Proposed Tech Spec Sections 4.0.5,3.4.3.2,4.4.3.2,per Generic Ltr 88-01
ML20065T495
Person / Time
Site: Limerick  Constellation icon.png
Issue date: 12/21/1990
From:
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
Shared Package
ML20065T484 List:
References
GL-88-01, GL-88-1, NUDOCS 9012280155
Download: ML20065T495 (16)


Text

.. _ . . __ _ __ _ . _ . _ _ _ _ . _ . - _ . . . _ _ _ . _ . _ _

ATTAQHD/r 2 LIMERICK GDIERATI!1G STATICt1 Ibcket Nos. 50-352

. 50-353 License 11os. NPF-39 NPF-85 PROIOSED TEQOTICAL SPECIFICATIO!1S QW1GES List of Attached Pages Unit 1 3/4 0-3 3/4 4-9 3/4 4-10 B 3/4 0-5 B 3/4 4-3 B 3/4 4-4 8 3/4 4-6 Unit 2 xix 3/4 0-3 3/4 4-9 3/4 4-10 B 3/4 0-5 B 3/4 4-3 B 3/4 4-3a B 3/4 4-6 1'

$$h22gggg{$$$fg2 P

~

. . APPLICABILITY SURVEILLANCE REQUIREMENTS (Continued) 1 I

ASME Bailer and Pressure Vessel Required frequencies Code and appliccble Addenda for performing inservice terminology for .nservice inspection and testing inspection and testing activities activities Weekly At least once per 7 days Monthly At least once per 31 days Quarterly or every 3 months At least once per 92 days Semiannually or every 6 months At least once per 184 days Every 9 months At least once per 276 days Yearly or annually At least once per 366 days

c. The provisions of Specification 4.0.2 are applicable to the above required. frequencies for performing inservice inspection and testing activities,
d. Performance of the'above inservice inspection and testing activities shall be in addition to other specified Surveillance Requirements.
e. Nothing in the ASME Boiler and Pressure Vessel Code shall be construed to supersede the requirements of any Technical Specification.
f. The Inservice Inspection (ISI) Program for piping identified in NRC Generic Letter 88-01 shall be performed in accordance with the staff positions on schedule, methods and personnel, and sample expansion included in the Generic Letter. Details for implementation of these requirements are included as augmented inspection requirements in the ISI Program.

l l

LIMERICK - UNIT 1 3/4 0-3

l RE' ACTOR COOLANT SYSTEM i 1

, _.0PERATIONAL LEAKAGE LIMITING CONDITION FOR OPERATION

)

3.4.3.2 . Reactor coolant system leakage shall be limited to

! - a '. - No PRESSURE BOUNDARY LEAKAGE.

a

b. 5 gpm UNIDENTIFIED LEAKAGE.
c. 30 gpm total leakage,
d. 25 gpm total leakage averaged ever any 24-hour period.

e.- 1 gpm' leakage at a reactor coolant system pressure of 950 +10 psig from any

-reactor coolant system pressure isolation valve specified Tn Table 3.4.3.2-1.

f. 2 gp,m increase in UNIDENTIFIED LEAKAGE over a 24-hour period. l APPLICABILITY: OPERATIONAL CONDITIONS 1, 2, and 3.

ACTION:

a. With any PRESSURE BOUNDARY LEAKAGE, be in at least HOT SHUTDOWN within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and'in COLD SHUTDOWN within the next 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.-

-i b; With any reactor coolant. system leakage greater than the limits in b, c and/or d'above, reduce the leakage rate to within the limits within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> or be in at:least HOT SHUTOOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

c.- With any reactor coolant system pressure isolation valve leakage greater than the_above limit, isolate the high: pressure portion of the affected' system from the low pressure portion within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> by-use of at least one other. closed mant.al, deactivated automatic, or check

  • valves, or be in at least HOT-SHUTOOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within the

'following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

d. With one or more of the high/ low pressure-interface valve leakage pressure L

monitors;shown in Table 3.4.3.2-1 inoperable, restore the inoperable

-monitor (s) to OPERABLE status within 7. days or verify the pressure to be '

less_than the alarm setpoint=at.least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />; restore the i inoperable monitor (s) to OPERABLE status within 30 days or be in at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUT 00WN within'the following 24. hours._

--e :With-any reactor coolant system leakage greater than~the limit in f'above, identify the source of leakage within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />.or be in at least H0T SHUTDOWN q

'within the.next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />'and in COLD SHUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

1 1

  • Which have been. verified not to exceed the allowable leakage limit at_the last refueling outage or after the last time the valve was disturbed, whichever is more recent.

