G E N E R A L-( )- ) E LE CTRIC J~
3/ee p
IRRADIAT!ON PROCESSING OPERATION e
'/
RADIDACTIVE MATERIALS SERVICES REMOTE HANDLING OPERATIONS 4
"' " 0" STANDARD OPERATING PROCEDURE SHIPPING PACKAGE SECTION,
Hodel No. IPO 200 -
U.
CHAPTER,
yg
.XVIII. ASSEMBLY / DISASSEMBLY K.
Loading / Unloading tI A' E
.g g 1.
ZEP.S.E.1 M
To provide instructions for loading and unloading the 4
- sT [
)
Model IPO 200 shipping package with radioactive materials
.j]
k using dry (hot cell) or wet-(underwater) facilities, and a
Ts'"
8 for preparing the package for return shipment to the~
~
GE Vallecitos Nuclear Center (GE VNC).
'T E E.n s
2.
Scope This procedure establishes the guidelines to be used for the We handling activities associated with the GE VNC supplied T
n shipping package. VARIANCES TO THESE CUIDELINES ARE
{
PERMISSIBLE PROVIDED THEY ARE IN COMPLIANCE WITH THE
'E j
APPLICABLE REQUIREMENTS OF THE SHIPPING PACKACE CERTIFICATE j
OF COMPLIANCE, NRC LICENSES, AND DOT RECULATIONS.
Internal 1
a
-customer operating procedures should be followed for the y4 ggg OO routine transfers, movements, decontamination, etc. of the i
shipping package.
e ~?
o N
_k 3.
Reference Documents i
1, g
w fl.
\\
_ l a.
NRC Certificate of Compliance No. 5971 for Model n.
- l. /
g 3'
No. IPO-200 Shipping Package.
/
-g:
g g
b.
Diagram Model 200 (Attachment I).
{
k j.
I 4.
Eouinment Recuired
'8 a.
E supplied Model No. IPO 200 cask and protective Q
O g pg
.~
jacket assembly, see Attachment I.
(EN I !
jeo i3C s
p b.
Internal hardware (holders, spacers, etc.) as may be j
l
, gp ;
required to provide containment and/or shoring for materials being shipped. The description and instruc-i m,-
i o
9
. (
tions for the use of such hardware, when required, are provided separately from this procedure, m
y <
- s.,
..e o
'DATEtSSUED 7/15/B7 SUPERSE0Es tSSVE PAGE 1
Of 8
l*l.
df h[l m
ISSUEDSY:
J. I. Tenorio rg;;U:
4/2/87 REVIEW DATE 7/91
-1
j 4
3 C-as
- SENER AL O ELECTRIC 3/86 L
g C
1RRADIATION PROCESSING OPER ATION RADIOACTIVE MATERIALS SERVICES
/,
REMOTE HANDLING OPERATIONS STANDARD OPERATING PROCED'JRE CHAPTER SHIPPING PACKAGE e&CTION XVIII.
ASSEMBLY / DISASSEMBLY K.
Model No. IPO 200 Loading / Unloading c.
Equipment adequate to safely lift and move package assembly and components.
~
Package weights are:
- 1) Total assembly (without cask liner) 9300 lb. (4218 kg);
- 2) Cask - 5900 lb. (2676 kg);
- 3) Cask lid 400 lb. (180 kg);
- 4) Lead Liner 520 lb. (240 kg).
l d.
Wrenches for removing and installing the 2 in, hex head protective jacket l
bolts; 1 in, hex head cask lid bolts; and 1/2 in. NPT hex socket head drain l
- plug, e.
Radiation survey instruments to determine package dose rate and surface contamination levels, f.
Decontamination materials, e.g. water / detergent, cloths, absorbent pads, brushes, etc.
g.
Teflon thread sealant tape, or equivalent.
h.
Duct tape, or equivalent.
i.
Cask cavity leak check equipment:
Compressed gas, regulator, drain plug adaptor.
5.
Reauirements and Precautions a.
The protective jacket and the exterior of the cask are free of smearable (non-fixed) contamination when shipped from GE-VNC.
The package must be returned to GE VNC in the same condition, b.
