Equipment Environ Qualification Review of Licensee Resolution of Outstanding Issues from NRC Equipment Environ Qualification Safety Evaluation Repts & TMI Action Plan Installed Equipment, Request for Addl Info
ML20151H160
Person / Time
Site: Millstone Dominion icon.png
Issue date: 11/11/1981
From:
Franklin Research Ctr, Franklin Institute
To:
NRC
Shared Package
ML20040D158 List:
References
RTR-NUREG-0737, RTR-NUREG-737 IEB-79-01B, IEB-79-1B, RFI-C5257-467, TAC-42493, NUDOCS 8201300343
Download: ML20151H160 (8)


Text

- - - - . . .

~ "

./ Lo LJ)' f/$

/

REQUEST FOR ADDITIONAL INFORMATION  !

EQUIPMENT ENVIRO!NENTAL QUALIFICATION (EEQ) ,

REVIEW OF LICENSEES' RESOLUTION OF OUTSTANDING ISSUES

{

FROM NRC EQUIPMENT ENVIRO?NENTAL QUALIFICATION SAFETY EVALUATION REPORTS (SER) AND TMI ACTION PLAN INSTALLED EQUIPMENT Northeast Nuclear Energy Company  ;

Millstone Unit 2 NRC Docket No. 50-336 November 11, 1981 NRC TAC No. 42493

.gv

. . . Franklin Research Center A Division of The Franklin Institute The Benparrun Franun Park *ey. PMa , Pa 19103 (215) 448 1000

$2.o 130 3 't 3 5

RFI-C5257-467 BACKGROUND Franklin Research Center (FRC) of Philadelphia, Pa. is providing assis-tance to the U.S. Nucleac Regulatory Commission (NRC) for the equipment environmental qualification (ED2) review of operating reactors. FRC will '

i perform an EEQ review of the Licensee's 90-day response to outstanding issues l from the NRC Equipment Environmental Qualification Safety Evaluation Report (SER) and the installed 'IMI Action Plan equipment. The review will be limited to safety-related equipment potentially exposed to a harsh environment. The l

results will be presented in the form of a technical evaluation report for each plant.

l This request for additional information (RFI) is the result of an evaluation of the information provided by letters dated August 26, 1981 (1) and January 30, 1981 (2).*

A. FRC REVIEW OF THE LICENSEE'S 90-DAY RESPONSE TO THE NRC EEQ SER Information Requested Date Received by FRC**

1. In reference to the Licensee's 90-day response [1] to the NRC SER [3), a legible single copy of each of the following qualification documents is requested in order that the FRC evaluation may proceeds
a. Conax IPS-556.2 (S*IWS 2A) [1]
b. GE letter, G-EH-8-16, dated 2-2-78 (SCEWS 3A) (1)
c. GE letter, G-EH-9-1-141, dated 10-18-79 (SCEWS 3A) (1)
d. GE letter, R. F. Thibault to R. DeRosa, dated 12-14-79, on terminal block IDCA test (FCEWS 3A) [1]

l l

  • Numbers in brackets refer to citaticns found in the list of references.
    • This column will be completed by FRC as the requested information is received .

_nkjin Rese_ arch _ Center

.- . - ~ . ..

RFI-C5257-467 Date Received by FRC**

e. Kerite Engineering memo, 178A, dated May 1, 1979 (SCEWS 5A) [1]
f. Cerro certified report, dated 2-1-77 (SCEWS 6A) [1]
g. Westinghouse letter, NEU-3546, dated Oct.

1, 1980 (SCEWS 7A) [1]

h. Vendor qualification report, plant file MRIR 41-26-79 (SCEWS 10A) [1]
i. NUSCO memoranda GEE-79-214, GEE-78-358, GEE-79-271 (SCEWS 13A) [1]
j. ASCO test report, No. AQS21678/TR Rev. B (SCEWS 14A) [1]
k. R. K. McCarthy letter to file, dated 9-29-80, GEE-80-710 (SCEWS 20A) [1]
1. Foxboro test report, T3-1013-MCA (SCEWS 28A) [1]
m. Conax qualification test report, IPS-556.1 (SCEWS 36A) [1]
n. Rockbestos report, "Qualification of Firewall III Coaxial Constructions,"

dated January 18, 1978 (SCEWS 37A) [1]

o. Isomedix test report, dated Dec. 27, 1977 (SCEWS 37A) [1]
p. Weidmuller letter, dated June 10, 1980 (SCEWS 38A) [1]
q. GE letter, O. A. Berquist to R. J. DeRosa, dated 9-22-80 (SCEWS 21B) [1]

i nklin Research Center A Deveson af The Frame Inseue

RFI-CS257-467 Date Received by FRC**

r. .NUSCO memo, R. J. DeRosa to file GEE-80-7 46, dated 10-10-80 (SCEWS 21B) [1]
s. GE topical report, IEEE 323, dated Dec. 1978 (SCEWS 21B) [1]
t. Siemans-Allis interof fice correspondence, dated Oct. 8, 1980, revised Oct. 16, 1980 (SCEWS 25B) [1]
u. Wyle test report, 17436-2 Rev. A, dated 2-27-81 (SCEWS 25B) [1]
v. GE letter, O. A. Berquist to R. J. DeRosa, dated Oct. 10, 1980, on RBCCW pump motors (SCEWS 29B) [1]
w. GE letter, O. A. Berquist to R. J. DeRosa, dated Nov. 15, 1979, on containment spray pump motors (SCEWS 29B) [1]
x. Wyle Laboratories NEQ Test Report 4357-2, Sept. 27, 1978 (SCEWS 30B) [1]
y. Wyle Laboratories NEQ Test Report 43757-2, Sept. 27, 1978 (SCEWS 31B) [1]
z. GE instruction 198-4532Kil-001A (SCEWS 36Ba) [1]

aa. Custom Control Centers letter, Theryn .