LIMERICK.- UNIT 1. 3/4 4-9 I

l l REACTOR COOLANT SYSTEM SURVEILLANCE REQUIREMENTS 4.4.3.2.1 The reactor coolant system leakage shall be demonstrated to be within each of the above limits by:

a. Monitoring the primary containment atmospheric gaseous radioactivity at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> (not a means of quantifying leakage),
b. Monitoring the drywell floor drain sump and drywell equipment drain tank flow rate at least once per eight (8) hours, l
c. Monitoring the drywell unit coolers condensate flow rate at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />,
d. Monttoring the primdry containment pressure at lesst once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> (not a means of quantifying leakage),
c. Monitoring the reactor vessel head flange leak detection system at least once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, and
f. Monitoring the primary containment temperature at least once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> (not a means of quantifying leakage).

4.4.3.2.2 Each reactor coolant system pressure isolation valve specified in Table 3.4.3.2-1 shall be demonstrated OPERABLE by leak testing pursuant to Specification 4.0.5 and verifying the leakage of each valve to be within the specified limit:

a. At least once per 18 months, and
b. Prior to returning the valve to service following maintenance, repair or replacement work on the valve which could affect its leakage rate.

The provisions of Specification 4.0.4 are not applicable for entry into OPERATIONAL CONDITION 3.

4.4.3.2.3 lhe high/ low pressure interface valve leakage pressure monitors shall be demonstrated OPERABLE with alarm setpoints set less than the allowable values in Table 3.4.3.2-1 by performance of a:

a. CHANNEL FUNCTIONAL TEST at least once per 31 days, and
b. CHANNEL CAllBRATION at least once per 18 months.

l LIMERICK - UNIT 1 3/4 4-10 l

3/4.0 APPLICABILITY

'8ASES 1

If the allowable outage time limits of the ACTION requirements are less than 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> or a shutdown is required to comply with ACTION requirements, e.g.,

i Specification 3.0.3, a 24-hour allowance is provided to permit a delay in implementing the ACTION requirements. This provides an adequate time limit to complete Surveillance Requirements that have not been performed. The purpose of this allowance is to permit the completion of a surveillance before a shutdown would be required to comply with ACTION requirements or before other remedial measures would be required that may preclude the completion of a surveillance.

The basis for this allowance includes consideration for plant conditions, adequate planning, availability of personnel, the time required to perform the surveillance, and the safety significance of the delay in completing tne required surveillance. This provision also provides a time limit for the completion of Surveillance Requirements that become applicable as a consequence of CONDITION changes imposed by ACTION requirements and for completing Surveillance Requirements that are applicable when an exception to the requirements of Specification 4.0.4 is allowed. If a surveillance is not completed within the 24-hour allowance, the time limits of the ACTION requirements are applicable at that time. When a surveillance is performed within the 24-hour allowance and the Surveillance Requirements are not met, the time limits of the ACTION requirements are applicable at the time that the surveillance is terminated.

Surveillance Requirements do not have to be performed on inoperable equipment because the ACTION requirements define the remedial measures that apply. However, the Surveillance Requirements have to be met to demonstrate that inoperable equipment has been restored to OPERABLE status.

Specification 4.0.4 establishes the requirement that all applicable surveillances must be met before entry into an OPERATIONAL CONDITION or other condition of operation specified in the Applicability statement. The purpose of this specification is to ensure that system and component OPERABILITY requirements or parameter limits are met before entry into an OPERATIONAL CONDITION or other specified condition for which these systems and components ensure safe operation of the facility. This provision applies to changes in OPERATIONAL CONDITIONS or other specified conditions associated with plant shutdown as well as startup.

