|
---|
Category:TECHNICAL SPECIFICATIONS
MONTHYEARML20217D7961999-10-12012 October 1999 Proposed Tech Specs Pages,Removing Turbine EHC Low Oil Pressure Trip from RPS Trip Function Requirements in TS Sections 2.2 & 3/4.1.A ML20210R8281999-08-13013 August 1999 Revised Bases Page B.3/4.9-6 to TS Section 3/4.9,providing Clarity & Consistency with Sys Design Description in UFSAR Sections 8.3.2.1 & 8.3.2.2 ML20209J2321999-07-16016 July 1999 Proposed Tech Specs 3/4.7.D Replacing Limit for Any One Msli Valve of Less than or Equal 11.5 Sfch with Aggregate Value of Less than or Equal 46 Scfh for All MSIVs ML20209C2951999-06-29029 June 1999 Proposed Tech Specs Section 3/4.3.C, Reactivity Control - Control Rod Operability ML20205L2631999-04-0505 April 1999 Tech Spec Page B 3/4.5-2 to TS Section 3/4.5, ECCS, to Clarify Requirement Discussed in ML20205J9321999-03-30030 March 1999 Proposed Tech Specs 3/4.6.E Changing SRs 4.6.E.2 to Allow one-time Extension of 18 Month Requirement to Pressure Test or Replace One Half of MSSVs to Interval of 24 Months ML20205J9911999-03-30030 March 1999 Proposed Tech Specs Allowing Alternative Methodology for Quantifying RCS Leakage When Normal RCS Leakage Detection Sys Is Inoperable ML20205J9741999-03-30030 March 1999 Proposed Tech Specs,Deleting Various License Conditions That Have Been Completed,Making Editorial Changes & Providing Clarifying Info ML20199L7741999-01-21021 January 1999 Proposed Tech Specs Bases for Sections 3/4.10.K & 3/4.10.L, Provides Description of Design & Operation of RHR SD Cooling Subsystem ML20199L6921999-01-21021 January 1999 Proposed Tech Specs Section 3/4.6.I,relocating from Chemistry TS Requirements to UFSAR ML20196H4571998-11-30030 November 1998 Proposed Tech Specs 3/4.8.J, Safe Shutdown Makeup Pump, Reducing Current AOT from 67 Days to 14 Days ML20196F6451998-11-30030 November 1998 Proposed Tech Specs 3/4.1.A,3/4.10.B & 3/4.12.B,proposing Changes to Relocate Requirement to Remove RPS Shorting Links Which Enable non-coincident Scram for Neutron Instrumentation,To Licensee Controlled Document ML20155D8091998-10-29029 October 1998 Proposed Tech Specs Bases Sections 3/4.2.D & 3/4.5.D, Providing Clarity & Consistency with Sys Design Description Contained in UFSAR Section 5.4.6.2 ML20151S7991998-08-31031 August 1998 Proposed Tech Specs,Increasing Max Allowable MSIV Leakage from 11.5 Scfh to 30 Scfh Per Valve When Tested at 25 Psig, IAW SR 4.7.D.6 ML20236W8401998-07-31031 July 1998 Proposed Tech Specs Bases 3/4.7.C & 3/4.7.12.C,clarifying Testing Requirements for Primary Containment Excess Flow Check Valves ML20247D7761998-05-0505 May 1998 Proposed Tech Specs Page B 3/4.4-1,changing Administrative Error.Bases for Net Quantity of Gallons for Solution Is Changed from 3254 (Correct Quantity) to 3245 ML20246Q3481998-04-29029 April 1998 TS Page B 3/4.5-3,reflecting Change to TS Bases for Section 3/4.5.C ML20217G1481998-03-27027 March 1998 Proposed Tech Specs Bases Section 3/4.5.A,reflecting Design Info Contained in Rev 4 to Ufsar,Dtd Apr 1997 ML20216C6381997-08-29029 August 1997 Proposed Tech Specs,Incorporating New Siemens' Methodologies That Will Enhance Operational Flexibility & Reducing Likelihood of Future Plant Derates ML20196G0271997-05-0101 May 1997 Proposed Tech Specs 4.9.A.8.b Revising Load Value for Diesel Generator to Be Equal to or Greater than Largest Single Load & Revising Frequency & Voltage Requirements During Performance of Test ML20138G3321997-04-29029 April 1997 Proposed Tech Specs,Permitting Loading of ATRIUM-9B Fuel in Plant Unit Core for Operational Modes 3,4 & 5.Modes Will Support Refueling Activities Such as Fuel Load,Vessel re- Assembly & Single Rod