ML20042A730
Jump to navigation
Jump to search
| ML20042A730 | |
| Person / Time | |
|---|---|
| Site: | Davis Besse |
| Issue date: | 02/16/1982 |
| From: | Caba E TOLEDO EDISON CO. |
| To: | |
| Shared Package | |
| ML20042A722 | List: |
| References | |
| NUDOCS 8203230723 | |
| Download: ML20042A730 (1) | |
Text
-
tr Rev. 1 - 2/16/82 OPERATING DATA REPORT DOCKET NO.
50-346 DATE February 16, 1982 CO51PLETED BY Erdal C. Caba TELEPilONE (419) 259-5000 Ext. 196 OPERATING STATUS
- 1. Unit Name:
Davis-Besse Unit 1 Notes
- 2. Reporting Period:
Aunust, 1978 2772
- 3. Licensed Thermal Power (31Wt):
- 4. Nameplate Rating (Gross StWe):
925
- 5. Design Electrical Rating (Net alwe):
906
- 6. Stasimum Dependable Capacity (Gross SIWE): to be determined to be determined
- 7. Sf aximum Dependable Capacity (Net S!We):
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
- 9. Power Level To Which Restricted. If Any (Net 51We):
906
- 10. Reasons For Restrictions. If Any:
This Month Yr.-to-Date Cumulative
- 11. Ilours in Reporting Period 744 5,831 8,836
- 12. Number Of liours Reactor was Critical 383.5 2.917.2 4.709.3
- 13. Reactor Resene Shutdown flours 0
19.8 403.5
- 14. liours Generator On Line 360.2 2,615.1 4,082
- 15. Unit Resene Shutdown flours 0
0 0
- 16. Gross Thermal Energy Generated (5tWil) 469,519 4,639,135 6,303,167
- 17. Gross Electrical Energy Generated (31Wil) 151,4X _
1,580,173 2,104,622
- 18. Net Electrical Energy Generated (31Wii) 129.032 1.433.946 1.863.764
- 19. Unit Service Factor 48.4 44.8 46.2
- 20. Unit Availability Factor 48.4 44.8 46.2
- 21. Unit Capacity Factor (Using SIDC Net) to be determined
- 22. Unit Capacity Factor (Using DER Net) 19.1 27.1 23.3 I
51.6 28.7 27.4
- 23. Unit Forced Outage Rate
- 24. Shutdowns Scheduled Over Next 6 Stonths(Type.Date.and Duration of Each1:
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
~
- 26. Units in Test Status (Prior to Commercial Operation):
Forecast Achiesed INITIAL CRITICALITY 8/12/77 INITIAL ELECTRICITY 8/28/77 CONT %1ERCIA L OPER ATION 11/21/77*
- Declared operational at 25%
12/19/77**
'T20'5230723820216
- om 25%)
1/23/78***
~
l PDR ADOCK 05000346
- om 40%)
7/31/7%*y C: R PD_R -_.
sfrom 75%)