MONTHYEARML20207E0051999-03-0202 March 1999 Transcript of 990302 Public Meeting with Commonwealth Edison in Rockville,Md.Pp 1-104.Supporting Documentation Encl ML20236H9381998-06-30030 June 1998 Transcript of 980630 Meeting W/Commonwealth Edison in Rockville,Md.Pp 1-123.Supporting Documentation Encl ML20198P3001997-11-0404 November 1997 Transcript of 971104 Public Meeting W/Ceco in Rockville,Md Re Measures Established by Ceco to Track Plant Performance & to Gain Understanding of CAs Put Into Place to Improve Safety.Pp 1-105.W/Certificate & Viewgraphs ML20149M2951996-11-29029 November 1996 Exemption from Requirements of 10CFR50.60 Re Safety Margins Recommended in ASME Boiler & Pressure Vessel Code Case N-514 TXX-9522, Comment Opposing Proposed GL on Testing of safety-related Logic Circuits.Believes That Complete Technical Review of All Surveillance Procedures Would Be Expensive & Unnecessary Expenditure of Licensee Resources1995-08-26026 August 1995 Comment Opposing Proposed GL on Testing of safety-related Logic Circuits.Believes That Complete Technical Review of All Surveillance Procedures Would Be Expensive & Unnecessary Expenditure of Licensee Resources ML20059C2351993-12-17017 December 1993 Comment Supporting Petition for Rulemaking PRM-21-2 Re Commercial Grade Item Dedication ML20044A8111990-06-27027 June 1990 Comment Opposing Closure of Lpdr of Rockford Public Library ML20245J0191989-04-14014 April 1989 Comment Re Proposed Rule 10CFR50 Re Ensuring Effectiveness of Maint Programs for Nuclear Power Plants ML20214X1871987-06-11011 June 1987 Order Imposing Civil Monetary Penalty in Amount of $25,000 Based on Four Severity Level III Violations Noted During 860721-0808 Insp ML20205Q1711987-04-0202 April 1987 Order Imposing Civil Monetary Penalty in Amount of $25,000. App Re Evaluations & Conclusions Encl IR 05000812/20100311987-02-26026 February 1987 Order Imposing Civil Monetary Penalty in Amount of $100,000 Based on Violations Noted During Insps on 850812-1031 ML20210T7321987-02-11011 February 1987 Unexecuted Amend 6 to Indemnity Agreement B-97 Substituting Item 3 of Attachment to Indemnity Agreement in Entirety W/ Listed License Numbers,Effective 870130 ML20209J3251987-01-30030 January 1987 Transcript of 870130 Commission Discussion/Possible Vote on Full Power OL for Facility.Pp 1-72.Supporting Viewgraphs Encl ML20213G4381986-10-24024 October 1986 Unexecuted Amend 5 to Indemnity Agreement B-97,substituting Item 3 of Attachment to Agreement in Entirety W/Listed License Numbers,Effective on 861106 ML20211B0841986-08-0505 August 1986 Transcript of 860805 Meeting Between Region Iii,Computer Interference Elimination & Util in Redmond,Wa Re Plant as-built Drawing Review.Pp 1-200 IR 05000506/20070221986-05-0202 May 1986 Order Imposing Civil Monetary Penalty in Amount of $25,000 for Violations Noted During Insp on 850506-0722.Violations Noted:Failure to Establish Radiological Safety Procedures & to Adequately Train Personnel ML20138C7301985-12-0909 December 1985 Order Imposing Civil Penalty in Amount of $25,000 Per 850606 Notice of Violation & Proposed Imposition of Civil Penalty.Licensee May Request Hearing within 30 Days of Date of Order ML20205E8741985-10-28028 October 1985 Exemption from GDC 4 of 10CFR50,App a Requirement to Install Protective Devices Associated W/Postulated Pipe Breaks Primary Coolant Sys.Topical Rept Evaluation Encl ML20102A2981985-01-0707 January 1985 Petition Requesting Aslab Grant Intervenor Appeal & Order Further Hearings on Safety of Plant ML20099L2581984-11-27027 November 1984 Notice of Withdrawal of Appearance in Proceeding.Certificate of Svc Encl ML20099G5381984-11-23023 November 1984 Supplemental Appeal Brief in Response to Intervenor 841106 Supplemental Brief on Appeal & in Support of ASLB 841016 Supplemental Initial Decision Authorizing Issuance of Ol. Certificate of Svc Encl ML20100K0411984-11-22022 November 1984 Submits Concerns Re Safety of Local Residents in Event of Accident & Excessively High Cost of Projected Operation of Facility ML20107H7841984-11-0606 November 1984 Supplemental Brief on Appeal of ASLB 841016 Supplemental Initial Decision Granting Authority for Issuance of Ol. Decision Should Be Reversed.Certificate of Svc Encl ML20140E4081984-10-31031 October 1984 Executed Amend 1 to Indemnity Agreement B-97,deleting Items 2A & 3 in Entirety ML20098G8841984-10-0202 October 1984 Joint Statement of RW Manz & W Faires Re Findings 3-11 Through 3-17 of NRC 830930 Integrated Design Insp Rept. Certificate of Svc Encl ML20098G8681984-10-0202 October 1984 Answer to Intervenor Motion to Reopen Record Re Bechtel Independent Design Review.Motion Should Be Denied ML20098G8901984-10-0202 October 1984 Joint Statement of Kj Green & RW Hooks Re Integrated Design Insp ML20098G8911984-10-0202 October 1984 Joint Statement of Cw Dick & EM Hughes Re Independent Design Insp ML20098G8821984-10-0101 October 1984 Affidavit of Kj Green Re Integrated Design Insp Concerning Mechanical Engineering Work ML20098G8741984-10-0101 October 1984 Affidavit of Br Shelton Re Integrated Design Insp ML20098G8881984-09-29029 September 1984 Affidavit of RW Hooks Re Integrated Design Insp Concerning Structural Design ML20098G8831984-09-28028 September 1984 Affidavit of W Faires Re Findings 3-15 & 3-16 of NRC 830930 Integrated Design Insp Rept ML20098G8811984-09-28028 September 1984 Affidavit of Cw Dick Re Independent Design Review ML20098G8791984-09-28028 September 1984 Affidavit of RP Tuetken Re Readiness for Fuel Loading ML20098G8781984-09-28028 September 1984 Affidavit of RW Manz Concerning Findings 3-11 Through 3-14 & 3-17 of NRC 830930 Integrated Design Insp Re Westinghouse ML20098G8871984-09-28028 September 1984 Affidavit of EM Hughes Re Idvp ML20098G8851984-09-27027 