Public Version of Revised Emergency Plan Implementing Procedures,Including Qep 340-6 Re Chlorine Dioxide Spill, Qep 530-S1 Re Monthly NARS Drill & Qep 530-0 Re Exercises & Drills
ML20066C827
Person / Time
Site: Quad Cities  Constellation icon.png
Issue date: 10/01/1982
From:
COMMONWEALTH EDISON CO.
To:
Shared Package
ML20066C821 List:
References
PROC-821001-01, NUDOCS 8211100486
Download: ML20066C827 (4)


Text

_ -_ -_ __

3 ,

QEP 340-0 Revision 9

. 2 October 1982 ID/1Q,1R CORRECTIVE ACTIONS 3

340-0 Corrective Actions Rev. 9 10-01-82 340-1 Operation During Earthquake Conditions Rev. 4 05-18-82 340-2 Operation During Tornado Warning Rev. 1 06-20-80 340-3 Lock and Das Number 14 Failure Rev. 2 02-19-81 340-4 Action to be Taken in the Event of an Oil Spill to the Mississippi River Rev. 3 12-07-81 340-5 Station Fire Fighting Rev. 4 02-16-82 340-6 Chlorine Dioxide Spill Rev. I 10-01-82 340-S1 Fire Drill Worksheet Rev. 2 10-03-80

  1. l

/

l l

l I -

l APPROVdu OCT 011982 U $ o. c.u a n j 8211100486 821101 t PDR ADOCK 05000254 (final)

F PDR

i

, . l i

?

~'

QEP 340-6 Revision 1 CHLCRINE DIOXIDE SPILL September 1982 ID/5H A. PURPOSE The purpose of this procedure is to describe actions to be taken in the event of a chlorine dioxide spill.

B. REFERENCES

1. Occupatiotal Health Guideline for Chlorine Dioxide, September 1978.

C. PREREQUISITES

1. None.

D. PRECAUTIONS

1. None.

E. LIMITATIONS AND ACTIONS

1. Notify Radiation Protection if chlorine dioxide odor is detected.

- , F. PROCEDURE

'~- 1. Persons not wearing protective equipment and clothing should be restricted from areas of spills or leaks until clean-up has been completed.

2. When chlorine dioxide has spilled or is leaking the following steps should be taken:
a. Remove all ignition sources.
b. Maximize ventilation in area of spill or leak.
c. Stop the spill or leak.
d. Isolate the area until chlorine dioxide gas is not detectable.

G. CHECKLISTS

1. None.

} H. TECHNICAL SPECIFICATION REFERENCES 1

1. None.

APPROVdu

,- OCT 011982 Q. C. O. i rt I

l' (final) l

t QEP 530-0 Revision 11 October 1982 ID/2W,2X EXERCISES AND DRILLS -

^s 530-0 Exercises and Drills Rev. 11 10-01-82 530-1 Emergency Exercise Rev. I 12-16-80 530-2 Emergency Drills Rev. 6 06-07-82 530-3 Off-Shift Augmentation Drill Rev. 2 06-21-82 530-S1 Monthly NARS Drill Quad-Cities Station Rev. 4 10-01-82 530-S2 Monthly Test of the NRC Health Physics Network Rev. 1 01-05-82 530-S3 Monthly Test of the NRC Emergency Notification System Rev. 1 02-17-82

?- .

l l

l APPRoyg, OCT 011992

    • ,Dq 1-(final)

-- - y- , - , y --- .~w ,,, . - , ,-

. e .

QEP 530-S1

'S Revision 4 MONTHLY NARS DRILL September 1982 QUAD-CITIES STATION ID/3P DATE:

DECLARATION TIME:

DIAL 23 MESSAGE: This is'a communications test. This is Quad-Cities Nuclear Power Station. Standby for communications drill. The simulated declaration time is . The current time is . Standby to acknowledge receipt of this communications message by stating your agency and initials.

CALL ROLL:

AGENCY INITIALS Illinois Emergency Services and Disaster Agency Illinois Department of Nuclear Safety N

f' Rock Island Communications

' -' Rock Island E.S.D.A.

Scott County Sheriff Corporate Command Center System Power Dispatch Clinton County EOC l Iowa Office of Disaster Services Whiteside County EOC l

Whiteside County Sheriff INQUIRE: Has anyone not been called?

RESPONSE

i BACKUP CONTACTS:

' AGENCY TIME COMMENTS:

NAME: 'iP P ROV E D OCT 011982 (final)

Q. G. O. 6. n.

-. .-. . . . - . . . . - . -