Testimony of Ak Singh Re Rockford League of Women Voters Contention 106 on Ground Acceleration Values for Design. Ground Acceleration Values & OBE Std Appropriate for Plant. Prof Qualifications EnclML20065A902 |
Person / Time |
---|
Site: |
Byron |
---|
Issue date: |
02/15/1983 |
---|
From: |
Singh A COMMONWEALTH EDISON CO., SARGENT & LUNDY, INC. |
---|
To: |
|
---|
Shared Package |
---|
ML20065A894 |
List: |
---|
References |
---|
ISSUANCES-OL, NUDOCS 8302220304 |
Download: ML20065A902 (11) |
|
Similar Documents at Byron |
---|
Category:LEGAL TRANSCRIPTS & ORDERS & PLEADINGS
MONTHYEARML20207E0051999-03-0202 March 1999 Transcript of 990302 Public Meeting with Commonwealth Edison in Rockville,Md.Pp 1-104.Supporting Documentation Encl ML20236H9381998-06-30030 June 1998 Transcript of 980630 Meeting W/Commonwealth Edison in Rockville,Md.Pp 1-123.Supporting Documentation Encl ML20198P3001997-11-0404 November 1997 Transcript of 971104 Public Meeting W/Ceco in Rockville,Md Re Measures Established by Ceco to Track Plant Performance & to Gain Understanding of CAs Put Into Place to Improve Safety.Pp 1-105.W/Certificate & Viewgraphs ML20149M2951996-11-29029 November 1996 Exemption from Requirements of 10CFR50.60 Re Safety Margins Recommended in ASME Boiler & Pressure Vessel Code Case N-514 TXX-9522, Comment Opposing Proposed GL on Testing of safety-related Logic Circuits.Believes That Complete Technical Review of All Surveillance Procedures Would Be Expensive & Unnecessary Expenditure of Licensee Resources1995-08-26026 August 1995 Comment Opposing Proposed GL on Testing of safety-related Logic Circuits.Believes That Complete Technical Review of All Surveillance Procedures Would Be Expensive & Unnecessary Expenditure of Licensee Resources ML20059C2351993-12-17017 December 1993 Comment Supporting Petition for Rulemaking PRM-21-2 Re Commercial Grade Item Dedication ML20044A8111990-06-27027 June 1990 Comment Opposing Closure of Lpdr of Rockford Public Library ML20245J0191989-04-14014 April 1989 Comment Re Proposed Rule 10CFR50 Re Ensuring Effectiveness of Maint Programs for Nuclear Power Plants ML20214X1871987-06-11011 June 1987 Order Imposing Civil Monetary Penalty in Amount of $25,000 Based on Four Severity Level III Violations Noted During 860721-0808 Insp ML20205Q1711987-04-0202 April 1987 Order Imposing Civil Monetary Penalty in Amount of $25,000. App Re Evaluations & Conclusions Encl IR 05000812/20100311987-02-26026 February 1987 Order Imposing Civil Monetary Penalty in Amount of $100,000 Based on Violations Noted During Insps on 850812-1031 ML20210T7321987-02-11011 February 1987 Unexecuted Amend 6 to Indemnity Agreement B-97 Substituting Item 3 of Attachment to Indemnity Agreement in Entirety W/ Listed License Numbers,Effective 870130 ML20209J3251987-01-30030 January 1987 Transcript of 870130 Commission Discussion/Possible Vote on Full Power OL for Facility.Pp 1-72.Supporting Viewgraphs Encl ML20213G4381986-10-24024 October 1986 Unexecuted Amend 5 to Indemnity Agreement B-97,substituting Item 3 of Attachment to Agreement in Entirety W/Listed License Numbers,Effective on 861106 ML20211B0841986-08-0505 August 1986 Transcript of 860805 Meeting Between Region Iii,Computer Interference Elimination & Util in Redmond,Wa Re Plant as-built Drawing Review.Pp 1-200 IR 05000506/20070221986-05-0202 May 1986 Order Imposing Civil Monetary Penalty in Amount of $25,000 for Violations Noted During Insp on 850506-0722.Violations Noted:Failure to Establish Radiological Safety Procedures & to Adequately Train Personnel ML20138C7301985-12-0909 December 1985 Order Imposing Civil Penalty in Amount of $25,000 Per 850606 Notice of Violation & Proposed Imposition of Civil Penalty.Licensee May Request Hearing within 30 Days of Date of Order ML20205E8741985-10-28028 October 1985 Exemption from GDC 4 of 10CFR50,App a Requirement to Install Protective Devices Associated W/Postulated Pipe Breaks Primary Coolant Sys.Topical Rept Evaluation Encl ML20102A2981985-01-0707 January 1985 Petition Requesting Aslab Grant Intervenor Appeal & Order Further Hearings on Safety of Plant ML20099L2581984-11-27027 November 1984 Notice of Withdrawal of Appearance in Proceeding.Certificate of Svc Encl ML20099G5381984-11-23023 November 1984 Supplemental Appeal Brief in Response to Intervenor 841106 Supplemental Brief on Appeal & in Support of ASLB 841016 Supplemental Initial Decision Authorizing Issuance of Ol. Certificate of Svc Encl ML20100K0411984-11-22022 November 1984 Submits Concerns Re Safety of Local Residents in Event of Accident & Excessively High Cost of Projected Operation of Facility ML20107H7841984-11-0606 November 1984 Supplemental Brief on Appeal of ASLB 841016 Supplemental Initial Decision Granting Authority for Issuance of Ol. Decision Should Be Reversed.Certificate of Svc Encl ML20140E4081984-10-31031 October 1984 Executed Amend 1 to Indemnity Agreement B-97,deleting Items 2A & 3 in Entirety ML20098G8841984-10-0202 October 1984 Joint Statement of RW Manz & W Faires Re Findings 3-11 Through 3-17 of NRC 830930 Integrated Design Insp Rept. Certificate of Svc Encl ML20098G8681984-10-0202 October 1984 Answer to Intervenor Motion to Reopen Record Re Bechtel Independent Design Review.Motion Should Be Denied ML20098G8901984-10-0202 October 1984 Joint Statement of Kj Green & RW Hooks Re Integrated Design Insp ML20098G8911984-10-0202 October 1984 Joint Statement of Cw Dick & EM Hughes Re Independent Design Insp ML20098G8821984-10-0101 October 1984 Affidavit of Kj Green Re Integrated Design Insp Concerning Mechanical Engineering Work ML20098G8741984-10-0101 October 1984 Affidavit of Br Shelton Re Integrated Design Insp ML20098G8881984-09-29029 September 1984 Affidavit of RW Hooks Re Integrated Design Insp Concerning Structural Design ML20098G8831984-09-28028 September 1984 Affidavit of W Faires Re Findings 