September 1984 Affidavit of Rl Heumann Re Costs of Delay in Startup & Operation of Unit 1 ML20098E2371984-09-24024 September 1984 Reply to Intervenor 840918 Proposed Supplemental Initial Decision.Certificate of Svc Encl ML20097E7221984-09-13013 September 1984 Agreed Motion for Time Extension Until 841101 to File Petition for Hearing Re Emergency Planning Commitment W ML20097C5311984-09-12012 September 1984 Motion to Reopen Record to Include Plant Design as Issue. Supporting Documentation & Certificate of Svc Encl ML20097B7791984-09-10010 September 1984 Proposed Supplemental Initial Decision Re Reinsp Program. Certificate of Svc Encl ML20096A6391984-08-30030 August 1984 Rebuttal Testimony of RW Hooks Re Validity of Info in Attachment 7 to Stokes Testimony Concerning Design Assumption for Plant.Stokes Info Inapplicable to Plant. Related Correspondence ML20096A6191984-08-30030 August 1984 Rebuttal Testimony of B Erler Re Stokes Allegations Concerning Evaluations of Discrepancies in Calculated Actual Stress Performed by Sargent & Lundy.Related Correspondence ML20096A6261984-08-30030 August 1984 Summary of Rebuttal Testimony & Testimony of ML Somsag, Eb Branch,D Demoss,Mr Frankel,Bf Maurer & Jk Buchanan Re Plant QC Inspector Reinsp Program & C Stokes Allegations Re Welds.Related Correspondence ML20096A6441984-08-28028 August 1984 Notice of Withdrawal of Appearance in Proceeding.Related Correspondence ML20112D5271984-08-24024 August 1984 Applicant Exhibit A-R-4,consisting of Feb 1984 Rept on Bryon QC Inspector Reinsp Program ML20112D5031984-08-24024 August 1984 Applicant Exhibit A-R-5,consisting of June 1984 Suppl to Rept on Bryon QC Inspector Reinsp Program ML20112D7441984-08-23023 August 1984 Intervenor Exhibit I-R-1,consisting of Undated List of Teutken Safety Category Insp Types ML20112D7511984-08-21021 August 1984 Staff Exhibit S-R-1,consisting of 840813 Instruction for Walkdown of Cable Tray Hanger Connection Welds ML20112D4641984-08-21021 August 1984 Intervenor Exhibit I-R-11,consisting of Undated Chronological Date Listing of Util Responses to Interrogatory 12.VA Judson to Mi Miller Re Interrogatory 12 & Supplemental Responses Encl 1999-03-02
[Table view] Category:TRANSCRIPTS
MONTHYEARML20207E0051999-03-0202 March 1999 Transcript of 990302 Public Meeting with Commonwealth Edison in Rockville,Md.Pp 1-104.Supporting Documentation Encl ML20236H9381998-06-30030 June 1998 Transcript of 980630 Meeting W/Commonwealth Edison in Rockville,Md.Pp 1-123.Supporting Documentation Encl ML20198P3001997-11-0404 November 1997 Transcript of 971104 Public Meeting W/Ceco in Rockville,Md Re Measures Established by Ceco to Track Plant Performance & to Gain Understanding of CAs Put Into Place to Improve Safety.Pp 1-105.W/Certificate & Viewgraphs ML20209J3251987-01-30030 January 1987 Transcript of 870130 Commission Discussion/Possible Vote on Full Power OL for Facility.Pp 1-72.Supporting Viewgraphs Encl ML20211B0841986-08-0505 August 1986 Transcript of 860805 Meeting Between Region Iii,Computer Interference Elimination & Util in Redmond,Wa Re Plant as-built Drawing Review.Pp 1-200 ML20096A6261984-08-30030 August 1984 Summary of Rebuttal Testimony & Testimony of ML Somsag, Eb Branch,D Demoss,Mr Frankel,Bf Maurer & Jk Buchanan Re Plant QC Inspector Reinsp Program & C Stokes Allegations Re Welds.Related Correspondence ML20096A6191984-08-30030 August 1984 Rebuttal Testimony of B Erler Re Stokes Allegations Concerning Evaluations of Discrepancies in Calculated Actual Stress Performed by Sargent & Lundy.Related Correspondence ML20096A6391984-08-30030 August 1984 Rebuttal Testimony of RW Hooks Re Validity of Info in Attachment 7 to Stokes Testimony Concerning Design Assumption for Plant.Stokes Info Inapplicable to Plant. Related Correspondence ML20094P7721984-08-17017 August 1984 Summary of Testimony & Direct Testimony of CC Stokes on Reinsp Program.Related Correspondence ML20094R1021984-08-17017 August 1984 Transcript of CC Stokes 840817 Deposition in Chicago,Il. Pp 1-173.Vol Ii.Related Correspondence ML20094P5991984-08-16016 August 1984 Direct Testimony of CC Stokes Re Engineering Evaluations Performed & Use of Engineering Judgement by Sargent & Lundy. Suggests Need for Independent Engineering Analysis of Safety Significance of Reinsp Program.Related Correspondence ML20094P6311984-08-14014 August 1984 Summary of Testimony & Testimony of Ds Kochhar on Contention 1 Re Reinsp Program.Certificate of Svc Encl.Related Correspondence ML20094P6831984-08-13013 August 1984 Summary of Testimony & Testimony of Wh Bleuel on Contention 1 Re Reinsp Program.Resume Encl.Related Correspondence ML20094P6951984-08-13013 August 1984 Summary of Testimony & Testimony of EP Erickson on Contention 1 Re Reinsp program-inspector Qualification & Work Quality.Resume & Certificate of Svc Encl.Related Correspondence ML20093L4881984-07-30030 July 1984 Summary of Testimony & Testimony of Eb Branch Re Contention 1 (Reinsp Program,Work Quality).Related Correspondence ML20093L1811984-07-30030 July 1984 Summary of Testimony & Testimony of KT Kostal on Contention 1 Re Capacity of Sys Control Corp Supplied Components to Carry Design Loads.Related Correspondence ML20093L2721984-07-30030 July 1984 Summary of Testimony & Testimony of Ak Singh on Contention 1 Re Evaluations of Discrepancies in Cable Tray Hanger Connections,Solid Bottom Tray Welds & Ladder Tray Weld Connections.Related Correspondence ML20093L2051984-07-30030 July 1984 Summary of Testimony & Testimony of Ld Johnson on Contention 1 Re Adequacy of Sys Control Corp Supplied Main Control Boards.Related Correspondence ML20090E5521984-07-17017 July 1984 Testimony of Eb Branch Re Job Responsibilities,Educ Background & Work Experience.Related Correspondence ML20090A7981984-07-0909 