Order Directing Licensee to Respond Fully & Completely to IE Bulletin 79-01B,re Environ Qualification of Class IE Equipment,By 801101
ML19347C123
Person / Time
Site: Millstone Dominion icon.png
Issue date: 09/19/1980
From: Eisenhut D
Office of Nuclear Reactor Regulation
To:
NORTHEAST NUCLEAR ENERGY CO.
Shared Package
ML19347C124 List:
References
IEB-79-01B, IEB-79-1B, TAC-42493, NUDOCS 8010160639
Download: ML19347C123 (6)


Text

-

i I

UNITED STATES OF AMERICA l

NUCLEAR REGULATORY COMMISSION 4

1 In the Matter of

)

)

NORTHEAST NUCLEAR ENERGY COMPANY

)

j CONNECTICUT LIGHT AND POWER COMPANY

)

J.

HARTFORD ELECTRIC LIGHT COMPANY

)

Docket No. 50-336 WESTERN MASSACHUSETTS ELECTRIC COMPANY)

(Millstone Nuclear Power Station

)

j Unit No. 2)

)

2 REVISED ORDER FOR MODIFICATION OF LICENSE

]

I.

I j

Northeast Nuclear Energy Company, et al. (licensee) is the holder of License No. DPR-65, which authorizes the operation of the Millstone Nuclear Power i

l Station, Unit No. 2 at steady state reactor power levels not in excess of 2700 megawatts thermal (rated power).

The facility consists of a Pressurized Water Reactor located at the licensee /s site in the Town of Waterford, l

Connecticut.

j II.

i On November 4,1977, the Union of Concerned Scientists (UCS) filed with 1

j the Commission a " Petition for Emergency and Remedial Relief."

The petition sought action in two areas:

fire protection for electrical cables, and environmental qualification of electrical components.

By Memorandum and Order dated April 13,1978 (7 NRC 400), the Commission denied certain aspects of the petition and, with respect to other aspects, I

i l

ordered the NRC staff to take several related actions.

UCS filed a Petition for Reconsideration on May 2,1978.

By Memorandum and Order, dated May 23, 1980, the Commission reaffirmed its April 13, 1978 decision i

l i

I i

8010160689

. regarding the possible shutdown of operating reactors.

However, the Commission /s May 23, 1980 decision directed licensees and the NRC staff to undertake certain actions.

With respect to environmental qualification of safety-related electrical equipment, the Commission detemined that the provisions of the two staff documents - the Division of Operating Reactors " Guidelines for Evaluating Environmental Qualification of Class lE Electrical Equipment in Operating Reactors" (00R Guidelines) and NUREG-0588, " Interim Staff Position on Environmental Qualification of Safety-Related Electrical Equipment," December 1979 "fom the requirements which licensees and applicants must meet in order to satisfy those aspects of 10 CFR Part 50, Appendix A General Design Criterion (GDC-4), which relate to envi-ronmental qualification of safety-related electrical equipment." The Commission directed, for replacement parts in operating plants, "unless there are sound reasons to the contrary, the 1974 standard in NLREG-0588 will apply." The Commission also directed the staff to complete its 1

review of the infomation sought from licensees by Bulletin 79-OlB and to complete its review of environmental qualification of safety-related electrical equipment in all operating plants, including the publication of Safety Evaluation Reports, by February 1,1981.

The Commission 1

Bulletin 79-OlB was not sent to licensees for plants under review as part of the staff /s Systematic Evaluation Program.

The infomation sought by Bulletin 79-01B was requested from these licensees by a l

series of letters and meetings during the months of February and March, j

1980.

l'

. imposed a deadline that, "by no later than June 30, 1982 all safety-related electrical equipment in all operating plants shall be qualified to the 00R Guidelines or NUREG-0588."

The Commission requested the staff to, " keep the Commission and the public apprised of any further findings of incomplete environmental qualification of safety-related electrical equipment, along with corrective actions taken or planned,"

and requested the staff to provide bi-monthly progress reports to the Commission.