Timing ML20138B3231997-04-21021 April 1997 Proposed Tech Specs,Requesting That NRC Grant Exigent Amend to TS 2.1.B & 6.9.A.6.b to Support Plant Unit 2 Cycle 15 Operation Scheduled to Begin 970519 ML20137G3981997-03-26026 March 1997 Proposed Tech Specs 3/4.7.P Re Standby Gas Treatment & TS 5.2.C Re Secondary Containment ML20135F7321997-03-0303 March 1997 Proposed Tech Spec Bases 3/4.9.E,clarifying Purpose of SR 4.9.E ML20135D9461997-02-24024 February 1997 Proposed Tech Specs,Clarifying Bases for TS Surveillance 4.8.D.5.c ML20138L4011997-02-17017 February 1997 Proposed Tech Specs Section 2.1.B Re Thermal Power,Section 3/4.11 Re Power Distribution Limits,Section 3/4.6 Re Primary Sys Boundary,Section 5.3 Re Reactor Core & Section 6.9 Re Reporting Requirements ML20138L3701997-02-17017 February 1997 Proposed Tech Specs 4.9.A.8.h Re Diesel Generator Endurance Test Surveillance Requirements ML20134D2191997-01-27027 January 1997 Proposed Tech Specs Deleting marked-up Sentence from TS Bases for Section 3/4.7.K ML20129C2391996-10-16016 October 1996 Proposed Tech Specs for Dresden 2 & 3 & Quad Cities 1 & 2, marked-up to Show Transition Verbiage ML20129D3981996-09-20020 September 1996 Proposed Tech Specs 3/4.6.K,updating Pressure-Temp Curves to 22 Effective Full Power Yrs & TS Bases ML20113C3571996-06-25025 June 1996 Proposed Tech Specs Re Upgrade Program ML20113A7861996-06-10010 June 1996 Proposed Tech Specs,App A,To Reflect Transition of Fuel Supplier from General Electric to Siemens Power Corp ML20117D7121996-05-0606 May 1996 Proposed Tech Specs,Implementing New LCO & SR Re Revs to TS for 10CFR50,App J,Lrt ML20107A1881996-04-0404 April 1996 Proposed Tech Specs 3.4/4.4 Re Standby Liquid Control Sys ML20101H1381996-03-25025 March 1996 Complete Version of TS Upgrade Program Pages That Reflect Current Configuration of Plant & Specifies SRs That Will Not Be Current Upon Implementation of Tsup Project ML20097D9231996-02-0808 February 1996 Proposed Tech Specs,Upgrading Existing TS 3/4.5, Eccs ML20098A3821995-09-20020 September 1995 Proposed Tech Specs,Revising TS Upgrade Program & Improving Plant Submittals ML20086D4741995-06-30030 June 1995 Proposed Tech Specs Re TS Upgrade Program for Dresden Units 2 & 3 & Quad Cities Units 1 & 2 ML20087H8651995-05-0202 May 1995 Proposed Tech Specs Re TS Upgrade Program Section 3/4.10 ML20082H7481995-04-10010 April 1995 Proposed Tech Specs,Revising SR for HPCI & RCIC Sys ML20080K8171995-02-23023 February 1995 Proposed Tech Specs,Changing Name of Iige to Reflect Results of Merger Between Iige,Mid American Energy Co,Midwest Power Sys Inc & Midwest Resources Inc ML20078E2051995-01-20020 January 1995 Proposed Tech Specs Re Snubber Visual Insp Intervals ML20078Q6061994-12-12012 December 1994 Proposed TS Section 3.4/4.4 Re Standby Liquid Control Sys ML20064J3181994-03-11011 March 1994 Proposed Tech Specs Re Snubber Visual Insp Intervals ML20059A7321993-12-20020 December 1993 Proposed Tech Specs 1.1/2.1-1 Increasing MCPR Safety Limit from 1.06 to 1.07 for Units 1 & 2 ML20059A8301993-10-21021 October 1993 Proposed Tech Specs Deleting Requirements for Demonstrating Operability of Redundant Equipment When ECCS Equipment Is Found Inoperable or Made Inoperable for Maint ML20125D6381992-12-0808 December 1992 Proposed Tech Specs 3/4.1 Re Reactor Protection Sys ML20116J7091992-11-0606 November 1992 Corrected Proposed TS 3.2/4.2-8 Re Administrative Changes ML20106A6221992-09-15015 September 1992 Proposed TS 2.0, Safety Limits & Limiting Safety Sys Settings & 3/4.11, Power Distribution Limits ML20099D7791992-07-29029 July 1992 Proposed Tech Specs Sections 1.0, Definitions, 3/4.0, Applicability & 3/4.3, Reactivity 1999-08-13
