Other: A01324, Requests Hearing to Determine Necessity of Environ Qualification of All safety-related Electrical Equipment at Facilities,As Required by NRC 801024 Orders for Mod of Licenses, A01374, Environ Qualification of Safety-Related Electrical Equipment, A01450, Accepts NRC 810116 Plan to Hold in Abeyance Hearing Request Re Environ Qualification of safety-related Electrical Equipment.Provides Alternative Approach Re 30-day Response Period for Safety Evaluations, A01740, Provides Editorial Corrections to Util 810826 & 0903 Ltrs Transmitting 90-day Responses to Safety Evaluations Re Environ Qualification of safety-related Electrical Equipment, A01919, Documents Concurrence W/Nrc Proposal to Hold 801204 Hearing Request in Abeyance Until NRC Has Completed Action on Industry Petition to Extend 820630 Deadline for Environ Qualification of safety-related Equipment, A02213, Submits Info Re SER on Environ Qualification.Info Provided to Franklin Research Ctr Under Separate Cover.W/O Encls, A03174, Responds to 830406 SER Re Environ Qualification of Electrical Equipment for Facility.Corresponding Technical Evaluation Rept Contains No Proprietary Info & Can Be Released for Public Disclosure,Per 10CFR2.790, A10740, Forwards Environ Qualification of Safety-Related Electrical Equipment,Millstone Unit 2, Per NRC 800919 Revised Order for Mod of License.Background Info Provided, B10038, Forwards Revised & Addl Electrical Qualification Work Sheets & Qualification Documentation Work Sheets for Components Located Outside Containment & Subj to High Radiation Levels, B10156, Advises That No Environ Qualification Testing Planned within Next Two Yrs for Haddam Neck or Millstone 1 & 2. Util Will Advise of Decision Re Millstone 3 Under Separate Cover, B10216, Requests Relief from 820630 Deadline for Environ Qualification.Utils Have Fulfilled Portion of Review Schedule Per 800523 Memorandum & Order & NRC Failed to Meet SER Issuance Deadline.Related Correspondence, B10230, Advises of Intention to Initiate re-evaluation of Seismic Qualification of Mechanical & Electrical Equipment. Exclusion from Iterative Process W/Nrc on Subj Qualification Requested.Detailed Concerns Encl.Related Correspondence, B10242, Discusses Environ Qualification of Electrical Equipment at Facility.Instances of Use of Equipment Lacking Full Qualification Have Arisen Due to Equipment Failures of Routine Maint.Basis for Actions Has Been Filed, B10300, Requests Meaningful Evaluation of Forthcoming 90-day Responses to NRC Environ Qualification Safety Evaluations. NRC Has Failed to Ack or Clarify Previous Util Positions, B10308, Forwards Mechanical & Electrical Equipment Seismic Qualification Program.Program Estimated for Approx 1-yr Duration.Concept Developed in Recognition of Util Ultimate Responsibility for Assuring Safe Nuclear Plant Operation, B11122, Forwards Summary of Qualification Status of Equipment Covered by 10CFR50.49,index to Sys Component Evaluation Work Sheet Package & Discrepant Equipment Summary Sheets, B11323, Forwards Documentation of Discussions Held on 840410 W/Nrc Re Resolution of Deficiencies Noted in Franklin Research Ctr Technical Evaluation Rept Concerning Environ Qualification of safety-related Electrical Equipment, ML19207C411, ML19254B155, ML19273B914, ML19323D249, ML19338D071, ML19338D074, ML19347C123, ML19350F155, ML19350F169, ML20003H548, ML20009B330, ML20010E360, ML20010E513, ML20010H380, ML20031A339, ML20032B150, ML20033C004, ML20041C202, ML20076C452
|
MONTHYEARML19209D1201979-04-18018 April 1979 Notice of ACRS Subcommittee on Reactor Operations 790509 Meeting to Consider License Amend for Facility Project stage: Request ML19273B9141979-06-12012 June 1979 Responds to IE Bulletin 79-01,Environ Qualification of Class IE Equipment. Second Suppl to Be Submitted by 791031 Project stage: Other ML19207C4111979-09-0505 September 1979 Responds to IE Bulletin 79-01 Re Environ Qualification of Class IE Equipment.Resistance Temp Detectors Used in Monitoring Containment Temps Not Qualified for Svc in LOCA Environ Project stage: Other ML19254B1551979-09-19019 September 1979 Discusses Qualification of Resistance Temp Detectors in LOCA Environ,Per IE Bulletin 79-01.Engineering Reviews Substantiated Adequacy of .Followup Rept Is Superfluous Project stage: Other ML19323D2491980-04-17017 April 1980 Responds to IE Bulletin 79-01B, Environ Qualification of Class IE Equipment. Util Is Reviewing Existing Documentation to Complete Qualification Sheets & Requesting Same from Vendors Project stage: Other