Similar Documents at Byron |
---|
Category:LEGAL TRANSCRIPTS & ORDERS & PLEADINGS
MONTHYEARML20207E0051999-03-0202 March 1999 Transcript of 990302 Public Meeting with Commonwealth Edison in Rockville,Md.Pp 1-104.Supporting Documentation Encl ML20236H9381998-06-30030 June 1998 Transcript of 980630 Meeting W/Commonwealth Edison in Rockville,Md.Pp 1-123.Supporting Documentation Encl ML20198P3001997-11-0404 November 1997 Transcript of 971104 Public Meeting W/Ceco in Rockville,Md Re Measures Established by Ceco to Track Plant Performance & to Gain Understanding of CAs Put Into Place to Improve Safety.Pp 1-105.W/Certificate & Viewgraphs ML20149M2951996-11-29029 November 1996 Exemption from Requirements of 10CFR50.60 Re Safety Margins Recommended in ASME Boiler & Pressure Vessel Code Case N-514 TXX-9522, Comment Opposing Proposed GL on Testing of safety-related Logic Circuits.Believes That Complete Technical Review of All Surveillance Procedures Would Be Expensive & Unnecessary Expenditure of Licensee Resources1995-08-26026 August 1995 Comment Opposing Proposed GL on Testing of safety-related Logic Circuits.Believes That Complete Technical Review of All Surveillance Procedures Would Be Expensive & Unnecessary Expenditure of Licensee Resources ML20059C2351993-12-17017 December 1993 Comment Supporting Petition for Rulemaking PRM-21-2 Re Commercial Grade Item Dedication ML20044A8111990-06-27027 June 1990 Comment Opposing Closure of Lpdr of Rockford Public Library ML20245J0191989-04-14014 April 1989 Comment Re Proposed Rule 10CFR50 Re Ensuring Effectiveness of Maint Programs for Nuclear Power Plants ML20214X1871987-06-11011 June 1987 Order Imposing Civil Monetary Penalty in Amount of $25,000 Based on Four Severity Level III Violations Noted During 860721-0808 Insp ML20205Q1711987-04-0202 April 1987 Order Imposing Civil Monetary Penalty in Amount of $25,000. App Re Evaluations & Conclusions Encl IR 05000812/20100311987-02-26026 February 1987 Order Imposing Civil Monetary Penalty in Amount of $100,000 Based on Violations Noted During Insps on 850812-1031 ML20210T7321987-02-11011 February 1987 Unexecuted Amend 6 to Indemnity Agreement B-97 Substituting Item 3 of Attachment to Indemnity Agreement in Entirety W/ Listed License Numbers,Effective 870130 ML20209J3251987-01-30030 January 1987 Transcript of 870130 Commission Discussion/Possible Vote on Full Power OL for Facility.Pp 1-72.Supporting Viewgraphs Encl ML20213G4381986-10-24024 October 1986 Unexecuted Amend 5 to Indemnity Agreement B-97,substituting Item 3 of Attachment to Agreement in Entirety W/Listed License Numbers,Effective on 861106 ML20211B0841986-08-0505 August 1986 Transcript of 860805 Meeting Between Region Iii,Computer Interference Elimination & Util in Redmond,Wa Re Plant as-built Drawing Review.Pp 1-200 IR 05000506/20070221986-05-0202 May 1986 Order Imposing Civil Monetary Penalty in Amount of $25,000 for Violations Noted During Insp on 850506-0722.Violations Noted:Failure to Establish Radiological Safety Procedures & to Adequately Train Personnel ML20138C7301985-12-0909 December 1985 Order Imposing Civil Penalty in Amount of $25,000 Per 850606 Notice of Violation & Proposed Imposition of Civil Penalty.Licensee May Request Hearing within 30 Days of Date of Order ML20205E8741985-10-28028 October 1985 Exemption from GDC 4 of 10CFR50,App a Requirement to Install Protective Devices Associated W/Postulated Pipe Breaks Primary Coolant Sys.Topical Rept Evaluation Encl ML20102A2981985-01-0707 January 1985 Petition Requesting Aslab Grant Intervenor Appeal & Order Further Hearings on Safety of Plant ML20099L2581984-11-27027 November 1984 Notice of Withdrawal of Appearance in Proceeding.Certificate of Svc Encl ML20099G5381984-11-23023 November 1984 Supplemental Appeal Brief in Response to Intervenor 841106 Supplemental Brief on Appeal & in Support of ASLB 841016 Supplemental Initial Decision Authorizing Issuance of Ol. Certificate of Svc Encl ML20100K0411984-11-22022 November 1984 Submits Concerns Re Safety of Local Residents in Event of Accident & Excessively High Cost of Projected Operation of Facility ML20107H7841984-11-0606 November 1984 Supplemental Brief on Appeal of ASLB 841016 Supplemental Initial Decision Granting Authority for Issuance of Ol. Decision Should Be Reversed.Certificate of Svc Encl ML20140E4081984-10-31031 October 1984 Executed Amend 1 to Indemnity Agreement B-97,deleting Items 2A & 3 in Entirety ML20098G8841984-10-0202 October 1984 Joint Statement of RW Manz & W Faires Re Findings 3-11 Through 3-17 of NRC 830930 Integrated Design Insp Rept. Certificate of Svc Encl ML20098G8681984-10-0202 October 1984 Answer to Intervenor Motion to Reopen Record Re Bechtel Independent Design Review.Motion Should Be Denied ML20098G8901984-10-0202 October 1984 Joint Statement of Kj Green & RW Hooks Re Integrated Design Insp ML20098G8911984-10-0202 October 1984 Joint Statement of Cw Dick & EM Hughes Re Independent Design Insp ML20098G8821984-10-0101 October 1984 Affidavit of Kj Green Re Integrated Design Insp Concerning