Eckstein to R. K. McCarthy, dated 10-13-80 (SCEWS 67B) [1]

bb. Custom Component Switches, Inc., Test Report QTR 604-01 (SCEWS 67B) [1]

cc. Limitorque Test Report 600198 Addendum 41 (SCEWS 83B) [1]

A UUNnklin Research Center A Dmeen of The Frerehn routwee

. ,. , _ .~ ~

RFI-C5257-467 Date Received by FRC**

dd. Westinghouse test report, "Qualification of Westinghouse Medium Motor and Gearing Div. Class IE M tors," WCAP-9112 (SCEWS 85B) [1]

ee. Operating and Maintenance Instructions Reciprocating and Charging Pump NP18-3.lTFS (SCEWS 85B) [1]

ff. Foxboro test report T2-1075 (SCEWS 91B) [1]

gg. Foxboro test report T2-6061 (SCEWS 121B) [1]

hh. Rosemount Engineering letter, from J.

Graham to R. K. McCarthy, dated 8-27-79 (SCEWS SC) [1]

11. General Atomic test report, Class IE Testing of Analog High Range Radiation Monitor, E-254-960 (SCEWS 15C) [1]

jj. Babcock & Wilcox, valve monitoring system, test program 3-21-80 (SCEWS 17C) [1]

kk. W. G. Counsil, letter to H. R. Denton (NRC), dated 12/31/79 (SCEWS 10D) [1]

. FRC REVIEW INSTALLED MI ACTION LAN ITES L

nformation Recuested \ Date Rece ed by FRC**

1.

\ N Refgrence 2 does not 'pqovide adequate detai with spect to identification of TMI Action Plan e s ipmentinstalled~\sof1/1/81. '

a. Ident ication of all MI Action g Plan N.

equipme installed as of 1/1/81 is requeste>N ]

f 4 bb Franklin Research Center A Dramen of The Fearden ressee RFI-CS257-467 '

r"~%

Date Received by FRC**

Identification of TMI Action Plan L equipment installed with implemen ation dates af ter 1/1/81 is requested,

c. e correlation of these equip ent items w h the specific sections of REG-0737 14] presented below (as appl cable) is requ sted.

Fo BWRs, Sections:

IIE4 2, IID3, IIB 3, IE4.1, IIK3.13, IIK3. 5, IIK3.19, K3.21, IIK3.27.

For PWRK Sectio IIEl.2,I(E4.2,IIE3.1,IIG1, IIF2, IID3, IIK3 IIK2.10(B&jl2(

W ,

x),

IB3,IIK3.9(Wx),

IIE4.1.

(The correl ion is needed to ensure that all it are included in the review, e. ., f a transmitter is identifie as g TMI Action Plan item, are the able ar terminal blocks associa d with e device also identif ed?)

d. For all i stalled TMI tion Plan equipmeng identified, a System Component Evaluatipn Worksheet (S ) (in accordafce with 79-OLB f emat) is reques ed.
e. The a proximate installati n date for the TMI ction Plan equipment i ems is re sted so that the appro, late qu ification criteria (NURE -0588 or DOR Gu elines) can be used in th EEQ ev luation.
2. The ualification documents, e.g., the actual tes reports and associated corresp ndence ci d as evidence of qualification isted on t SCEW sheets, for all identified I tion Plan equipment are requested. (The entification of those reports consi ered to e proprietary is requested so that pr per control of documents can be maintained.

]

x ~~~~~

UL Franklin Research Center A t>neen of The Frywen insupe

Q RFI-C5257-467 Date Received by FRC**

3. ere the Licensee has a standard rs' Gr position with respect to a G-0737 tech al area or has requested ensions of implem tation dates, this info ation is requeste in order to incorpo te it into the review.

1

) C TRANS TTING INFORMATION REQUESTED L . INSTRUCTIONS FO N

1. The schedule for c letion of the FRC assignment requires that the Licensee provide e equested information within 3 weeks of the date of the RFI.
2. The Licensee y transmit e requested information as follows:

o complet package directly o the NRC project manager or o c y of cover letter to NRC proj t manager and complete package to FRC.

FRC mailing address is as follows:

Mr. Cyril J. Crane Franklin Research Center The Parkway at Twentieth Street.

Philadelphia, PA 19103 Telephone No. 215/448-1353 Telecopy No. 215/448-1296 Telecepy Confirmation No. 215/448-1215 l

I i

I Pn 00 nklin Research Center A Duman of The Frer*> womiuse l

6 4 __ __ _ _ _ _ _

RFI-C5257-467 REFERENCES

1. W. G. Counsil Letter to D. G. Eisenhut, NRC.

Subject:

Environmental Qualification of Electrical Equipment, Millstone Nuclear Power Station, Unit No. 2 Northeast Utilities, 26-Aug-81 A01740

2. W. G. Counsil Letter to D. G. Eisenhut, NRC. Subject Environmental Qualification of Safety-Related Electrical Equipment Northeast Utilities, 30-Jan-81
3. Of fice of Nuclear Reactor Regulation Safety Evaluation Report for Millstone Unit 2 Environmental Qualification of Safety-Related Electrical Equipment NRC, 27-May-81
4. NUREG-0737, "Clarification of 'INI Action Plan Requirements" NRC, November 1980 nklin Research Center A Deesen of The Frannha he

.-