Exelon Generation 200 Exelon Way Kennett Square. PA 19348 www.exeloncorp.com 10 CFR 50.55a March 18, 2020 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 Peach Bottom Atomic Power Station, Units 2 and 3 Renewed Facility Operating License Nos. DPR-44 and DPR-56 NRC Docket Nos. 50-277 and 50-278

Subject:

Relief Request 14R-63 Associated with the Fourth lnservice Inspection (ISi)

Interval

References:

1. Letter from D. Helker (Exelon Generation Company, LLC) to U.S. Nuclear Regulatory Commission, "Relief Request 14R-63 Associated with the Fourth lnservice Inspection (ISi) Interval," dated October 31, 2019
2. Email from J. Tobin (U.S. Nuclear Regulatory Commission) to D. Helker (Exelon Generation Company, LLC), "Peach Bottom Units 2 and 3 -

Request for Additional Information - RR (EPID L-2019-LLR-0103)," dated March 10, 2020 In the Reference 1 letter, Exelon Generation Company, LLC (EGC), requested relief from the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code,Section XI, "Rules for lnservice Inspection of Nuclear Power Plant Components." This relief request applied to the fourth 10-year interval lnservice Inspection (ISi) program, which concluded on December 31, 2018 for Peach Bottom Atomic Power Station (PBAPS), Units 2 and 3. In the Reference 2 email, the U.S. Nuclear Regulatory Commission requested additional information.

In that Relief Request, EGC requested relief from inspections of Emergency Service Water (ESW) component supports (Examination Category F-A, Item Number F1 .40 (Component ID OAP57-SC, OBP57-SC)). Upon further review, EGC is withdrawing this portion of the relief request. All other aspects of the Reference 1 submittal are unaffected by this specific withdrawal.

No commitments are contained in this letter.

Should you have any questions concerning this letter, please contact Tom Loomis at (610) 765-5510.

Sincerely, f} /?, c-;;-~

David P. Helker Sr. Manager - Licensing Exelon Generation Company, LLC

Relief Request I4R-63 Associated with the Fourth Inservice Inspection (ISI) Interval March 18, 2020 Page 2 cc: USNRC Region I, Regional Administrator USNRC Senior Resident Inspector, PBAPS USNRC Project Manager, PBAPS R. R. Janati, Pennsylvania Bureau of Radiation Protection D. A. Tancabel, State of Maryland