Mechanical Engineering Work ML20098G8741984-10-0101 October 1984 Affidavit of Br Shelton Re Integrated Design Insp ML20098G8881984-09-29029 September 1984 Affidavit of RW Hooks Re Integrated Design Insp Concerning Structural Design ML20098G8831984-09-28028 September 1984 Affidavit of W Faires Re Findings 3-15 & 3-16 of NRC 830930 Integrated Design Insp Rept ML20098G8811984-09-28028 September 1984 Affidavit of Cw Dick Re Independent Design Review ML20098G8791984-09-28028 September 1984 Affidavit of RP Tuetken Re Readiness for Fuel Loading ML20098G8781984-09-28028 September 1984 Affidavit of RW Manz Concerning Findings 3-11 Through 3-14 & 3-17 of NRC 830930 Integrated Design Insp Re Westinghouse ML20098G8871984-09-28028 September 1984 Affidavit of EM Hughes Re Idvp ML20098G8851984-09-27027 September 1984 Affidavit of Rl Heumann Re Costs of Delay in Startup & Operation of Unit 1 ML20098E2371984-09-24024 September 1984 Reply to Intervenor 840918 Proposed Supplemental Initial Decision.Certificate of Svc Encl ML20097E7221984-09-13013 September 1984 Agreed Motion for Time Extension Until 841101 to File Petition for Hearing Re Emergency Planning Commitment W ML20097C5311984-09-12012 September 1984 Motion to Reopen Record to Include Plant Design as Issue. Supporting Documentation & Certificate of Svc Encl ML20097B7791984-09-10010 September 1984 Proposed Supplemental Initial Decision Re Reinsp Program. Certificate of Svc Encl ML20096A6391984-08-30030 August 1984 Rebuttal Testimony of RW Hooks Re Validity of Info in Attachment 7 to Stokes Testimony Concerning Design Assumption for Plant.Stokes Info Inapplicable to Plant. Related Correspondence ML20096A6191984-08-30030 August 1984 Rebuttal Testimony of B Erler Re Stokes Allegations Concerning Evaluations of Discrepancies in Calculated Actual Stress Performed by Sargent & Lundy.Related Correspondence ML20096A6261984-08-30030 August 1984 Summary of Rebuttal Testimony & Testimony of ML Somsag, Eb Branch,D Demoss,Mr Frankel,Bf Maurer & Jk Buchanan Re Plant QC Inspector Reinsp Program & C Stokes Allegations Re Welds.Related Correspondence ML20096A6441984-08-28028 August 1984 Notice of Withdrawal of Appearance in Proceeding.Related Correspondence ML20112D5271984-08-24024 August 1984 Applicant Exhibit A-R-4,consisting of Feb 1984 Rept on Bryon QC Inspector Reinsp Program ML20112D5031984-08-24024 August 1984 Applicant Exhibit A-R-5,consisting of June 1984 Suppl to Rept on Bryon QC Inspector Reinsp Program ML20112D7441984-08-23023 August 1984 Intervenor Exhibit I-R-1,consisting of Undated List of Teutken Safety Category Insp Types ML20112D7511984-08-21021 August 1984 Staff Exhibit S-R-1,consisting of 840813 Instruction for Walkdown of Cable Tray Hanger Connection Welds ML20112D4641984-08-21021 August 1984 Intervenor Exhibit I-R-11,consisting of Undated Chronological Date Listing of Util Responses to Interrogatory 12.VA Judson to Mi Miller Re Interrogatory 12 & Supplemental Responses Encl 1999-03-02
[Table view] Category:TRANSCRIPTS
MONTHYEARML20207E0051999-03-0202 March 1999 Transcript of 990302 Public Meeting with Commonwealth Edison in Rockville,Md.Pp 1-104.Supporting Documentation Encl ML20236H9381998-06-30030 June 1998 Transcript of 980630 Meeting W/Commonwealth Edison in Rockville,Md.Pp 1-123.Supporting Documentation Encl ML20198P3001997-11-0404 November 1997 Transcript of 971104 Public Meeting W/Ceco in Rockville,Md Re Measures Established by Ceco to Track Plant Performance & to Gain Understanding of CAs Put Into Place to Improve Safety.Pp 1-105.W/Certificate & Viewgraphs ML20209J3251987-01-30030 January 1987 Transcript of 870130 Commission Discussion/Possible Vote on Full Power OL for Facility.Pp 1-72.Supporting Viewgraphs Encl ML20211B0841986-08-0505 August 1986 Transcript of 860805 Meeting Between Region Iii,Computer Interference Elimination & Util in Redmond,Wa Re Plant as-built Drawing Review.Pp 1-200 ML20096A6261984-08-30030 August 1984 Summary of Rebuttal Testimony & Testimony of ML Somsag, Eb Branch,D Demoss,Mr Frankel,Bf Maurer & Jk Buchanan Re Plant QC Inspector Reinsp Program & C Stokes Allegations Re Welds.Related Correspondence ML20096A6191984-08-30030 August 1984 Rebuttal Testimony of B Erler Re Stokes Allegations Concerning Evaluations of Discrepancies in Calculated Actual Stress Performed by Sargent & Lundy.Related Correspondence ML20096A6391984-08-30030 August 1984 Rebuttal Testimony of RW Hooks Re Validity of Info in Attachment 7 to Stokes Testimony Concerning Design Assumption for Plant.Stokes Info Inapplicable to Plant. Related Correspondence ML20094P7721984-08-17017 August 1984 Summary of Testimony & Direct Testimony of CC Stokes on Reinsp Program.Related Correspondence ML20094R1021984-08-17017 August 1984 Transcript of CC Stokes 840817 Deposition in Chicago,Il. Pp 1-173.Vol Ii.Related Correspondence ML20094P5991984-08-16016 August 1984 Direct Testimony of CC Stokes Re Engineering Evaluations Performed & Use of Engineering Judgement by Sargent & Lundy. Suggests Need for Independent Engineering Analysis of Safety