ML20055C912
| ML20055C912 | |
| Person / Time | |
|---|---|
| Site: | 07105971 |
| Issue date: | 10/02/1980 |
| From: | Tenorio J, Zimmerman D GENERAL ELECTRIC CO. |
| To: | |
| Shared Package | |
| ML20055C908 | List: |
| References | |
| PROC-801002, NUDOCS 9006280374 | |
| Download: ML20055C912 (2) | |
Text
.
IRRADIATION PROCES$1N@ OPERATION.
f RADIOACTIVE PRODUCTS AND SERVICES OPERATING PROCEDURE aEVWON O
1 CHAPitt: XVII. CASK /FIRESHIEH)
SECT)ON:
E.
Fireshield Skirt Ii MAINIENANCE Insoection and Re W r 1.
Purpose g
7b define the inspection and repair requirements for the protective
+
skirt on the metal fireshield pallets.
g I !.b$v es 4 2.
Applicability g
a.
This procedure is applicable to all RP&S owned shipping l
container mcxlels utilizing metal protective jackets 8
(fireshields) which incorporate a metal skirt to protect the fireshield base nuts frcrn forktruck damage.
[t b.' ihe following model runbers utilize netal protective jackets:
r h
100 500 1000 1500 0
I 200 600 1100 1600 h
400 900 1400 Sg*8$I gg m
8 3
Special Requirements aaaE 8.
The protective skirt inspection is conducted prior to any OEOO off-site shipnent of any listed cask model.
ag $
b.
All inspection activities are documented en the "Fireshield Q
g l
Checksheet", R-7 and repair activities are recorded on the Cask 54 PM Ingbook.
k W
k j
8 4.
Procedure l[j E
a.
Visutlly inspect the metal skirt for damage, weld failure, prt d
loss, etc.
Q a.
b.
Determine the amearable arxl/or fixed contamination level prior i
8@@@
to beginning repair work.
- 2 c.
Use large hamrner and heat to straighten the skirt.
qg sSE50 d.
aepair fractured or failed welds as necessary to meet drawing
$3 b
requirements.
RS 6
16
)
Mi igi
+
2 10-2~80 NW l
2 28. g g g g.
DATEISSUED SUPER $808515308 PAGE OF hto,
aaa 5i 300
'5$uso svi J.I. Tenorio OAT 50 anview oat: 1/91 J
n-as G E N E R AL IJ E LECTRIC-2"'
1 IRR ADI ATION PR'OCESSING OPER ATION-o~
RADIOACTIVE PRODUCTS & SERVICES
. OPERATING PROCEDURE CHAPTEn SECTION XVII. CASK /FIRESHIELD MAINIU1ANCE E. Pireshield Skirt Inspection & Repair
- 11. - Procedure (continued) d.
Paints the repaired skirt to match the fireshield following SOP XVII:L, " Metal' Fireshield Painting".
e.
Record repair data in the Cask PM I.ogbook and cn the "Contamer PM Checksheet",
'R-9 f.
Fbrward the completed Check. sheet to the Area Supervisor for review.
g.
'Ibe completed Checksheet will be filed in the appropriate cask file by the RHO Shipping Clerk.
l L
1
(
' oAte issuto 10-2-80 surenssoss issur NEW nEVislON NO. 0 PAos 2 op 2 oATao:
' Issuto BY: J.I. % norio
-