Under the provisions of this specification, the applicable Surveillance Requirements must be performed within the specified surveillance interval to ensure that the Limiting Conditions for Operation are met during initial plant startup or following a plant outage.

When a shutdown is required to comply with ACTION requirements, the provisions of Specification 4.0.4 do not apply because this would delay placing the facility in a lower CONDITION of operation.

Specification 4.0.5 establishes the requirement that inservice inspection of ASME Code Class 1, 2 and 3 components and inservice testing of ASME Code Class 1, 2 and 3 pumps and valves shall be performed in accordance with a periodically updated version of Section XI of the ASME Boiler and Pressure Vessel Code and Addenda as required by 10 CFR 50.55a. These requirements apply except when relief has been provided in writing by the Commission. Additionally, the Inservice Inspection I Program conforms to the NRC staff positions identified in NRC Generic Letter 88 01, "NRC Position on IGSCC in BWR Austinetic Stainless Steel Piping," as approved in NRC Safety Evaluations dated March 6, 1990 and October 22, 1990.

LIMERICK - UNIT 1 B 3/4 0-5

REACTOR COOLANT SYSTEM I BASES J

3/4.4.3 REACTOR COOLANT SYSTEM LEAKAGE 3/4.4.3.1 LEAKAGE DETECTION SYSTEMS The RCS leakage detection systems required by this specification are provided to l monitor and detect leakage from the reactor coolant pressure boundary. These detection systems are consistent with the recommendations of Regulatory Guide 1.45, " Reactor Coolant Pressure Boundary Leakage Detection Systems," May 1973. In conformance with Regulatory Guide 1.45, the channel calibration tests will verify the ability to detect a1gpmleakinlegsthan1hourandanatmosphericgaseousradioactivitysystem sensitivity of 10- pC/cc.

1 3/4.4.3.2 OPERATIONAL LEAKAGE l

, The allowable leakage rates from the reactor coolant system have been based on the ,

predicted and experimentally observed behavior of cracks in pipes. The normally I expected background leakage due to equipment design and the detection capability of the instrumentation for determining system leakage was also considered. The evidence obtained from experiments suggests that for leakage somewhat greater than that specified for UNIDENTIFIED LEAKAGE the probability is small that the imperfection or crack associated with such leakage would grow rapidly. However, in all cases, if the leakage rates exceed the values specified or the leakage is located and known to be PRESSURE BOUNDARY LEAKAGE, the reactor will be shutdown to allow further investigation and corrective action. The limit of 2 gpm increase in UNIDENTIFIED LEAKAGE over a 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> period and the monitoring of drywell floor drain sump and drywell equipment drain )

tank flow rate at least once every eight (8) hours conforms with NRC staff positions '

specified in NRC Generic Letter 88-01, "NRC Positi M on IGSCC in BWR Austenitic Stainless Steel Piping," as revised by NRC Safety Evaluation dated March 6, 1990. The ACTION requirement for the 2 gpm increase in UNIDENTIFIED LEAKAGE limit ensures that  !

such leakage is identified or a plant shutdown is initiated to allow further '

investigation and corrective action. Once identified, reactor operation may continue dependent upon the impact on total leakage.

The ACTION requirements for pressure isolation valves (PlVs) are used in conjunction with the system specifications for which PIVs are listed in Table 3.4.3.2-1 and with primary containment isolation valve requirements to ensure that plant operation is appropriately limited.

The Surveillance Requirements for the RCS pressure isolation valves provide added assurance of valve integrity thereby reducing the probability of gross valve failure

, and consequent intersystem LOCA, Leakage from the RCS pressure isolation valves is IDENTIFIED LEAKAGE and will be considered as a portion of the allowed limit.

R4.4.4 CHEMISTRY The water chemistry limits of the reactor coolant system are established to l prevent damage to the reactor materials in contact with the coolant. Chloride limits are specified to prevent stress corrosion-cracking of the stainless steel. The effect of chloride is not as great when the oxygen concentration in the coolant is low, thus the 0.2 ppm limit on chlorides is permitted during POWER OPERATION. During shutdown and refueling operations, the temperature necessary for stress corrosion to occur is not present so a 0.5 ppm concentration of chlorides is not considered harmful during these periods.

