ML20207E005 | 2 March 1999 | Transcript of 990302 Public Meeting with Commonwealth Edison in Rockville,Md.Pp 1-104.Supporting Documentation Encl | Missed surveillance Fire Protection Program |
ML20236H938 | 30 June 1998 | Transcript of 980630 Meeting W/Commonwealth Edison in Rockville,Md.Pp 1-123.Supporting Documentation Encl | Safe Shutdown Half scram Foreign Material Exclusion |
ML20198P300 | 4 November 1997 | Transcript of 971104 Public Meeting W/Ceco in Rockville,Md Re Measures Established by Ceco to Track Plant Performance & to Gain Understanding of CAs Put Into Place to Improve Safety.Pp 1-105.W/Certificate & Viewgraphs | Safe Shutdown Temporary Modification |
ML20209J325 | 30 January 1987 | Transcript of 870130 Commission Discussion/Possible Vote on Full Power OL for Facility.Pp 1-72.Supporting Viewgraphs Encl | |
ML20211B084 | 5 August 1986 | Transcript of 860805 Meeting Between Region Iii,Computer Interference Elimination & Util in Redmond,Wa Re Plant as-built Drawing Review.Pp 1-200 | Scaffolding |
ML20096A626 | 30 August 1984 | Summary of Rebuttal Testimony & Testimony of ML Somsag, Eb Branch,D Demoss,Mr Frankel,Bf Maurer & Jk Buchanan Re Plant QC Inspector Reinsp Program & C Stokes Allegations Re Welds.Related Correspondence | |
ML20096A619 | 30 August 1984 | Rebuttal Testimony of B Erler Re Stokes Allegations Concerning Evaluations of Discrepancies in Calculated Actual Stress Performed by Sargent & Lundy.Related Correspondence | |
ML20096A639 | 30 August 1984 | Rebuttal Testimony of RW Hooks Re Validity of Info in Attachment 7 to Stokes Testimony Concerning Design Assumption for Plant.Stokes Info Inapplicable to Plant. Related Correspondence | |
ML20094P772 | 17 August 1984 | Summary of Testimony & Direct Testimony of CC Stokes on Reinsp Program.Related Correspondence | Safe Shutdown Earthquake Hydrostatic Operating Basis Earthquake Finite Element Analysis Earthquake |
ML20094R102 | 17 August 1984 | Transcript of CC Stokes 840817 Deposition in Chicago,Il. Pp 1-173.Vol Ii.Related Correspondence | Safe Shutdown Safe Shutdown Earthquake Earthquake |
ML20094P599 | 16 August 1984 | Direct Testimony of CC Stokes Re Engineering Evaluations Performed & Use of Engineering Judgement by Sargent & Lundy. Suggests Need for Independent Engineering Analysis of Safety Significance of Reinsp Program.Related Correspondence | |
ML20094P631 | 14 August 1984 | Summary of Testimony & Testimony of Ds Kochhar on Contention 1 Re Reinsp Program.Certificate of Svc Encl.Related Correspondence | |
ML20094P683 | 13 August 1984 | Summary of Testimony & Testimony of Wh Bleuel on Contention 1 Re Reinsp Program.Resume Encl.Related Correspondence | |
ML20094P695 | 13 August 1984 | Summary of Testimony & Testimony of EP Erickson on Contention 1 Re Reinsp program-inspector Qualification & Work Quality.Resume & Certificate of Svc Encl.Related Correspondence | Hydrostatic |
ML20093L488 | 30 July 1984 | Summary of Testimony & Testimony of Eb Branch Re Contention 1 (Reinsp Program,Work Quality).Related Correspondence | |
ML20093L181 | 30 July 1984 | Summary of Testimony & Testimony of KT Kostal on Contention 1 Re Capacity of Sys Control Corp Supplied Components to Carry Design Loads.Related Correspondence | Finite Element Analysis |
ML20093L272 | 30 July 1984 | Summary of Testimony & Testimony of Ak Singh on Contention 1 Re Evaluations of Discrepancies in Cable Tray Hanger Connections,Solid Bottom Tray Welds & Ladder Tray Weld Connections.Related Correspondence | Earthquake |
ML20093L205 | 30 July 1984 | Summary of Testimony & Testimony of Ld Johnson on Contention 1 Re Adequacy of Sys Control Corp Supplied Main Control Boards.Related Correspondence | Safe Shutdown Earthquake Probabilistic Risk Assessment Operating Basis Earthquake Dissimilar Metal Weld |
ML20090E552 | 17 July 1984 | Testimony of Eb Branch Re Job Responsibilities,Educ Background & Work Experience.Related Correspondence | |
ML20090A798 | 9 July 1984 | Testimony of Gf Marcus Re Pittsburgh Testing Lab Source Insp of Equipment & Components Supplied by Sys Control Corp | |
ML20090A812 | 9 July 1984 | Testimony of Bf Maurer Re Analysis of Structural Adequacy of Main Control Panels Designed & Fabricated by Sys Control Corp | Safe Shutdown Earthquake Finite Element Analysis Design basis earthquake Turbine Missile |
ML20092P792 | 2 July 1984 | Summary of Testimony & Testimony of ML Somsag Re QA Inspector Reinsp Program for Hunter Corp.Related Correspondence | |
ML20092P789 | 2 July 1984 | Summary of Testimony & Testimony of Rv Laney on Contention 1 Re Work Quality.Related Correspondence | |
ML20092P795 | 2 July 1984 | Summary of Testimony & Testimony of Ak Singh on Contention 1 Re Reinsp Program,Work Quality.Related Correspondence | |