3-15 & 3-16 of NRC 830930 Integrated Design Insp Rept ML20098G8811984-09-28028 September 1984 Affidavit of Cw Dick Re Independent Design Review ML20098G8791984-09-28028 September 1984 Affidavit of RP Tuetken Re Readiness for Fuel Loading ML20098G8781984-09-28028 September 1984 Affidavit of RW Manz Concerning Findings 3-11 Through 3-14 & 3-17 of NRC 830930 Integrated Design Insp Re Westinghouse ML20098G8871984-09-28028 September 1984 Affidavit of EM Hughes Re Idvp ML20098G8851984-09-27027 September 1984 Affidavit of Rl Heumann Re Costs of Delay in Startup & Operation of Unit 1 ML20098E2371984-09-24024 September 1984 Reply to Intervenor 840918 Proposed Supplemental Initial Decision.Certificate of Svc Encl ML20097E7221984-09-13013 September 1984 Agreed Motion for Time Extension Until 841101 to File Petition for Hearing Re Emergency Planning Commitment W ML20097C5311984-09-12012 September 1984 Motion to Reopen Record to Include Plant Design as Issue. Supporting Documentation & Certificate of Svc Encl ML20097B7791984-09-10010 September 1984 Proposed Supplemental Initial Decision Re Reinsp Program. Certificate of Svc Encl ML20096A6391984-08-30030 August 1984 Rebuttal Testimony of RW Hooks Re Validity of Info in Attachment 7 to Stokes Testimony Concerning Design Assumption for Plant.Stokes Info Inapplicable to Plant. Related Correspondence ML20096A6191984-08-30030 August 1984 Rebuttal Testimony of B Erler Re Stokes Allegations Concerning Evaluations of Discrepancies in Calculated Actual Stress Performed by Sargent & Lundy.Related Correspondence ML20096A6261984-08-30030 August 1984 Summary of Rebuttal Testimony & Testimony of ML Somsag, Eb Branch,D Demoss,Mr Frankel,Bf Maurer & Jk Buchanan Re Plant QC Inspector Reinsp Program & C Stokes Allegations Re Welds.Related Correspondence ML20096A6441984-08-28028 August 1984 Notice of Withdrawal of Appearance in Proceeding.Related Correspondence ML20112D5271984-08-24024 August 1984 Applicant Exhibit A-R-4,consisting of Feb 1984 Rept on Bryon QC Inspector Reinsp Program ML20112D5031984-08-24024 August 1984 Applicant Exhibit A-R-5,consisting of June 1984 Suppl to Rept on Bryon QC Inspector Reinsp Program ML20112D7441984-08-23023 August 1984 Intervenor Exhibit I-R-1,consisting of Undated List of Teutken Safety Category Insp Types ML20112D7511984-08-21021 August 1984 Staff Exhibit S-R-1,consisting of 840813 Instruction for Walkdown of Cable Tray Hanger Connection Welds ML20112D4641984-08-21021 August 1984 Intervenor Exhibit I-R-11,consisting of Undated Chronological Date Listing of Util Responses to Interrogatory 12.VA Judson to Mi Miller Re Interrogatory 12 & Supplemental Responses Encl 1999-03-02
[Table view] Category:TRANSCRIPTS
MONTHYEARML20207E0051999-03-0202 March 1999 Transcript of 990302 Public Meeting with Commonwealth Edison in Rockville,Md.Pp 1-104.Supporting Documentation Encl ML20236H9381998-06-30030 June 1998 Transcript of 980630 Meeting W/Commonwealth Edison in Rockville,Md.Pp 1-123.Supporting Documentation Encl ML20198P3001997-11-0404 November 1997 Transcript of 971104 Public Meeting W/Ceco in Rockville,Md Re Measures Established by Ceco to Track Plant Performance & to Gain Understanding of CAs Put Into Place to Improve Safety.Pp 1-105.W/Certificate & Viewgraphs ML20209J3251987-01-30030 January 1987 Transcript of 870130 Commission Discussion/Possible Vote on Full Power OL for Facility.Pp 1-72.Supporting Viewgraphs Encl ML20211B0841986-08-0505 August 1986 Transcript of 860805 Meeting Between Region Iii,Computer Interference Elimination & Util in Redmond,Wa Re Plant as-built Drawing Review.Pp 1-200 ML20096A6261984-08-30030 August 1984 Summary of Rebuttal Testimony & Testimony of ML Somsag, Eb Branch,D Demoss,Mr Frankel,Bf Maurer & Jk Buchanan Re Plant QC Inspector Reinsp Program & C Stokes Allegations Re Welds.Related Correspondence ML20096A6191984-08-30030 August 1984 Rebuttal Testimony of B Erler Re Stokes Allegations Concerning Evaluations of Discrepancies in Calculated Actual Stress Performed by Sargent & Lundy.Related Correspondence ML20096A6391984-08-30030 August 1984 Rebuttal Testimony of RW Hooks Re Validity of Info in Attachment 7 to Stokes Testimony Concerning Design Assumption for Plant.Stokes Info Inapplicable to Plant. Related Correspondence ML20094P7721984-08-17017 August 1984 Summary of Testimony & Direct Testimony of CC Stokes on Reinsp Program.Related Correspondence ML20094R1021984-08-17017 August 1984 Transcript of CC Stokes 840817 Deposition in Chicago,Il. Pp 1-173.Vol Ii.Related Correspondence ML20094P5991984-08-16016 August 1984 Direct Testimony of CC Stokes Re Engineering Evaluations Performed & Use of Engineering Judgement by Sargent & Lundy. Suggests Need for Independent Engineering Analysis of Safety Significance of Reinsp Program.Related Correspondence ML20094P6311984-08-14014 August 1984 Summary of Testimony & Testimony of Ds Kochhar on Contention 1 Re Reinsp Program.Certificate of Svc Encl.Related Correspondence ML20094P6831984-08-13013 August 1984 Summary of Testimony & Testimony of Wh Bleuel on Contention 1 Re Reinsp Program.Resume Encl.Related Correspondence ML20094P6951984-08-13013 August 1984 Summary of Testimony & Testimony of EP Erickson on Contention 1 Re Reinsp program-inspector Qualification & Work Quality.Resume & Certificate of Svc Encl.Related Correspondence ML20093L4881984-07-30030 July 1984 Summary of Testimony & Testimony of Eb Branch Re Contention 1 (Reinsp Program,Work Quality).Related Correspondence ML20093L1811984-07-30030 July 1984 Summary of Testimony & Testimony of KT Kostal on Contention 1 Re Capacity of Sys Control Corp Supplied Components to Carry Design Loads.Related Correspondence ML20093L2721984-07-30030 July 1984 Summary of Testimony & Testimony of Ak Singh on Contention 1 Re Evaluations of Discrepancies in Cable Tray Hanger Connections,Solid Bottom