Notifies That 30-day Abeyance Period for 801204 Hearing Request Re Environ Qualification of safety-related Electrical Equipment Will Be Extended to 90 Days.Response Due within 90 Days of Issuance of Safety Evaluation
ML20009B128
Person / Time
Site: Haddam Neck, Millstone  File:Connecticut Yankee Atomic Power Co icon.png
Issue date: 06/12/1981
From: Eisenhut D
Office of Nuclear Reactor Regulation
To: Counsil W
NORTHEAST NUCLEAR ENERGY CO.
References
LSO5-81-06-037, LSO5-81-6-37, TAC-42493, NUDOCS 8107140830
Download: ML20009B128 (2)


Text

.

x s

,1 June 12, 1981

~

Docket Hus. fe-T3/245/336 LS05-81-06-037 DISTRIBUTI0ft:

Jbekets (3)

MConner OI&E (3)

NRC PDR (3)

MWilliams ACRS (10)

LPDR (3 TIppolito TERA (3 JLiebeman Mr. W. G. Counsil NSIC (3 WRussell Senior Vice President ORB #5 RF RHermann Northeast Nuclear Energy Coapany ORB #4 RF CBerlinger Post Office Box 270 GLainas HSmith Hartford, Connecticut 06101 TNovak PKreutzer DEisenhut Gray File (3)

Dear Mr. Counsil:

WPaulson Xtra Cys (8)

JShea OELD

SUBJECT:

ENVIRONMENTAL QUALIFICATION OF SAFETY-RELATED LLECTRICAL EQUIPMENT - HEARING REQUEST Our letter of January 16, 1981 proposed that we hold your request in of December 4,1980, on the subject, in abeyance until thirty (30) 4 b

days after the issuance of the Safety Evaluations.

Your letter of ns January 30, 1981 accepted our proposal.

We have recently issued 0

p i

J.<

L.

these Safety Evaluations.

~

2 JUN 181991 % -8 Since the Evaluations allow a ninety (90) day licensee response m

Q' >"TEEW"4 'j tir..e, we will extend the thirty (30) day abeyance period of our ietter of January 16, 1981 to ninety (90) days.

Please inform us within ninety (90) days of the issuance of the l_LT9D Safety Evaluation for the facility, whether you intend to pursue your hearing request.

If you request a hearing, please advise us of the specific issues you wish to raise in the proceeding.

For any further information regarding this matter, please contact Jim Lieberman (301-492-7267), Office of the Executive Legal Director.

Please send a copy of any correspondence to Mr. Lieberman.

Sincerely,

/Sk'(f)&

edc Darrell G. Eisenhut, Director Division of Licensing Office of Nuclear Reactor Pegulation cc:

See nc ;t page

' E R M D E <:T. i I).l. C 0 W 8107140830 810612 w. rcut3c.,

PDR ADOCK 05000213 a)Ei/w/3/

sa x

..0 ;..

M..

.p RB 7,,

.01:

d R,,

,,0E L y

, pg,g

, h,,,j,, ;,,,,,

o"'">

u md)

,)

DET,s,nhut T vi h,,,,,

J ie man Mi T

.(....

..lfRIf8f.......b h.....

.(.)

.f.b........b? /hl..

y:c ronu m no A ccu o24o op :lCIAL REC RD COPY

=o =-m24

-y a

i n'ic

  • 0, IETED STATES 4'h, J'.

NUCLEAR REGULATORY C.OrdMISSION d, g;'", i

.?

c womaron, o. c. nsss 1 %...$/,4 Docket Mos. 50-213/245/336 June 12,1981 LS05-81-06-037 Mr. W. G. Counsil Senior Vice President Northeast Nuclear Energy Company Post Office Box 270 Hartford, Connecticut 061U1

Dear Mr. Counsil:

SUBJECT:

ENVIRONMENTAL QUALIFICATION OF SAFETY-RELATED ELECTRICM.

EQUIPMENT - HEARING REQUEST Our letter of January 16, 1981 proposed that we hold your request of December 4,1980, on the subject, in abeyance until thirty (30) days af ter the issuance of the Saf aty Evaluations. Your letter of January 30, 1981 accepted our proposal.

We have recently issued these Safety Evaluations.

Since the Evaluations allow a ninety (90) day licensee response time, we will extend the thirty (30) day abeyance period of our letter of January 16, 1981 to ninety (90) days.

Please inform us within ninety (90) days of the issuance of the Safety Evaluation for the f acility, whether you intend to pursue your hearing request.

If you request a hearing, please advise us of the specific issues you wish to raise in the proceeding.

For any further information regarding this matter, please contact Jim Lieberman (301-492-7267), Office of the Executive Legal Director.

Please send a copy of any correspondence to Mr. Lieberman.

Sincerely, C

'O

,LgQLXG-h,4:

-er Darrell G. Eisenhut,' Director

/

Divis ton of Licensing Office of Nuclear Reactor Regulation cc:

See next page

4 y

. o Mr. W. G. Counsil June 12, 1981 cc:

William H. Cuddy, Esquire Connecticut Energy Agency Day, Berry & Howard ATTN: Assistant Director Counselors at Law Research and Policy One Constitution Plaza Development Partford, Connecticut 06103 Department of Planning and Energy Policy -

Board of Selectmen 20 Grand Street Town Hall Hartford, Connecticut 06106 Haddam, Connecticut 06103 Mr. Charles Brinkman Manager - Washington Nuclear Northeast Nuclear Energy Cogany Operations ATTN: Superintendent C-E Power Systems Millstone Plant Combustion Engineering, Inc.

P. O. Box 128 4853 Cordell Aven., Suite A-1 Waterf ord, Connecticut 06385 Bethesda, MD 20014 Mr. James R. Himelwright U. S. Environmental Protection Northeast Utilities Service Co@any Agency P. O. Box 270 Region I Office Hartford, Connecticut 06101 ATTN: EIS C0ORDINATOR JFK Federal Building Resident Inspector Boston, Massachusetts 02203 c/o V. S. NRC P. O. Box Drawer KK Superintendent Niantic, Connecticut 06357 Haddam Neck Plant RFD #1 Waterford Public Library Post Office Box 127E Repe Ferry Road, Route 156 East Hampton, Connecticut 06424 Waterford, Connecticut 06385 Resident Inspector First Selectman of the Town Haddam Neck Nuclear Power Station of Waterford c/o V. S. NRC Hall of Records East Haddam Post Office 200 Boston Post Road East Haddam, Connecticut 06423 Waterford, Connecticut 06385 John F. Opeka Northeast Nuclear Energy Coreany ATIN:

Superi ntendent Systems Superintendent Millstone Plant Northeast Utilities Service Cogany P. O. Box 270 Post Office Box 128 Hartford, Connecticut 06101 Waterford, Connecticut 06385 Natural Resources Defense Council 91715th Street, N. W.

Mr. John Shediosky Washington, D. C.

20005 Resident Inspector / Millstone c/o U.S.N.R.C.

P. O. Drawer KK Niantic, CT 06357

.