Significance of Reinsp Program.Related Correspondence ML20094P6311984-08-14014 August 1984 Summary of Testimony & Testimony of Ds Kochhar on Contention 1 Re Reinsp Program.Certificate of Svc Encl.Related Correspondence ML20094P6831984-08-13013 August 1984 Summary of Testimony & Testimony of Wh Bleuel on Contention 1 Re Reinsp Program.Resume Encl.Related Correspondence ML20094P6951984-08-13013 August 1984 Summary of Testimony & Testimony of EP Erickson on Contention 1 Re Reinsp program-inspector Qualification & Work Quality.Resume & Certificate of Svc Encl.Related Correspondence ML20093L4881984-07-30030 July 1984 Summary of Testimony & Testimony of Eb Branch Re Contention 1 (Reinsp Program,Work Quality).Related Correspondence ML20093L1811984-07-30030 July 1984 Summary of Testimony & Testimony of KT Kostal on Contention 1 Re Capacity of Sys Control Corp Supplied Components to Carry Design Loads.Related Correspondence ML20093L2721984-07-30030 July 1984 Summary of Testimony & Testimony of Ak Singh on Contention 1 Re Evaluations of Discrepancies in Cable Tray Hanger Connections,Solid Bottom Tray Welds & Ladder Tray Weld Connections.Related Correspondence ML20093L2051984-07-30030 July 1984 Summary of Testimony & Testimony of Ld Johnson on Contention 1 Re Adequacy of Sys Control Corp Supplied Main Control Boards.Related Correspondence ML20090E5521984-07-17017 July 1984 Testimony of Eb Branch Re Job Responsibilities,Educ Background & Work Experience.Related Correspondence ML20090A7981984-07-0909 July 1984 Testimony of Gf Marcus Re Pittsburgh Testing Lab Source Insp of Equipment & Components Supplied by Sys Control Corp ML20090A8121984-07-0909 July 1984 Testimony of Bf Maurer Re Analysis of Structural Adequacy of Main Control Panels Designed & Fabricated by Sys Control Corp ML20092P7921984-07-0202 July 1984 Summary of Testimony & Testimony of ML Somsag Re QA Inspector Reinsp Program for Hunter Corp.Related Correspondence ML20092P7891984-07-0202 July 1984 Summary of Testimony & Testimony of Rv Laney on Contention 1 Re Work Quality.Related Correspondence ML20092P7951984-07-0202 July 1984 Summary of Testimony & Testimony of Ak Singh on Contention 1 Re Reinsp Program,Work Quality.Related Correspondence ML20092P7941984-07-0202 July 1984 Summary of Testimony & Testimony of LO Delgeorge on Contention 1 Re Reinsp Program,Inspector Qualification & Work Quality.Related Correspondence ML20092P5541984-07-0202 July 1984 Summary of Testimony & Testimony of Dl Leone on Contention 1 Re Reinsp Program for Work Quality ML20092P5551984-07-0202 July 1984 Summary of Testimony & Testimony of R French on Contention 1 Re Reinsp Program ML20092P7781984-07-0202 July 1984 Summary of Testimony & Testimony of Wj Shewski on Contention 1 Re Reinsp Program,Inspector Qualification.Related Correspondence ML20092P7811984-07-0202 July 1984 Summary of Testimony & Testimony of Jm Mclaughlin on Contention 1 Re Reinsp Program,Work Quality.Related Correspondence ML20092P7871984-07-0202 July 1984 Summary of Direct Testimony & Testimony of RP Tuetken Re Reinsp Program.Related Correspondence ML20092P7851984-07-0202 July 1984 Summary of Testimony & Testimony of Wb Behnke on Contention 1 Re Overview of Quality Program,Work Quality. Related Correspondence ML20092N4971984-06-29029 June 1984 Testimony of Bg Treece on Issues 5 & 6 Re Cable Overtensioning,As Limited by ASLB 840608 Order.Related Correspondence ML20092N4911984-06-29029 June 1984 Summary of Direct Testimony of Jo Binder on Issues 5 & 6 Re Cable Overtensioning,As Limited by ASLB 840608 Order.Related Correspondence ML20092K7691984-06-26026 June 1984 Summary of Testimony of J Hansel on Contention 1 Re Reinsp Program.Prof Qualifications Encl.Related Correspondence ML20205H8901983-08-10010 August 1983 Public Version of Transcript of 830810 in Camera,Ex Parte Hearing in Rockford,Il.Pp 7,585-7,610 ML20205H8941983-08-10010 August 1983 Public Version of Transcript of 830810 in Camera,Ex Parte Hearing W/Ofc of Investigations in Rockford,Il.Pp 7,611.1- 7,611.71 ML20205H8841983-08-0909 August 1983 Public Version of Transcript of 830809 in Camera,Ex Parte Hearing in Rockford,Il.Pp 7,304-7,405 ML20080B3051983-08-0303 August 1983 Testimony of RP Tuetken Re Util Reinsp Program of Work Performed by Contractor Insp Personnel Prior to NRC Region III Mar,Apr & May 1982 Insps.Appropriate Steps Taken to Remedy Problems ML20080B3091983-08-0303 August 1983 Testimony of Aw Koca Re General Nature of Hatfield Inspector Training & Certification Program.Certification of J Hughes Described ML20080B2951983-08-0303 August 1983 Testimony of Ma Stanish Re Recertification of Qa/Qc Inspectors Subsequent to NRC Region III Mar,Apr & May 1982 Special Team Insps.Reinsp Program Implemented to Review Work Performed by Inspectors Before NRC 1982 Insp ML20023C7151983-05-12012 May 1983 Testimony of P Holmbeck Re Investigation Into Adequacy of Emergency Plans Re Emergency Planning Contentions.Util Made No Attempt to Study Protective Value of Sheltering Populations Around Plant ML20204F5721983-04-26026 April 1983 