Public Version of Rev 1 to Emergency Plan Implementing Procedure EPIP-5.04, Security Duties at Roadblock
ML20076J394
Person / Time
Site: Surry  Dominion icon.png
Issue date: 08/23/1983
From: Dewandel E
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
Shared Package
ML18141A094 List:
References
EPIP-5.04-01, EPIP-5.04-1, NUDOCS 8309060644
Download: ML20076J394 (4)


Text

- . . . - . - - - . . . . -. . . - . . _ .

4

,,, No. 978SM20 g*

NUMBER A TTACHMENT TITLE REVISION

~

i, EPIP-5.04 01 SECURITY DUTIES AT K0ADBLOCK A TTACHMENT PAGE 1, 2 of 2 NOTE: Access to the station is to be limited to those individuals responding in accordance with the Emergency Plan i.e. , Surry Power Station employees, Vepco corporate personnel, local fire or rescue units and personnel, NRC employees and State employees.

5. DETAIN PERSONNEL WITH NO IDENTIFICATION:

a) IF, F doubt exists pertaining to identity and responee purpose of an individual:

1) Do not allow passage through roadblock
2) Seek authorization to proceed from the Station Emergency Manager in the TSC or Control Room
6. TERMINATE ATTACHMENT 1:

a) Close Out r

1) COMPLETED BY:

DATE:

TIME:

b) Affix this Attachment i to EPIP-5.04 END 8309060644 830831 PDR ADOCK 05000280 F PDR QQ

, , No 97887220 NUMBER A TTACHMENT TITLE REVISION EPIP-5.04 01

'-- SECURITY DUTIES AT ALTERNATE

, ATTACNMENT REMOTE ASSEMBLY AREA (HOG ISLAND) PAGE 2, 1 of 2

1. VERIFY EVACUATION ORDERED TO HOG ISLAND:

a) Verify with Security Shift a) ))[ required, check with Supervisor Station Emergency Manager

2. ENTRANCE TO HOG ISLAND GATE:

a) Obtain keys to Hog Island gate from Security Shift Supervisor b) Take bolt cutters in the event keys do not work

3. DIRECT TRAFFIC TO HOG ISLAND:

a) Direct traffic from station site AND b) Construction site

4. EVACUATION TO HOG ISLAND:

a) Insure orderly evacuation to Hog Island by the following:

1) Evacuees continue to end of road
2) Evacuees do not block the road
3) Evacuees remain in vehicles for further instruction

No.97887220 NUMBER ATTACHMENT TITLE REVIS10N b

EPIP-5.04 SECURITY DUTIES AT ALTERNATE 01 A TTACNMENT PAGE REMOTE ASSEMBLY AREA (90G ISLAND) 2 2 of 2

~

5. DETAIN EVACUEES:

a) For Health Physics Monitoring b) For further instructions from Security Shift Supervisor /

Station Emergency Manager

6. TERMINATE ATTACHMENT 2:

a) Close Out

1) COMPLETED BY: .

DATE:

TIME:

b) Affix this Attachment 2 to EPIP-5.04 .

l l

l l END

__ 1

. .. -- .. --..~.n.-.._. , -.- - -

, =

3 Vepco VIRGINIA ELECTRIC AND POWER COMPANY Surry Power Station

  • ~ P. O. Box 315 Surry,Virginie 23883 l4bNRC hgust U, N T). . sua ci it.+,. p gPe N4-u, Ta g Ibn - n ot - So l I w .tsk.' 6q ~ f Li - 3o53 (

SURRY POWER STATION EMERGENCY PLAN IMPLEMENTING PROCEDURES Please find attached, page 2 of 2 of Attachment 1, page 1 of 2, and page 2 of 2 of Attachment 2 of EPIP-5.04.

Insert these pages into your Emergency Plan Implementing Procedures and destroy the old pages.

E. P. DeWandel Supervisor, Records Management EPD: c:ag Attachments '