Do NOT lif t the protective jacket / cask assembly by the top rectangular holes in the jacket (Jacket lifting eyes, Item 1 of Attachment I).
These are for removing the jacket from the jacket base (Item 2) only, c.
ONLY THE TIE-DOWN LUGS (ITEM 3) LOCATED ON THE UPPER SIDES OF THE JACKET ARE l
APPROVED TO-TIE DOWN THE PACKAGE DURING TRANSPORTATION. TWO ADDITIONAL CHAINS TO SECURE THE PROTECTIVE JACKET PALLET TO THE VEHICLE ARE RECOMMENDED. USE OF OTHER TIE DOWN SYSTEMS WILL REQUIRE AN ENGINEERING ANALYSIS AND EVALUATION BE PERFORMED BY THE SHIPPER.
I.
O ED E SUPERSEDES ISSUE REVl810h NO.
4 PAGE 2 0F 8
CATE15UED' 4/2/87 J. I..Tenorio paygo:
- sesUED ay:
.~,
c-.
GENERAL Qg ELECTRIC.
am.
l IRRADIATION PROCES$1NO OPERATION RADIDACTIVE MATERIALS SERVICES REMOTE HANDLING OPERATIONS STANDARD OPERATING PROCEDURE cMarTER SHIPPING PACKAGE 8ECT80N XVIII.
ASSEMBLY / DISASSEMBLY K.
Model No. IPO-200 Loading / Unloading d.
The tie down-lugs are approved for lifting the jacket from the base (Item 2), and for lifting the entire package.
e.
.The jacket lifting eyes (Item 1) must NOT be used for tie down purposes and must be closed with anti tie down covers (Item 4) to prevent use during transport, f.
The protective jacket and jacket base should be remo'ed in an uncontaminated area. Only the cask should be subjected to potential contamination.
g.
Do NOT attempt to lift the cask by the eye (Item 5) on the cask lid. The i
eye is for' lifting the cask lid only, h.
Component parts of the shipping package (protective jacket, cask, base, gasket, etc.) may not be repaired, replaced, or modified without written permission from General Electric Company, Vallecitos Nuclear Center (GE-VNC).Pleasanton, California. Any damage to the package sustained during transport or handling operations must be reported to GE VNC.
1.
The full cask shall be leak checked prior to shipment utilizing a method
-3 capable of determining that leakage of 10 atm em /s at STP is not exceeded. Acceptable methods include bubble check by water immersion and Snoop / gas pressure check.
'j. A leak check is not necessary for any cask which complies with the requirement for a DOT " EMPTY" container, o
6.
Packare Disassemb1v Instructions Survey the package in accordance with own internal procedures to assure that a.
radiation dose rate levels do not exceed acceptable limics, b.
Using appropriate capacity handling equipment, transfer the package assembly into an area free of radioactive contamination.
The package assembly without the liner is 8860 lb. (4050 Kg),
c.
Remove the wire security seal located at the base of the jacket. 'Unserew
.and remove the bolts (Item 6) from the base of the jacket. Remove the anti-tiedown covers Item 4).
Use care not to damage covers or to lose the bolts.
CAT
- ssuto
.ddl 161987 SUPERSEDES e0UE REVWlON NO.
4 PAGE 3 0F 8
J. I. Tenorio DATED:
4/2/87 essuso sY.
C-43 GEN ER AL O ELECTRIC 3/80 1RRADI ATION PROCESSING OPER ATION-RADIOACTIVE MATERIALS SERVICES REMOTE HANDLING OPERATIONS STANDARD OPERATING PROCEDURE CHAPTER SHIPPING PACKAGE sect a XVIII.
ASSEMBLY / DISASSEMBLY K.
Model No. IPO 200 Loading / Unloading o
.d.
Carefully lift the jacket off the cask by using the rectangular lifting eyes (Item 1) on top of the jacket or by using the tiedown lugs.(Item 3) and-appropriately rated slings. The cask surface is potentially contaminated.
Handle with care, e.
Place the jacket in a noncontaminated area.
f.
Survey the external cask surfaces for radioactive contamination, If smear-able contamination is detected, follow appropriate internal procedures for contamination control.
7.
Dry Loadine/Unioadine Instructions a.