July 1984 Testimony of Gf Marcus Re Pittsburgh Testing Lab Source Insp of Equipment & Components Supplied by Sys Control Corp ML20090A8121984-07-0909 July 1984 Testimony of Bf Maurer Re Analysis of Structural Adequacy of Main Control Panels Designed & Fabricated by Sys Control Corp ML20092P7921984-07-0202 July 1984 Summary of Testimony & Testimony of ML Somsag Re QA Inspector Reinsp Program for Hunter Corp.Related Correspondence ML20092P7891984-07-0202 July 1984 Summary of Testimony & Testimony of Rv Laney on Contention 1 Re Work Quality.Related Correspondence ML20092P7951984-07-0202 July 1984 Summary of Testimony & Testimony of Ak Singh on Contention 1 Re Reinsp Program,Work Quality.Related Correspondence ML20092P7941984-07-0202 July 1984 Summary of Testimony & Testimony of LO Delgeorge on Contention 1 Re Reinsp Program,Inspector Qualification & Work Quality.Related Correspondence ML20092P5541984-07-0202 July 1984 Summary of Testimony & Testimony of Dl Leone on Contention 1 Re Reinsp Program for Work Quality ML20092P5551984-07-0202 July 1984 Summary of Testimony & Testimony of R French on Contention 1 Re Reinsp Program ML20092P7781984-07-0202 July 1984 Summary of Testimony & Testimony of Wj Shewski on Contention 1 Re Reinsp Program,Inspector Qualification.Related Correspondence ML20092P7811984-07-0202 July 1984 Summary of Testimony & Testimony of Jm Mclaughlin on Contention 1 Re Reinsp Program,Work Quality.Related Correspondence ML20092P7871984-07-0202 July 1984 Summary of Direct Testimony & Testimony of RP Tuetken Re Reinsp Program.Related Correspondence ML20092P7851984-07-0202 July 1984 Summary of Testimony & Testimony of Wb Behnke on Contention 1 Re Overview of Quality Program,Work Quality. Related Correspondence ML20092N4971984-06-29029 June 1984 Testimony of Bg Treece on Issues 5 & 6 Re Cable Overtensioning,As Limited by ASLB 840608 Order.Related Correspondence ML20092N4911984-06-29029 June 1984 Summary of Direct Testimony of Jo Binder on Issues 5 & 6 Re Cable Overtensioning,As Limited by ASLB 840608 Order.Related Correspondence ML20092K7691984-06-26026 June 1984 Summary of Testimony of J Hansel on Contention 1 Re Reinsp Program.Prof Qualifications Encl.Related Correspondence ML20205H8901983-08-10010 August 1983 Public Version of Transcript of 830810 in Camera,Ex Parte Hearing in Rockford,Il.Pp 7,585-7,610 ML20205H8941983-08-10010 August 1983 Public Version of Transcript of 830810 in Camera,Ex Parte Hearing W/Ofc of Investigations in Rockford,Il.Pp 7,611.1- 7,611.71 ML20205H8841983-08-0909 August 1983 Public Version of Transcript of 830809 in Camera,Ex Parte Hearing in Rockford,Il.Pp 7,304-7,405 ML20080B3051983-08-0303 August 1983 Testimony of RP Tuetken Re Util Reinsp Program of Work Performed by Contractor Insp Personnel Prior to NRC Region III Mar,Apr & May 1982 Insps.Appropriate Steps Taken to Remedy Problems ML20080B3091983-08-0303 August 1983 Testimony of Aw Koca Re General Nature of Hatfield Inspector Training & Certification Program.Certification of J Hughes Described ML20080B2951983-08-0303 August 1983 Testimony of Ma Stanish Re Recertification of Qa/Qc Inspectors Subsequent to NRC Region III Mar,Apr & May 1982 Special Team Insps.Reinsp Program Implemented to Review Work Performed by Inspectors Before NRC 1982 Insp ML20023C7151983-05-12012 May 1983 Testimony of P Holmbeck Re Investigation Into Adequacy of Emergency Plans Re Emergency Planning Contentions.Util Made No Attempt to Study Protective Value of Sheltering Populations Around Plant ML20204F5721983-04-26026 April 1983 Transcript of 830426 Hearing in Rockford,Il.Pp 5,964-6,156 ML20069M4791983-04-25025 April 1983 Handwritten Testimony of J Hughes Re Qa/Qc at Facility ML20069K5691983-04-21021 April 1983 Testimony of Ld Butterfield Re Steam Generator Tube Integrity.Proposed Steam Generator Mods Would Minimize Tube Wear Due to Flow Induced Vibration.Related Correspondence ML20069K5631983-04-21021 April 1983 Revised Testimony of Tf Timmons Re Steam Generator Tube Integrity (Flow Induced Vibration Phenomenon).No Significant Tube Wear Will Be Experienced in Steam Generators Due to Flow Induced Vibration.Related Correspondence ML20073J6691983-04-18018 April 1983 Testimony of Jl Murphy on Rockford League of Women Voters & Dekalb Area Alliance for Responsible Energy/Sinnissippi Alliance for Environ Consolidated Emergency Planning Contentions 3 & 13.Related Correspondence ML20073K4461983-04-18018 April 1983 Rebuttal Testimony of Levine Re Rockford League of Women Voters Contentions 8 & 62 & Dekalb Area Alliance for Responsible Energy/Sinnissippi Alliance for Environ Contention 2a on Public Risk.Related Correspondence ML20073G4241983-04-11011 April 1983 Testimony of Ee Jones Re State of Il Emergency Svc & Disaster Agency Responsibilities Concerning Emergency Planning for Nuclear Facilities & Intervenor Amended Emergency Planning Contention ML20073G4051983-04-11011 April 1983 Testimony of Jc Golden Re Amended Emergency Planning Contention ML20073G4121983-04-11011 April 1983 Testimony of Dl Smith Re Resources Available for Transport & Treatment of Contaminated Injured Persons.Resume Encl 1999-03-02
[Table view] Category:DEPOSITIONS