LIMERICK - UNIT 1 B 3/4 4-3

REACTOR COOLANT SYSTEM i .

'UASES l

3/4.4.4 CHEMISTRY (Continued) i i

Conductivity measurements are required on a continuous basis since changes in

this parameter are an indication of abnormal conditions. When the conductivity is within limits, the pH, chlorides and other impurities affecting conductivity must also be within their acceptable limits. With the conductivity meter inoperable, additional samples must be analyzed to ensure that the chlorides are not exceeding i the limits.

The surveillance requirements provide adequate assurance that concentrations in excess of the limits will be detected in sufficient time to take corrective

action.

3/4.4.5 SPECIFIC ACTIVITY

. The limitations on the specific activity of the primary coolant ensure that L

the 2 hour2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> thyroid and whole body doses resulting from a main steam line failure outside the containment during steady state operation will not exceed small fractions of the dose guidelines of 10 CFR Part 100. The values for the limits on i specific activity represent interim limits based upon a parametric evaluation by '

3 the NRC of typical site locations. These values are conservative in that specific site parameters, such as SITE BOUNDARY location and meteorological conditions, i

1 were not considered in this evaluation.

The ACTION statement permitting POWER OPERATION to continue for limited time

, periods with the primary coolant's specific activit; greater than 0.2 microcurie per gram DOSE EQUIVALENT I-131, but less than or equal to 4 microcuries per gram DOSE EQUIVALENT l-131, accommodates possible iodine spiking phenomenon which may

, occur following changes in the THERMAL POWER. Operation with specific activity levels exceeding 0.2 microcurie per gram DOSE EQUIVALENT I-131 but less than or equal to 4 microcuries per gram DOSE EQUIVALENT l-131 must be restricted since these activity levels increase the 2-hour thyroid dose at the SITE BOUNDARY following a postulated steam line rupture.

Closing the main steam line isolation valves prevents the release uf activity to the environs should a steam line rupture occur outside containment. The surveillance requirements provide adcquate assurance that excessive specific activity levels in the reactor coolant will be detected in sufficient time to take corrective action.

3/4.4.6 PRESSURE / TEMPERATURE LIMITS All components in the reactor coolant system are designed to withstand the effects of cyclic loads due to system temperature and pressure changes. These

-cyclic loads are introduced by normal-load transients, reactor-trips, and startup and shutdown operations. The various categories of load cycles used for design purposes are provided in Section 3.9 of the FSAR. During startup and shutdown, the rates of temperature and pressure changes are limited so that the maximum ,

specified heatup and cooldown rates are consistent with the design assumptions and 1 satisfy the stress limits for cyclic operation.

LIMERICK - UNIT 1 B 3/4 4-4  ;

3 MACTORCOOLANTSYSTEM l

' BASES l

{ 3/4.4.7 MAIN STEAM LINE ISOLATION VALVES Double isolation valves are provided on each of the main steam lines to minimize the potential leakage paths from the containment in case of a line break.

Only one valve in each line is required to maintain the integrity of the containment, however, single failure consideration; require that two valves be OPERABLE. The surveillance requirements are based on the operating history of this type valve. The maximum closure time has been selected to contain fission products and to ensure the core is not uncovered following line breaks. The minimum closure time is consistent with the assumptions in the safety analyses to prevent pressure surges.

3/4.4.8 STRUCTURAL INTEGRITY The inspection programs for ASME Code Class 1, 2, and 3 components ensure that the structural integrity of these components will be maintained at an acceptable level throughout the life of the plant.

Components of the reactor coolant system were designed to provide access to permit inservice inspections in accordance with Section XI of the ASME Boiler and Pressure Vessel Code 1971 Edition and Addenda through Winter 1972.