[Table view] Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML20217D7961999-10-12012 October 1999 Proposed Tech Specs Pages,Removing Turbine EHC Low Oil Pressure Trip from RPS Trip Function Requirements in TS Sections 2.2 & 3/4.1.A ML20210R8281999-08-13013 August 1999 Revised Bases Page B.3/4.9-6 to TS Section 3/4.9,providing Clarity & Consistency with Sys Design Description in UFSAR Sections 8.3.2.1 & 8.3.2.2 ML20209J2321999-07-16016 July 1999 Proposed Tech Specs 3/4.7.D Replacing Limit for Any One Msli Valve of Less than or Equal 11.5 Sfch with Aggregate Value of Less than or Equal 46 Scfh for All MSIVs ML20196K1941999-06-30030 June 1999 Rev 2.0 to Chapter 11 of Quad Cities Offsite Dose Calculation Manual ML20209C2951999-06-29029 June 1999 Proposed Tech Specs Section 3/4.3.C, Reactivity Control - Control Rod Operability ML20211C3311999-04-30030 April 1999 Rev 2.0 to Generic ODCM for Dresden,Quad Cities,Zion, Lasalle,Byron & Braidwood ML20205L2631999-04-0505 April 1999 Tech Spec Page B 3/4.5-2 to TS Section 3/4.5, ECCS, to Clarify Requirement Discussed in ML20205J9741999-03-30030 March 1999 Proposed Tech Specs,Deleting Various License Conditions That Have Been Completed,Making Editorial Changes & Providing Clarifying Info ML20205J9321999-03-30030 March 1999 Proposed Tech Specs 3/4.6.E Changing SRs 4.6.E.2 to Allow one-time Extension of 18 Month Requirement to Pressure Test or Replace One Half of MSSVs to Interval of 24 Months ML20205J9911999-03-30030 March 1999 Proposed Tech Specs Allowing Alternative Methodology for Quantifying RCS Leakage When Normal RCS Leakage Detection Sys Is Inoperable ML20199L6921999-01-21021 January 1999 Proposed Tech Specs Section 3/4.6.I,relocating from Chemistry TS Requirements to UFSAR ML20199L7741999-01-21021 January 1999 Proposed Tech Specs Bases for Sections 3/4.10.K & 3/4.10.L, Provides Description of Design & Operation of RHR SD Cooling Subsystem ML20196H4571998-11-30030 November 1998 Proposed Tech Specs 3/4.8.J, Safe Shutdown Makeup Pump, Reducing Current AOT from 67 Days to 14 Days ML20196F6451998-11-30030 November 1998 Proposed Tech Specs 3/4.1.A,3/4.10.B & 3/4.12.B,proposing Changes to Relocate Requirement to Remove RPS Shorting Links Which Enable non-coincident Scram for Neutron Instrumentation,To Licensee Controlled Document ML20196K5861998-11-0505 November 1998 Rev 3 to Qcap 0280-01, Process Control Program for Processing of Radioactive Wet Wastes at Quad Cities Nuclear Power Station ML20155D8091998-10-29029 October 1998 Proposed Tech Specs Bases Sections 3/4.2.D & 3/4.5.D, Providing Clarity & Consistency with Sys Design Description Contained in UFSAR Section 5.4.6.2 ML20195J9041998-09-24024 September 1998 Rev 0 to TR-VQ1500-02, Clean ECCS Suction Strainer Head Loss Test Rept ML20151S7991998-08-31031 August 1998 Proposed Tech Specs,Increasing Max Allowable MSIV Leakage from 11.5 Scfh to 30 Scfh Per Valve When Tested at 25 Psig, IAW SR 4.7.D.6 ML20236W8401998-07-31031 July 1998 Proposed Tech Specs Bases 3/4.7.C & 3/4.7.12.C,clarifying Testing Requirements for Primary Containment Excess Flow Check Valves ML20247D7761998-05-0505 May 1998 Proposed Tech Specs Page B 3/4.4-1,changing Administrative Error.Bases for Net Quantity of Gallons for Solution Is Changed from 3254 (Correct Quantity) to 3245 ML20246Q3481998-04-29029 April 1998 TS Page B 3/4.5-3,reflecting Change to TS Bases for Section 3/4.5.C ML20217G1481998-03-27027 March 1998 Proposed Tech Specs Bases Section 3/4.5.A,reflecting Design Info Contained in Rev 4 to Ufsar,Dtd Apr 1997 ML20216C6381997-08-29029 August 1997 Proposed Tech Specs,Incorporating New Siemens' Methodologies That Will Enhance