MONTHYEARML20207E0051999-03-0202 March 1999 Transcript of 990302 Public Meeting with Commonwealth Edison in Rockville,Md.Pp 1-104.Supporting Documentation Encl ML20236H9381998-06-30030 June 1998 Transcript of 980630 Meeting W/Commonwealth Edison in Rockville,Md.Pp 1-123.Supporting Documentation Encl ML20198P3001997-11-0404 November 1997 Transcript of 971104 Public Meeting W/Ceco in Rockville,Md Re Measures Established by Ceco to Track Plant Performance & to Gain Understanding of CAs Put Into Place to Improve Safety.Pp 1-105.W/Certificate & Viewgraphs ML20209J3251987-01-30030 January 1987 Transcript of 870130 Commission Discussion/Possible Vote on Full Power OL for Facility.Pp 1-72.Supporting Viewgraphs Encl ML20211B0841986-08-0505 August 1986 Transcript of 860805 Meeting Between Region Iii,Computer Interference Elimination & Util in Redmond,Wa Re Plant as-built Drawing Review.Pp 1-200 ML20096A6261984-08-30030 August 1984 Summary of Rebuttal Testimony & Testimony of ML Somsag, Eb Branch,D Demoss,Mr Frankel,Bf Maurer & Jk Buchanan Re Plant QC Inspector Reinsp Program & C Stokes Allegations Re Welds.Related Correspondence ML20096A6191984-08-30030 August 1984 Rebuttal Testimony of B Erler Re Stokes Allegations Concerning Evaluations of Discrepancies in Calculated Actual Stress Performed by Sargent & Lundy.Related Correspondence ML20096A6391984-08-30030 August 1984 Rebuttal Testimony of RW Hooks Re Validity of Info in Attachment 7 to Stokes Testimony Concerning Design Assumption for Plant.Stokes Info Inapplicable to Plant. Related Correspondence ML20094P7721984-08-17017 August 1984 Summary of Testimony & Direct Testimony of CC Stokes on Reinsp Program.Related Correspondence ML20094R1021984-08-17017 August 1984 Transcript of CC Stokes 840817 Deposition in Chicago,Il. Pp 1-173.Vol Ii.Related Correspondence ML20094P5991984-08-16016 August 1984 Direct Testimony of CC Stokes Re Engineering Evaluations Performed & Use of Engineering Judgement by Sargent & Lundy. Suggests Need for Independent Engineering Analysis of Safety Significance of Reinsp Program.Related Correspondence ML20094P6311984-08-14014 August 1984 Summary of Testimony & Testimony of Ds Kochhar on Contention 1 Re Reinsp Program.Certificate of Svc Encl.Related Correspondence ML20094P6831984-08-13013 August 1984 Summary of Testimony & Testimony of Wh Bleuel on Contention 1 Re Reinsp Program.Resume Encl.Related Correspondence ML20094P6951984-08-13013 August 1984 Summary of Testimony & Testimony of EP Erickson on Contention 1 Re Reinsp program-inspector Qualification & Work Quality.Resume & Certificate of Svc Encl.Related Correspondence ML20093L4881984-07-30030 July 1984 Summary of Testimony & Testimony of Eb Branch Re Contention 1 (Reinsp Program,Work Quality).Related Correspondence ML20093L1811984-07-30030 July 1984 Summary of Testimony & Testimony of KT Kostal on Contention 1 Re Capacity of Sys Control Corp Supplied Components to Carry Design Loads.Related Correspondence ML20093L2721984-07-30030 July 1984 Summary of Testimony & Testimony of Ak Singh on Contention 1 Re Evaluations of Discrepancies in Cable Tray Hanger Connections,Solid Bottom Tray Welds & Ladder Tray Weld Connections.Related Correspondence ML20093L2051984-07-30030 July 1984 Summary of Testimony & Testimony of Ld Johnson on Contention 1 Re Adequacy of Sys Control Corp Supplied Main Control Boards.Related Correspondence ML20090E5521984-07-17017 July 1984 Testimony of Eb Branch Re Job Responsibilities,Educ Background & Work Experience.Related Correspondence ML20090A7981984-07-0909 July 1984 Testimony of Gf Marcus Re Pittsburgh Testing Lab Source Insp of Equipment & Components Supplied by Sys Control Corp ML20090A8121984-07-0909 July 1984 Testimony of Bf Maurer Re Analysis of Structural Adequacy of Main Control Panels Designed & Fabricated by Sys Control Corp ML20092P7921984-07-0202 July 1984 Summary of Testimony & Testimony of ML Somsag Re QA Inspector Reinsp Program for Hunter Corp.Related Correspondence ML20092P7891984-07-0202 July 1984 Summary of Testimony & Testimony of Rv Laney on Contention 1 Re Work Quality.Related Correspondence ML20092P7951984-07-0202 July 1984 Summary of Testimony & Testimony of Ak Singh on Contention 1 Re Reinsp Program,Work Quality.Related Correspondence ML20092P7941984-07-0202 July 1984 Summary of Testimony & Testimony of LO Delgeorge on Contention 1 Re Reinsp Program,Inspector Qualification & Work Quality.Related Correspondence ML20092P5541984-07-0202 July 1984 Summary of Testimony & Testimony of Dl Leone on Contention 1 Re Reinsp Program for Work Quality ML20092P5551984-07-0202 July 1984 Summary of Testimony & Testimony of R French on Contention 1 Re Reinsp Program ML20092P7781984-07-0202 July 1984 Summary of Testimony & Testimony of Wj Shewski on Contention 1 Re Reinsp Program,Inspector Qualification.Related Correspondence ML20092P7811984-07-0202 July 1984 Summary of Testimony & Testimony of Jm Mclaughlin on Contention 1 Re Reinsp Program,Work Quality.Related Correspondence ML20092P7871984-07-0202 July 1984 Summary of Direct Testimony & Testimony of RP Tuetken Re Reinsp Program.Related Correspondence ML20092P7851984-07-0202 July 1984 Summary of Testimony & Testimony of Wb Behnke on Contention 1 Re Overview of Quality Program,Work Quality. Related Correspondence ML20092N4971984-06-29029 June 1984 Testimony of Bg Treece on Issues 5 & 6 Re Cable Overtensioning,As Limited by ASLB 840608 Order.Related Correspondence ML20092N4911984-06-29029 June 1984 Summary of Direct Testimony of Jo Binder on Issues 5 & 6 Re Cable Overtensioning,As Limited by ASLB 840608 Order.Related Correspondence ML20092K7691984-06-26026 June 1984 Summary of Testimony of J Hansel on Contention 1 Re Reinsp Program.Prof Qualifications Encl.Related Correspondence ML20205H8901983-08-10010 August 1983 Public Version of Transcript of 830810 in Camera,Ex Parte Hearing in Rockford,Il.Pp 7,585-7,610 ML20205H8941983-08-10010 August 1983 Public Version of Transcript of 830810 in Camera,Ex Parte Hearing W/Ofc of Investigations in Rockford,Il.Pp 7,611.1- 7,611.71 ML20205H8841983-08-0909 August 1983 Public Version of Transcript of 830809 in Camera,Ex Parte Hearing in Rockford,Il.Pp 7,304-7,405 ML20080B3051983-08-0303 August 1983 Testimony of RP Tuetken Re Util Reinsp Program of Work Performed by Contractor Insp Personnel Prior to NRC Region III Mar,Apr & May 1982 Insps.Appropriate Steps Taken to Remedy Problems ML20080B3091983-08-0303 August 1983 Testimony of Aw Koca Re General Nature of Hatfield Inspector Training & Certification Program.Certification of J Hughes Described ML20080B2951983-08-0303 August 1983 Testimony of Ma Stanish Re Recertification of Qa/Qc Inspectors Subsequent to NRC Region III Mar,Apr & May 1982 Special Team Insps.Reinsp Program Implemented to Review Work Performed by Inspectors Before NRC 1982 Insp ML20023C7151983-05-12012 May 1983 Testimony of P Holmbeck Re Investigation Into Adequacy of Emergency Plans Re Emergency Planning Contentions.Util Made No Attempt to Study Protective Value of Sheltering Populations Around Plant ML20204F5721983-04-26026 April 1983 Transcript of 830426 Hearing in Rockford,Il.Pp 5,964-6,156 ML20069M4791983-04-25025 April 1983 Handwritten Testimony of J Hughes Re Qa/Qc at Facility ML20069K5691983-04-21021 April 1983 Testimony of Ld Butterfield Re Steam Generator Tube Integrity.Proposed Steam Generator Mods Would Minimize Tube Wear Due to Flow Induced Vibration.Related Correspondence ML20069K5631983-04-21021 April 1983 Revised Testimony of Tf Timmons Re Steam Generator Tube Integrity (Flow Induced Vibration Phenomenon).No Significant Tube Wear Will Be Experienced in Steam Generators Due to Flow Induced Vibration.Related Correspondence ML20073J6691983-04-18018 April 1983 Testimony of Jl Murphy on Rockford League of Women Voters & Dekalb Area Alliance for Responsible Energy/Sinnissippi Alliance for Environ Consolidated Emergency Planning Contentions 3 & 13.Related Correspondence ML20073K4461983-04-18018 April 1983 Rebuttal Testimony of Levine Re Rockford League of Women Voters Contentions 8 & 62 & Dekalb Area Alliance for Responsible Energy/Sinnissippi Alliance for Environ Contention 2a on Public Risk.Related Correspondence ML20073G4241983-04-11011 April 1983 Testimony of Ee Jones Re State of Il Emergency Svc & Disaster Agency Responsibilities Concerning Emergency Planning for Nuclear Facilities & Intervenor Amended Emergency Planning Contention ML20073G4051983-04-11011 April 1983 Testimony of Jc Golden Re Amended Emergency Planning Contention ML20073G4121983-04-11011 April 1983 Testimony of Dl Smith Re Resources Available for Transport & Treatment of Contaminated Injured Persons.Resume Encl 1999-03-02
[Table view] Category:NARRATIVE TESTIMONY
MONTHYEARML20207E0051999-03-0202 March 1999 Transcript of 990302 Public Meeting with Commonwealth Edison in Rockville,Md.Pp 1-104.Supporting Documentation Encl ML20236H9381998-06-30030 June 1998 Transcript of 980630 Meeting W/Commonwealth Edison in Rockville,Md.Pp 1-123.Supporting Documentation Encl ML20198P3001997-11-0404 November 1997 Transcript of 971104 Public Meeting W/Ceco in Rockville,Md Re Measures Established by Ceco to Track Plant Performance & to Gain Understanding of CAs Put Into Place to Improve Safety.Pp 1-105.W/Certificate & Viewgraphs ML20209J3251987-01-30030 January 1987 Transcript of 870130 Commission Discussion/Possible Vote on Full Power OL for Facility.Pp 1-72.Supporting Viewgraphs Encl ML20211B0841986-08-0505 August 1986 Transcript of 860805 Meeting Between Region Iii,Computer Interference Elimination & Util in Redmond,Wa Re Plant as-built Drawing Review.Pp 1-200 ML20096A6261984-08-30030 August 1984 Summary of Rebuttal Testimony & Testimony of ML Somsag, Eb Branch,D Demoss,Mr Frankel,Bf Maurer & Jk Buchanan Re Plant QC Inspector Reinsp Program & C Stokes Allegations Re Welds.Related Correspondence ML20096A6191984-08-30030 August 1984 Rebuttal Testimony of B Erler Re Stokes Allegations Concerning Evaluations of Discrepancies in Calculated Actual Stress Performed by Sargent & Lundy.Related Correspondence ML20096A6391984-08-30030 August 1984 Rebuttal Testimony of RW Hooks Re Validity of Info in Attachment 7 to Stokes Testimony Concerning Design Assumption for Plant.Stokes Info Inapplicable to Plant. Related Correspondence ML20094P7721984-08-17017 August 1984 Summary of Testimony & Direct Testimony of CC Stokes on Reinsp Program.Related Correspondence ML20094R1021984-08-17017 August 1984 Transcript of CC Stokes 840817 Deposition in Chicago,Il. Pp 1-173.Vol Ii.Related Correspondence ML20094P5991984-08-16016 August 1984 Direct Testimony of CC Stokes Re Engineering Evaluations Performed & Use of Engineering Judgement by Sargent & Lundy. Suggests Need for Independent Engineering Analysis of Safety Significance of Reinsp Program.Related Correspondence ML20094P6311984-08-14014 August 1984 Summary of Testimony & Testimony of Ds Kochhar on Contention 1 Re Reinsp Program.Certificate of Svc Encl.Related Correspondence ML20094P6831984-08-13013 August 1984 Summary of Testimony & Testimony of Wh Bleuel on Contention 1 Re Reinsp Program.Resume Encl.Related Correspondence ML20094P6951984-08-13013 August 1984 Summary of Testimony & Testimony of EP Erickson on Contention 1 Re Reinsp program-inspector Qualification & Work Quality.Resume & Certificate of Svc Encl.Related Correspondence ML20093L4881984-07-30030 July 1984 Summary of Testimony & Testimony of Eb Branch Re Contention 1 (Reinsp Program,Work Quality).Related Correspondence ML20093L1811984-07-30030 July 1984 Summary of Testimony & Testimony of KT Kostal on Contention 1 Re Capacity of Sys Control Corp Supplied Components to Carry Design Loads.Related Correspondence ML20093L2721984-07-30030 July 1984 Summary of Testimony & Testimony of Ak Singh on Contention 1 Re Evaluations of Discrepancies in Cable Tray Hanger Connections,Solid Bottom Tray Welds & Ladder Tray Weld Connections.Related Correspondence ML20093L2051984-07-30030 July 1984 Summary of Testimony & Testimony of Ld Johnson on Contention 1 Re Adequacy of Sys Control Corp Supplied Main Control Boards.Related Correspondence