Transcript of 830426 Hearing in Rockford,Il.Pp 5,964-6,156 ML20069M4791983-04-25025 April 1983 Handwritten Testimony of J Hughes Re Qa/Qc at Facility ML20069K5691983-04-21021 April 1983 Testimony of Ld Butterfield Re Steam Generator Tube Integrity.Proposed Steam Generator Mods Would Minimize Tube Wear Due to Flow Induced Vibration.Related Correspondence ML20069K5631983-04-21021 April 1983 Revised Testimony of Tf Timmons Re Steam Generator Tube Integrity (Flow Induced Vibration Phenomenon).No Significant Tube Wear Will Be Experienced in Steam Generators Due to Flow Induced Vibration.Related Correspondence ML20073J6691983-04-18018 April 1983 Testimony of Jl Murphy on Rockford League of Women Voters & Dekalb Area Alliance for Responsible Energy/Sinnissippi Alliance for Environ Consolidated Emergency Planning Contentions 3 & 13.Related Correspondence ML20073K4461983-04-18018 April 1983 Rebuttal Testimony of Levine Re Rockford League of Women Voters Contentions 8 & 62 & Dekalb Area Alliance for Responsible Energy/Sinnissippi Alliance for Environ Contention 2a on Public Risk.Related Correspondence ML20073G4241983-04-11011 April 1983 Testimony of Ee Jones Re State of Il Emergency Svc & Disaster Agency Responsibilities Concerning Emergency Planning for Nuclear Facilities & Intervenor Amended Emergency Planning Contention ML20073G4051983-04-11011 April 1983 Testimony of Jc Golden Re Amended Emergency Planning Contention ML20073G4121983-04-11011 April 1983 Testimony of Dl Smith Re Resources Available for Transport & Treatment of Contaminated Injured Persons.Resume Encl 1999-03-02
[Table view] Category:DEPOSITIONS
MONTHYEARML20207E0051999-03-0202 March 1999 Transcript of 990302 Public Meeting with Commonwealth Edison in Rockville,Md.Pp 1-104.Supporting Documentation Encl ML20236H9381998-06-30030 June 1998 Transcript of 980630 Meeting W/Commonwealth Edison in Rockville,Md.Pp 1-123.Supporting Documentation Encl ML20198P3001997-11-0404 November 1997 Transcript of 971104 Public Meeting W/Ceco in Rockville,Md Re Measures Established by Ceco to Track Plant Performance & to Gain Understanding of CAs Put Into Place to Improve Safety.Pp 1-105.W/Certificate & Viewgraphs ML20209J3251987-01-30030 January 1987 Transcript of 870130 Commission Discussion/Possible Vote on Full Power OL for Facility.Pp 1-72.Supporting Viewgraphs Encl ML20211B0841986-08-0505 August 1986 Transcript of 860805 Meeting Between Region Iii,Computer Interference Elimination & Util in Redmond,Wa Re Plant as-built Drawing Review.Pp 1-200 ML20096A6261984-08-30030 August 1984 Summary of Rebuttal Testimony & Testimony of ML Somsag, Eb Branch,D Demoss,Mr Frankel,Bf Maurer & Jk Buchanan Re Plant QC Inspector Reinsp Program & C Stokes Allegations Re Welds.Related Correspondence ML20096A6191984-08-30030 August 1984 Rebuttal Testimony of B Erler Re Stokes Allegations Concerning Evaluations of Discrepancies in Calculated Actual Stress Performed by Sargent & Lundy.Related Correspondence ML20096A6391984-08-30030 August 1984 Rebuttal Testimony of RW Hooks Re Validity of Info in Attachment 7 to Stokes Testimony Concerning Design Assumption for Plant.Stokes Info Inapplicable to Plant. Related Correspondence ML20094P7721984-08-17017 August 1984 Summary of Testimony & Direct Testimony of CC Stokes on Reinsp Program.Related Correspondence ML20094R1021984-08-17017 August 1984 Transcript of CC Stokes 840817 Deposition in Chicago,Il. Pp 1-173.Vol Ii.Related Correspondence ML20094P5991984-08-16016 August 1984 Direct Testimony of CC Stokes Re Engineering Evaluations Performed & Use of Engineering Judgement by Sargent & Lundy. Suggests Need for Independent Engineering Analysis of Safety Significance of Reinsp Program.Related Correspondence ML20094P6311984-08-14014 August 1984 Summary of Testimony & Testimony of Ds Kochhar on Contention 1 Re Reinsp Program.Certificate of Svc Encl.Related Correspondence ML20094P6831984-08-13013 August 1984 Summary of Testimony & Testimony of Wh Bleuel on Contention 1 Re Reinsp Program.Resume Encl.Related Correspondence ML20094P6951984-08-13013 August 1984 Summary of Testimony & Testimony of EP Erickson on Contention 1 Re Reinsp program-inspector Qualification & Work Quality.Resume & Certificate of Svc Encl.Related Correspondence ML20093L4881984-07-30030 July 1984 Summary of Testimony & Testimony of Eb Branch Re Contention 1 (Reinsp Program,Work Quality).Related Correspondence ML20093L1811984-07-30030 July 1984 Summary of Testimony & Testimony of KT Kostal on Contention 1 Re Capacity of Sys Control Corp Supplied Components to Carry Design Loads.Related Correspondence ML20093L2721984-07-30030 July 1984 Summary of Testimony & Testimony of Ak Singh on Contention 1 Re Evaluations of Discrepancies in Cable Tray Hanger Connections,Solid Bottom Tray Welds & Ladder Tray Weld Connections.Related Correspondence ML20093L2051984-07-30030 July 1984 Summary of Testimony & Testimony of Ld Johnson on Contention 1 Re Adequacy of Sys Control Corp Supplied Main Control Boards.Related Correspondence ML20090E5521984-07-17017 July 1984 