Tray Welds & Ladder Tray Weld Connections.Related Correspondence ML20093L2051984-07-30030 July 1984 Summary of Testimony & Testimony of Ld Johnson on Contention 1 Re Adequacy of Sys Control Corp Supplied Main Control Boards.Related Correspondence ML20090E5521984-07-17017 July 1984 Testimony of Eb Branch Re Job Responsibilities,Educ Background & Work Experience.Related Correspondence ML20090A7981984-07-0909 July 1984 Testimony of Gf Marcus Re Pittsburgh Testing Lab Source Insp of Equipment & Components Supplied by Sys Control Corp ML20090A8121984-07-0909 July 1984 Testimony of Bf Maurer Re Analysis of Structural Adequacy of Main Control Panels Designed & Fabricated by Sys Control Corp ML20092P7921984-07-0202 July 1984 Summary of Testimony & Testimony of ML Somsag Re QA Inspector Reinsp Program for Hunter Corp.Related Correspondence ML20092P7891984-07-0202 July 1984 Summary of Testimony & Testimony of Rv Laney on Contention 1 Re Work Quality.Related Correspondence ML20092P7951984-07-0202 July 1984 Summary of Testimony & Testimony of Ak Singh on Contention 1 Re Reinsp Program,Work Quality.Related Correspondence ML20092P7941984-07-0202 July 1984 Summary of Testimony & Testimony of LO Delgeorge on Contention 1 Re Reinsp Program,Inspector Qualification & Work Quality.Related Correspondence ML20092P5541984-07-0202 July 1984 Summary of Testimony & Testimony of Dl Leone on Contention 1 Re Reinsp Program for Work Quality ML20092P5551984-07-0202 July 1984 Summary of Testimony & Testimony of R French on Contention 1 Re Reinsp Program ML20092P7781984-07-0202 July 1984 Summary of Testimony & Testimony of Wj Shewski on Contention 1 Re Reinsp Program,Inspector Qualification.Related Correspondence ML20092P7811984-07-0202 July 1984 Summary of Testimony & Testimony of Jm Mclaughlin on Contention 1 Re Reinsp Program,Work Quality.Related Correspondence ML20092P7871984-07-0202 July 1984 Summary of Direct Testimony & Testimony of RP Tuetken Re Reinsp Program.Related Correspondence ML20092P7851984-07-0202 July 1984 Summary of Testimony & Testimony of Wb Behnke on Contention 1 Re Overview of Quality Program,Work Quality. Related Correspondence ML20092N4971984-06-29029 June 1984 Testimony of Bg Treece on Issues 5 & 6 Re Cable Overtensioning,As Limited by ASLB 840608 Order.Related Correspondence ML20092N4911984-06-29029 June 1984 Summary of Direct Testimony of Jo Binder on Issues 5 & 6 Re Cable Overtensioning,As Limited by ASLB 840608 Order.Related Correspondence ML20092K7691984-06-26026 June 1984 Summary of Testimony of J Hansel on Contention 1 Re Reinsp Program.Prof Qualifications Encl.Related Correspondence ML20205H8901983-08-10010 August 1983 Public Version of Transcript of 830810 in Camera,Ex Parte Hearing in Rockford,Il.Pp 7,585-7,610 ML20205H8941983-08-10010 August 1983 Public Version of Transcript of 830810 in Camera,Ex Parte Hearing W/Ofc of Investigations in Rockford,Il.Pp 7,611.1- 7,611.71 ML20205H8841983-08-0909 August 1983 Public Version of Transcript of 830809 in Camera,Ex Parte Hearing in Rockford,Il.Pp 7,304-7,405 ML20080B3051983-08-0303 August 1983 Testimony of RP Tuetken Re Util Reinsp Program of Work Performed by Contractor Insp Personnel Prior to NRC Region III Mar,Apr & May 1982 Insps.Appropriate Steps Taken to Remedy Problems ML20080B3091983-08-0303 August 1983 Testimony of Aw Koca Re General Nature of Hatfield Inspector Training & Certification Program.Certification of J Hughes Described ML20080B2951983-08-0303 August 1983 Testimony of Ma Stanish Re Recertification of Qa/Qc Inspectors Subsequent to NRC Region III Mar,Apr & May 1982 Special Team Insps.Reinsp Program Implemented to Review Work Performed by Inspectors Before NRC 1982 Insp ML20023C7151983-05-12012 May 1983 Testimony of P Holmbeck Re Investigation Into Adequacy of Emergency Plans Re Emergency Planning Contentions.Util Made No Attempt to Study Protective Value of Sheltering Populations Around Plant ML20204F5721983-04-26026 April 1983 Transcript of 830426 Hearing in Rockford,Il.Pp 5,964-6,156 ML20069M4791983-04-25025 April 1983 Handwritten Testimony of J Hughes Re Qa/Qc at Facility ML20069K5691983-04-21021 April 1983 Testimony of Ld Butterfield Re Steam Generator Tube Integrity.Proposed Steam Generator Mods Would Minimize Tube Wear Due to Flow Induced Vibration.Related Correspondence ML20069K5631983-04-21021 April 1983 Revised Testimony of Tf Timmons Re Steam Generator Tube Integrity (Flow Induced Vibration Phenomenon).No Significant Tube Wear Will Be Experienced in Steam Generators Due to Flow Induced Vibration.Related Correspondence ML20073J6691983-04-18018 April 1983 Testimony of Jl Murphy on Rockford League of Women Voters & Dekalb Area Alliance for Responsible Energy/Sinnissippi Alliance for Environ Consolidated Emergency Planning Contentions 3 & 13.Related Correspondence ML20073K4461983-04-18018 April 1983 Rebuttal Testimony of Levine Re Rockford League of Women Voters Contentions 8 & 62 & Dekalb Area Alliance for Responsible Energy/Sinnissippi Alliance for Environ Contention 2a on Public Risk.Related Correspondence ML20073G4241983-04-11011 April 1983 Testimony of Ee Jones Re State of Il Emergency Svc & Disaster Agency Responsibilities Concerning Emergency Planning for Nuclear Facilities & Intervenor Amended Emergency Planning Contention ML20073G4051983-04-11011 April 1983 Testimony of Jc Golden Re Amended Emergency Planning Contention ML20073G4121983-04-11011 April 1983 Testimony of Dl Smith Re Resources Available for Transport & Treatment of Contaminated Injured Persons.Resume Encl 1999-03-02
[Table view] Category:DEPOSITIONS