Lift the cask from the jacket base (Item 2) using the lifting ears (Item 8) and transfer the cask to the shielded (hot cell) facility designated for the dry loading / unloading operations in accordance with own internal procedures, b.
Remove the cask lid bolts (Item 7) and store to prevent loss, contamination, or damage, c.
Carefully remove the lid from the cask using the lid lifting eye (Item 5) 1.
and sling. Monitor cask dor rates during this step as prescribed by internal procedures.
d.
Inspect the seal gasket (Item 9), lid seal area, and lid bolts for damage 1
which could affect the integrity of the closure seal. The inspection should be conducted prior to loading material into the empty cask cavity, or after the cask contents have been removed and safely stored.
If any damage is observed, notity GE-VNC, (415) 862-2211.
]
e.
Transfer the radioactive materials and associated internal hardware being shipped, or being received, into or out of the cask cavity in accordance with separately provided special procedures and/or applicaM e internal l-procedures. NOTE: When required, special instructions regarding the use of internal hardware (e.g. sample containers, holders, spacers, etc.) provided by GE-VNC for the specific material being shipped will be provided in a separate document.
Inavi CAtt assuto JUL 151987 sunnesoesissus 10N No.
4 PAGE 4 0F 8
issuso ev:
J. I. Tenorio oATEo:
4/2/87
\\
Q-as -
GENER AL $ ELECTRIC sm IRRADIATION PROCES$1NG OPERATION i
RADI0 ACTIVE MATERIALS SERVICES l
REMOTE HANDLING OPERATIONS STANDARD OPERATING PROCEDURE l
CHAPTER '
SHIPPING PACKAGE escTim XVIII.
ASSEMBLY / DISASSEMBLY K.
Model No. IPO 200 Loading /Unioading f.
Check the seal gasket for proper positioning and carefully install the cask lid, taking care not to displace the gasket..
g.
Monitor cask per own internal procedures, to assure that dose rates are within prescribed limits.
l h.
Re-instal 1L and tighten all lid bolts to assure good lid seal.
i.- Perform cask cavity leak check to assure leakage does not exceed'10' atm cm /sec.
If cask fails to pass the cavity leak check, notify GE-VNC.
The leak check is not required for any cask in compliance with the DOT " EMPTY" container requirements,
- j. Remove all old labels from cask and apply new label as= appropriate for this
- shipment, i.e., " FULL" or " EMPTY", App 1tcation of new labels is optional, 3-k.
Survey the external cask surfacts for smearabla cantamination and decontaminate per_ internal procedures as necessa?:y to reduce smearable s
contamination levels to below 49CFR t.,d NRC reluase limits.
" Fixing" contamination by painting or other means is L2.t; permitted.
' 1.
Tape the interface between the cask lid and cask body with ventilation
(" duct") tape or a comparable tape.
y m.
The cask is now ready for transfer into protective jacket.
8.
Wet Loadine/Unioadine Instructi2B1 a.
Lift the cask from the jacket base (Item 2) using the lifting ears (Item 8) and transfer cask to the facility designated for the wot (underwater) loading / unloading operations in accordance with own internal procedures, b.
Remove the ' cask lid bolts (Item 7) and store to prevent loss, contamination, or damage, c.
Remove the drain plug (Item 10) and store with the cask lid bolts, d.
Rig cask for lowering into water pool vith overhead crane in accordance with own internal procedures. Clevis bolts may be nounted to the cask lifting ears for crane hook attachment points.
1 DATE ISSUED jd[ { f O$]
SUPERSEDES ISBUE REVill0N 980.
4 PaGE $
09 3
. 'nesuEc sv
'J.
I. Tonorio oATEo:
4/2/87 L
u o u.
+
GENERAL ELECTRIC vat
. /i
~
IRRADIATION PROCESSING OPERATION RADIDACTIVE MATERIALS SERVICES REMOTE HANDt.ING OPERATIONS STANDARD OPERATING PROCEDURE
~
cHAPTsR SHIPPING PACKAGE ascTim XVIII.
ASSEMBLY / DISASSEMBLY K.
Model No. IPO 200 loading /Unioading
?
e.
Cask may be lifted SDlX by side lifting ears (Item 8).
Do not lift entire cask with eye in cask lid.
f.