B10038, Forwards Revised & Addl Electrical Qualification Work Sheets & Qualification Documentation Work Sheets for Components Located Outside Containment & Subj to High Radiation Levels1980-07-16016 July 1980 Forwards Revised & Addl Electrical Qualification Work Sheets & Qualification Documentation Work Sheets for Components Located Outside Containment & Subj to High Radiation Levels Project stage: Other ML19338D0741980-08-29029 August 1980 Order for Mod of License DPR-65 to Add Info Which Fully Responds to NRC Request for Info Re Environ Qualification of safety-related Electrical Equipment.Info Should Be Submitted by 801101 Project stage: Other ML19338D0711980-08-29029 August 1980 Forwards Order Requiring Info Supporting Environ Qualification of safety-related Electrical Equipment. Requests Submittal of Info by 801101 Project stage: Other ML19347C1231980-09-19019 September 1980 Order Directing Licensee to Respond Fully & Completely to IE Bulletin 79-01B,re Environ Qualification of Class IE Equipment,By 801101 Project stage: Other A01204, Forwards Environ Qualification of Safety-Related Electrical Equipment & App 1, Master Listing of Electrical Components by Sys, in Response to NRC 800919 Order for Mod of License & IE Bulletin 79-01B1980-10-31031 October 1980 Forwards Environ Qualification of Safety-Related Electrical Equipment & App 1, Master Listing of Electrical Components by Sys, in Response to NRC 800919 Order for Mod of License & IE Bulletin 79-01B Project stage: Request A01324, Requests Hearing to Determine Necessity of Environ Qualification of All safety-related Electrical Equipment at Facilities,As Required by NRC 801024 Orders for Mod of Licenses1980-12-0404 December 1980 Requests Hearing to Determine Necessity of Environ Qualification of All safety-related Electrical Equipment at Facilities,As Required by NRC 801024 Orders for Mod of Licenses Project stage: Other B10156, Advises That No Environ Qualification Testing Planned within Next Two Yrs for Haddam Neck or Millstone 1 & 2. Util Will Advise of Decision Re Millstone 3 Under Separate Cover1981-01-20020 January 1981 Advises That No Environ Qualification Testing Planned within Next Two Yrs for Haddam Neck or Millstone 1 & 2. Util Will Advise of Decision Re Millstone 3 Under Separate Cover Project stage: Other A01450, Accepts NRC 810116 Plan to Hold in Abeyance Hearing Request Re Environ Qualification of safety-related Electrical Equipment.Provides Alternative Approach Re 30-day Response Period for Safety Evaluations1981-01-30030 January 1981 Accepts NRC 810116 Plan to Hold in Abeyance Hearing Request Re Environ Qualification of safety-related Electrical Equipment.Provides Alternative Approach Re 30-day Response Period for Safety Evaluations Project stage: Other ML20003H5481981-04-30030 April 1981 Forwards Overall Findings Re Continued Safe Operation of Facility in Response to .Current Status of Safety Evaluations Does Not Accurately Reflect Qualification Status of Electrical Equipment.Supporting Documentation Encl Project stage: Other ML20004C2121981-05-27027 May 1981 Safety Evaluation Re Environ Qualification of safety-related Electrical Equipment.Equipment,Required to Mitigate LOCA Following Accident in Harsh Environ,Found Acceptable Except as Noted in Section 3 Project stage: Approval ML20004C2101981-05-27027 May 1981 Forwards Safety Evaluation Re Environ Qualification of safety-related Electrical Equipment.Evaluation Based on Util 801031 Submittal Project stage: Approval B10216, Requests Relief from 820630 Deadline for Environ Qualification.Utils Have Fulfilled Portion of Review Schedule Per 800523 Memorandum & Order & NRC Failed to Meet SER Issuance Deadline.Related Correspondence1981-06-0404 June 1981 Requests Relief from 820630 Deadline for Environ Qualification.Utils Have Fulfilled Portion of Review Schedule Per 800523 Memorandum & Order & NRC Failed to Meet SER Issuance Deadline.Related Correspondence Project stage: Other ML20009B1281981-06-12012 June 1981 Notifies That 30-day Abeyance Period for 801204 Hearing Request Re Environ Qualification of safety-related Electrical Equipment Will Be Extended to 90 Days.Response Due within 90 Days of Issuance of Safety Evaluation Project stage: Approval ML19350F1691981-06-19019 June 1981 Affidavit That Licensees Could Not Meet CLI-80-21 820630 Deadline Due to Lack of Appropriate Regulatory Guidance to Allow Utils to Proceed W/Qualification,Replacement or Reanalysis of Equipment.W/Certificate of Svc Project stage: Other ML19350F1551981-06-22022 June 1981 Petition,On