Text
-
Rev. 1 - 2/9/79 Rev. 2 - 3/8/79 Rev. 3 - 2/16/82 OPERATING DATA REPORT 50-346 DOCKET NO.
DATE Februarv 16, 1982 COMPLETED BY Fra,1 C. Caba TELEPlf0NE (419) 259-5000, Ext. 196 OPERATING STATUS
- 1. Unit Name.
Davis-Besse Unit 1 Notes
- 2. Reporting Period:
December, 1978
- 3. Licensed Thennal Power (SIW:):
2772
- 4. Nameplate Rating (Gross atWe):
925,
906
- 5. Design Electrical Rating (Net 31We):
- 6. Maximum Dependable Capacity (Gross 31We): to be determine 1 to be determine 1
- 7. Maximum Dependable Capacity (Net alwe).
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
- 9. Power Level To Which Restricted. if Any (Net MWe):
None
- 10. Reasons For Restrictions,if Any:
This S.onth Yr.-to-Date Cumulative
- 11. Hours in Reporting Period 744 8,760 11,765
- 12. Number Of flours Reactor Was Critical 328.8 4,839.7 6,631.8
- 13. Reactor Resene Shutdown flours 367.7 406.6 790.3
- 14. Hours Generator On-Line 314.1 4,266.2 5,733.2
- 15. Unit Resene Shutdown flours 0
0 0
- 16. Gross Thermal Energy Generated (MWil) 6?6.864 8,523,538 10.187,570
- 17. Gross Electrical Energy Generated (MWil) 196,972 _,
2.859,306 3,383,755
- 18. Net Electrical Energy Generated (MWil) 175,312 2,611,642 3,041,460
- 19. Unit Senice Factor 42.2 48.7 51.4
- 20. Unit Asailability Factor 42.2 48.7 51.4
- 21. Unit Capacity Factor (Using MDC Net) to be determined
- 22. Unit Capacity Factor IUsing DER Net) 25.7 32.9 33.3 3
- 23. Unit Forced Outage Rate 57.8 27.7 26.7
- 24. Shutdowns Scheduled Oser Ne.st 6 Months (Type. Date.and Duration of Each):
None
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
- 26. Units in Test Status (Prior to Commercial Operation >:
Forecast Achiesed I
INITIAL CRITICALITY INITIAL ELECTRICITY N/A COMMERCIA L OPER A TION g3h 0
(9/771 l
R
___.