The inservice inspection program for ASME Code Class 1, 2, and 3 components will be performed in accordance with Section XI of the ASME Boiler and Pressure Vessel Code and applicable addenda as required by 10 CfR 50.55a(g) except where specific written relief has been granted by the NRC pursuant to 10 CFR 50.55a(g)(6)(i). Additionally, the Inservice Inspection Program conforms to the NRC ttaff positions identified in NRC Generic Letter 88-01, "NRC Position on IGSCC in BWR Austenitic Stainless Steel Piping," as approved in NRC Safety Evaluations dated March 6, 1990 and October 22, 1990.

3/4.4.9 RESIDUAL HEAT REMOVAL A single shutdown cooling mode loop provides sufficient heat removal capability for removing core decay heat and mixing to assure accurate temperature indication, however, single failure considerations require that two loops be OPERABLE or that alternate methods capable of decay heat removal be demonstrated and that an alternate method of coolant mixing be in operation.

l

LIMERICK - UNIT 1 B 3/4 4-6 1

. INDEX l

BA.SE S .

SECTION PAGE INSTRUMENTATION (Continued)

Seismic Monitoring Instrumentation.......................... B 3/4 3-4 (Deleted) .................................................. B 3/4 3-4 Remote Shutdown System Instrumentation and Controls......... B 3/4 3-5 Accident Monitoring Instrumentation......................... B 3/4 3-5 Source Range Monitors....................................... B 3/4 3-5 Traversing In-Core Probe System............................. B 3/4 3-5 Chlorine and Toxic Gas Detection Systems.................... B 3/4 3-6 Fire Detection Instrumentation.............................. B 3/4 3-6  ;

Loose-Part Detection System................................. B 3/4 3-6 (Deleted) .................................................. B 3/4 3-6 Offgas Monitoring Instrumentation........................... B 3/4 3-7 3/4.3.8 TURBINE OVERSPEED PROTECTION SYSTEM......................... B 3/4 3-7 3/4.3.9 FEE 0 WATER / MAIN TURBINE TRIP SYSTEM ACTUATION INSTRUMENTATION............................................. B 3/4 3-7 Bases Figure B 3/4.3-1 Reactor Vessel Water Leve1........................... B 3/4 3-8 3/4.4 REACTOR COOLANT SYSTEM, 3/4.4.1 RECIRCULATION SYSTEM........................................ B 3/4 4-1 3/4.4.2 SAFETY / RELIEF VALVES........................................ B 3/4 4-2 3/4.4.3 REACTOR COOLANT SYSTEM LEAKAGE l

Leakage Detection Systems................................... B 3/4 4-3 Operational Leakage......................................... B 3/4 4-3 3/4.4.4_ CHEMISTRY................................................... B 3/4 4-3a l I

l' LIMERICK - UNIT 2 xix

. APPLICABILITY SURVEILLANCE REQUIREMENTS (Continued)

ASME Boiler and Pressure Vessel Required frequencies Code and applicable Addenda for performing inservice terminology for inservice inspection and testing inspection and testing activities activities Weekly At least once per 7 days Monthly At least once per 31 days Quarterly or every 3 months At least once per 92 days Semiannually or every 6 months At least once per 184 days Every 9 months At least once per 276 days Yearly or annually At least once per 366 days

c. The provisions of Specification 4.0.2 are applicable to the above required frequencies for performing inservice inspection and testing activities.
d. Performance of the above inservice inspection and testing activities shall be in addition to other specified Surveillance Requirements.
e. Nothing in the ASME Boiler and Pressure Vessel Code shall be construed to supersede the requirements of any Technic 11 Specification,
f. The Inservice Inspection (ISI) Program for piping identified in NRC Generic Letter 88-01 shall be performed in accordance with the staff positions on schedule, methods and personnel, and sample expansion included in the Generic Letter. Details for implementation of these requirements are included as augmented inspection requirements in the ISI Program, i LIMERICK - UNIT 2 3/4 0-3

l - Rf* ACTOR COOLANT SYSTEM

,0PERATIONAL LEAKAGE LIMITING CONDITION FOR OPERATION 3.4.3.2 Reactor coolant system leakage shall be limited to:

a. No PRESSURE BOUNDARY LEAKAGE.
b. 5 gpm UNIDENTIFIED LEAKAGE.
c. 30 gpm total leakage,
d. 25 gpm total leakage averaged over any 24-hour period.
e. 1 gpm leakage at a reactor coolant system pressure of 950 +10 psig from any reactor coolant system pressure isolation valve specified Tn Table 3.4.3.2-1.
f. 2 gpm increase in UNIDENTIFIED LEAKAGE over a 24-hour period. l APPLICABILITY: OPERATIONAL CONDITIONS 1, 2, and 3.

