ML20065M051

From kanterella
Jump to navigation Jump to search
Forwards Rev 1 to CNEI-0400-25, Catawba Unit 2 Cycle 6 Colr
ML20065M051
Person / Time
Site: Catawba Duke Energy icon.png
Issue date: 04/14/1994
From: Canady K
DUKE POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20065M057 List:
References
NUDOCS 9404220214
Download: ML20065M051 (2)


Text

, 11 I Duke ibuer Company Electric Center l

  • PO Box 1006 Charlotte, N C. 282012006 DUKEPOWER April 14,1994 U. S. Nuclear Regulatory Commission A'ITN: Document Control Desk Washington, D.C. 20555

Subject:

Catawba Nuclear Station, Unit 2 ,

Docket Number 50-414 Core Operating Limits Report for Cycle 6, Revision 1 File: CN-1553.02 Please find attached Revision 1 to the Core Operating Limits Report (COLR) for Catawba 2 Cycle 6, pursuant to Catawba Technical Specification 6.9.l.9. This mvision is necessary as a result of Amendment No.109 to Catawba Nuclear Station, Unit 2 Technical Speci0 cations which provides for movement of certain cycle-specine parameters to the COLR.

If there arp any questions, please contact R.11. Clark at (704) 382-5823.

/ i 4_

1 s

.A#L4'M K. S. Canady Manager, Nuclear Engineering NuclearGeneral Office Nuclear Generation Depanment rrs cc: Mr. R. E. Martin, Project Manager Of fice of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Mail Stop 141125, OWFN Washington, D.C. 20555 Mr. S. D. Ebncter, Regional Administrator U. S. Nuclear Regulatory Commission - Region 11 101 Marietta Street, NW - Suite 2900 Atlanta, GA 30323 Mr. R. J. Emudenberger Senior Resident inspector Catawba Nuclear Station o c. . .

c c G v u i) 940422o214 940414 hgg{ l n_ m .,y% PDR ADOCK 05000414 v P PDR I

.e, ; ..,

U. S. Nuclear Regulatory Commission April 13,1994 Page 2 bxc: (w/o attacilments)

S.' A. Gewehr R. II. Clark M. L. Elder M. E Carroll L. K. Workman G. P. Ilornc(CNS)

Z. L. Taylor (CNS)

CNS Master File: CN-801.01 f

b t

4 i

'k L

i

  • h.