4 .

  • DukelswerCom(cny .

D. L Rmx

. Casau,tc Nuclear Genemnon Department  ; nce hesident CNICwordRoad (803)DI3:05 OfTice York. SC29745 (803)DI3426Far DlHG? POWER i

February 10, 1994 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk ,

Washington, D. C. 20555 .

Subject:

Catawba Nuclear Station  !

Dockets Nos. 50-413 and 50-414 l Inspection Report Nos. 50-413/93-28 and 50-414/93-28  !

At the conclusion of the Station Blackout (SBO) Implementation

  • Inspection, Duke personnel verbally outlined seven calculations that would be prepared or revised to complete the' documentation '

to support implementation of the requirements of the SBO Rule.

The calculations are Class 1E Battery Sizing,' Class lE Battery Voltage, SSF Battery Voltage, EDG Battery Sizing, EDG Battery ,

Voltage, SSF Diesel Loading, and SSF Diesel Voltage. The last two have now been combined into one calculation for SSF Diesel '

Loading and Voltage, resulting in six calculations to be completed. Attachment 1 documents Duke's plans for completion of the documentation'by June 30, 1994. '

Any questions related to this response may be directed to Z. L.

Taylor, Regulatory Compliance Manager, at (803) 831-3812.

Very truly yours, i

D. L. Rehn

\ KEN: RESP #293.28 l

xc: S. D. Ebneter l Regional Administrator, Region II

]

.i R. E. Martin, ONRR- 'i R. J. Freudenberger  !

Senior Resident Inspector MFoR086it 888866 P PDR f

L

/L)l @ ' I

?

b

9

. DUKE POWER COMPANY

, CATAWBA NUCLEAR STATION INSPECTION REPORT 413,414/93-28

-Attachment 1 Seven electrical calculations were discussed during the SBO inspection which either needed to be . revised or- completed and placed on file to support implementation of the Station Blackout.

Rule. These calculations were:

1) Class 1E Battery Sizing - EPL System
2) Class 1E Battery Voltage - EPL System

. 3) SSF Battery Voltage - ETM System

4) EDG Battery Sizing - EPQ System
5) EDG Battery Voltage - EPQ System
6) SSF Diesel Loading - ETL System
7) SSF Diesel Voltage ETL System The last two have been combined into one calculation for SSF Diene 3 Loading and Voltage - ETL System, resulting in'six calculations to be completed. The recommendations and concerns detailed in the Inspection Report will be addressed in .the revisions to the calculations. These calculations, as well as related procedures and training will be completed by 06/30/94.