Behalf of 18 Licensees Operating &/Or Constructing Nuclear Power Plants,Requesting 13-month Extension Until 830729 for Qualification of safety-related Electrical Equipment Per NUREG-0588 (CLI-80-21) Project stage: Other A01758, Informs That Utils Will Attend industry-wide 810707-10 Environ Qualification Meeting in Bethesda,Md.Utils Intend to Propose Dates for docket-specific Meetings to Discuss Safety & Technical Evaluation Repts1981-06-26026 June 1981 Informs That Utils Will Attend industry-wide 810707-10 Environ Qualification Meeting in Bethesda,Md.Utils Intend to Propose Dates for docket-specific Meetings to Discuss Safety & Technical Evaluation Repts Project stage: Meeting ML20009B3301981-07-10010 July 1981 Requests That NRC Notify N Reynolds That 810622 Petition for Extension of Deadline for Compliance w/CLI-80-21 Has Been Retitled.Svc Should Be Made of All Subsequent Papers on Parties to Proceeding,Including Ucs Project stage: Other B10233, Submits Comments on 810707-10 Environ Qualification Meeting in Bethesda,Md.Issuance of Another Bulletin Suppl or Generic Ltr Would Further Util Understanding of NRC Positions1981-07-16016 July 1981 Submits Comments on 810707-10 Environ Qualification Meeting in Bethesda,Md.Issuance of Another Bulletin Suppl or Generic Ltr Would Further Util Understanding of NRC Positions Project stage: Meeting B10230, Advises of Intention to Initiate re-evaluation of Seismic Qualification of Mechanical & Electrical Equipment. Exclusion from Iterative Process W/Nrc on Subj Qualification Requested.Detailed Concerns Encl.Related Correspondence1981-07-23023 July 1981 Advises of Intention to Initiate re-evaluation of Seismic Qualification of Mechanical & Electrical Equipment. Exclusion from Iterative Process W/Nrc on Subj Qualification Requested.Detailed Concerns Encl.Related Correspondence Project stage: Other ML20010E3601981-08-14014 August 1981 Notifies That Util 801204 Request for Hearing Re Environ Qualification of safety-related Electrical Equipment Will Be Held in Abeyance for 30 Days After NRC Action on Industry Petition to Extend Deadline.Response Requested by 810901 Project stage: Other B10242, Discusses Environ Qualification of Electrical Equipment at Facility.Instances of Use of Equipment Lacking Full Qualification Have Arisen Due to Equipment Failures of Routine Maint.Basis for Actions Has Been Filed1981-08-14014 August 1981 Discusses Environ Qualification of Electrical Equipment at Facility.Instances of Use of Equipment Lacking Full Qualification Have Arisen Due to Equipment Failures of Routine Maint.Basis for Actions Has Been Filed Project stage: Other A01919, Documents Concurrence W/Nrc Proposal to Hold 801204 Hearing Request in Abeyance Until NRC Has Completed Action on Industry Petition to Extend 820630 Deadline for Environ Qualification of safety-related Equipment1981-08-20020 August 1981 Documents Concurrence W/Nrc Proposal to Hold 801204 Hearing Request in Abeyance Until NRC Has Completed Action on Industry Petition to Extend 820630 Deadline for Environ Qualification of safety-related Equipment Project stage: Other A10740, Forwards Environ Qualification of Safety-Related Electrical Equipment,Millstone Unit 2, Per NRC 800919 Revised Order for Mod of License.Background Info Provided1981-08-26026 August 1981 Forwards Environ Qualification of Safety-Related Electrical Equipment,Millstone Unit 2, Per NRC 800919 Revised Order for Mod of License.Background Info Provided Project stage: Other B10300, Requests Meaningful Evaluation of Forthcoming 90-day Responses to NRC Environ Qualification Safety Evaluations. NRC Has Failed to Ack or Clarify Previous Util Positions1981-08-26026 August 1981 Requests Meaningful Evaluation of Forthcoming 90-day Responses to NRC Environ Qualification Safety Evaluations. NRC Has Failed to Ack or Clarify Previous Util Positions Project stage: Other ML20010E5131981-08-31031 August 1981 Motion for Opportunity to Respond to Utils 810622 Petition for 13-month Extension of 820630 Deadline Imposed by CLI-80-21 & NRC 810731 Response.Requests Svc of Past & Future Filings.Certificate of Svc Encl Project stage: Other B10308, Forwards Mechanical & Electrical Equipment Seismic Qualification Program.Program Estimated for Approx 1-yr Duration.Concept Developed in Recognition of Util Ultimate Responsibility for Assuring Safe Nuclear Plant Operation1981-09-15015 September 1981 Forwards Mechanical & Electrical Equipment Seismic Qualification Program.Program Estimated for Approx 1-yr Duration.Concept Developed in Recognition