Testimony of Eb Branch Re Job Responsibilities,Educ Background & Work Experience.Related Correspondence ML20090A7981984-07-0909 July 1984 Testimony of Gf Marcus Re Pittsburgh Testing Lab Source Insp of Equipment & Components Supplied by Sys Control Corp ML20090A8121984-07-0909 July 1984 Testimony of Bf Maurer Re Analysis of Structural Adequacy of Main Control Panels Designed & Fabricated by Sys Control Corp ML20092P7921984-07-0202 July 1984 Summary of Testimony & Testimony of ML Somsag Re QA Inspector Reinsp Program for Hunter Corp.Related Correspondence ML20092P7891984-07-0202 July 1984 Summary of Testimony & Testimony of Rv Laney on Contention 1 Re Work Quality.Related Correspondence ML20092P7951984-07-0202 July 1984 Summary of Testimony & Testimony of Ak Singh on Contention 1 Re Reinsp Program,Work Quality.Related Correspondence ML20092P7941984-07-0202 July 1984 Summary of Testimony & Testimony of LO Delgeorge on Contention 1 Re Reinsp Program,Inspector Qualification & Work Quality.Related Correspondence ML20092P5541984-07-0202 July 1984 Summary of Testimony & Testimony of Dl Leone on Contention 1 Re Reinsp Program for Work Quality ML20092P5551984-07-0202 July 1984 Summary of Testimony & Testimony of R French on Contention 1 Re Reinsp Program ML20092P7781984-07-0202 July 1984 Summary of Testimony & Testimony of Wj Shewski on Contention 1 Re Reinsp Program,Inspector Qualification.Related Correspondence ML20092P7811984-07-0202 July 1984 Summary of Testimony & Testimony of Jm Mclaughlin on Contention 1 Re Reinsp Program,Work Quality.Related Correspondence ML20092P7871984-07-0202 July 1984 Summary of Direct Testimony & Testimony of RP Tuetken Re Reinsp Program.Related Correspondence ML20092P7851984-07-0202 July 1984 Summary of Testimony & Testimony of Wb Behnke on Contention 1 Re Overview of Quality Program,Work Quality. Related Correspondence ML20092N4971984-06-29029 June 1984 Testimony of Bg Treece on Issues 5 & 6 Re Cable Overtensioning,As Limited by ASLB 840608 Order.Related Correspondence ML20092N4911984-06-29029 June 1984 Summary of Direct Testimony of Jo Binder on Issues 5 & 6 Re Cable Overtensioning,As Limited by ASLB 840608 Order.Related Correspondence ML20092K7691984-06-26026 June 1984 Summary of Testimony of J Hansel on Contention 1 Re Reinsp Program.Prof Qualifications Encl.Related Correspondence ML20205H8901983-08-10010 August 1983 Public Version of Transcript of 830810 in Camera,Ex Parte Hearing in Rockford,Il.Pp 7,585-7,610 ML20205H8941983-08-10010 August 1983 Public Version of Transcript of 830810 in Camera,Ex Parte Hearing W/Ofc of Investigations in Rockford,Il.Pp 7,611.1- 7,611.71 ML20205H8841983-08-0909 August 1983 Public Version of Transcript of 830809 in Camera,Ex Parte Hearing in Rockford,Il.Pp 7,304-7,405 ML20080B3051983-08-0303 August 1983 Testimony of RP Tuetken Re Util Reinsp Program of Work Performed by Contractor Insp Personnel Prior to NRC Region III Mar,Apr & May 1982 Insps.Appropriate Steps Taken to Remedy Problems ML20080B3091983-08-0303 August 1983 Testimony of Aw Koca Re General Nature of Hatfield Inspector Training & Certification Program.Certification of J Hughes Described ML20080B2951983-08-0303 August 1983 Testimony of Ma Stanish Re Recertification of Qa/Qc Inspectors Subsequent to NRC Region III Mar,Apr & May 1982 Special Team Insps.Reinsp Program Implemented to Review Work Performed by Inspectors Before NRC 1982 Insp ML20023C7151983-05-12012 May 1983 Testimony of P Holmbeck Re Investigation Into Adequacy of Emergency Plans Re Emergency Planning Contentions.Util Made No Attempt to Study Protective Value of Sheltering Populations Around Plant ML20204F5721983-04-26026 April 1983 Transcript of 830426 Hearing in Rockford,Il.Pp 5,964-6,156 ML20069M4791983-04-25025 April 1983 Handwritten Testimony of J Hughes Re Qa/Qc at Facility ML20069K5691983-04-21021 April 1983 Testimony of Ld Butterfield Re Steam Generator Tube Integrity.Proposed Steam Generator Mods Would Minimize Tube Wear Due to Flow Induced Vibration.Related Correspondence ML20069K5631983-04-21021 April 1983 Revised Testimony of Tf Timmons Re Steam Generator Tube Integrity (Flow Induced Vibration Phenomenon).No Significant Tube Wear Will Be Experienced in Steam Generators Due to Flow Induced Vibration.Related Correspondence ML20073J6691983-04-18018 April 1983 Testimony of Jl Murphy on Rockford League of Women Voters & Dekalb Area Alliance for Responsible Energy/Sinnissippi Alliance for Environ Consolidated Emergency Planning Contentions 3 & 13.Related Correspondence ML20073K4461983-04-18018 April 1983 Rebuttal Testimony of Levine Re Rockford League of Women Voters Contentions 8 & 62 & Dekalb Area Alliance for Responsible Energy/Sinnissippi Alliance for Environ Contention 2a on Public Risk.Related Correspondence ML20073G4241983-04-11011 April 1983 Testimony of Ee Jones Re State of Il Emergency Svc & Disaster Agency Responsibilities Concerning Emergency Planning for Nuclear Facilities & Intervenor Amended Emergency Planning Contention ML20073G4051983-04-11011 April 1983 Testimony of Jc Golden Re Amended Emergency Planning Contention ML20073G4121983-04-11011 April 1983 Testimony of Dl Smith Re Resources Available for Transport & Treatment of Contaminated Injured Persons.Resume Encl 1999-03-02
