3 3 r, W14 Sr '
f rom.E. Case, !.itC, negarding Djablo Canyon (one enclosure missmg) 6
--m
,e.
- ~-
I.
S 9/27/77 Letter to D. Allison, NRC, from D. Caf fiero (citizen) Rejarding Diablo Canyon 9/29/77 Letter to NRC from PG6E Transmitting Risk Analysis of Dichlo Canyon 10/14/77
' Letter to NRC from PG&E Transmitting Rer:ponses to Questions Raised,
During 10/6/77 Meeting with NRC I
10/25/77 Letter to T. Danovich (citizen) from E. Case, NRC, Regarding Diablo Canyon l
l 10/26/77 Letter to Congressman Clausen from W. Dircks, NRC, Regarding Diablo Canyon 10/31/77 Summary of 10/21 and 22/77 NRC Meeting with PG6E Regarding Diablo Canyon Seismic Reevaluation Portions of PG&E Final Safety Analysis Report (FSAR) regarding seismic or geologic matters.
(The IE FSAR does not contain all material filed by PGLE. The superseded portions of the FSAR were discarded as ne.v amendments were filed. These materials are available on microfilm in the NRC technical library).