of Util Ultimate Responsibility for Assuring Safe Nuclear Plant Operation Project stage: Other ML20031A3391981-09-18018 September 1981 Response Opposing Licensees 810622 Petition for Extension of Effective Deadline of CLI-80-21 & NRC 810731 Response Recommending 1-yr Extension.No Justification That Utils Unable to Qualify Equipment.Certificate of Svc Encl Project stage: Other ML20010H3801981-09-30030 September 1981 Mechanical & Electrical Equipment Seismic Qualification Program Project stage: Other A01740, Provides Editorial Corrections to Util 810826 & 0903 Ltrs Transmitting 90-day Responses to Safety Evaluations Re Environ Qualification of safety-related Electrical Equipment1981-09-30030 September 1981 Provides Editorial Corrections to Util 810826 & 0903 Ltrs Transmitting 90-day Responses to Safety Evaluations Re Environ Qualification of safety-related Electrical Equipment Project stage: Other ML20032B1501981-10-21021 October 1981 Ack Receipt of 810723 Application Supplemented by Proposing Seismic re-evaluation Program for Qualification of Mechanical & Electrical Equipment.Util Should Submit Class I & III Fees Project stage: Other ML20151H1601981-11-11011 November 1981 Equipment Environ Qualification Review of Licensee Resolution of Outstanding Issues from NRC Equipment Environ Qualification Safety Evaluation Repts & TMI Action Plan Installed Equipment, Request for Addl Info Project stage: Request ML20033C0041981-11-30030 November 1981 Order Extending Time Until 811207 for Commission to Act to Review 810929 Directors Decision Project stage: Other A020063, Advises That 810723 & 0915 Ltrs Re Seismic Qualification of Mechanical & Electrical Equipment Do Not Constitute Application for Review & Acceptance.Remittance Fee Not Applicable,Per 10CFR1701982-01-13013 January 1982 Advises That 810723 & 0915 Ltrs Re Seismic Qualification of Mechanical & Electrical Equipment Do Not Constitute Application for Review & Acceptance.Remittance Fee Not Applicable,Per 10CFR170 Project stage: Request A02213, Submits Info Re SER on Environ Qualification.Info Provided to Franklin Research Ctr Under Separate Cover.W/O Encls1982-02-0909 February 1982 Submits Info Re SER on Environ Qualification.Info Provided to Franklin Research Ctr Under Separate Cover.W/O Encls Project stage: Other ML20041C2021982-02-12012 February 1982 Advises That No Fees Are Due Re NRC .Submittals Referred to in Ltr Not for Review & Acceptance Project stage: Other ML20076C4521983-02-21021 February 1983 Review of Licensee Resolution of Outstanding Issues from NRC Equipment Environ Qualification SERs (F-11 & B-60), Nonproprietary Technical Evaluation Rept Project stage: Other A03174, Responds to 830406 SER Re Environ Qualification of Electrical Equipment for Facility.Corresponding Technical Evaluation Rept Contains No Proprietary Info & Can Be Released for Public Disclosure,Per 10CFR2.7901983-04-25025 April 1983 Responds to 830406 SER Re Environ Qualification of Electrical Equipment for Facility.Corresponding Technical Evaluation Rept Contains No Proprietary Info & Can Be Released for Public Disclosure,Per 10CFR2.790 Project stage: Other A01374, Environ Qualification of Safety-Related Electrical Equipment1983-05-20020 May 1983 Environ Qualification of Safety-Related Electrical Equipment Project stage: Other B11122, Forwards Summary of Qualification Status of Equipment Covered by 10CFR50.49,index to Sys Component Evaluation Work Sheet Package & Discrepant Equipment Summary Sheets1984-04-0909 April 1984 Forwards Summary of Qualification Status of Equipment Covered by 10CFR50.49,index to Sys Component Evaluation Work Sheet Package & Discrepant Equipment Summary Sheets Project stage: Other ML17255A8201984-04-27027 April 1984 Submits Equipment Qualification Program Status Rept for Wk Ending 840420.Equipment Qualification Review Meetings Held for Ginna,Vermont Yankee & Indian Point 2 on 840417,18 & 19, Respectively,To Review Compliance w/10CFR50.49 Project stage: Meeting B11323, Forwards Documentation of Discussions Held on 840410 W/Nrc Re Resolution of Deficiencies Noted in Franklin Research Ctr Technical Evaluation Rept Concerning Environ Qualification of safety-related Electrical Equipment1984-12-18018 December 1984 Forwards Documentation of Discussions Held on 840410 W/Nrc Re Resolution of Deficiencies Noted in Franklin Research Ctr Technical Evaluation Rept Concerning Environ Qualification of safety-related Electrical Equipment Project stage: Other 1981-06-26
[Table View] |
Text
-
IH)ITIEI!AST tlTil.ITIIIS
,s 4 -
.m.
