ENCLOSUREL 3 -)

i V0GTLE ELECTRIC GENERATING PLANT- -

r REVISION TO TECHNICAL SPECIFICATION TABLE:4.8 '

l INSTRUCTIONS FOR' INCORPORATION The proposed change to table 4.8-1 of the.Vogtle- Electric Generating Plant _

Technical Specifications would be-incorporated as follows:

Remove Paae Ir_ sert Pace-3/4 8-9 and 3/4 8-10*- 3/4 8-9 and:3/4_8-10* - 4

  • Overleaf page containing noLchange-t s

E3-1; 9104296203 p10422 PDR ADOCK 05000424 P PDR 1 i

1 TABLE 4.8 1 DIESEL GENERATOR TEST SCHEDULE mber of Failur Number of Failures in in est 100 V d i

Last 20 Valid Tests

  • ests* Test Frequency 51 54 Once per 31 days

> 2** >5 Once per 7 days

  • Criteria for determining number of failures and number of valid tests shall be in accordance with Regulatory Position C.2.e of Regulatory Guide 1.108, but determined on a per diesel generator basis.

For the purposes of de'termining the required test frequency, the previous test failure count may be reduced to zero if a complete diesel overhaul to -

like-new condition is completed, provided that the overhaul, including appro--

priate post maintenance operation and testing, is specifically approved by

  • the manufacturer and if acceptable reliability has been demonstrated. The reliability criterion shall be the successful completion of 14 consecutive tests in a single series. Ten of these tests shall be in accordance with the routine Survei? lance Requirements 4.8.1.1.2.a.4 and 4.8.1.1.2.a.5 and four

, tests in accoro6r.:e with the 184-day testing requirement of Surveillance Requirement 4.8.1.1.2.f. If this criterion is not satisfied during.the first series of tests, any alternate criterion to be used to transvalue the failure count to zero requires NRC approval.-

    • The associated test frequency shall be maintained until seven consecutive I failure free demands have been performed and the number of failures in the last 20 valid demands has been reduced to one.

V0GTLE UNITS - 1 & 2 3/4 8-9

+ t TABLE' 4.8'-1 DIESEL GENERATOR TEST SCNEDULE Number of Failures in last 20 Valid Tests *  : Test Frecuency'

s 1 Once per 31 days a 2** 0nce per 7 days ,

t i

l 4

  • Criteria for determining number of failures and: number of valid tests 'shall be in accordance with Regulatory Position C' 32.e-'of. Regulatory / Guide 1.108,-

but determined on a per' diesel generator basis..:

l For the purpos'es.of determining the requiredLtest frequency, the previous:

test failure count may be' reduced to-zero' ifra: complete diesel overhaul to -

like-new conditionxis: completed, provided that thecoverhaul,Lincluding appro--

~

priate post-maintenance ' operation .and--testing', .is Lspecifically approved' by ;

the manufacturer andLif acceptable reliability has-been demonstrated.12The l

. reliability. criterion:shall .be the successful; completion;of-14 consecutive tests in' a single series. : Ten of these. tests /shall be in-accordance.with ?the routine-Surveillance Requirements-4.8.lil-2.a.4iand.4.8 lil.2.'a 5 and fouri tests in accordance:with-the.184-day testing requirement of-Surveillance-Requirement 4'.8.1. l'.2. f. If this criterion is not-satisfied during theffirsti

. series of tests, any -alternate criterion ,to' be' used .to* tran's value thel:fai.lurei count'to zero requires NRC approval.-

    • The-associated test frequency shall- be maintained untilofseven failuresconsecutiveh failure' free' demands:have: been! performed: and the number in th 1ast 20' valid demands has-been. reduced-to one.