ML20092P794 | 2 July 1984 | Summary of Testimony & Testimony of LO Delgeorge on Contention 1 Re Reinsp Program,Inspector Qualification & Work Quality.Related Correspondence | Scaffolding Backfit |
ML20092P554 | 2 July 1984 | Summary of Testimony & Testimony of Dl Leone on Contention 1 Re Reinsp Program for Work Quality | |
ML20092P555 | 2 July 1984 | Summary of Testimony & Testimony of R French on Contention 1 Re Reinsp Program | |
ML20092P778 | 2 July 1984 | Summary of Testimony & Testimony of Wj Shewski on Contention 1 Re Reinsp Program,Inspector Qualification.Related Correspondence | Liquid penetrant |
ML20092P781 | 2 July 1984 | Summary of Testimony & Testimony of Jm Mclaughlin on Contention 1 Re Reinsp Program,Work Quality.Related Correspondence | Earthquake |
ML20092P787 | 2 July 1984 | Summary of Direct Testimony & Testimony of RP Tuetken Re Reinsp Program.Related Correspondence | |
ML20092P785 | 2 July 1984 | Summary of Testimony & Testimony of Wb Behnke on Contention 1 Re Overview of Quality Program,Work Quality. Related Correspondence | |
ML20092N497 | 29 June 1984 | Testimony of Bg Treece on Issues 5 & 6 Re Cable Overtensioning,As Limited by ASLB 840608 Order.Related Correspondence | Fire Barrier |
ML20092N491 | 29 June 1984 | Summary of Direct Testimony of Jo Binder on Issues 5 & 6 Re Cable Overtensioning,As Limited by ASLB 840608 Order.Related Correspondence | Fire Barrier Liquid penetrant |
ML20092K769 | 26 June 1984 | Summary of Testimony of J Hansel on Contention 1 Re Reinsp Program.Prof Qualifications Encl.Related Correspondence | |
ML20205H890 | 10 August 1983 | Public Version of Transcript of 830810 in Camera,Ex Parte Hearing in Rockford,Il.Pp 7,585-7,610 | Scaffolding |
ML20205H894 | 10 August 1983 | Public Version of Transcript of 830810 in Camera,Ex Parte Hearing W/Ofc of Investigations in Rockford,Il.Pp 7,611.1- 7,611.71 | |
ML20205H884 | 9 August 1983 | Public Version of Transcript of 830809 in Camera,Ex Parte Hearing in Rockford,Il.Pp 7,304-7,405 | |
ML20080B305 | 3 August 1983 | Testimony of RP Tuetken Re Util Reinsp Program of Work Performed by Contractor Insp Personnel Prior to NRC Region III Mar,Apr & May 1982 Insps.Appropriate Steps Taken to Remedy Problems | |
ML20080B309 | 3 August 1983 | Testimony of Aw Koca Re General Nature of Hatfield Inspector Training & Certification Program.Certification of J Hughes Described | |
ML20080B295 | 3 August 1983 | Testimony of Ma Stanish Re Recertification of Qa/Qc Inspectors Subsequent to NRC Region III Mar,Apr & May 1982 Special Team Insps.Reinsp Program Implemented to Review Work Performed by Inspectors Before NRC 1982 Insp | |
ML20023C715 | 12 May 1983 | Testimony of P Holmbeck Re Investigation Into Adequacy of Emergency Plans Re Emergency Planning Contentions.Util Made No Attempt to Study Protective Value of Sheltering Populations Around Plant | |
ML20204F572 | 26 April 1983 | Transcript of 830426 Hearing in Rockford,Il.Pp 5,964-6,156 | Through-Wall Leak Flow Induced Vibration |
ML20069M479 | 25 April 1983 | Handwritten Testimony of J Hughes Re Qa/Qc at Facility | |
ML20069K569 | 21 April 1983 | Testimony of Ld Butterfield Re Steam Generator Tube Integrity.Proposed Steam Generator Mods Would Minimize Tube Wear Due to Flow Induced Vibration.Related Correspondence | Flow Induced Vibration |
ML20069K563 | 21 April 1983 | Revised Testimony of Tf Timmons Re Steam Generator Tube Integrity (Flow Induced Vibration Phenomenon).No Significant Tube Wear Will Be Experienced in Steam Generators Due to Flow Induced Vibration.Related Correspondence | Nondestructive Examination Flow Induced Vibration |
ML20073J669 | 18 April 1983 | Testimony of Jl Murphy on Rockford League of Women Voters & Dekalb Area Alliance for Responsible Energy/Sinnissippi Alliance for Environ Consolidated Emergency Planning Contentions 3 & 13.Related Correspondence | |
ML20073K446 | 18 April 1983 | Rebuttal Testimony of Levine Re Rockford League of Women Voters Contentions 8 & 62 & Dekalb Area Alliance for Responsible Energy/Sinnissippi Alliance for Environ Contention 2a on Public Risk.Related Correspondence | Fatality |
ML20073G424 | 11 April 1983 | Testimony of Ee Jones Re State of Il Emergency Svc & Disaster Agency Responsibilities Concerning Emergency Planning for Nuclear Facilities & Intervenor Amended Emergency Planning Contention | |
ML20073G405 | 11 April 1983 | Testimony of Jc Golden Re Amended Emergency Planning Contention | Nuclear Accident Reporting System |
ML20073G412 | 11 April 1983 | Testimony of Dl Smith Re Resources Available for Transport & Treatment of Contaminated Injured Persons.Resume Encl |