Submits Equipment Qualification Program Status Rept for Wk Ending 840420.Equipment Qualification Review Meetings Held for Ginna,Vermont Yankee & Indian Point 2 on 840417,18 & 19, Respectively,To Review Compliance w/10CFR50.49
ML17255A820
Person / Time
Site: Indian Point, Vermont Yankee, Ginna, 05000000
Issue date: 04/27/1984
From: Karsch R, Karsch R
Office of Nuclear Reactor Regulation
To: Miraglia F, Mirgalia F
Office of Nuclear Reactor Regulation
References
TAC-42493, NUDOCS 8405150097
Download: ML17255A820 (10)


Text

gp.R ~ECy

~C

~

Wp0i+a L

)

ew)

~

~+**+

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, O. C. 20555 l08'EMORANDUM FOR:

THRU:

FROM:

SUBJECT:

Frank J. Miraglia, Assistant Director for Safety Assessment Division of Licensing Gary M. Holahan, ChiIf~

Operating Reactors Assessment Branch Division of Licensing John A. Zwolinski, Section L a'der Operating Reactors Assessmen ranch Division of Licensing Rudy Karsch, Lead Project Manager for Equipment Qualification, MPA B-60 Operating Reactors Assessment Branch Division of Licensing EQUIPMENT QUALIFICATION PROGRAM STATUS REPORT, ONE llEEK PERIOD llEEK ENDING APRIL 20, 1984 The Equipment Qualification Review Meetings f'r compliance to 10 CFR 50.49 (the EQ Rule) were held for Ginna, Vermont Yankee and Indian Point 2 on April 17, 18 and 19 respectively.

The licensees'urveillance inspection and preventative maintenance

programs, as they pertain to EQ, were reviewed.

Procedures for screening IE Bulletins, Notices and Circulars by the licensee for any EQ related impact was also discussed.

Ginna - This plant is presently shutdown for refueling.

Upon restart they will be in compliance with the rule except for two items (RTDs and valves) which may not get installed at this outage.

If they are not replaced an extension request and JCOs will be submitted.

All other J.C.O.s will clear prior to restart.

Vermont Yankee - All EQ related work is expected to be completed during the refueling outage scheduled for June.

No extensions are anticipated and all outstanding J.C.O.s will clear prior to restart.

On April ll, 1984 the licensee notified the NRC that new calculations disclose a

more severe post accident HELB environment than previously considered.

The new data and post HELB environmental profile was given to ASB (Ridgley) for review.

In response ASR gave the licensee an information sheet detailing the kinds of information necessary for confirmation of their analysis.

ASB will notify EQB if it is determined that the testing conducted to the new post accident environmental conditions is invalid because the environmental envelope is incorrect.

8405l50097 840427 PDR ADOCK 05000244 P

'DR.

l APR S S >S84 Indian Point 2 - Following restart from a June 1984 refueling outage this plant is expected to be in compliance with the E.g. rule.

Extension requests might be needed for several items now undergoing testing.

These tests include; sealing cable connectors for high range radiation monitors, testing of cables and main steam flow instrumentation.

All outstanding open items identified by the FRC TER were discussed with the licensees and successfully resolved.

The remaining issues identified should not jeopardize timely completion of the Eg program.

The Point Beach SER received from E(B last week has completed its DL review.

When all 'comments are consolidated a meeting will be held between all concerned to discuss how the SER can be improved.

A meeting date has not been set at this time.

A schedule/status list,and lists of attendees at the three meetings is attached.

Enclosures:

1.

Schedule of Upcoming Meetings 2.

Meeting Attendees cc:

D. Eisenhut/R.

Purple R. Mattson R. Vollmer G. Lainas T. Novak W. Butler V. Noonan DL Branch Chiefs

0. Parr J. Kudrick DL Project Managers T. Le, IE J. Corrado, SECY Rudy Karsch, Lead Project Manager for Equipment gualification, MPA B-60 Operating Reactors Assessment Branch Division of Licensing DISTRIBUTION

~c ORAB R/F GHolahan JZwolinski RKarsch NRC PDR 0 e(i<

R arsch 4/~84 ORAB:

JZwolinski 4/~84 A! i GHolahan 4+b/84

ll

'4 ~

~

g

,I II is N

ii

~ >vV~

~/zz/z~

JR g]Q

.:l~wrE Qi,"mls L m

~

+W+~ ~Y'dl Pfecrcdy

/y7 wg go 5 f (R~L

~5~ ~ < 0~ h I pi iOy

] gI ig~d L~~

C'.

