. . Rev. 1 - 2/16/82 l

OPERATING DATA REPORT ,

DOCKET NO. 50-346 DATE February 16, 1982 COMPLETED BY Erdal C. Caba TELEPif0NE (419) 259-5000, Ext. 196 OPERATING STATUS Davis-Besse Unit 1 Notes

1. Unit Name:
2. Reporting Period: November. 1978
3. Licensed Thermal Power (MWt): 2772
4. Nameplate Rating (Gross SIWE): 925
5. Design Electrical Rating (Net MWe): 906
6. Maximum Dependable Capacity (Gross MWe): to be determined -
7. Maximum Dependable Capacity (Net MWe): to be determined
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
9. Power Level To Which Restricted,if Any (Net MWe): None
10. Reasons For Restrictions. If Any:

This Month Yr to-Date Cumulative

11. Ilours in Reporting Period 720 8,016 11,021
12. Number Of flours Reactor Was Critical 691.9 4.510.9 6.303
13. Reactor Resene Shutdown llours 0 38.9 422.6
14. liours Generator On-Line 567.2 3,952.1 5,419.1
15. Unit Re,ene Shutdown flours 0 0 0 ~
16. Gross Thermal Energy Generated (MWil) 1,380,036 7.896,674 9.560.706
17. Gross Electrical Energy Generated (MWill 453,563 _, 2,662,334 3,186,783
18. Net Electrical Energy Generated (MWil) 423.578 2.438.330 2.868.148
19. Unit Senice Factor 78.8 49.3 52.2
20. Unit Availability Factor 78.8 49.3 52.2
21. Unit Capacity Factor (Using MDC Net) _Lp be determined
22. Unit Capacity Factor (Using DER Net) 64.9 33.6 33.9 1 23. Unit Forced Outage Rate 4.2 23.4 23.2
24. Shutdowns Scheduled Oser Next 6 Months (T)pe. Date,and Duration of Eachl:

i I

l l 25. If Shut Down At End Of Report Period. Estimated Date of Startup:

l 26. Units in Test Status (Prior to Commercial Operation): Forecart Achiesed 1

1 ~

l INITIA L CRITICA LITY 8/12/77 INITIAL ELECTRICITY 8/28/77 COMMERCIAL OPER ATION ,, 11/21/77*

  • Declared ne '

12/19/77**

hD R

0 . . a t. /5%

.. aed operational at 100% (from 75%)

4

.