Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML20207E0052 March 1999Transcript of 990302 Public Meeting with Commonwealth Edison in Rockville,Md.Pp 1-104.Supporting Documentation EnclMissed surveillance
Fire Protection Program
ML20236H93830 June 1998Transcript of 980630 Meeting W/Commonwealth Edison in Rockville,Md.Pp 1-123.Supporting Documentation EnclSafe Shutdown
Half scram
Foreign Material Exclusion
ML20198P3004 November 1997Transcript of 971104 Public Meeting W/Ceco in Rockville,Md Re Measures Established by Ceco to Track Plant Performance & to Gain Understanding of CAs Put Into Place to Improve Safety.Pp 1-105.W/Certificate & ViewgraphsSafe Shutdown
Temporary Modification
ML20209J32530 January 1987Transcript of 870130 Commission Discussion/Possible Vote on Full Power OL for Facility.Pp 1-72.Supporting Viewgraphs Encl
ML20211B0845 August 1986Transcript of 860805 Meeting Between Region Iii,Computer Interference Elimination & Util in Redmond,Wa Re Plant as-built Drawing Review.Pp 1-200Scaffolding
ML20096A62630 August 1984Summary of Rebuttal Testimony & Testimony of ML Somsag, Eb Branch,D Demoss,Mr Frankel,Bf Maurer & Jk Buchanan Re Plant QC Inspector Reinsp Program & C Stokes Allegations Re Welds.Related Correspondence
ML20096A61930 August 1984Rebuttal Testimony of B Erler Re Stokes Allegations Concerning Evaluations of Discrepancies in Calculated Actual Stress Performed by Sargent & Lundy.Related Correspondence
ML20096A63930 August 1984Rebuttal Testimony of RW Hooks Re Validity of Info in Attachment 7 to Stokes Testimony Concerning Design Assumption for Plant.Stokes Info Inapplicable to Plant. Related Correspondence
ML20094P77217 August 1984Summary of Testimony & Direct Testimony of CC Stokes on Reinsp Program.Related CorrespondenceSafe Shutdown Earthquake
Hydrostatic
Operating Basis Earthquake
Finite Element Analysis
Earthquake
ML20094R10217 August 1984Transcript of CC Stokes 840817 Deposition in Chicago,Il. Pp 1-173.Vol Ii.Related CorrespondenceSafe Shutdown
Safe Shutdown Earthquake
Earthquake
ML20094P59916 August 1984Direct Testimony of CC Stokes Re Engineering Evaluations Performed & Use of Engineering Judgement by Sargent & Lundy. Suggests Need for Independent Engineering Analysis of Safety Significance of Reinsp Program.Related Correspondence
ML20094P63114 August 1984Summary of Testimony & Testimony of Ds Kochhar on Contention 1 Re Reinsp Program.Certificate of Svc Encl.Related Correspondence
ML20094P68313 August 1984Summary of Testimony & Testimony of Wh Bleuel on Contention 1 Re Reinsp Program.Resume Encl.Related Correspondence
ML20094P69513 August 1984Summary of Testimony & Testimony of EP Erickson on Contention 1 Re Reinsp program-inspector Qualification & Work Quality.Resume & Certificate of Svc Encl.Related CorrespondenceHydrostatic
ML20093L48830 July 1984Summary of Testimony & Testimony of Eb Branch Re Contention 1 (Reinsp Program,Work Quality).Related Correspondence
ML20093L18130 July 1984Summary of Testimony & Testimony of KT Kostal on Contention 1 Re Capacity of Sys Control Corp Supplied Components to Carry Design Loads.Related CorrespondenceFinite Element Analysis
ML20093L27230 July 1984Summary of Testimony & Testimony of Ak Singh on Contention 1 Re Evaluations of Discrepancies in Cable Tray Hanger Connections,Solid Bottom Tray Welds & Ladder Tray Weld Connections.Related CorrespondenceEarthquake
ML20093L20530 July 1984Summary of Testimony & Testimony of Ld Johnson on Contention 1 Re Adequacy of Sys Control Corp Supplied Main Control Boards.Related CorrespondenceSafe Shutdown Earthquake
Probabilistic Risk Assessment
Operating Basis Earthquake
Dissimilar Metal Weld
ML20090E55217 July 1984Testimony of Eb Branch Re Job Responsibilities,Educ Background & Work Experience.Related Correspondence
ML20090A7989 July 1984Testimony of Gf Marcus Re Pittsburgh Testing Lab Source Insp of Equipment & Components Supplied by Sys Control Corp
ML20090A8129 July 1984Testimony of Bf Maurer Re Analysis of Structural Adequacy of Main Control Panels Designed & Fabricated by Sys Control CorpSafe Shutdown Earthquake
Finite Element Analysis
Design basis earthquake
Turbine Missile
ML20092P7922 July 1984Summary of Testimony & Testimony of ML Somsag Re QA Inspector Reinsp Program for Hunter Corp.Related Correspondence
ML20092P7892 July 1984Summary of Testimony & Testimony of Rv Laney on Contention 1 Re Work Quality.Related Correspondence