Operational Flexibility & Reducing Likelihood of Future Plant Derates ML20196G0271997-05-0101 May 1997 Proposed Tech Specs 4.9.A.8.b Revising Load Value for Diesel Generator to Be Equal to or Greater than Largest Single Load & Revising Frequency & Voltage Requirements During Performance of Test ML20138G3321997-04-29029 April 1997 Proposed Tech Specs,Permitting Loading of ATRIUM-9B Fuel in Plant Unit Core for Operational Modes 3,4 & 5.Modes Will Support Refueling Activities Such as Fuel Load,Vessel re- Assembly & Single Rod Timing ML20138B3231997-04-21021 April 1997 Proposed Tech Specs,Requesting That NRC Grant Exigent Amend to TS 2.1.B & 6.9.A.6.b to Support Plant Unit 2 Cycle 15 Operation Scheduled to Begin 970519 ML20137G3981997-03-26026 March 1997 Proposed Tech Specs 3/4.7.P Re Standby Gas Treatment & TS 5.2.C Re Secondary Containment ML20135F7321997-03-0303 March 1997 Proposed Tech Spec Bases 3/4.9.E,clarifying Purpose of SR 4.9.E ML20135D9461997-02-24024 February 1997 Proposed Tech Specs,Clarifying Bases for TS Surveillance 4.8.D.5.c ML20138L4011997-02-17017 February 1997 Proposed Tech Specs Section 2.1.B Re Thermal Power,Section 3/4.11 Re Power Distribution Limits,Section 3/4.6 Re Primary Sys Boundary,Section 5.3 Re Reactor Core & Section 6.9 Re Reporting Requirements ML20138L3701997-02-17017 February 1997 Proposed Tech Specs 4.9.A.8.h Re Diesel Generator Endurance Test Surveillance Requirements ML20134D2191997-01-27027 January 1997 Proposed Tech Specs Deleting marked-up Sentence from TS Bases for Section 3/4.7.K ML20129K3321996-10-18018 October 1996 Cycle 15 Startup Test Results ML20129C2391996-10-16016 October 1996 Proposed Tech Specs for Dresden 2 & 3 & Quad Cities 1 & 2, marked-up to Show Transition Verbiage ML20129D3981996-09-20020 September 1996 Proposed Tech Specs 3/4.6.K,updating Pressure-Temp Curves to 22 Effective Full Power Yrs & TS Bases ML20216H8841996-06-30030 June 1996 Revs to ODCM for Quad Cities,Including Rev 1.8 to Chapters 10,11,12 & App F ML20116F3971996-06-30030 June 1996 Rev 1.8 to ODCM, Annex,Chapters 10,11,12 & App F ML20113C3571996-06-25025 June 1996 Proposed Tech Specs Re Upgrade Program ML20113A7861996-06-10010 June 1996 Proposed Tech Specs,App A,To Reflect Transition of Fuel Supplier from General Electric to Siemens Power Corp ML20117D7121996-05-0606 May 1996 Proposed Tech Specs,Implementing New LCO & SR Re Revs to TS for 10CFR50,App J,Lrt ML20107A1881996-04-0404 April 1996 Proposed Tech Specs 3.4/4.4 Re Standby Liquid Control Sys ML20101H1381996-03-25025 March 1996 Complete Version of TS Upgrade Program Pages That Reflect Current Configuration of Plant & Specifies SRs That Will Not Be Current Upon Implementation of Tsup Project ML20097D9231996-02-0808 February 1996 Proposed Tech Specs,Upgrading Existing TS 3/4.5, Eccs ML20100C0441996-01-24024 January 1996 Secondary Containment Leak Test Summary ML20093K7721995-10-12012 October 1995 Quad-Cities Nuclear Power Station Unit 2 Cycle 14 Startup Test Results Summary ML20098A3821995-09-20020 September 1995 Proposed Tech Specs,Revising TS Upgrade Program & Improving Plant Submittals ML20086D4741995-06-30030 June 1995 Proposed Tech Specs Re TS Upgrade Program for Dresden Units 2 & 3 & Quad Cities Units 1 & 2 ML20087H8651995-05-0202 May 1995 Proposed Tech Specs Re TS Upgrade Program Section 3/4.10 ML20082H7481995-04-10010 April 1995 Proposed Tech Specs,Revising SR for HPCI & RCIC Sys ML20080K8171995-02-23023 February 1995 Proposed Tech Specs,Changing Name of Iige to Reflect Results of Merger Between Iige,Mid American Energy Co,Midwest Power Sys Inc & Midwest Resources Inc 1999-08-13
[Table view] |
Text
._- . - _ . - . - - ._ . . - - . _ _ .