ML20090E5521984-07-17017 July 1984 Testimony of Eb Branch Re Job Responsibilities,Educ Background & Work Experience.Related Correspondence ML20090A7981984-07-0909 July 1984 Testimony of Gf Marcus Re Pittsburgh Testing Lab Source Insp of Equipment & Components Supplied by Sys Control Corp ML20090A8121984-07-0909 July 1984 Testimony of Bf Maurer Re Analysis of Structural Adequacy of Main Control Panels Designed & Fabricated by Sys Control Corp ML20092P7921984-07-0202 July 1984 Summary of Testimony & Testimony of ML Somsag Re QA Inspector Reinsp Program for Hunter Corp.Related Correspondence ML20092P7891984-07-0202 July 1984 Summary of Testimony & Testimony of Rv Laney on Contention 1 Re Work Quality.Related Correspondence ML20092P7951984-07-0202 July 1984 Summary of Testimony & Testimony of Ak Singh on Contention 1 Re Reinsp Program,Work Quality.Related Correspondence ML20092P7941984-07-0202 July 1984 Summary of Testimony & Testimony of LO Delgeorge on Contention 1 Re Reinsp Program,Inspector Qualification & Work Quality.Related Correspondence ML20092P5541984-07-0202 July 1984 Summary of Testimony & Testimony of Dl Leone on Contention 1 Re Reinsp Program for Work Quality ML20092P5551984-07-0202 July 1984 Summary of Testimony & Testimony of R French on Contention 1 Re Reinsp Program ML20092P7781984-07-0202 July 1984 Summary of Testimony & Testimony of Wj Shewski on Contention 1 Re Reinsp Program,Inspector Qualification.Related Correspondence ML20092P7811984-07-0202 July 1984 Summary of Testimony & Testimony of Jm Mclaughlin on Contention 1 Re Reinsp Program,Work Quality.Related Correspondence ML20092P7871984-07-0202 July 1984 Summary of Direct Testimony & Testimony of RP Tuetken Re Reinsp Program.Related Correspondence ML20092P7851984-07-0202 July 1984 Summary of Testimony & Testimony of Wb Behnke on Contention 1 Re Overview of Quality Program,Work Quality. Related Correspondence ML20092N4971984-06-29029 June 1984 Testimony of Bg Treece on Issues 5 & 6 Re Cable Overtensioning,As Limited by ASLB 840608 Order.Related Correspondence ML20092N4911984-06-29029 June 1984 Summary of Direct Testimony of Jo Binder on Issues 5 & 6 Re Cable Overtensioning,As Limited by ASLB 840608 Order.Related Correspondence ML20092K7691984-06-26026 June 1984 Summary of Testimony of J Hansel on Contention 1 Re Reinsp Program.Prof Qualifications Encl.Related Correspondence ML20205H8901983-08-10010 August 1983 Public Version of Transcript of 830810 in Camera,Ex Parte Hearing in Rockford,Il.Pp 7,585-7,610 ML20205H8941983-08-10010 August 1983 Public Version of Transcript of 830810 in Camera,Ex Parte Hearing W/Ofc of Investigations in Rockford,Il.Pp 7,611.1- 7,611.71 ML20205H8841983-08-0909 August 1983 Public Version of Transcript of 830809 in Camera,Ex Parte Hearing in Rockford,Il.Pp 7,304-7,405 ML20080B3051983-08-0303 August 1983 Testimony of RP Tuetken Re Util Reinsp Program of Work Performed by Contractor Insp Personnel Prior to NRC Region III Mar,Apr & May 1982 Insps.Appropriate Steps Taken to Remedy Problems ML20080B3091983-08-0303 August 1983 Testimony of Aw Koca Re General Nature of Hatfield Inspector Training & Certification Program.Certification of J Hughes Described ML20080B2951983-08-0303 August 1983 Testimony of Ma Stanish Re Recertification of Qa/Qc Inspectors Subsequent to NRC Region III Mar,Apr & May 1982 Special Team Insps.Reinsp Program Implemented to Review Work Performed by Inspectors Before NRC 1982 Insp ML20023C7151983-05-12012 May 1983 Testimony of P Holmbeck Re Investigation Into Adequacy of Emergency Plans Re Emergency Planning Contentions.Util Made No Attempt to Study Protective Value of Sheltering Populations Around Plant ML20204F5721983-04-26026 April 1983 Transcript of 830426 Hearing in Rockford,Il.Pp 5,964-6,156 ML20069M4791983-04-25025 April 1983 Handwritten Testimony of J Hughes Re Qa/Qc at Facility ML20069K5691983-04-21021 April 1983 Testimony of Ld Butterfield Re Steam Generator Tube Integrity.Proposed Steam Generator Mods Would Minimize Tube Wear Due to Flow Induced Vibration.Related Correspondence ML20069K5631983-04-21021 April 1983 Revised Testimony of Tf Timmons Re Steam Generator Tube Integrity (Flow Induced Vibration Phenomenon).No Significant Tube Wear Will Be Experienced in Steam Generators Due to Flow Induced Vibration.Related Correspondence ML20073J6691983-04-18018 April 1983 Testimony of Jl Murphy on Rockford League of Women Voters & Dekalb Area Alliance for Responsible Energy/Sinnissippi Alliance for Environ Consolidated Emergency Planning Contentions 3 & 13.Related Correspondence ML20073K4461983-04-18018 April 1983 Rebuttal Testimony of Levine Re Rockford League of Women Voters Contentions 8 & 62 & Dekalb Area Alliance for Responsible Energy/Sinnissippi Alliance for Environ Contention 2a on Public Risk.Related Correspondence ML20073G4241983-04-11011 April 1983 Testimony of Ee Jones Re State of Il Emergency Svc & Disaster Agency Responsibilities Concerning Emergency Planning for Nuclear Facilities & Intervenor Amended Emergency Planning Contention ML20073G4051983-04-11011 April 1983 Testimony of Jc Golden Re Amended Emergency Planning Contention ML20073G4121983-04-11011 April 1983 Testimony of Dl Smith Re Resources Available for Transport & Treatment of Contaminated Injured Persons.Resume Encl 1999-03-02
[Table view] |
Text
t Date: July 2' 1984 e,
RELATO C7.rGlDEl:CE UNITED STATES OF AMERICA 00CEETED JUhC NUCLEAR REGULATORY COMMISSION BEFORETHEATOMICSAFETYANDLICENQGgOgD
- % L - 'im w i
In the Matter of )
)
COMMONWEALTH EDISON COMPANY ) Docket Nos. 50-454 OL
) 50-455 OL (Byron Nuclear Power Station, )
Units 1 & 2 )
SUMMARY
OF TESTIMONY OF MALCOLM L. SOMSAG I. Mr. Somsag is the Site Quality Assurance Super-visor for Hunter Corporation at the Byron Station.