[Table view] Category:NARRATIVE TESTIMONY
MONTHYEARML20207E0051999-03-0202 March 1999 Transcript of 990302 Public Meeting with Commonwealth Edison in Rockville,Md.Pp 1-104.Supporting Documentation Encl ML20236H9381998-06-30030 June 1998 Transcript of 980630 Meeting W/Commonwealth Edison in Rockville,Md.Pp 1-123.Supporting Documentation Encl ML20198P3001997-11-0404 November 1997 Transcript of 971104 Public Meeting W/Ceco in Rockville,Md Re Measures Established by Ceco to Track Plant Performance & to Gain Understanding of CAs Put Into Place to Improve Safety.Pp 1-105.W/Certificate & Viewgraphs ML20209J3251987-01-30030 January 1987 Transcript of 870130 Commission Discussion/Possible Vote on Full Power OL for Facility.Pp 1-72.Supporting Viewgraphs Encl ML20211B0841986-08-0505 August 1986 Transcript of 860805 Meeting Between Region Iii,Computer Interference Elimination & Util in Redmond,Wa Re Plant as-built Drawing Review.Pp 1-200 ML20096A6261984-08-30030 August 1984 Summary of Rebuttal Testimony & Testimony of ML Somsag, Eb Branch,D Demoss,Mr Frankel,Bf Maurer & Jk Buchanan Re Plant QC Inspector Reinsp Program & C Stokes Allegations Re Welds.Related Correspondence ML20096A6191984-08-30030 August 1984 Rebuttal Testimony of B Erler Re Stokes Allegations Concerning Evaluations of Discrepancies in Calculated Actual Stress Performed by Sargent & Lundy.Related Correspondence ML20096A6391984-08-30030 August 1984 Rebuttal Testimony of RW Hooks Re Validity of Info in Attachment 7 to Stokes Testimony Concerning Design Assumption for Plant.Stokes Info Inapplicable to Plant. Related Correspondence ML20094P7721984-08-17017 August 1984 Summary of Testimony & Direct Testimony of CC Stokes on Reinsp Program.Related Correspondence ML20094R1021984-08-17017 August 1984 Transcript of CC Stokes 840817 Deposition in Chicago,Il. Pp 1-173.Vol Ii.Related Correspondence ML20094P5991984-08-16016 August 1984 Direct Testimony of CC Stokes Re Engineering Evaluations Performed & Use of Engineering Judgement by Sargent & Lundy. Suggests Need for Independent Engineering Analysis of Safety Significance of Reinsp Program.Related Correspondence ML20094P6311984-08-14014 August 1984 Summary of Testimony & Testimony of Ds Kochhar on Contention 1 Re Reinsp Program.Certificate of Svc Encl.Related Correspondence ML20094P6831984-08-13013 August 1984 Summary of Testimony & Testimony of Wh Bleuel on Contention 1 Re Reinsp Program.Resume Encl.Related Correspondence ML20094P6951984-08-13013 August 1984 Summary of Testimony & Testimony of EP Erickson on Contention 1 Re Reinsp program-inspector Qualification & Work Quality.Resume & Certificate of Svc Encl.Related Correspondence ML20093L4881984-07-30030 July 1984 Summary of Testimony & Testimony of Eb Branch Re Contention 1 (Reinsp Program,Work Quality).Related Correspondence ML20093L1811984-07-30030 July 1984 Summary of Testimony & Testimony of KT Kostal on Contention 1 Re Capacity of Sys Control Corp Supplied Components to Carry Design Loads.Related Correspondence ML20093L2721984-07-30030 July 1984 Summary of Testimony & Testimony of Ak Singh on Contention 1 Re Evaluations of Discrepancies in Cable Tray Hanger Connections,Solid Bottom Tray Welds & Ladder Tray Weld Connections.Related Correspondence ML20093L2051984-07-30030 July 1984 Summary of Testimony & Testimony of Ld Johnson on Contention 1 Re Adequacy of Sys Control Corp Supplied Main Control Boards.Related Correspondence ML20090E5521984-07-17017 July 1984 Testimony of Eb Branch Re Job Responsibilities,Educ Background & Work Experience.Related Correspondence ML20090A7981984-07-0909 July 1984 Testimony of Gf Marcus Re Pittsburgh Testing Lab Source Insp of Equipment & Components Supplied by Sys Control Corp ML20090A8121984-07-0909 July 1984 Testimony of Bf Maurer Re Analysis of Structural Adequacy of Main Control Panels Designed & Fabricated by Sys Control Corp ML20092P7921984-07-0202 July 1984 Summary of Testimony & Testimony of ML Somsag Re QA Inspector Reinsp Program for Hunter Corp.Related Correspondence ML20092P7891984-07-0202 July 1984 Summary of Testimony & Testimony of Rv Laney on Contention 1 Re Work Quality.Related Correspondence ML20092P7951984-07-0202 July 1984 Summary of Testimony & Testimony of Ak Singh on Contention 1 Re Reinsp Program,Work Quality.Related Correspondence ML20092P7941984-07-0202 July 1984 Summary of Testimony & Testimony of LO Delgeorge on Contention 1 Re Reinsp Program,Inspector Qualification & Work Quality.Related Correspondence ML20092P5541984-07-0202 July 1984 Summary of Testimony & Testimony of Dl Leone on Contention 1 Re Reinsp Program for Work Quality ML20092P5551984-07-0202 July 1984 Summary of Testimony & Testimony of R French on Contention 1 Re Reinsp Program ML20092P7781984-07-0202 July 1984 Summary of Testimony & Testimony of Wj Shewski on Contention 1 Re Reinsp