Ack Receipt of 810723 Application Supplemented by Proposing Seismic re-evaluation Program for Qualification of Mechanical & Electrical Equipment.Util Should Submit Class I & III Fees
ML20032B150
Person / Time
Site: Haddam Neck, Millstone  File:Connecticut Yankee Atomic Power Co icon.png
Issue date: 10/21/1981
From: Diggs R
NRC OFFICE OF ADMINISTRATION (ADM)
To: Counsil W
CONNECTICUT YANKEE ATOMIC POWER CO.
References
TAC-42493, NUDOCS 8111040638
Download: ML20032B150 (1)


Text

,

s 1

a.

3CL 21.1981 I

e T

($

~

k Docket Nos. 50-213, Y

-E I

DISTRIBUTION:

50-245 and 50-336 q

00T2 2.1981 7ej PDR "Es5E".

cetFileY T

/

WPaulson, ORB-5

. s 'y HSmith, ORB-5 Northeast Nuclear Energy Company

  • ld:O @/

JShea,: ORB-5 Connecticut Yankee Atomic Power Compan MConner, ORB-3 l

ATTN: Mr. W. G. Counsil PKreutzer, ORB-3 Vice President - Nuclear Engineering RMDiggs, LFMB and Operation LFMB Reactor File P.O. Box 270 LFMB Pending Check File l

Hartford, Connecticut 06101 LFMB R/F (2)

Gentlemen:

We have received a copy of your application dated July 23, 1981, as supplemented by letter _ dated September 15, 1981, which was filed with the Office of Nuclear Reactor Regulation (ONRR) for review end acceptance. This application' proposed a seismic reevaluation program for qualification of mechanical and electrical equipinent in lieu of participation in the NRC's program for the Haddam Neck Plant and Millstone Nuclear Power Station Units Nos.1 and 2.

Fees pursuant to 10 CFR 170.22 were not remitted with the application.

Based on information provided by the ONRR staff as a result of their preliminary review of this application, it has been determined that a Class III fee -($4,000) each is applicable to the Haddam Neck Plant and Millstone Nuclear Station Unit I and a Class I fee ($400) is applicable to Millstone Nuclear Station Unit 2 because tt.a review will involve consideration of a single safety issue for Haddam Neck and Millstone Nuclear Station Un101 and more than one unit (Millstone Nuclear Station Unit 2). Although Millstone Units 1 and 2 are not identical units, we, s have been advised by the ONRR staff that due to the nature of the item'being' i j considered and the fact that both units are or, the same site with one major C

review covering both units, a duplicate fee for Millstone Unit 2 would'be

\\

applicable rather than a Class III fee. Therefore, you are requested to remit N

the sum of $8,400 to our office. If the ONRR staff's final review of your 4

application reveals that these fees are not correct, you will be notified and -

kV.

any r.ecessary adjustment will be made.

Sincerely, Oriz;W.1 C'md 57 Ma LWp 8111o40638 s Reba M. Diggs gDRADOCK05hohf3 Facilities Program Coordinator N

PDR License Fee Management Branch Office of Administration JM.B..:.ADMM.

.9.RB

,,Lgg omm>

cua.=, gTre,n,per,,v,1,,,,,,n,,,,,6, RMD,1,ggs,,,,,,,,

1.9f.&l.8.1......

.19L.DL.Q.1...... 3.0INI.B1.....

- -. -..... +.

an>

Nac ronu sia tio-so> nacu o24o OFFiClAL RECORD COPY usam isei-ar-see