An appropriate length sling or hook should be attached to the cask lid lift.
i ing eye to facilitate subsequent underwa*. r removal of the lid with the crane.
g.
If the cask is to be lowered to rest on the pool floor, protect the bottom of the cask to prevent embedding particulate contaminants in the bottom of
- j a
the cask.
h.
Carefully lower the cask slowly into the pool and poaition cask for loading / unloading operations es prescribed by own internal procedures.
i.
Carefully lift the cask lid from the cask with the crane. The cask lid should be lifted slowly to allow cask cavity to fill with water without generating large air bubbles.
- j. Move lid aside to provide access to cask cavity.
The cask lid may be set down or remain suspended, k.
Transfer the radioactive materials and any associated internal hardware being shipped, or received, into or out of the cask cavity in accordance with separately-provided special procedures and/or applicable own internal procedures.
' NOTE: When required, special instructions regarding the use of internal hardware (e.g., sample containers, holders, spacers, etc.) provided by General Electric'for the specific material being shipped,-will be provided in a separate document.
1, check the seal gasket for damage and proper positioning. If damage is oM erved, notify CE VNC.
m.
Carefully re-inscall the cask lid, taking care not to displace the gasket.
n.
Rttise cask out of pool and monitor per own internal procedures to assure 4
that dose rates are within acceptable limits.
,\\
onir issuno -
JiL151987 w eess e s us a v m m ao.
4 eaan 6 cr 3
han gy:-
J. X sTenorio saign:
4/2/87 l
U M
t
~~
,f[&Jl?hkf?.?l.l,f fh f W $;lkl*f [&(h
t.
e n
cm z*
GENERAL /
TELECTRIC sm V
i o<
IRRADIATION PROCES$1NG OPERATION RADIOACTIVE MATERIALS SERVICES REMOTE HANDLING OPERATIONS STANDARD OPERATING PROCEDURE
' CHAPTER SHIPPING PACKAGE escTim XVIII.
ASSEMBLY / DISASSEMBLY K.
Model No. IPO 200 - Loading /Unioading-o.
Rinse cask thoroughly with clean (uncontaminated) water to remove any residual contaminated pool water from external cask surfaces, p.
Allow water to completely drain from cask cavity.
NOTE: To assure complete drainage of water, the cask-lid should be raised slightly to break the cavity seal and provide venting, q.
Inspect the lid bolts and the drain plug for damage.
If damage is' observed, notify GE VNC.
r.
Re seat cask lid and ins',all and tighten all cask lid bolts to assure good lid seal.
Perform cask cavity 2eak check to assure leakage does not exceed 10'3 atm
-s.
em /sec. ^The leak check is not required for-any cask in compliance with the DOT " EMPTY" container requirements, t.
Remove old Teflon tape sealant from drain plug threads and apply new Teflon
.)
tape or equivalent thread sealant.
u.
Install the drain plug and tighten to assure good plug seal.
v.
Remove all old labels from cask and apply new label as appropriate for this
- shipment, i.e., " FULL" or-" EMPTY", Application of new labels is optional.
w.
Survey the external cask surfaces-for smearable contamination and decontaminate per own internal procedures as necessary to reduce smearable contamination levels to below 49CFR and NRC release limits.
" Fixing" contamination by painting or other sieans is not permitted.
x.
Tape the interface between the cask lid and: cask body with " duct" tape or a comparable tape, i
y.
The cask is now ready for transfer into the protective jacket.
1 9.
IAchagt Assembly and PrtRaratjpn for Shinment j
a.
Return the cask to the protective j e.cket storage area.
b.
Inspect the protective jacket, base, and bolts for damage Notify GE VNC if 1
t.ny damage requiring rept.ir or rep' lace;nen: of parts ir observed.
9
-ll
't
'4
-)OI.I6$$7 p ens ois msos stvmono.
FAnr. 7 or 8
DATEtar,oso enuto 6..
J. I. Tenorio i cAvan-4/2/87 i
@ ' l U
.3 is anA
!;,i L..