ACTION:

a. With any PRESSURE BOUNDARY LEAKAGE, be in at least HOT SHUTDOWN within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within the next 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />,
b. With any reactor coolant system leakage greater than the limits in b, c and/or d above, reduce the leakage rate to within the limits within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> or be in at least H0T SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />,
c. With an,' reactor coolant system pressure isolation valve leakage greater than the above limit, isolate the high pressure portion of the affected system f'om the low pressure portion within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> by use of at least one other closed manual, deactivated automatic, or check
  • valves, or be in at least H0' SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within the followinj 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />,
d. With or.a or more of the high/ low pressure interface valve leakage pressure monitors shown in Table 3.4.3.2-1 inoperable, restore the inoperable monitor (s) to OPERABLE status within 7 days or verify the pressure to be less than the alarm setpoint at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />; restore the inoperable monitor (s) to OPERABLE status within 30 days or be in at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
e. With any reactor coolant system leakage greater than the limit in f above, identify the source of leakage within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> or be in at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
  • Which have been verified not to exceed the allowable leakage limit at the last refueling outage or after the last time the valve was disturbed, whichever is more recent.

LIMERICK - UNIT 2 3/4 4-9 l

. o

. REACTOR COOLANT SYSTEM SURVEILLANCE REQUIREMENTS 4.4.3.2.1 The reactor coolant system leakage shall be demonstrated to be within each of the above limits by:

a. Monitoring the primary containment atmospheric gaseous radioactivity at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> (not a means of quantifying leakage),
b. Monitoring the drywell floor drain sump and drywell equipment drain tank flow rate at least once per eight (8) hours, l
c. Monitoring the drywell unit coolers condensate flow rate at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />,
d. Monitoring the primary containment pressure at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> (notameansofquantifyingleakage),
e. Monitoring the reactor vessel head flange leak detection system at least once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, and
f. Monitoring the primary containment temperature at least once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> (notameansofquantifying. leakage).

4.4.3.2.2 Each reactor coolant system pressure isolation valve specified in Table 3.4.3.2-1 shall be demonstrated OPERABLE by leak testing pursuant to Specification 4.0.5 and verifying the leakage of each valve to be within the specified limit:

a. At least once per 18 months, and
b. Prior to returning the valve to service _fol_ lowing maintenance, repair or replacement work on the valve which could affect its leakage rate.

The provisions of Specification 4.0.4 are not applicable for entry into OPERATIONAL CONDITION 3.

4.4.3.2.3 The high/ low pressure interface valve leakage pressure monitors shall be demonstrated OPERA 8LE with alarm setpoints set less than the allowable values in Table 3.4.3.2-1 by performance of a:

a. CHANNEL FUNCTIONAL TEST at least once per 31 days, and
b. CHANNEL CAllBRATION_at least once per 18 months.

l' i

l l

t LIMERICK - UNIT 2 3/4 4-10 l

AfPLICABILITY

  • BASES if the allowable outage time limits of the ACTION requirements are less than 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> or a shutdown is required to comply with ACTION requirements, e.g.,

Specification 3.0.3, a 24-hour allowance is provided to permit a delay in implementing the ACTION requirements. This provides an adequate time limit to complete Surveillance Requirements that have not been performed. The purpose of this allowance is to permit the completion of a surveillance before a shutdown ,

l would be required to comply with ACTION requirements or before other remedial  !

measures would be required that may preclude the completion of a surveillance. '

The basis for this allowance includes consideration for plant conditions, adequate planning, availability of personnel, the time required to perform the surveillance, and the safety significance of the delay in completing the required surveillance. This provision also provides a time limit for the completion of Surveillance Requirements that become applicable as a consequence of CONDITION changes imposed by ACTION requirements and for completing Surveillance l Requirements that are applicable when an exception to the requirements of  !