ATTACHMENT B
,' MARKED-UP PAGES FOR PROPOSED CIIANGES ~
SVP-98-355 Page1 of1 i
REVISED PAGES -
LICENSES DPR-29 and DPR-30 l
I
\
l Remove Insert )
l 3 /4.8-24 3/4.8-24 B 3/4.8-5 B 3/4.8-5 l
l l
l l
l l
9812090080 PDR 981130 f' P
ADOCK 05000254:
PDR t;
,' PLANT SYSTEMS SSMP 3/4.8.J 3.8 LIMITING CONDITIONS FOR OPERATION 4.8 - SURVEILLANCE REQUIREMENTS
l APPLICABILITY: 1. At least once per 31 days by:
OPERATIONAL MODE (s) 1,2 and 3 with a. Verifying that each valve, manual, reactor steam dome pressure greater than power operated or automatic in the ;
150 psig. flow path that is not locked, sealed l or otherwise secured in position, is
! ACTION: in its correct position. -
l
- 1. With the SSMP system inoper b. Verifying that the pump flow
! restore the inoperable S -
ystem to controller is in the correct position.
OPERABLE status withi [kfays, or be in at least HOT SHUTDO N within the 2. At least once per 92 days by verifying next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD that the SSMP develops a flow of l SHUTDOWN within the following 24 greater than or equal to 400 gpm l hours. against a system head corresponding to l raactor vessel pressure of greater than i 1120 psig. I
('\ l j
i i
l l(
QUAD CITIES - UNITS 1 & 2 Amendment Nos. 171 8 167 l 3/4.8 24 l
.- . .. - _ _. _ _ - - - ~ . -. -- .
PLANT SYSTEMS B 3/4.8 BASES i
i l \
l header. The flow rate of the SSMP system is approximately equal to the reactor water boil-off rate 15 minutes after shutdown. l l
The SSMP system is re o be OPERABLE when either Unit 1 or Unit 2 is in OPERATIONAL i l MODE (s) 1, 2 or 3 actor steam dome pressure greater than 150 psig. With the SSMP I system inoperable, ay allowable out-of service (AOT) is provided to restore the inoperable ;
system to OPERABL st tus before the Unit (s) must be shut down. '"r'r----- "- " r'--"r- l
...:;.. FeeLe,. ;TPFCF;, "" ; ":;;;;;;; . F.e r ..b" t'ek... 2, T.L 4, 0.' ; .mmv o, .
" .;t, ;.; . ',
The surveillance requirements provide adequate assurance that the SSMP system will be OPERABLE when required. A design flow test can be performed during plant operation using a full l flow test return line to the CCST. (
l l
1 QUAD CITIES - UNITS 1 & 2 B 3/4.8-5 Amendment Nos. 171 & 167
l l
ATTACHMENT C l l
, SIGNIFICANT II AZARDS CONSIDERATION l SVP-98-355 Page 1 of 2
- i l SIGNIFICANT IIAZARDS CONSIDERATION i
! i Comed has evaluated this proposed amendment and determined that it involves no significant
! hazards consideration. According to 10 CFR 50.92(c), a proposed amendment to an operating !
license involves no significant hazards consideration if operation of the facility in accordance with the proposed amendment would not:
Involve a significant increase in the probability of occurrence or consequences of an accident ;
previously evaluated; l
Create the possibility of a new or different kind of accident from any accident previously l evaluated; or j l
l Involve a significant reduction in a margin of safety.