MONTHYEARML20207E0051999-03-0202 March 1999 Transcript of 990302 Public Meeting with Commonwealth Edison in Rockville,Md.Pp 1-104.Supporting Documentation Encl ML20236H9381998-06-30030 June 1998 Transcript of 980630 Meeting W/Commonwealth Edison in Rockville,Md.Pp 1-123.Supporting Documentation Encl ML20198P3001997-11-0404 November 1997 Transcript of 971104 Public Meeting W/Ceco in Rockville,Md Re Measures Established by Ceco to Track Plant Performance & to Gain Understanding of CAs Put Into Place to Improve Safety.Pp 1-105.W/Certificate & Viewgraphs ML20209J3251987-01-30030 January 1987 Transcript of 870130 Commission Discussion/Possible Vote on Full Power OL for Facility.Pp 1-72.Supporting Viewgraphs Encl ML20211B0841986-08-0505 August 1986 Transcript of 860805 Meeting Between Region Iii,Computer Interference Elimination & Util in Redmond,Wa Re Plant as-built Drawing Review.Pp 1-200 ML20096A6261984-08-30030 August 1984 Summary of Rebuttal Testimony & Testimony of ML Somsag, Eb Branch,D Demoss,Mr Frankel,Bf Maurer & Jk Buchanan Re Plant QC Inspector Reinsp Program & C Stokes Allegations Re Welds.Related Correspondence ML20096A6191984-08-30030 August 1984 Rebuttal Testimony of B Erler Re Stokes Allegations Concerning Evaluations of Discrepancies in Calculated Actual Stress Performed by Sargent & Lundy.Related Correspondence ML20096A6391984-08-30030 August 1984 Rebuttal Testimony of RW Hooks Re Validity of Info in Attachment 7 to Stokes Testimony Concerning Design Assumption for Plant.Stokes Info Inapplicable to Plant. Related Correspondence ML20094P7721984-08-17017 August 1984 Summary of Testimony & Direct Testimony of CC Stokes on Reinsp Program.Related Correspondence ML20094R1021984-08-17017 August 1984 Transcript of CC Stokes 840817 Deposition in Chicago,Il. Pp 1-173.Vol Ii.Related Correspondence ML20094P5991984-08-16016 August 1984 Direct Testimony of CC Stokes Re Engineering Evaluations Performed & Use of Engineering Judgement by Sargent & Lundy. Suggests Need for Independent Engineering Analysis of Safety Significance of Reinsp Program.Related Correspondence ML20094P6311984-08-14014 August 1984 Summary of Testimony & Testimony of Ds Kochhar on Contention 1 Re Reinsp Program.Certificate of Svc Encl.Related Correspondence ML20094P6831984-08-13013 August 1984 Summary of Testimony & Testimony of Wh Bleuel on Contention 1 Re Reinsp Program.Resume Encl.Related Correspondence ML20094P6951984-08-13013 August 1984 Summary of Testimony & Testimony of EP Erickson on Contention 1 Re Reinsp program-inspector Qualification & Work Quality.Resume & Certificate of Svc Encl.Related Correspondence ML20093L4881984-07-30030 July 1984 Summary of Testimony & Testimony of Eb Branch Re Contention 1 (Reinsp Program,Work Quality).Related Correspondence ML20093L1811984-07-30030 July 1984 Summary of Testimony & Testimony of KT Kostal on Contention 1 Re Capacity of Sys Control Corp Supplied Components to Carry Design Loads.Related Correspondence ML20093L2721984-07-30030 July 1984 Summary of Testimony & Testimony of Ak Singh on Contention 1 Re Evaluations of Discrepancies in Cable Tray Hanger Connections,Solid Bottom Tray Welds & Ladder Tray Weld Connections.Related Correspondence ML20093L2051984-07-30030 July 1984 Summary of Testimony & Testimony of Ld Johnson on Contention 1 Re Adequacy of Sys Control Corp Supplied Main Control Boards.Related Correspondence ML20090E5521984-07-17017 July 1984 Testimony of Eb Branch Re Job Responsibilities,Educ Background & Work Experience.Related Correspondence ML20090A7981984-07-0909 July 1984 Testimony of Gf Marcus Re Pittsburgh Testing Lab Source Insp of Equipment & Components Supplied by Sys Control Corp ML20090A8121984-07-0909 July 1984 Testimony of Bf Maurer Re Analysis of Structural Adequacy of Main Control Panels Designed & Fabricated by Sys Control Corp ML20092P7921984-07-0202 July 1984 Summary of Testimony & Testimony of ML Somsag Re QA Inspector Reinsp Program for Hunter Corp.Related Correspondence ML20092P7891984-07-0202 July 1984 Summary of Testimony & Testimony of Rv Laney on Contention 1 Re Work Quality.Related Correspondence ML20092P7951984-07-0202 July 1984 Summary of Testimony & Testimony of Ak Singh on Contention 1 Re Reinsp Program,Work Quality.Related Correspondence ML20092P7941984-07-0202 July 1984 Summary of Testimony & Testimony of LO Delgeorge on Contention 1 Re Reinsp Program,Inspector Qualification & Work Quality.Related Correspondence ML20092P5541984-07-0202 July 1984 Summary of Testimony & Testimony of Dl Leone on Contention 1 Re Reinsp Program for Work Quality ML20092P5551984-07-0202 July 1984 Summary of Testimony & Testimony of R French on Contention 1 Re Reinsp Program ML20092P7781984-07-0202 July 1984 Summary of Testimony & Testimony of Wj Shewski on Contention 1 Re Reinsp Program,Inspector Qualification.Related Correspondence ML20092P7811984-07-0202 July 1984 Summary of Testimony & Testimony of Jm Mclaughlin on Contention 1 Re Reinsp Program,Work Quality.Related Correspondence ML20092P7871984-07-0202 July 1984 Summary of Direct Testimony & Testimony of RP Tuetken Re Reinsp Program.Related Correspondence ML20092P7851984-07-0202 July 1984 Summary of Testimony & Testimony of Wb Behnke on Contention 1 Re Overview of Quality Program,Work Quality. Related Correspondence ML20092N4971984-06-29029 June 1984 Testimony of Bg Treece on Issues 5 & 6 Re Cable Overtensioning,As Limited by ASLB 840608 Order.Related Correspondence ML20092N4911984-06-29029 June 1984 Summary of Direct Testimony of Jo Binder on Issues 5 & 6 Re Cable Overtensioning,As Limited by ASLB 840608 Order.Related Correspondence ML20092K7691984-06-26026 June 1984 Summary of Testimony of J Hansel on Contention 1 Re Reinsp Program.Prof Qualifications Encl.Related Correspondence ML20205H8901983-08-10010 August 1983 Public Version of Transcript of 830810 in Camera,Ex Parte Hearing in Rockford,Il.Pp 7,585-7,610 ML20205H8941983-08-10010 August 1983 Public Version of Transcript of 830810 in Camera,Ex Parte Hearing W/Ofc of Investigations in Rockford,Il.Pp 7,611.1- 7,611.71 ML20205H8841983-08-0909 August 1983 Public Version