tr Rev. 1 - 2/16/82 OPERATING DATA REPORT DOCKET NO.

50-346 DATE February 16, 1982 CO51PLETED BY Erdal C. Caba TELEPilONE (419) 259-5000 Ext. 196 OPERATING STATUS

1. Unit Name:

Davis-Besse Unit 1 Notes

2. Reporting Period:

Aunust, 1978 2772

3. Licensed Thermal Power (31Wt):
4. Nameplate Rating (Gross StWe):

925

5. Design Electrical Rating (Net alwe):

906

6. Stasimum Dependable Capacity (Gross SIWE): to be determined to be determined
7. Sf aximum Dependable Capacity (Net S!We):
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
9. Power Level To Which Restricted. If Any (Net 51We):

906

10. Reasons For Restrictions. If Any:

This Month Yr.-to-Date Cumulative

11. Ilours in Reporting Period 744 5,831 8,836
12. Number Of liours Reactor was Critical 383.5 2.917.2 4.709.3
13. Reactor Resene Shutdown flours 0

19.8 403.5

14. liours Generator On Line 360.2 2,615.1 4,082
15. Unit Resene Shutdown flours 0

0 0

16. Gross Thermal Energy Generated (5tWil) 469,519 4,639,135 6,303,167
17. Gross Electrical Energy Generated (31Wil) 151,4X _

1,580,173 2,104,622

18. Net Electrical Energy Generated (31Wii) 129.032 1.433.946 1.863.764
19. Unit Service Factor 48.4 44.8 46.2
20. Unit Availability Factor 48.4 44.8 46.2
21. Unit Capacity Factor (Using SIDC Net) to be determined
22. Unit Capacity Factor (Using DER Net) 19.1 27.1 23.3 I

51.6 28.7 27.4

23. Unit Forced Outage Rate
24. Shutdowns Scheduled Over Next 6 Stonths(Type.Date.and Duration of Each1:
25. If Shut Down At End Of Report Period. Estimated Date of Startup:

~

26. Units in Test Status (Prior to Commercial Operation):

Forecast Achiesed INITIAL CRITICALITY 8/12/77 INITIAL ELECTRICITY 8/28/77 CONT %1ERCIA L OPER ATION 11/21/77*

  • Declared operational at 25%

12/19/77**

'T20'5230723820216

om 25%)

1/23/78***

~

l PDR ADOCK 05000346

om 40%)

7/31/7%*y C: R PD_R -_.

sfrom 75%)