ML20057B453
| ML20057B453 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 02/28/1992 |
| From: | Wise R NRC |
| To: | Dow S AFFILIATION NOT ASSIGNED |
| Shared Package | |
| ML20057B156 | List: |
| References | |
| FOIA-92-584 NUDOCS 9309220055 | |
| Download: ML20057B453 (2) | |
Text
~
FEB 28892
-e
(
@h M ~
Sandra long Dow
- 135 1078 Wellington Ottawa, Ontario KlY-2Y3
Dear Mrs. Dow:
Reference:
Allegation No. RIV-92-A-0016 This is in reference to our January 27, and February 5, 1992, telephone conversations during which you inquired about events that occurred at Comanche i
Peak, and expressed concerns related to operations.
An attachment to this letter documents your concerns, as I understand them.
We have initiated actions to examine the facts and circumstances regarding your concerns; therefore, if this letter does not completely and accurately reflect your concerns, please call me collect at (817) 860-8245 immediately, so that we can assure your information is adequately addressed during our review.
If you should call and I am not available, please leave a message and I will return your call.
In closing, let me assure you that every effort will be made to resolve your concerns. The U.S. Nuclear Regulatory Commission is responsible for j
protecting the public in the uses of nuclear facilities and materials. We engage in major efforts on a daily basis to fulfill that responsibility.
Sincerely, ORIGINAL SIGNED BY RUSSELL WISE I
Russell Wise Allegations Coordinator
Attachment:
Statement of Concerns cc w/ attachment:
Allegation file
\\
9309220055 930420 PDR FOIA MORRIS92-584 PDR
2 l
l l
STATEMENT OF CONCERNS
Reference:
Allegation No. RIV-92-A-0016 1.
Allegedly, during hot functional tests in 1983, CPSES loaded fuel, operated the reactor to generate steam in order to perform the hot i
functional tests.
As a result of this unauthorized event, workers removing coatings inside containment were exposed to radiation.
l 2.
Allegedly, tritium alarms have been sounding as material is released into Squaw Creek Reservoir and other release areas.
You believe from information you have received that CPSES released approximately 1800 i
pCi/l during the 2nd quarter 1991.
3.
CPSES is using landfills onsite to dispose of radioactive waste.
1