of Transcript of 830809 in Camera,Ex Parte Hearing in Rockford,Il.Pp 7,304-7,405 ML20080B3051983-08-0303 August 1983 Testimony of RP Tuetken Re Util Reinsp Program of Work Performed by Contractor Insp Personnel Prior to NRC Region III Mar,Apr & May 1982 Insps.Appropriate Steps Taken to Remedy Problems ML20080B3091983-08-0303 August 1983 Testimony of Aw Koca Re General Nature of Hatfield Inspector Training & Certification Program.Certification of J Hughes Described ML20080B2951983-08-0303 August 1983 Testimony of Ma Stanish Re Recertification of Qa/Qc Inspectors Subsequent to NRC Region III Mar,Apr & May 1982 Special Team Insps.Reinsp Program Implemented to Review Work Performed by Inspectors Before NRC 1982 Insp ML20023C7151983-05-12012 May 1983 Testimony of P Holmbeck Re Investigation Into Adequacy of Emergency Plans Re Emergency Planning Contentions.Util Made No Attempt to Study Protective Value of Sheltering Populations Around Plant ML20204F5721983-04-26026 April 1983 Transcript of 830426 Hearing in Rockford,Il.Pp 5,964-6,156 ML20069M4791983-04-25025 April 1983 Handwritten Testimony of J Hughes Re Qa/Qc at Facility ML20069K5691983-04-21021 April 1983 Testimony of Ld Butterfield Re Steam Generator Tube Integrity.Proposed Steam Generator Mods Would Minimize Tube Wear Due to Flow Induced Vibration.Related Correspondence ML20069K5631983-04-21021 April 1983 Revised Testimony of Tf Timmons Re Steam Generator Tube Integrity (Flow Induced Vibration Phenomenon).No Significant Tube Wear Will Be Experienced in Steam Generators Due to Flow Induced Vibration.Related Correspondence ML20073J6691983-04-18018 April 1983 Testimony of Jl Murphy on Rockford League of Women Voters & Dekalb Area Alliance for Responsible Energy/Sinnissippi Alliance for Environ Consolidated Emergency Planning Contentions 3 & 13.Related Correspondence ML20073K4461983-04-18018 April 1983 Rebuttal Testimony of Levine Re Rockford League of Women Voters Contentions 8 & 62 & Dekalb Area Alliance for Responsible Energy/Sinnissippi Alliance for Environ Contention 2a on Public Risk.Related Correspondence ML20073G4241983-04-11011 April 1983 Testimony of Ee Jones Re State of Il Emergency Svc & Disaster Agency Responsibilities Concerning Emergency Planning for Nuclear Facilities & Intervenor Amended Emergency Planning Contention ML20073G4051983-04-11011 April 1983 Testimony of Jc Golden Re Amended Emergency Planning Contention ML20073G4121983-04-11011 April 1983 Testimony of Dl Smith Re Resources Available for Transport & Treatment of Contaminated Injured Persons.Resume Encl 1999-03-02
[Table view] Category:NARRATIVE TESTIMONY
MONTHYEARML20207E0051999-03-0202 March 1999 Transcript of 990302 Public Meeting with Commonwealth Edison in Rockville,Md.Pp 1-104.Supporting Documentation Encl ML20236H9381998-06-30030 June 1998 Transcript of 980630 Meeting W/Commonwealth Edison in Rockville,Md.Pp 1-123.Supporting Documentation Encl ML20198P3001997-11-0404 November 1997 Transcript of 971104 Public Meeting W/Ceco in Rockville,Md Re Measures Established by Ceco to Track Plant Performance & to Gain Understanding of CAs Put Into Place to Improve Safety.Pp 1-105.W/Certificate & Viewgraphs ML20209J3251987-01-30030 January 1987 Transcript of 870130 Commission Discussion/Possible Vote on Full Power OL for Facility.Pp 1-72.Supporting Viewgraphs Encl ML20211B0841986-08-0505 August 1986 Transcript of 860805 Meeting Between Region Iii,Computer Interference Elimination & Util in Redmond,Wa Re Plant as-built Drawing Review.Pp 1-200 ML20096A6261984-08-30030 August 1984 Summary of Rebuttal Testimony & Testimony of ML Somsag, Eb Branch,D Demoss,Mr Frankel,Bf Maurer & Jk Buchanan Re Plant QC Inspector Reinsp Program & C Stokes Allegations Re Welds.Related Correspondence ML20096A6191984-08-30030 August 1984 Rebuttal Testimony of B Erler Re Stokes Allegations Concerning Evaluations of Discrepancies in Calculated Actual Stress Performed by Sargent & Lundy.Related Correspondence ML20096A6391984-08-30030 August 1984 Rebuttal Testimony of RW Hooks Re Validity of Info in Attachment 7 to Stokes Testimony Concerning Design Assumption for Plant.Stokes Info Inapplicable to Plant. Related Correspondence ML20094P7721984-08-17017 August 1984 Summary of Testimony & Direct Testimony of CC Stokes on Reinsp Program.Related Correspondence ML20094R1021984-08-17017 August 1984 Transcript of CC Stokes 840817 Deposition in Chicago,Il. Pp 1-173.Vol Ii.Related Correspondence ML20094P5991984-08-16016 August 1984 Direct Testimony of CC Stokes Re Engineering Evaluations Performed & Use of Engineering Judgement by Sargent & Lundy. Suggests Need for Independent Engineering Analysis of Safety Significance of Reinsp Program.Related Correspondence ML20094P6311984-08-14014 August 1984 Summary of Testimony & Testimony of Ds Kochhar on Contention 1 Re Reinsp Program.Certificate of Svc Encl.Related Correspondence ML20094P6831984-08-13013 August 1984 Summary of Testimony & Testimony of Wh Bleuel on Contention 1 Re Reinsp Program.Resume Encl.Related Correspondence ML20094P6951984-08-13013 August 1984 Summary of Testimony & Testimony of EP Erickson on Contention 1 Re Reinsp program-inspector Qualification & Work Quality.Resume & Certificate of Svc Encl.Related Correspondence ML20093L4881984-07-30030 July 1984 Summary of Testimony & Testimony of Eb Branch Re Contention 1 (Reinsp Program,Work Quality).Related Correspondence ML20093L1811984-07-30030 July 1984 Summary of Testimony & Testimony of KT Kostal on Contention 1 Re Capacity of Sys Control Corp Supplied Components to Carry Design Loads.Related Correspondence ML20093L2721984-07-30030 July 1984 Summary of Testimony & Testimony of Ak Singh on Contention 1 Re Evaluations of Discrepancies in Cable Tray Hanger Connections,Solid Bottom Tray Welds & Ladder Tray Weld Connections.Related Correspondence ML20093L2051984-07-30030 