Program,Inspector Qualification.Related Correspondence ML20092P7811984-07-0202 July 1984 Summary of Testimony & Testimony of Jm Mclaughlin on Contention 1 Re Reinsp Program,Work Quality.Related Correspondence ML20092P7871984-07-0202 July 1984 Summary of Direct Testimony & Testimony of RP Tuetken Re Reinsp Program.Related Correspondence ML20092P7851984-07-0202 July 1984 Summary of Testimony & Testimony of Wb Behnke on Contention 1 Re Overview of Quality Program,Work Quality. Related Correspondence ML20092N4971984-06-29029 June 1984 Testimony of Bg Treece on Issues 5 & 6 Re Cable Overtensioning,As Limited by ASLB 840608 Order.Related Correspondence ML20092N4911984-06-29029 June 1984 Summary of Direct Testimony of Jo Binder on Issues 5 & 6 Re Cable Overtensioning,As Limited by ASLB 840608 Order.Related Correspondence ML20092K7691984-06-26026 June 1984 Summary of Testimony of J Hansel on Contention 1 Re Reinsp Program.Prof Qualifications Encl.Related Correspondence ML20205H8901983-08-10010 August 1983 Public Version of Transcript of 830810 in Camera,Ex Parte Hearing in Rockford,Il.Pp 7,585-7,610 ML20205H8941983-08-10010 August 1983 Public Version of Transcript of 830810 in Camera,Ex Parte Hearing W/Ofc of Investigations in Rockford,Il.Pp 7,611.1- 7,611.71 ML20205H8841983-08-0909 August 1983 Public Version of Transcript of 830809 in Camera,Ex Parte Hearing in Rockford,Il.Pp 7,304-7,405 ML20080B3051983-08-0303 August 1983 Testimony of RP Tuetken Re Util Reinsp Program of Work Performed by Contractor Insp Personnel Prior to NRC Region III Mar,Apr & May 1982 Insps.Appropriate Steps Taken to Remedy Problems ML20080B3091983-08-0303 August 1983 Testimony of Aw Koca Re General Nature of Hatfield Inspector Training & Certification Program.Certification of J Hughes Described ML20080B2951983-08-0303 August 1983 Testimony of Ma Stanish Re Recertification of Qa/Qc Inspectors Subsequent to NRC Region III Mar,Apr & May 1982 Special Team Insps.Reinsp Program Implemented to Review Work Performed by Inspectors Before NRC 1982 Insp ML20023C7151983-05-12012 May 1983 Testimony of P Holmbeck Re Investigation Into Adequacy of Emergency Plans Re Emergency Planning Contentions.Util Made No Attempt to Study Protective Value of Sheltering Populations Around Plant ML20204F5721983-04-26026 April 1983 Transcript of 830426 Hearing in Rockford,Il.Pp 5,964-6,156 ML20069M4791983-04-25025 April 1983 Handwritten Testimony of J Hughes Re Qa/Qc at Facility ML20069K5691983-04-21021 April 1983 Testimony of Ld Butterfield Re Steam Generator Tube Integrity.Proposed Steam Generator Mods Would Minimize Tube Wear Due to Flow Induced Vibration.Related Correspondence ML20069K5631983-04-21021 April 1983 Revised Testimony of Tf Timmons Re Steam Generator Tube Integrity (Flow Induced Vibration Phenomenon).No Significant Tube Wear Will Be Experienced in Steam Generators Due to Flow Induced Vibration.Related Correspondence ML20073J6691983-04-18018 April 1983 Testimony of Jl Murphy on Rockford League of Women Voters & Dekalb Area Alliance for Responsible Energy/Sinnissippi Alliance for Environ Consolidated Emergency Planning Contentions 3 & 13.Related Correspondence ML20073K4461983-04-18018 April 1983 Rebuttal Testimony of Levine Re Rockford League of Women Voters Contentions 8 & 62 & Dekalb Area Alliance for Responsible Energy/Sinnissippi Alliance for Environ Contention 2a on Public Risk.Related Correspondence ML20073G4241983-04-11011 April 1983 Testimony of Ee Jones Re State of Il Emergency Svc & Disaster Agency Responsibilities Concerning Emergency Planning for Nuclear Facilities & Intervenor Amended Emergency Planning Contention ML20073G4051983-04-11011 April 1983 Testimony of Jc Golden Re Amended Emergency Planning Contention ML20073G4121983-04-11011 April 1983 Testimony of Dl Smith Re Resources Available for Transport & Treatment of Contaminated Injured Persons.Resume Encl 1999-03-02
[Table view] |
Text
.
~
. v.
p:
nFUTS W G ,
/ 4 ,e% %s I'sy
-:. y APg n . k,
.9- UNITED STATES OF AMERICA f 0N
\q #if l{UCLEAh'iREGULATORY-
- !)y% .
[>! COMMISSION
, , _ , , y DEFORE THE. ATOMIC SAFETY AND LICENSING BOARD In the Matter of )
)
COMMONWEALTH EDISON COMPANY -) Docket No. 50-454-OLA
) 50-455-OLA (Byron Station, Units 1 and 2) )
4 TESTIMONY OF LAWRENCE D. BUTTERFIELD CONCERNING STEAM GENERATOR TUBE INTEGRITY (COMMONWEALTH EDISON'S POSITION WITH RESPECT TO THE FLOW-INDUCED VIBRATION PHENOMENON)
Submitted on behalf of the Applicant, Commonwealth Edison Company, in Response to DAARE/ SAFE Contention 9c and League Contention 22 l April 21, 1983 y:
i M a.
g.$
, 8$
O Os
, 38 43Q
< f o a:
b-i
UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of )
)
COMMONWEALTH EDISON COMPANY ) Docket Nos. 50-454-OLA
) 50-455-OLA (Byron Station, Units 1 and 2) )
SUMMARY
The testimony of Lawrence D. Butterfield, Jr.
addresses the position of Commonwealth Edison with respect to Westinghouse Electric Corporation's proposed modifications to the Byron steam generators. The proposed modifications would minimize tube wear due to flow-induced vibration.