.E-
.,1 4
4 c
' G E N ER AL O El,E CTRIC 3/86 v
b.-
IRRADIATION PROCESSING OPERATION l
RADIDACTIVE MATERIALS SERVICES REMOTE HANDLING OPERATIONS STANDARD OPERATING PROCEDURE l1:
SHIPPING PACKACE escTeoN CHAPTER XVIII.
ASSEMBLY / DISASSEMBLY K.
Model No. IPO-200 - Leading / Unloading c.
Place cask on jacket base.and align so that protective jacket can be
' properly positioned over cask lifting ears and mate with base bolt holes.
l d.
Position protective-jacket on jacket base.
l e.,
Install the jacket bolts and tighten, j
f.
Fasten anti tiedown covers to jacket lifting eyes.
l g.
Perform final radiation survey of assembled package, including a smear check j
f of external jacket surfaces and complete shipping papers as required by applicable-internal procedures and government regulations.
l h.
Remove all old labels and attach appropriate shipping labels and security seal to jacket,
- i. ASSURE THAT ONLY THE APPRO7ED TIE DOWN LUCS (ITEM 3) ARE USED TO SECURE THE
]
PACKACE ASSEMBLY TO THE TRANSPORT VEHICLE. USE OF OTHER TIE DOWN SYSTEM VILL REQUIRE AN ENCINEERING ANALYSIS AND EVALUATION BE PERFORMED BY THE SHIPPER.
TWO ADDITIONAL CHAINS TO SECURE THE PROTECTIVE JACKET PALLET TO THE. VEHICLE ARE RECOMMENDED.
J.
Return the shipping package, in accordance with appropriate internal ship-ping instructions, to:
i h7 General Electric Company Vallecitos Nuclear Center
/
Highway 84 (Vallecicos Road)
Pleasanton, California 94566 U.S.A.
hb K
h i
I 1 f
(,.
l /
/.
i
. ll j
[%
- = " * * * ' * * *
"< v *o" "o-4
'^" a or 8
icATE tatuso a 15 PFT
,M
- ssux
- a cy:
J. I. Tenorio oATro:
4/2./87 j
m.
M M
a uf%_
- 200 serios D.0.T. S.P. No. 5971 (6 1.A.E.A. Certified)
Cask Weight 6700 Lbs. - 3045 Kgs.
L..
Assembly Weight 8860 Lbs. - 4050 Kgs.
, y,,,,i
- Assembly Drawing No. -212E236G1 1
gie, -.--
,,, "('
ATTACHMENT I L(
b.I Co#7 2 % Due=
[
lo ne.
4 q-I
.. L goed vee, (fo9 /4) M.
Y Bea See#ee Ow*e* esebW $7 F/le 04. 8""
k I See Soedea leeet Acebee 38.F/16 te. E AnYio7'o't.gfee96 C ever.r ca.6 uhiae see ss.1/ ele.
,y Lil'ti%
s tooee deshoe1.d. -
- r83 4 \\
881/ ele.
\\(.
-_ w W/A V///
' >b=
g#o,n.a s i.< < m
~
SY*
g y;yy 6 fe t kt
- 4,s de /for 4
s Ye a r.r p
sg,,,,Q y,.,, +.. it - y.
---,..i ~
T
..Q.',*
".f,' !. 'I
'a'""" g, m
.[.
'q'. g y
F 4 /14 m d6e m.
owee a
g esebet ass ="
=*"
s $AF/L' le.
,2.,j.'.,.
48 8/16 la.
- 4..
emeee p*..1
,.s :...
seehee
.,, :[
tesh g.' l 64 h m,. '.
88 8/ela.
3 FF.9 f 4 te.
i
'*e'S,
.i?
tb s'i.
e*.
I ss== S.f /4le. 488d
==""'""*
q;'s.,..[k P
I
,e
. s. -
.\\
sseer (optionel)
- '4',
i g.
,I
- D d 'e '.', *
.?
i',*:.
QooMin w,
s.
_..a. ::.; L.'>
.'.J.
.1 1.....:...
ifi.ie.see.
g w.
1
- y
~
i a
- e.......r A.
v -"
NhdIF M
N
.N.
]
.7a'craf Base l~
cash
/'
""""" 3..I / 4.a. die m l
- Pelles 471/3 49. De -
MODEL 200 SMitLD89 COM1AIN88