Specification 4.0.4 is allowed. if a surveillance is not completed within 24-hour I allowance, the time limits of the ACTION requirements are applicable at that time.

When a surveillance is performed within the 24-hour allowance and the Surveillance Requirements are not met, the time limits of the ACTION requirements are applicable at the time that the surveillance is terminated.

Surveillance Requirements do not have to be performed on inoperable equipment because the ACTION requirements define the remedial measures that apply. However, the Surveillance Requirements have to be met to demonstrate that inoperable equipment has been restored to OPERABLE status.

Specification 4.0.4 establishes the requirement that all applicable surveillances must be met before entry into an OPERATIONAL CONDil!0N or other condition of operation specified in the Applicability statement. The purpose of this specification is to ensure that system and component OPERABILITY requirements or parameter limits are met before entry into an OPERATIONAL CONDITION or other specified condition for which these systems and components ensure safe operation of the facility. This provision applies to changes in OPERATIONAL CONDITIONS or other specified conditions associated with plant shutdown as well as startup.

Under the provisions of this specification, the applicable Surveillance Requirements must be performed within the specified surveillance interval to ensure that the Limiting Conditions for Operation are met during initial plant startup or following a plant outage.

When a shutdown is required to comply with ACTION requi ements, the provisions of Specification 4.0.4 do not apply because this would delay placing the facility in a lower CONDITION of operation.

Specification 4.0.5 establishes the requirement that inservice inspection of ASME Code Class 1, 2 and 3 components and inservice testing of ASME Code Class 1, 2 and 3 pumps and valves shall be performed in accordance with a periodically updated version of Section XI of the ASME Boiler and Pressure Vessel Code and Addenda as required by 10 CFR 50.55a. These requirements apply except when relief has been provided in writing by the Commission. Additionally, the Inservice Inspection Program conforms to the NRC staff positions identified in NRC Generic Letter 88-01, "NRC Position on IGSCC in BWR Austinetic Stainless Steel Piping," as approved in NRC Safety Evaluations dated March 6, 1990 and October 22, 1990.

LIMERICK - UNIT 2 8 3/4 0-5

REACTOR COOLANT SYSTEM D'ASES 3/4.4.3 REACTOR COOLANT SYSTEM LEAKAGE 3/4.4.3.1 LEAKAGE DETECTION SYSTEMS The RCS leakage detection systems required by this specification are provided to monitor and detect leakage from the reactor coolant pressure boundary. These detection systems are consistent with the recommendations of Regulatory Guide 1.45, " Reactor Coolant Pressure Boundary Leakage Detection Systems," May 1973. In conformance with Regulatory Guide 1.45, the channel calibration tests will verify the ability to detect a 1 gpm leak in le sensitivityof10'gsthan1hourandanatmosphericgaseousradioactivitysystem

  1. C/cc.

3/4.4.3.2 OPERATIONAL LEAKAGE The allowable leakage rates from the reactor coolant system have been bitsed on the predicted and experimentally observed behavior of cracks in pipes. The normally expected background leakage due to equipment design and the detection capability of the instrumentation for determining system leakage was also considered. The evidence obtained from experiments suggests that for leakage somewhat greater than that specified for UNIDENTIFIED LEAKAGE the probability is small that the imperfection or crack associated with such leakage would grow rapidly. However, in all cases, if the leakage rates exceed the values specified or the leakage is located and known to be PRESSURE BOUNDARY LEAKAGE, the reactor will be shutdown to allow further investigation and corrective action. The ;imit of 2 gpm increase in UNIDENTIFIED LEAKAGE over a 24-hour period and the monitoring of drywell floor drain sump and drywell equipment drain tank flow rate at least once every eight (8) hours conforms with NRC staff positions specified in NRC Generic Letter 88-01, "NRC Position on IGSCC in BWR Austenitic Stainless Steel Piping," as revised by NRC Safety Evaluation dated March 6, 1990. The ACTION requirement for the 2 gpm increase in UNIDENTIFIED LEAKAGE limit ensures that such leakage is identified or a plant shutdown is initiated to allow further investigation and corrective action. Once identified, reactor operation may continue dependent upon the impact on total leakage.