Mr. Somsag testified previously in this proceeding primarily to respond to Mr. Smith's allegations regarding Hunter Corporation. (See f f. Tr. 2883 and Tr. 3950-3959.) Mr. Somsag's earlier testimony describes Hunter Corporation's Quality Assurance Department at Bryon and his responsibilities in that Department.
II. Mr. Somsag's testimony describe'. the measures taken by Hunter Corporation which respond to the Licensing Board's concerns set forth in its Initial Decision regarding Hunter's program for assuring that missing component supports and documentation regarding supports are properly addressed. (See Initial Decision 1tD-137-145 and D-169.) Mr. Somsag also addresses Mr. Smith's tabling allegation, inasmuch as that allegation gave rise to the above-mentioned Board concern.
Finally, Mr. Somsag addresses the statement made by the Board with respect to Commonwealth Edison's Quality Assurance Department Finding regarding the manner in which Hunter initially documented re-jected characteristics during the 1983 Reinspection Program.
III. With respect to Hunter Corporation's program for assuring that missing supports and documentation are properly addressed, Mr. Somsag describes the inspection programs implemented by Hunter which are designed to assure that 100% of the component 8407090379 840702 PDR ADOCK 05000454 T pyg k _ _ .
I supports installed by Hunter are inspected during j
installation, following completion of the work and, again, prior to turning over a system to the i Station. (pp. 2-4.) To demonstrate the effectiveness of these inspection programs, Mr. Somsag testifies that during the course of the 1983 Reinspection Program, whicn included a review of supports, there was not one instance in which documentation for safety-related component supports was missing or one instance where documentation existed but the associated component support was not installed.
IV. Mr. Somsag explains why he did not consider Mr.
Smith's allegations concerning tabling to be significant, but that given the significance of the issue to the Board he attempted to recall whether the events described by Mr. Smith could have occurred and determine their significance.
(p. 6.) He concludes that during the course of audit 059-3 Mr. Smith initially selected some supports which were non-safety-related and accordingly instructed Mr. Smith to remove these supports from those to be reviewed for the audit. These are the supports which Mr. Somsag believes Mr. Smith alleges were tabled. (p. 7.) Since the non-safety-related supports were not subject to quality assurance review, Mr. Somsag concludes that there is no safety significance attributable to their Moreover, omission from the audit. (p. 0.)
Mr. Somsag testifies that had the practice of tabling existed, evidence of the practice would have surfaced during subsequent inspections. The fact that no such evidence was uncovered leads Mr. Somsag to conclude that there is no safety significance to Mr. Smith's tabling allegations.
(p. 8.)
V. Mr. Somsag explains that during an early period of the Reinspection Program Hunter inspectors noted rejected characteristics in their inspection i
reports. At the time, it was intended that the nonconformances identified in the reports would be
,f made the subject of discrepancy or nonconformance reports following completion of the Reinspection However, Hunter changed its Program. (pp. 8-9.)
practice and began noting rejected characteristics on appropriate QA documentation and continued to l follow this practice throughout the course of the l Reinspection Program.
l l
l l
l Date: July 2, 1984 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of )
)
) Docket Nos. 50-454 OL COMMONWEALTH EDISON COMPANY 50-455 OL
)
(Byron Nuclear Power Station, )
)
Units 1 & 2 .
TESTIMONY OF MALCOLM LEO SOMSAG 01: Please state your name.
A1: Malcolm L. Somsag.
02: Did you previously provide testimony in this proceeding in the spring of 1983?
A2: Yes.
03: At that time, you stated that you were the Hunter Corporation Quality Assurance Supervisor for the Byron project. Do you still hold that position?
A3: Yes. The descriptions of Hunter Corporation, my background and my responsibilities as Quality Assurance Supervisor set forth in my prefiled testimony submitted in the spring of 1983 are still accurate.
04: What is the scope your testimony?
A4: My testimony describes the steps taken by Hunter Corporation, including evaluation of the Quality Control Inspector Reinspection Program, which rea9ond to the Licensing Board's concerns set forth in its Initial Decision.
i k_.
r Those concerns focus on Hunter's program for assuring that missing component supports and documentation regarding supports are properly addressed. Mr. Smith's allegations regarding " tabling" were also deemed by the Licensing Board to relate to this issue.
05: Mr. Somsag, what assurance do you have that component supports which are required to be installed at the By rt :. plant are installed, have been inspected, are acceptable and that these matters are properly documented?
A5: Three separate inspection programs which have been or are being implemented by Hunter Corporation provide such assurance. First, as discussed in my 1983 prefiled testimony, in response to NRC inspection 80-05 Hunter conducted an inspection of 100% of the supports ins'talled prior to March 1, 1980. This program included a physical inspection of each support and a review of the associated documentation to assure among other things that the hangers were properly installed in accordance with construction Nonconforming specifications and as-built documentation.
supports were identified, the nonconformances were documented and reinspected following any additional work necessary to cure the nonconformances.
Second, in 1980 Hunter Corporation formally established an expanded inspection program. The program consists of four broad inspection types to which all safety-related work, including the installation of safety-related !
supports, is subjected. Thpe1inspectionsareconducted 1
{
l i
during initial installation activities to assure the existence and adequacy of required documentation relative to the work being performed. Type 2 inspections are also conducted during installation activities and are designed to assure the that the hardware meets design requirements and that the status of construc-documentation continues to reflect tion and inspection.