PA gCf/dC-<<w~

j7FJS )Luc-w'ec:zu-'C-g6~

R5 "e ZNEl t gc/e g g./pc/c)g jvp. e (~w (b < $0&i AQ AKE k.~~

S~l (

) c ~ g,(

/r.'qn e c g ppuL Shen, an s y i AX P'os7 p~.(

(~. J4';

IY.c.A,~<A ~ 3 a-~u<<g Ywsi

/

/

W7i> Pji D'zan%

ppu

gxc. ) C-Q)'zr7 Q / >w~l ear/0s / eve ygZc vY P~..k p'4C~ dy'~roje cl YASC. 4 Y graEcc-~ /P / f'Roy. p wa'c.. 4 c.,g Mesc. P(M6 g(~ig Q7. ~y. c ~p~~,y~g ~~ nag g s-a)$ r f~c-v'V 4~S<ep Y. S ~~ s~). vy,~<.WW~~k 5~~~@ V~/- iud/: ci:4 Ips-e'l +gag p s;,; /um/gra. )~ e, +~ ( ph QO (M~ 2. Con Edison - NRC Meeting on EQ Resolutions . April 19, 1984 aA. Q S~ p L C'zg.~ c~ 71i~FA'r.'5 l5~WCSA I c. aP . o~ g i g MGAWMF'~ l G n1 ~$ g u u i/ Q tl'v\\S < Fl 7a/m~ y'7 4/23/84 Enclosure 1 Equipment Environmental qualification Review Meetings With the Licensees Schedule Status Plant Meeting Scheduled Expected Project Submittal ~Mana er SER Issued bvuEB Cook 1 and 2 Three Mile Island 1 Point Beach 1 and 2 Prairie Island 1 and 2 Peach Bottom 2 and 3 Oyster Creek Monticello Davis-Besse 1 Crystal River 3 San Onofre 1 Palisades Farley 1 and 2 Yankee Rowe Robinson Kewaunee 7ion 1 and 2 squad Cities 1 and 2 Dresden 2 and 3 Oconee 1, 2, 3 Brunswick 1 and 2 Duane Arnold Hatch 1 and 2 Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed Received~ ~ 5/1/84 Received Received Received Received Received Received Received Draft Received Received Received Received Received Received Received Received 3/9/84 Received Received Received D. Wigginton J. Van Vliet T. Colburn 3/30, 4/10 D. DiIanni G. Gears J. Lombardo H. Nicolaras A. DeAgazio R. Hernan W. Paulson T. Wambach E. Reeves P. Erickson G. Requa D. Neighbors J. Norris R. Bevan R. Gilbert J. Suermann S. Mackay M. Thadani G. Rivenbar k Contacts: P. Shemanski, E(B, 492-8289; R.

Karsch, ORAB, 492-8563 (1) requested additional information from licensee

3/30/84 Equipment Environmental qualification Review Meetings (Continued) Plant Meeting Scheduled Expected Submittal project ~Mana er LaCrosse Ft. St. Vrain Big Rock Point Nine Mile Point 1 Calvert Cliffs 1 and Surry 1 and 2 North Anna 1 and 2 Fort Calhoun Trojan Cooper Fitzpatrick Maine Yankee Beaver Valley 1 Haddam Neck Millstone 1 Millstone 2 Ginna Vermont Yankee Indian Point 2 Salem 1 8t 2 Indian Point 3 Arkansas 1 Arkansas 2 St. Lucie 1 Turkey Point 3 8 4 Sequoyah 1 8 2 Rancho Seco Pilgrim Browns Ferry, 1, 2, 3 Completed Completed / Cnppl eted Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed 4/24/84 4/25/84 4/26/84 4/26/84 5/8/84 5/9/84 5/10/84 5/16/84 5/22/84 5/24/84 Draft 5/16/84 5/1/84 5/1/84 5/1/84 5/1/84 5/1/84 5/11/84 4/29/84 5/4/84 5/7/84 5/7/84 5/10/84 5/11/84 5/11/84 6/4/84 5/18/84 5/21/84 5/24/84 5/25/84 5/26/84 5/26/84 6/8/84 6/9/84 6/10/84 6/16/84 6/22/84 6/24/84 R. Dudley P. Wagner R. Emch R. Hermann D. Jaffe D. Neighbors L. Engle E. Tourigny C. Trammel 1 B. Siegel H. Abelson K. Heitner P. Tam J. Lyons J. Shea K. Heitner G. Dick V. Rooney R. Pederson D. Fischer P. Polk G. Vissing B. Lee D. Sells D. McDonald C. Stahle S. Miner P. Leech R. Clark t A ~ ~ 1 I