July 1984 Summary of Testimony & Testimony of Ld Johnson on Contention 1 Re Adequacy of Sys Control Corp Supplied Main Control Boards.Related Correspondence ML20090E5521984-07-17017 July 1984 Testimony of Eb Branch Re Job Responsibilities,Educ Background & Work Experience.Related Correspondence ML20090A7981984-07-0909 July 1984 Testimony of Gf Marcus Re Pittsburgh Testing Lab Source Insp of Equipment & Components Supplied by Sys Control Corp ML20090A8121984-07-0909 July 1984 Testimony of Bf Maurer Re Analysis of Structural Adequacy of Main Control Panels Designed & Fabricated by Sys Control Corp ML20092P7921984-07-0202 July 1984 Summary of Testimony & Testimony of ML Somsag Re QA Inspector Reinsp Program for Hunter Corp.Related Correspondence ML20092P7891984-07-0202 July 1984 Summary of Testimony & Testimony of Rv Laney on Contention 1 Re Work Quality.Related Correspondence ML20092P7951984-07-0202 July 1984 Summary of Testimony & Testimony of Ak Singh on Contention 1 Re Reinsp Program,Work Quality.Related Correspondence ML20092P7941984-07-0202 July 1984 Summary of Testimony & Testimony of LO Delgeorge on Contention 1 Re Reinsp Program,Inspector Qualification & Work Quality.Related Correspondence ML20092P5541984-07-0202 July 1984 Summary of Testimony & Testimony of Dl Leone on Contention 1 Re Reinsp Program for Work Quality ML20092P5551984-07-0202 July 1984 Summary of Testimony & Testimony of R French on Contention 1 Re Reinsp Program ML20092P7781984-07-0202 July 1984 Summary of Testimony & Testimony of Wj Shewski on Contention 1 Re Reinsp Program,Inspector Qualification.Related Correspondence ML20092P7811984-07-0202 July 1984 Summary of Testimony & Testimony of Jm Mclaughlin on Contention 1 Re Reinsp Program,Work Quality.Related Correspondence ML20092P7871984-07-0202 July 1984 Summary of Direct Testimony & Testimony of RP Tuetken Re Reinsp Program.Related Correspondence ML20092P7851984-07-0202 July 1984 Summary of Testimony & Testimony of Wb Behnke on Contention 1 Re Overview of Quality Program,Work Quality. Related Correspondence ML20092N4971984-06-29029 June 1984 Testimony of Bg Treece on Issues 5 & 6 Re Cable Overtensioning,As Limited by ASLB 840608 Order.Related Correspondence ML20092N4911984-06-29029 June 1984 Summary of Direct Testimony of Jo Binder on Issues 5 & 6 Re Cable Overtensioning,As Limited by ASLB 840608 Order.Related Correspondence ML20092K7691984-06-26026 June 1984 Summary of Testimony of J Hansel on Contention 1 Re Reinsp Program.Prof Qualifications Encl.Related Correspondence ML20205H8901983-08-10010 August 1983 Public Version of Transcript of 830810 in Camera,Ex Parte Hearing in Rockford,Il.Pp 7,585-7,610 ML20205H8941983-08-10010 August 1983 Public Version of Transcript of 830810 in Camera,Ex Parte Hearing W/Ofc of Investigations in Rockford,Il.Pp 7,611.1- 7,611.71 ML20205H8841983-08-0909 August 1983 Public Version of Transcript of 830809 in Camera,Ex Parte Hearing in Rockford,Il.Pp 7,304-7,405 ML20080B3051983-08-0303 August 1983 Testimony of RP Tuetken Re Util Reinsp Program of Work Performed by Contractor Insp Personnel Prior to NRC Region III Mar,Apr & May 1982 Insps.Appropriate Steps Taken to Remedy Problems ML20080B3091983-08-0303 August 1983 Testimony of Aw Koca Re General Nature of Hatfield Inspector Training & Certification Program.Certification of J Hughes Described ML20080B2951983-08-0303 August 1983 Testimony of Ma Stanish Re Recertification of Qa/Qc Inspectors Subsequent to NRC Region III Mar,Apr & May 1982 Special Team Insps.Reinsp Program Implemented to Review Work Performed by Inspectors Before NRC 1982 Insp ML20023C7151983-05-12012 May 1983 Testimony of P Holmbeck Re Investigation Into Adequacy of Emergency Plans Re Emergency Planning Contentions.Util Made No Attempt to Study Protective Value of Sheltering Populations Around Plant ML20204F5721983-04-26026 April 1983 Transcript of 830426 Hearing in Rockford,Il.Pp 5,964-6,156 ML20069M4791983-04-25025 April 1983 Handwritten Testimony of J Hughes Re Qa/Qc at Facility ML20069K5691983-04-21021 April 1983 Testimony of Ld Butterfield Re Steam Generator Tube Integrity.Proposed Steam Generator Mods Would Minimize Tube Wear Due to Flow Induced Vibration.Related Correspondence ML20069K5631983-04-21021 April 1983 Revised Testimony of Tf Timmons Re Steam Generator Tube Integrity (Flow Induced Vibration Phenomenon).No Significant Tube Wear Will Be Experienced in Steam Generators Due to Flow Induced Vibration.Related Correspondence ML20073J6691983-04-18018 April 1983 Testimony of Jl Murphy on Rockford League of Women Voters & Dekalb Area Alliance for Responsible Energy/Sinnissippi Alliance for Environ Consolidated Emergency Planning Contentions 3 & 13.Related Correspondence ML20073K4461983-04-18018 April 1983 Rebuttal Testimony of Levine Re Rockford League of Women Voters Contentions 8 & 62 & Dekalb Area Alliance for Responsible Energy/Sinnissippi Alliance for Environ Contention 2a on Public Risk.Related Correspondence ML20073G4241983-04-11011 April 1983 Testimony of Ee Jones Re State of Il Emergency Svc & Disaster Agency Responsibilities Concerning Emergency Planning for Nuclear Facilities & Intervenor Amended Emergency Planning Contention ML20073G4051983-04-11011 April 1983 Testimony of Jc Golden Re Amended Emergency Planning Contention ML20073G4121983-04-11011 April 1983 Testimony of Dl Smith Re Resources Available for Transport & Treatment of Contaminated Injured Persons.Resume Encl 1999-03-02
[Table view] |
Text
l Date: 2/15/83 l
UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD l
In The Matter of )
)
)
COMMONWEALTH EDISON COMPANY ) Docket Nos. 50-454 OL
) 50-455 OL l
) ,
(Byron Nuclear Power Station, ) l Units 1 & 2)
)
SUMMARY
OF TESTIMONY OF ANAND K. SINGH Dr. Singh is a structural engineer employed by I Sargent and Lundy, the Byron Station architect-engineer.