Once the work and Type 1 and 2 inspections associated with the work on a construction drawing are completed, Type 3 inspections are conducted to verify the overall adequacy of the work. Type 3 inspections consist of a detailed review of documentation generated during con-struction to assure that all required inspections have been conducted, are documented and that the hardware conforms to the requirements of the construction drawing and associated as-built documentation. Type 4 inspections occur before turning over systems to the Station to assure that the intact and previously inspected hardware is still in place, 1980 were undamaged. Hangers installed prior to March 1, During each also subject to Type 3 and Type 4 inspections.
of these inspections, a document is generated for each category and item of hardware inspected, and identifies whether it is acceptable or unacceptable. If unacceptable, the noncomplying condition is corrected and reinspected in The accordance with Hunter's quality assurance procedures.
requirements for t).e Type 1 through 4 inspection program are set forth in Hunter Corporation Site Implementation Procedure
w 4
4.201.
Finally, the 1983 Reinspection Program conducted to review selected inspections performed by Hunter quality control inspectors included a review of component supports installed by Hunter Corporation. The Reinspection Program did not identify one instance in which documentation for safety-related component supports required by the design was missing or an instance where documentation existed but the associated component support was not installed. This further confirms the adequacy of the system devised for assuring that supports have been and are being installed and in-spected, and that the inspections are properly documented.
06: In its Initial Decision, the Licensing Board expressed concern regarding the possibility that hangers which had been installed and inspected would subsequently be removed during construction, with no followup inspection.
Does Hunter have procedural controls to address this type of situation?
A6: Yes. The Type 4 inspection program described in my previous answer was specifically developed in part to deal with such a concern. The program requires a scheduled follow-up physical inspection of 100% of the safety-related hardware installed by Hunter to assure that the installations If design have remained in place, intact and undamaged.
documents require the existence of an item,. and that item were not in place, this cradition would be' identified, s
L. ~ - - - - . _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ ___
f 4
documented and corrected.
If, following completion of Type 3 or 4 inspections, hardware is removed or altered other than as would be required by a design change, the program requires that a Hardware Removal / Alteration Report be utilized to report the change of status of the hardware. The report is routed to the Quality Assurance Department and triggers reinspection to assure the hardware has been reinstalled and is acceptable.
If hardware is removed or altered as a result of a design change Type 1 through 4 inspections would be conducted with regard to this work.
07: Mr. Somsag, are you familiar with Mr. Smith's testimony regarding the practice of " tabling" which he alleges occurred at Byron?
A7: Yes.
Please describe your understanding of Mr. Smith's 08:
testimony concerning this alleged practice.
A8: As I understand it, Mr. Smith alleged in broad terms that there was a practice within Hunter Corporation of setting aside issues relating to the adequacy of component supports, with no assurance that later inspections would be conducted to verify the adequacy of the work. In support of this allegation, Mr. Smith stated that during the course of the 059-3 audit he discovered that there were pipe hangers with no associated documentation and documents with no
l t
associated hangers and was instructed not to include these matters in the audit report.
09: Have you given further thought to Mr. Smith's allegations since you last testified in 1983?
A9: Yes. Quite frankly, at the time I heard and reviewed Mr. Smith's testimony during the 1983 hearings, I
did not attribute much significance to Mr. Smith's allega-tions regarding tabling. Mr. Smith left Hunter in early 1980. At that time very few hangers had been permanently installed and I knew that the 1980 inspection following NRC inspection report 80-05 and the expanded inspection program discussed above would have uncovered any concerns such as addressed by Mr. Smith. However, following my review of the Licensing Board's Initial Decision and in light of the Smith's.allega-significance which the Board placed upon Mr.
tions regarding tabling, I attempted to recall whether the events described by Mr. Smith may have occurred and determine the significance of these events.
010: What is your recollection of the events described by Mr. Smith?
A10: As I recall, during the initial phases of the 059-3 audit Mr. Smith was directed to gather a data base of hangers in the plant. I was informed that there appeared to be a significant number of hangers which were installed without OC inspections and accompanying documentation and I
in other cases hangers appeared to have some amount of documentation yet the installation could not be physically i
)
4 _
/
w located. I reviewed the data base Mr. Smith had gathered in the plant and discovered that the system designations for some of the supports were systems where one would not expect to find safety-related hardware. The data base collected by Mr. Smith was reviewed to ensure that it included only safety-related hangers, because the audit was only intended to evaluate safety-related work, and it was determined that there were indeed some hangers in the data base that were non-safety-related. I then instructed that the non-safety-related hangers be excluded from the audit and ordered that Mr. Smith gather an additional data basc comprised of safety-related hangers, to replace the non-safety-related hangers he had previously selected. I believe that the non safety-related hangers which I instructed be excluded from the audit were the hangers which Mr. Smith alleges were tabled.
Oll:
What assurance did you have that the in-completed non safety-related hangers initially selected by Mr. Smith would be completed?
All: I knew that the production department would most likely use the hanger field problem system or, in any event, utilize the final walkdown to identify and resolve any incompleted non-safety-related work.
012: In your opinion, does the specific instance raised by Mr. Smith support his general allegation regarding tabling by llunter Corporation?
u
f
- Al2: No, since the supports which Mr. Smith identified initially were non safety-related supports their omission from the 059-3 audit cannot be viewed as an attempt to disregard, or set aside, a safety concern related to the work performed by Hunter.
013: Have subsequent programs implemented by Hunter verified that the practice of tabling of safety-related issues did not occur?
A13: Yes, I believe that if the practice of tabling issues related to safety-related supports had occurred, the inspection programs described in Answer 5 above, would have uncovered evidence of such a practice.
The fact that no such evidence was uncovered leads me to conclude that there is no safety significance to Mr. Smith's allegations concerning tabling.
014: In its laitial Decision, the Board char-acterized Finding 1, Part A of Commonwealth Edison Company's Audit Report 6-83-66 of the Reinspection Program as reflecting a continuing failure on Hunter's part to take appropriate steps to issue documentation on nonconforming conditions.
In your view, should the finding in Audit Report 6-83-66 be l
interpreted in this manner? )
A14: No. The finding reflects the fact that during an early period of the Reinspection Program rejected characteristics were not documented on discrepancy reports ,
)
and nonconformance repor ts but rather were documented on the u _ _ _ _
o QC inspector's inspection reports. This system was adequate to track the quality of previous inspectors' work which was During this the primary goal of the Reinspection Program.
time Hunter intended to utilize the inspection reports to issue discrepancy or nonconformance reports following the completion of the Reinspection Program to assure that Therefore, we nonconforming condition was addressed.
believed that this system was adequate to document non-conforming conditions identified during the Reinspection Program. Nonetheless, Hunter implemented the practice of noting rejected characteristics on appropriate quality assurance documentation and continued to follow this practice throughout the course of the Reinspection Program.
1 1
L