ML20004C210

From kanterella
Jump to navigation Jump to search

Forwards Safety Evaluation Re Environ Qualification of safety-related Electrical Equipment.Evaluation Based on Util 801031 Submittal
ML20004C210
Person / Time
Site: Millstone Dominion icon.png
Issue date: 05/27/1981
From: Clark R
Office of Nuclear Reactor Regulation
To: Counsil W
NORTHEAST NUCLEAR ENERGY CO.
Shared Package
ML20004C211 List:
References
IEB-79-01B, IEB-79-1B, TAC-42493, NUDOCS 8106010772
Download: ML20004C210 (3)


Text

&

f * * %,4 UNITED STATES f_

y g( j' p,

_ NUCLEAR REGULATORY COMMISSION 7g gj WASHINGTON, D. C. 20555 May 27, 1981 D

<1 Docket No. 50-336 b

1 2-f,N' 2 3 79Ok ^8 Mr. W. G. Counsil, Vice President

~] %%

%!$reerA Nuclear Engineering & Operations

\\

Northeast Nuclear Energy Company g

P. O. Box 270 t

T Hartford, Connecticut 06101

SUBJECT:

ENVIRONMENTAL QUALIFICATION OF SAFETY-RELATED ELECTRICAL EQUIPMENT RE: MILLSTONE NUCLEAR POWER STATION, UNIT NO. 2 - DPR-65 Reference (a) - Order for Modification of License Concerning the Environmental Qualification of Safety-Related Electrical Equipment dated October 24, 1980.

Dear Mr. Counsil:

This letter transmits the Safety Evaluation for the Environmental Qualification of Safety-Related Electrical Equipment at your facility. This evaluation was based on your submittal dated October 31, 1980. Our letter of April 14, 1981, which forwarded our preliminary results, indicated that an item-by-item re-evaluation would be required at a later date. This safety evaluation identifies the specific information required by the staff and the actions, on your part, necessary to comply with Reference (a). We request that you provide the information identified in sections 3 and4 of this Safety Evaluation to us within 90 days. We are aware that some additional information has been provided in your letters of January 30 and April 30, 1981. We will evaluate this additional information along with your 90 day response.

f This safety evaluation addresses only the safety-related electrical equipment l

exposed to a harsh environment resulting from an accident (i.e., the IE Bulletin l

79-01B review). Reference (a) requires that all safety-related electrical l

equipment be qualified by June 30, 1982. The NRC review effort for the l

equipment in mild environments will be addressed by separate correspondence.

Your response may present alternatives to the staff positions in the evaluation.

l The staff will consider alternative approaches if these methods are within the D0R Guidelines or NUREG-0588, as appropriate. For example, an acceptable l

alternative to the NRC staff's temperature criterion used for the service conditions (i.e. Section 3.3) must base that service condition on the FSAR analysis or other NRC approved analysis, provided that the specific analysts, together with reference to the previous NRC acceptance of that analysis, i

accompanie? the 90 day response.

In addition, some of the information in the Safety Eval stion may require clarification. Contact your project manager for assistance in ti.ae matters.

810 6 010 7U-

)

2-It remains your responsibility to assure that the qualification deadline is met for all safety-related electrical equipment. The staff's review of your response to this letter should not delay any action which is required in order to meet the deadline.

Sincerely, C&i/

Robert A. Clark, Chief Operating Reactors Branch #3 Division of Licensing

Enclosures:

1.

SER I

2.

TER cc w/ enclosures:

See next page b

8 %'O l

,,,.a,

,m.,

.?,_,

,,,v

,.,-n,..

y_,-

,.,,,,,,q-...,,,

.._.,,v..,,

_--p,,

~ ' Northeast Nuclear Energy Company de:

~

52 William H. Cuddy, Esquire Mr. John Shediosky Day, Berry & Howard Resident Inspector / Millstone Counselors at Law c/o U.S.N.R.C.

One Constitution Plaza P. O. Drawer KK Hartford, Connecticut 06103 Niantic, CT 06357 Anthony Z. Roisman Mr. Charles Brinkman Natural Resources Defense Council Manager - Washington Nuclear 91715th Street, N.W.

Operations Washington, D. C.

20005 C-E Power Systems Combustien Engineering, Inc.

Mr. Lawrence Bettencourt, First Selectman 4853 Cordell Aven., Suite A-1 Town of Waterford Bethesda, MD 20014 Hall of Records - 200 Boston Post Road Waterford, Connecticut 06385 Northeast Nuclear Energy Co'rpany ATTN:

Superi ntendent Millstone Plant Connecticut Energy Agency

. Post Office Box 128 ATTN: Assistant Director, Research Waterford, Connecticut 06385 and Policy Development Department of Planning and Energy Waterford Public Library Policy Rope Ferry Road, Route 156 20 Grand Street Waterford, Connecticut 06385 Hartford, CT 06106 Director, Criteria and Standards Division Office of Radiation Programs (ANR-460)

U.S. Environmental Protection Agency Washington, D. C.

20460 U. S. Environmental Protection Agnecy Region I Office ATTN:

EIS C0ORDINATOR John F. Kennedy Federal Building l

Boston, Massachusetts 02203 Northeast Utilities Service Company ATTN:

Mr. James R. Himmelwright Nuclear Engineering and Operations P. O. Box 270 Hartford, Connecticut 06101 l

l

_~

-7

+--g n..9..,.

vy w

w pi 3

g gie y--

~

-,--p

&