Mr. Butterfield is Chairman of the Steering Committee for the Counterflow Steam Generator Owners' Review Group.- This 'roupg is reviewing and evaluating the modifica-tions proposed by Westinghouse for the D4 and D5 steam generators. Mr. Butterfield describes the nature of the modifications to be incorporated into the Byron steam generators, indicates the schedule for implementation of the modifications and offers his opinion concerning their efficacy. On this latter point, Mr. Butterfield states that
- the steam generator tubes, if modified as proposed by Westhinghouse, will not experience significant tube wear due to the flow-induced vibration phenomenon.
l l
l l
l l
k
,e- -g ,w.y- ,, , , , - , , , - - - , . ~ , e e. rw.,-, ,- y -
4
, .:- 4/21/83 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD y In the Matt'er of )
) _ _.
COMMONWEALTH EDISON COMPANY ) Docket Nos. 50-454-OLA
) 50-455-OLA (Byron Station, Units 1 and 2) )
TESTIMONY OF LAWRENCE D. BUTTERFIELD' CONCERNING STEAM GENERATOR TUBE INTEGRITY (COMMONWEALTH EDISON'S' POSITION WITH RESPECT TO THE FLOW-INDUCED VIBRATION PHENOMENON)'
O.l. State your name, a'ddress and present occupation.
A.l. Btr name is Lawrence D. Butterfield, Jr. . My business
!' address'is P.O. Box 767, Chicago, Illinois 60690.- I am employed by Commonwealth Edison Company as a
, Section Engineer in the Station Nuclear Engineering Department.
. Q.2. State your educational background and professional I- work experience.
A.2. I graduated from the University of Florida in 1960, i
with.a Bachelors Degree in Electrical Engineering. --
Upon graduation, I worked for the Nuclear Engineer-
. ing Department of the University of Florida, where I
[, -eventually became the supervisor of the University l of Florida Training Reactor and held an NRC Senior Reactor Operator's license. During my six years of.
I l
e
W employment with the University of Florida, I received a Master of Science. Degree in Nuclear
' Engineering. Since coming to Illinois, I have become a registered Professional Engineer.
,- In'1966, I joined Commonwealth Edison as a member:of l
the Technical Staff at Dresden Station. Since that I time, I have had assignments at Dresden during.the
^
startup of Units 2 and 3 and as the Administrative
, Assistant to the Superintendent. Other company assignments have included positions in the Nuclear Fuel Services' Department where fuel management and plant transient analyses are reviewed or performed, !
two and a half years'in the Nuclear Licensing 4
Department, and two years as the Zion Project
!~
Engineer in the Station Nuclear Engineering I Department.
t While I was the Zion Project Engineer, I was heavily involved in the review of the repair of a Zion l Station Steam Generator which was damaged on the primary side due to a loose part. I was involved in i
reviewing the techniques used to repair the steam l
l generator, evaluating the adequacy of the repair, l
[ and developing the presentation to the NRC to justify the return of the unit to power.
I 1 I
i e
,- - - -- . - - . , . . - . - - - - - - . . - . . - _ . . . - - . . , - - , _ . - . . - , - - . , . - - - .--,-.,--,----....----------.-,-,i
F My present position is to direct the activities of a group of engineers responsible-for improving the productivity of the operating nuclear units and to address specific problems for which there is expertise in the group.
A Counterflow Steam Generator Owners' Review Group has been formed by several utilities with D4/D5 steam generators to provide a broad based technical review of the proposed modifications to the preheater section of the steam generators to resolve the flow-induced vibration problem. Technical consultants are joining with members of the utilities to form the Technical Review Committee.
.I, as Chairman of the Steering Committee, monitor the progress of the Technical Review Committee and report to other members of the Steering Committee.
I have attended and. participated in al'1 meetings of the Technical Review Committee. It is also my responsibility, as Commonwealth Edison's Represen-f tative, to report to the Company's management my evaluation and assessment of the technical adequacy of the modifications proposed by Westinghouse.
f-I Q.3. Has Westinghouse recommended a modification to the l Byron Plant for the purpose of minimizing tube wear l
I
W in the preheater section of the steam generators due
, to flow-induced vibration?
A . 3 ~. Yes.- Westinghouse has recommended that Commonwealth Edison expand' selected tubes in the preheater region and operate _the units with about 10 percent of the feedwater flow entering the steam generator through the auxiliary feedwater nozzle. Approximately 100 tubes will be expanded at several of the tube support baffl'es in the preheater section. The 10 percent bypassf' low to the auxiliary feedwater nozzle will be accomplished by fully opening the presently' existing feedwater preheater bypass valve during power operation.
, 0.4. What.is the basis.for your judgment that the 10 percent bypass flow can be accomplished by " fully opening" the feedwater preheater bypass valve?
l A.4. The feedwater piping system has been analyzed by i
l both Westinghouse and our Architect - Engineer and both setslof calculations agree that 10 percent bypass flow can be achieved by fully opening the feedwater preheater' bypass valve. The feedwater l flows will be monitored early in plant operation to f
assure that the design requirements are met.
I l
l
0.5. Has a schedule been established for installing the modifications to the preheater sections of the Byron steam generators.
A.5. Yes.
Q.6. What is that schedule?
A 6. The tube expansion process is scheduled to start in mid-July prior to startup of the Byron Station.
Changes to the control circuitry of the feedwater preheater bypass valve and the installation of a feedwater bypass line flowmeter will also occur concurrent with the tube expansion program.
Q. 7. . Do you have an opinion as to whether the Westinghouse proposed modifications will minimize successfully tube wear due to flow-induced vibration?
A.7. Yes.
Q.8. What is that opinion?
l A.8. Based on Westinghouse-calculations and experimental I
data presented to Commonwealth Edison and the Counterflow Steam Generator Owners' Review GrEup, I believe that the Westinghouse recommended modifica-tions will reduce flow-induced vibration in the
__-~
preheater sections of the Byron steam generators to a point where tube wear will not be significant.
%