ML20092P7952 July 1984Summary of Testimony & Testimony of Ak Singh on Contention 1 Re Reinsp Program,Work Quality.Related Correspondence
ML20092P7942 July 1984Summary of Testimony & Testimony of LO Delgeorge on Contention 1 Re Reinsp Program,Inspector Qualification & Work Quality.Related CorrespondenceScaffolding
Backfit
ML20092P5542 July 1984Summary of Testimony & Testimony of Dl Leone on Contention 1 Re Reinsp Program for Work Quality
ML20092P5552 July 1984Summary of Testimony & Testimony of R French on Contention 1 Re Reinsp Program
ML20092P7782 July 1984Summary of Testimony & Testimony of Wj Shewski on Contention 1 Re Reinsp Program,Inspector Qualification.Related CorrespondenceLiquid penetrant
ML20092P7812 July 1984Summary of Testimony & Testimony of Jm Mclaughlin on Contention 1 Re Reinsp Program,Work Quality.Related CorrespondenceEarthquake
ML20092P7872 July 1984Summary of Direct Testimony & Testimony of RP Tuetken Re Reinsp Program.Related Correspondence
ML20092P7852 July 1984Summary of Testimony & Testimony of Wb Behnke on Contention 1 Re Overview of Quality Program,Work Quality. Related Correspondence
ML20092N49729 June 1984Testimony of Bg Treece on Issues 5 & 6 Re Cable Overtensioning,As Limited by ASLB 840608 Order.Related CorrespondenceFire Barrier
ML20092N49129 June 1984Summary of Direct Testimony of Jo Binder on Issues 5 & 6 Re Cable Overtensioning,As Limited by ASLB 840608 Order.Related CorrespondenceFire Barrier
Liquid penetrant
ML20092K76926 June 1984Summary of Testimony of J Hansel on Contention 1 Re Reinsp Program.Prof Qualifications Encl.Related Correspondence
ML20205H89010 August 1983Public Version of Transcript of 830810 in Camera,Ex Parte Hearing in Rockford,Il.Pp 7,585-7,610Scaffolding
ML20205H89410 August 1983Public Version of Transcript of 830810 in Camera,Ex Parte Hearing W/Ofc of Investigations in Rockford,Il.Pp 7,611.1- 7,611.71
ML20205H8849 August 1983Public Version of Transcript of 830809 in Camera,Ex Parte Hearing in Rockford,Il.Pp 7,304-7,405
ML20080B3053 August 1983Testimony of RP Tuetken Re Util Reinsp Program of Work Performed by Contractor Insp Personnel Prior to NRC Region III Mar,Apr & May 1982 Insps.Appropriate Steps Taken to Remedy Problems
ML20080B3093 August 1983Testimony of Aw Koca Re General Nature of Hatfield Inspector Training & Certification Program.Certification of J Hughes Described
ML20080B2953 August 1983Testimony of Ma Stanish Re Recertification of Qa/Qc Inspectors Subsequent to NRC Region III Mar,Apr & May 1982 Special Team Insps.Reinsp Program Implemented to Review Work Performed by Inspectors Before NRC 1982 Insp
ML20023C71512 May 1983Testimony of P Holmbeck Re Investigation Into Adequacy of Emergency Plans Re Emergency Planning Contentions.Util Made No Attempt to Study Protective Value of Sheltering Populations Around Plant
ML20204F57226 April 1983Transcript of 830426 Hearing in Rockford,Il.Pp 5,964-6,156Through-Wall Leak
Flow Induced Vibration
ML20069M47925 April 1983Handwritten Testimony of J Hughes Re Qa/Qc at Facility
ML20069K56921 April 1983Testimony of Ld Butterfield Re Steam Generator Tube Integrity.Proposed Steam Generator Mods Would Minimize Tube Wear Due to Flow Induced Vibration.Related CorrespondenceFlow Induced Vibration
ML20069K56321 April 1983Revised Testimony of Tf Timmons Re Steam Generator Tube Integrity (Flow Induced Vibration Phenomenon).No Significant Tube Wear Will Be Experienced in Steam Generators Due to Flow Induced Vibration.Related CorrespondenceNondestructive Examination
Flow Induced Vibration
ML20073J66918 April 1983Testimony of Jl Murphy on Rockford League of Women Voters & Dekalb Area Alliance for Responsible Energy/Sinnissippi Alliance for Environ Consolidated Emergency Planning Contentions 3 & 13.Related Correspondence
ML20073K44618 April 1983Rebuttal Testimony of Levine Re Rockford League of Women Voters Contentions 8 & 62 & Dekalb Area Alliance for Responsible Energy/Sinnissippi Alliance for Environ Contention 2a on Public Risk.Related CorrespondenceFatality
ML20073G42411 April 1983Testimony of Ee Jones Re State of Il Emergency Svc & Disaster Agency Responsibilities Concerning Emergency Planning for Nuclear Facilities & Intervenor Amended Emergency Planning Contention
ML20073G40511 April 1983Testimony of Jc Golden Re Amended Emergency Planning ContentionNuclear Accident Reporting System
ML20073G41211 April 1983Testimony of Dl Smith Re Resources Available for Transport & Treatment of Contaminated Injured Persons.Resume Encl