The Commission further directed the staff to add certain documentation requirements to each license after the specific requirements were approved by the Commission.

The Commission also pointed out that the various deadlines imposed in its Order, "do not excuse a licensee from the obligation to modify or replace inadequate equipment promptly."

III.

The information developed during this proceeding emphasizes the importance of adequate documentation, the prompt completion of the review of environ-mental qualification of safety-related electrical equipment, and the prompt completion of any plant modification needed to assure confonnance with the DDR Guidelines or NUREG-0588.

A significant aspect of this review is the timely submittal cf environmental qualification information by the operating plant licensees to enable the staff to complete its review in accordance with the Commission /s Order.

The staff has a program presently underway to reevaluate, using the DDR Guidelines and NUREG-0588, the qualifications of safety-related electrical equipment exposed

! i to environments that may exist following postulated accidents.

These accidents are Loss of Coolant Accident and Main Steam Line Break j

inside containment, and High Energy Line Breaks inside and outside containment.

In this connection the licensee was requested by I&E Bulletin 79-OlB i

dated January 14, 1980 to provide a detailed review of the environ-

)

mental qualification of Class lE electrical equipment.

This review j

was to include all equipment required to function under postulated j

accident conditions, both inside and outside the primary containment, j

and recognize all conditions specified in the bulletin.

Evidence 1

of qualification together with methods and justification, was requested.

.I Clarification was provided by supplemental information, briefings, and 4

in some cases, meetings with the licensee.

Timely completion of the 4

staff /s review of environmental qualification of electrical equipment and. timely completion of needed modifications by the licensee is required to provide continuing reasonable assurance of public health j

and safety.

Such completion is dependent on the prompt receipt of a complete response by the licensee to the staff /s requests for infonnation.

~

However, the licensee /s response,- to date, is incomplete.

1 1

Therefore, I have concluded that the public health, safety, and interest require that a firm schedule for the timely submission of all the information previously requested by the staff should be established by Order effective immediately, i

i

4 1

j

_5-i l

IV.

i I

Accordingly, pursuant to the Atomic Energy Act of 1954, as amended, and j

the Commission's regulations in 10 CFR Parts 2 and 50, IT IS ORDERED THAT EFFECTIVE IMMEDIATELY Facility Operating License No. DPR-65 is 5

hereby amended to add the following provisions:

"Information which fully and completely responds to the staff's j

request as specified in I&E Bulletin 79-01B, shall be submitted to j

the Director, Region I, Office of Inspection and Enforcement, by I

the licensee not later than November 1,1980."

i l

An earlier response is encouraged to facilitate staff review and issuance l

of the safety evaluation report.

The licensee or any person whose interest

]

nay be affected by this Order ray request a hearing within 20 days of the j

date of publication of this Revised Order in the Federal Register.

Any request for a hearing will not stay the effective date of this Order.

Any request for a hearing shall be addressed to the Director, Office of i

Nuclear Reactor Regulation, U.S. Nuclear Regulatory Commission, Washington, f

D. C.

20555.

A copy of the request should also be sent to the Executive

]'

legal Director, U. S. Nuclear Regulatory Comaission, Washington, D. C.

j 20555, and to William H. Cuddy,,Esq., Day, Berry & Howard, One Constitution i

Plaza, Hartford, Connecticut, attorney for the licensee.

1 4

If a hearing is held concerning this Order, the issue to be considered at the hearing shall be whether the license should be modified to require submission of information as set forth.in Section IV. of the Order.

i

,_._..,.._-,._.__-.,_-..-.m.,,

Operating of the facility on tenns consistent with this Order is not stayed by the pendency of any proceedings on the Order.

This Order revises, in its entirety., the Order issued August 29,1980, and published in the Federal Register September 11,1980 (45 FR 60086).

FOR THE NUCLEAR REGULATORY C0iMISSION a reii u.'

senhut, 1 rec t o r' Division of icensing Effective Date: September 19, 1980 Bethesda, Maryland l