Dr. Singh is a specialist in the area of seismic design of nuclear power plants, and has worked extensively on the seismic design of the Byron Station. His testimony is offered l
in response to that portion of League Contention 106 which ,
challenges the appropriateness of the ground acceleration values selected for the Byron design.
Dr. Singh begins his testimony by describing his background and qualifications. (pp. 1-2). He then explains what is meant by the terms " safe shutdown earthquake" and
" operating basis earthquake." (pp. 3-4). Dr. Singh's testimony goes oa to explain the basis for his opinion that the ground acceleration values selected for Byron are appro-priate. This explanation consists of a discussion of the manner in which the MM VIII intensity value of the design 8302220304 830215 PDR ADOCK 05000454 T PDR
basis earthquake was selected and how that intensity value was translated into a ground motion value which is appro-priate for the Byron site conditions. To show that the .29 ground motion value is appropriate, Dr. Singh compared it with the site specific spectrum generated for the Sequoyah Nuclear Power Plant site, and determined that for the frequency range of interest, the Byron design basis response spectrum closely corresponds to the Sequoyah site specific spectrum. The Sequoyah site specific spectrum is based upon real accelerograms of earthquakes of similar magnitude as the Byron design basis earthquake recorded at rock sites.
Thus, Dr. Singh concludes that use of the Sequoyah site specific spectrum was appropriate. (pp. 4-6).
Finally, Dr. Singh explains why the operating basis earthquake selected for Byron is appropriate. Instead of selecting a ground acceleration value equal to one half the safe shutdown earthquake value, Edison demonstrated through recurrence interval studies that it is not reasonable to expect an earthquake greater than an MM VI intensity earthquake with an acceleration value of .09 during the operating life of the plant. This is precisely the value selected for the operating basis earthquake. (pp. 6-7).
i l
I
O TESTIMONY OF ANAND K.'SINGH Q1 Please state your name.
Al Anand K. Singh.
Q2 By whom are you employed?
A2 Sargent and Lundy Engineers.
Q3 In what capacity? -
l A3 I am Assistant Head of the Structural Analytical Division.
Q4 Please describe your educational and professional background.
A4 I have a Doctor in Philosophy and Master of Science degree in Structural Engineering from the University of Illinois at Champaign-Urbana. These degrees were awarded in 1972 and 1970 respectively. I am a registered professional engineer and a registered structural engineer in the State of Illinois. I am a member of the American Society of Civil Engineers (AUCE), and a member of the Seismic Analysis Committee of the ASCE Nuclear Structures and Materials Committee, a member of the Working Group on the Seismic Analysis of Safety Class Struc-tures of the ASCE Nuclear Standards Committee and a member of the ASCE Committee on Turbine Foundations.
I have published numerous technical papers in the area of seismic and dynamic analysis of structures and piping.
A list of my publications is attached to my testimony.
. I joined Sargent and Lundy in 1972 as a Senior
l l
)
1 i
I Engineering Analyst. I was responsible for the develop-ment and maintenance of computer programs for seismic and dynamic analyses of structures and piping and for performing and/or reviewing seismic analyses of nuclear power plant structures. In 1975, I was promoted to the position of Supervisor of the Dynamic Analysis Section responsible for seismic and dynamic analysis of struc-tures and the develop' ment of-computer programs for dynamic and seismic analysis. In 1979, I was promoted to the position of Assistant Division Head. In that capacity, I supervise and coordinate the work of the Structural Analysis Section in preparation of analytical studies, special problem analyses, and computer. program development. In 1980, I was made an associate of Sargent and Lundy.
05 What are your responsibilities with respect to the Byron Plant?
AS Since 1974, I have been involved in the seismic analy-sis and review of the Byron Station. In particular, I have been involved in determining the appropriate seismic input for the design of the Byron Station, and review of the plant structure models and analysis methods.
06 To which contention is this testimony addressed?
A6 League Contention 106. In particular that portion of the contention which asserts "recent evidence from the central portion of the United States shows that neither the Byron designated safe shut down earthquake peak
3-ground acceleration value of 0.20 (g) nor the operating basis earthquake peak ground acceleration value of
- 0. 09 (g) are sufficiently conservative. Ground acceler-ation significantly greater than both of these values are possible at the Byron site."
07 WE... are the peak ground acceleration values which were selected for the seismic design of the Byron Station?
A7 Thepeakgroundacce$erationvaluesforByronareas stated in the League's Contention, that is, .20g for the safe shutdown earthquake and .09g for the operating basis ear +.hquake.
Q8 Please define what is meant by safe shutdown and operating basis earthquake.
A8 As set forth in the NRC's regulations, 10 CFR Part 100, Appendix A, the safe shutdown carthquake, also commonly referred to as the design basis earthquake, is that earthquake which is based upon an evaluation of the maximum earthquake potential considering the regional and , cal geology and seismology and specific charac-4 teristics of local subsurface material.. It is the earthquake that produces the maximum vibratory ground motion for which the structures, systems, and components which are necessary to enable a reactor to shut down j and avoid major offsite exposures are designed to withstand.
t The operating basis earthquake is that earthquake l which, considering the regional and local geology and 1
- , - - - . - _ , , . ~
s seismology and specific characteristics of local sub-surface material, could reasonably be expected to affect the plant site during the operating life of the plant. It is the earthquake which produces the vibra-tory ground motion for which those features of the nuclear power plant necessary for continued operation without undue risk to the health and safety of the public are designed.to remain functional. If the vibratory ground motion exceeding that of the operating basis earthquake occurs during the life of the plant, the Commission's regulations require that the plant be shut down and that prior to resuming operations, it is demonstrated that no functional damage has occurred to those features of the plant necessary for the continued operation without undue risk to the health and safety of the public.
09 How were the ground acceleration values for Byron selected?
A9 The selection of ground acceleration values is closely connected to the determination of the intensity of the earthquake for which a facility is designed. Since it was determined that the faults in the Byron area are not capable faults, we were required to consider the intensities of earthquakes which had been experienced in the Byron region, and based upon a consideration of the geology of the area, postulate the occurrence of an
s earthquake near the Byron site with an intensity at least as great as that experienced in the Byron region.
The controlling earthquake for Byron was determined to be the 1937 Anna, Ohio MM VII-VIII earthquake. Since an MM VII earthquake was experienced in the Northern Illinois area, the NRC Staff required that the design basis earthquake be a MM VIII earthquake. This value was selected for reasons of conservatism; no MM VIII earthquake has ever been recorded in the Byron area.