p o gox 270 l
HARTFOAD. CONNECTICUT 06101 (203) 666-6911 s
L L
J September 5, 1979 Docket No. 50-336 Director of Nuclear Reactor Regulation Atto:
Mr. R. Reid, Chief Operating Reactors Branch #4 U. S. Nuclear Regulatory Commission Washington, D. C.
20555
Reference:
(1)
B. H. Grier letter to W. G. Counsil dated February 8,1979 forwarding I&E Bulletin #79-01.
Gentlenen :
Millstone Nuclear Power Station, Unit No. 2 I&E Bulletin #79-01 Environmental Qualification of Class lE Equipment In accordance with the reporting requirements of Reference (1), Northeast Nuclear Energy Company (NNECO) is informing the NRC Staff that it has determined that the Resistance Temperature Detectors (RTD) utilized in monitoring containment temperatures have not been qualified for service in the LOCA environment.
NNECO was informed September 4, 1979 by Rosemount, Incorporated, the RTD manu-facturer, that the connection head in the RTD assembly has not been qualified to remain functional in a post-LOCA environment.
This equipment was stated to be qualified for post-LOCA operation in Section 7.5.1.2.1.2 of the Millstone Unit No. 2 FSAR.
Specifically, it was stated that:
"The RTD and cables are specified for continuous operation in the containment including the environmental conditions after a loss-of-coolant or steam line break incident."
A review of the evolution of the design function for the subject RTD's reveals tha t the original design intent was Integrated Leak Rate Test monitoring.
The RID design function was upgraded during the latter stages of the plant licensing process to accommodate post-accident monitoring concerns.
This substantiates NNECO's conclusion that this occurrence is not indicative of a generic deficiency in the electrical equipment qualification of Millstone Unit No. 2.
NNECO's review of the unavailability of these detectors post-LOCA has determined that r.o significant adverse ef fects would result.
hkb Y 900110:5]tsr~
The Technical Specification operability requirement for these RID's is identified in Specifications 3.6.1.5 and 4.6.1.5.
These Specifications require that containment ambient temperature not exceed 120*F.
The fact that the containment temperature monitoring RTD's are not LOCA qualified does not preclude them from satisfactorily performing this function.
Table 7.5 -2 of the FSAR indicates that the subject RTD's are utilized to assist in:
(1) Determination of the magnitude of a pipe break; (2) Determination of the location of the pipe break; and (3) issuring that the containment air coolers are operational.
Functions 1 through 3 above would be of informational interest to the plant operators, but are not essent ial.
Qualified pressure detection instrumentation is available to assist the operator in accomplishing the above objectives.
Current plant procedures do not rely on information provided by these instru-ments.
In response to Item 4 of Reference (1), continued plant operation is justified by the following considerations:
(1) Current plant emergency procedures do not rely on the information provided by these instruments to diagnose and respond to of f-normal or accident conditions.
(2) The containment is equipped with eight (8) redundant detectors and it is ualikely that all will. fail post-LOCA.
(3) Temperature detectors are also located outside containment on the containment air recirculation units cooling water lines; these can be utilized to determine containment temperatures. Other alternate means of determining or inferring post-LOCA ambient containment temperatures are available such as the safety-related containment pressure sensors.
(4)
While qualification cannot be guaranteed at this time, the vendor supplying the gasket seal in the connection head has indicated the component will function in temperatures up to 300 F and 100% humidity.
(5)
No credit is taken for these RID's in any current transient / accident analy ses.
Nonetheless, in recognition of the Three Mile Island issues, NNECO recognizes it may ultimately be appropriate to upgrade post-incident monitoring capability at Millstone.
At that time, the current qualification status of the subject RTD's will be duly considered during the upgrading process.
9
p.
Additional information will be provided in the 14-day report as required in Reference (1).
We trust the above information is responsive to your requests of Reference (1).
Very truly yours, NORTIIEAST NUCLEAR ENERGY COMPANY W.'G.'Counsil Vice President c, ;-