Comed proposes to amend Appendix A, Technical Specification (TS), of Facility Operating Licenses DPR-29 and DPR-30. The proposed amendment requests a change to Technical Specification (TS) 3/4.8.J, Safe Shutdown Makeup Pump (SSMP), to reduce the current Allowed Outage Time (AOT) from 67 days to 14 days.
The determination that the criteria set forth in 10 CFR 50.92 are met for this amendment request is indicated below: ,
Does the change involve a significant increase in the probability or consequences of an accident previously evaluated?
The change does not involve a significant increase in the probability or consequences of an accident previously evaluated. The proposed change to the Technical Specification Allowed Outage Time is conservative with respect to current requirements. This change is being proposed to establish an AOT for the SSMP that is equivalent to that for the reactor core isolation cooling (RCIC) pump (14 day AOT) in order to enhance system performance by assuring maximum SSMP pump availability to a level consistent with RCIC. This is necessary since, pursuant to Paragraph III.G.3 of 10 CFR 50, Appendix R, the SSMP is an alternate system to the RCIC system. By ensuring equipment availability, the probability or consequences of an accident previously evaluated are not increased. In addition, the proposed change has no impact on any accident initiators or initial condition assumptions for accident scenarios. Onsite or offsite dose consequences resulting from an event previously l evaluated are not affected by this proposed amendment request.
} Therefore, this proposed amendment does not involve a significant increase in the probability or consequences of an accident previously evaluated.
i r
_ . - - . ~ _ - - . - _ - . _- - - - -
1 l
ATTACllMENT C
. SIGNIFICANT liAZARDS CONSIDERATION SVP-98-355 Page 2 of 2 Does the change create the possibility of a new or different kind of accident from any accident previously evaluated?
The proposed amendment does not create the possibility of a new or different kind of accident from any accident previously evaluated. The proposed license amendment provides ,
l a reduction to a Technical Specification Allowed Outage Time to enhance system performance by assuring maximum SSMP pump availability to a level consistent with RCIC.
The proposed change is conservative with respect to the current requirements. The proposed amendment does not involve any plant physical changes that would create the possibility of a
{
new or different kind of accident from any accident previously evaluated.
Therefore, the proposed change does not create the possibility of a new or difTerent kind of accident from any accident previously evaluated.
I i
Does the change involve a significant reduction in a margin of safety?
The proposed change does not involve a significant reduction in a margin of safety. The i proposed change enhances system performance by assuring maximum SSMP pump availability to a level consistent with RCIC. Since this is a conservative change that will enhance the I performance of the SSMP system, it does not involve a significant reduction in the margin of safety.
Therefore, this change does not involve a significant reduction in a margin of safety.
Based on the above evaluation, Comed has concluded that these changes involve no significant hazards consideration.
l l
i i
l l
- 1
' ATTACHMENT D '
. ENVIRONMENTAL ASSESSMENT SVP-98-355 Page1of1 ENVIRONMENTAL ASSESSMENT Comed has evaluated this proposed operating license amendment request against the criteria for identification oflicensing and regulatory actions requiring environmental assessment in accordance with 10 CFR 51.21. Comed has determined that this proposed license amendment request meets the criteria for a categorical exclusion set forth in 10 CFR 51.22(c)(9) and as such, has determined that no irreversible consequences exist in accordance with 10 CFR 50.92(b). This determination is based on the fact that this change is being proposed as an amendment to a license issued pursuant to 10 CFR 50 that changes a requirement with respect to installation or use of a facility component located within the restricted area, as defined in 10 CFR 20, or that changes an inspection or a surveillance requirement, and the amendment meets the following specific criteria:
(i) the amendment involves no significant hazards consideration.
As demonstrated in Attachment C, this proposed amendment does not involve any significant hazards consideration.
(ii) there is no significant change in the types or significant increase in the amounts of any effluent that may be released offsite.
1 The proposed changes will not result in changes in the operation or configuration of l
the facility. There will be no change in the level of controls or methodology used for l processim; of radioactive ellluents or handling of solid radioactive waste. i (iii) there is no significant increase in individual or cumulative occupational radiation exposure. '
The proposed changes will not result in changes in the operation or configuration of l the facility. The proposed changes will not result in any change in the normal l radiation levels within the plant. Therefore, there will be no increase in individual or ,
cumulative occupational radiation exposure resulting from this change.
l l
l L
4 I
e v