To justify the selection of .29 surface ground motion we first determined the relation between the postulated MM VIII earthquake and its expected magnitude. Using studies which considered the-intensity versus magnitude of earthquakes experienced in the Central United States we ultimately selected a magnitude value of 5.8. This value is conservative due to the fact that the studies indicate that for earthquakes in the Central United States an MM VIII intensity earthquake corresponds to an earth-quake with a magnitude of 5.75. Moreover, the magnitude of the 1937 Anna, Ohio earthquake is estimated to range from 5.0 to 5.3, and the magnitude of the largest historical earthquake in the Byron area, the May, 1909 Northern Illinois earthquake is estimated to be 5.1.
We could then have computed a site specific response spectrum to attempt to demonstrate that the .2g ground I
l
motion value is appropriate for the Byron site. How-ever, based upon a review of a site specific response spectrum which was calculated for the Tennessee Valley Authority's Sequoyah Nuclear Power Plant, it was deter-mined that such an effort was not required. The Sequoyah site specific spectrum was generated for a 5.8 magnitude earthquake, based on real accelerograms of earthquakes recorded at rock sites, at epicentral distances of less than 25 km. A Byron site specific spectrum would have utilized these same parameters.
Thus, we compared the Sequoyah spectrum to the Byron design basis ground motion. The comparison demonstrates that the Byron design basis response spectrum closely corresponds to the Sequoyah site specific spectrum in the frequency range of interest and is therefore appropriate for the Byron site.
In determining the ground acceleration value for the operating basis earthquake, we focused on the earth-quake, and associated ground acceleration, which could reasonably be expected to affect the plant site during the operating life of the plant. The earthquake selected was an MM VI earthquake with a corresponding ground acceleration value of .09g. To determine whether such an earthquake could reasonably be expected to occur sometime during the 40 year life of the Byron plant, we calculated its expected recurrence interval.
Edison calculated its recurrence interval to be approxi-mately 2150 years. Lawrence Livermore National Labora-
s tories, acting as a consultant to the NRC, also per-formed a recurrence interval calculation, and concluded that the recurrence interval for the .09g earthquake was in the 200 to 1000 year range.
Q10 Does the difference in the Commonwealth Edison Company and Lawrence Livermore Lab conclusions regarding the recurrence interval affect your opinion regarding the appropriateness of th) .099 level selected for the operating basis earthquake?
A10 No, for two reasons. First, even if you accept the Lawrence Livermore conclusion, the 200 year to 1000 year range is still conservative regarding whether such an earthquake could reasonably be expected to affect the Byron plant. Second, and more importantly, since the Byron plant is designed to withstand a design basis earthquake of .29 and would be required to shut down in the event an earthquake with a ground acceleration in excess of .09 occurs during its operating life and be inspected and demonstrated to be operable before it is l permitted to resume operations, the public health and
! safety will be adequately protected.
l Oll Dr. Singh, are you aware of any new information which would lead you to question whether the ground acceler-ation values chosen for Byron are adequately conserva-tive?
All No, I believe these acceleration values to be conserva-tive.
I
s - ,
Resume ANAND K. SINGH i s -
PUBLICATIONS "A Stochastic Model for Predicting Seismic Response of Light Secondary Systems",
' coauthor A. H. S. Ang, Proceedings of the Fifth World Conference on Earthqucke Engineering, Rome,1973 -
" Influence of Closely Spaced Modes in Response Spectrum Method of Analysis",
coauthors S. L. Chu cnd S. Singh, Proceedings, ASCE Specialty Conference on Structural Design of Nuclear Plant Facilities, Chicago, Illinois, December 1973
" Stochastic Prediction of Maximum Seismic Response of Light Secondary Systems",
coauthor A. H. S. Ang, Nuclear Engineering and Design 29 (1974), pp. 218-230 o
" Reliability Assessment of ASME Code Equations for Nuclear Components", coauthor M. K. Ravindra, Relichility Encineerino in Pressure Vesse!s c-d Picino, ASME, June 1975 '
" Seismic Response of Pipelines on Friction hupports", cocuthor J. C. Anderson, Journal of the Engineering Mechanics Division, ASCE, EM2, April 1976, pp. 275-291
" inelastic Response of Nuclear Piping Subjected to Rupture Forces", coauthor J. C.
Anderson, Journal of Pressure Vessel Technology, ASME, May 1976, pp.98-104 "A Probabilistic Model for Seismic Analysis of Nuclear Plant Structures", cocuthor S.
Singh, Paper K3/3, 4th International Conference on Structural Mechanics in Reactor Technology, August 15-19,1977, San Francisco, California
" Dynamic Analysis of Piping Systems Using Substructures", coauthor V. Kumar, presented at the ASME Design Engineering Technical Conference, Chicago, Illinois, September 26-30,1977, Preprint No. 77-DET-144
" Technical Bases for the Use of the Square Root of the Sum of Squares (SRSS) Method for Combining Dynamic Loads for Mark 11 Plants", coauthors S. W. Tcgart and C. V.
Subramanian, General Electric Company Report NEDE 24010, July 1977
" Dynamic Analysis Using Modal Synthesis", Journal of the Power Division, ASCE, PO2, April 1978, pp.131-140
" Response Analysis Using Dynamic influence Coefficients", coauthors T. P. Khetua, N. A. Holmes and S. L. Chu, Proceedings of the 7th Conference on Electronic Computation, American Society of Civil Engineers, St. Louis, Missouri, August 1979
" Structural Building Response Review", coauthors T. I. Hsu and T. P. Khatua.
NUREG/CR-1423, Washington, D. C.
Vol. II, U. S. Nuclear Regulatory Commission, May 1980,
' Prevention end Control of Vibrations", coauthor D. E. Olson, Presented at the General Engineering Conference, March 1980, Chicago, Illinois 0682 Page 2 of S
u .-
- e .
Resurre i ANAND K. SINGH , , . .
PUBLICATIONS, Continued
" Vibration in Power Plant Structures and Piping", coauthor D. E. Olson, Proceedings of the American Power Conference, April 1980, Chicago, Illinois
" Soil Structure Interaction Using Substructures", cocuthors T. I. Hsu crid N. A.
Holmes, Proceedings of the ASCE Specialty Conference, Civil Engineering and Nuclear Power, September 1980, Knoxville, Tennessee
" Evaluation of Soil Structure Interaction Methods", coauthors T. I. Hsu, T. P. Khatua and S. L. Chu, presented tt the second ASCE Engineering Mechanics Division Specialty Conference on Dynamic Response of Structures, January 1981, Attento, Georgic- "
"Seisnfic Analysis - Changing Considerations", Proceedings of the American Power Conference, April 1981, Chicago, Illinois t -
"An integrated and Interactive Piping Analysis and Design Information System",
coauthor C. A. Podczerwinski, Proceedings of the General Engineering Conference, March 1982, Chicago, Illinois
\
0682 Page 3 of 5
= -