o.40 H0.UU1 P'.
0g hob aren G. Jennings G
OM State Raptossntative Minnesota Distrid 188 House of Chisago and Pine Counties Representatives COMMITTEEE:
REGULATED INDUSTMIE8 AND ENEMGf, MNA April 14, 1994 4
I Ha. Marsha camberoni, Project Manager Project Directorate III-1 Us Nuclear Regulatory commission Washington, D.C.
205$5-0001 Dear Ms. Camberonis s
As you are aware, 1 am the author of a bill in the Minne i
the Prairie taland nuclear plant.
1 have some questions relating to therage at l
length cf time that would be required to rarack the Prairie Island spe t f pool 11 NSP were denied the une of dry cask storage.
n uel similar information to some members of the Minnesota leg 1J1stureWhile NSP has prov operations at Prairie Island. prefer to receive it from the federal agency respo I would Hy specific questions are as follows:
If MsP decided to rarack the spent fuel pool, how long would each of the
{
following activities take?
1)
Design and preparation of an NRC application.
- 2) NRC review of the application.
3 NRC review assuming either (a)
Please provide the length of Licensing Board. public hearing before an Atomic Safety andno third party i intervention and 3)
Tabrication and installation at Prairie Island.
As the legielstion that would permit dry cask storage is currently bei debated before the Hinnesota House of Representatives, 1 would app ng timely response to rny questions.
reciate a.-
iding 612) 296-0518 I can be reached at ny office in the State office 31 rol Lorer. anni go stat Representative la7/bcsa Ik 9405030144 940414 PDR ADOCK 05000282 Q
// O r
Box 27. Rask C% Me++cis 850&s
\\0 EisCmoeA % SL Pa.d. Mw;=m SS156
- h-4CsVbn7 Mcess Fax (812) 296-1563. TDD (612) 2964466 (812) 446 4514 nnn (612) 87a 7838 v