The AC4 0N requirements for pressure isolation valves (PIVs) are used in i

conjunction with the system specifications for which P!Vs are listed in Table 3.4.3.2-1 and with primary containment isolation valve requirements to ensure that plant operation is appropriately limited.

! The Surveillance Requirements for the RCS pressure isolation valves provide added assurance of valve integrity thereby reducing the probability of gross valve failure and consequent intersystem LOCA. Leakage from the RCS pressure isolation valves is IDENTIFIED LEAXAGE and will be considered as a portion of the allowed limit.

LIMERICK - UNIT 2 8 3/4 4-3

! . e REACTOR COOLANT SYSTEM i e

BASES l

3/4.4.4 CHEMISTRY The water chemistry limits of the reactor coolant system are established to prevent damage to the reactor materials in contact with the coolant. Chloride limits are specified to prevent stress corrosion cracking of the stainless steel.

The effect of chloride is not as great when the oxygen concentration in the coolant is low, thus the 0.2 ppm limit on chlorides is permitted during POWER

OPERATION. During shutdown and refueling operations, the temperature necessary for stress corrosion to occur is not present so a 0.5 ppm concentration of chlorides is not considered harmful during these periods.

Conductivity measurements are required on a continuous basis since changes in this parameter are an indication of abnormal conditions. When the conductivity is within limits, the pH, chlorides and other impurities affecting conductivity must also be within their acceptable limits. With the conductivity meter inoperable, additional samples must be analyzed to ensure that the chlorides are not exceeding the limits.

The surveillance requirements provide adequate assurance that concentrations in excess of the limits will be detected in sufficient time to take corrective action.

LIMERICK - UNIT 2 B 3/4 4-3a

  • REhCTOR COOLANT SYSTEM

' BAS'ES 3/4.4.7 MAIN STEAM LINE ISOLATION VALVES Ocuble isolation valves are provided on each of the main steam lines to minimize the potential leakage paths from the containment in case of a line break.

Only one valve in each line is required to maintain the integrity of the containment, however, single failure considerations require that two valves be OPERABLE. The surveillance requirements are based on the operating histor3 of this type "alve. The maximum closure time has been selected to contain fission products and to ensure the core is not uncovered following line breaks. The minimum closure time is consistent with the assumptions in the safety analyses to prevent pressure surges.

3/4.4.8 STRUCTURAL INTEGRITY The inspection programs for ASME Code Class 1, 2, and 3 components ensure that the structural integrity of these components will be maintained at an acceptable level throughout the life of the plant.

Components of the reactor coolant system were designed to provide access to permit inservice inspections in accordance with Section XI of the ASME Boiler and Pressure Vessel Code 1971 Edition and Addenda through Winter 1972.

The inservice inspection program for ASME Code Class 1, 2, and 3 components will be performed in accordance with Section XI of the ASME Boilet and Pressure Vessel Code and applicable addenda as required by 10 CFR 50.55a(g) except where specific written relief has been granted by the NRC pursuant to 10 CFR 50.55a(g)(6)(i). Additionally, the Inservice inspection Program conforms to the NRC staff positions identiflad in NRC Generic letter 88-01, "NRC Position on IGSCC in BWR Austenitic Stainless Steel Piping," as approved in NRC Safety Evaluations dated March 6, 1990 and October 22, 1990.

3/4.4.9 RESIDUAL HEAT REMOVAL A single shutdown cooling mode loop provides sufficient heat removal capability for removing core decay heat and mixing to assure accurate temperature l indication, however, single failure considerations require that two loops be OPERABLE or that alternate methods capable of decay heat removal be demonstrated and that an alternate method of coolant mixing be in operation.

I

(

l l

l LIMERICK - UNIT 2 8 3/4 4-6