UNITED STATES OF AMERICA

~

NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of )

)

DUKE POWER COMPANY, et al.-- ) Docket Nos. 50-413

) 50-414 (Catawba Nuclear Station, )

Units 3 and 2) )

l AFFIDAVIT OF MICHAEL C. GREEN REGARDING PALMETTO ALLIANCE CONTENTION 16 -

1. My name is Michael C. Green. I am employed by Duke Power Company as .

a Supervising Design Engineer. I have been employed in this position since June 1978. My professional qualifications are contained in an attachment to this affidavit.

2. My job responsibilities include struEtural analysis and design of several Catawba building structures and components, including the spent fuel pool and liner plate system. My familiarity with the issues discussed in this affidavit results from my association with the originial and continual design of spent fuel pool and liner plate system.
3. The purpose of this affidavit is to address three questions which Palmetto Alliance has raised relating to Contention 16. The first deals with leakage of the , spent fuel pool liner plate due to high temperatures. The second question deals with the possibility of a cask drop accident resulting in a fuel cask entering the spent fuel pool. The third question deals with applicants compliance with GDC 2 and GDC 4.

Reference liner plate leakage

4. I understand that Palmetto Alliance alleges that the spent fuel liner would l l $ .. . .

" rupture" in the event the spent fuel pool temperatures exceed the '150 .F .

l 0307130213 83070s l gDRADOCK 05000413 t PDR l

. 1

( ..

. ' for which the pool and liner are designed. The purpose of the- liner plate is to contain water in the pool area. To allege that the liner plate

" ruptures" is to assert that the liner could no longer perform its function of containing this water.

5. This allegation of Palmetto Alliance is incorrect. The liner plate system is constructed as follows:

(a) Steel plates and shapes embedded,in the concrete surface of tige pool; (b) Stainless steel " liner" plates are cordinuously welded to the embedded plates and shapes, such that the entire concrete surface is covered by liner plate. -

(c) Over each of these initial welds, an angle shape is placed.

This angle is welded continuously and is referred to as

" leak-chase angle. "

6. For water to reach the surface of the4 concrete, and thereby leak out of the pool area, both the welds of the " liner" plate to the embedded plate
and the welds of the " leak-chase angle" to the liner would have to fail.

At a temperature of 212 F, the weld of the liner plate to the embedded plate or shape are postulated to fail. However, at the temperature of 212 F, the weld of the " leak-cha,se angle" to the liner plate remains intact. Thereby , the-leak tight integrity of the spent fuel pool liner s system is maintained

7. As the previous paragraphs demonstrate, the water in the spent fuel pool will not reach the surface of the concrete, and thereby cannot leak to the environment, even , i f subjected to the temperature of 212 F. In any event, even if the liner plate did fail and water did come in contact with the concrete walls and floors, calcula3 ions indicate that a , total outflow

(

, through all of the cracks in the concrete surfaces of the fuel pool would be less that one-half ( ) gallon per day.

1 Reference Cask Drop

8. I understand that Palmetto Alliance alleges that a spent fuel cask can be dropped onto spent fuel assemblies stored in a spent fuel pool, thereby creating a " criticality" concern and a violation of General Design Criteria.
9. This allegation is incorrect. The spent fuel' cask cannot be dropped inpo the spent fuel pool. Two cask drop incidents were postulated and examined.

~

The first postulation assumes the fudl cask crane traveling at its maximum horizontal speed of 50 feet per minute, then impacting the j.

stops located on the crane rail. This sudden stop of the crane would -

" swing" the cask towards the wall that separates the cask pit from the fuel pool proper. This calculation further assumes that the cables break when the cask reaches its maximum horizontal displacement. From this position, basic laws of motion and nf6 mentum are used to show that the cask will not " flip" over this wall into the pool, but would rather fall I

back into the cask pit.

10. The second calculation examines the possibility of a cask being dropped on the wall that separates the decontamination pit from the cask pit, pos,sibly tipping over the cask pit, impacting the wall that separates the cask pit from the fuel pool proper, and finally " flipping" into the pool.

t Again, this calculation assumes the maximum speed of the crane, thus providing the greatest momentum of the cask prior to its release. Once again , basic laws of momentum prove this postulation to be impossible.

11. On the basis of the above calculations the " criticality" requirement of GDC 62 is sadsfied.

$ l- , .

12. ' Palmetto Alliance raises a point during depositions taken on May 12, 1983 regarding the extension of crane rails out over the spent fuel pool. It is true that during the construction phase of Catawba the rails associated with the 125 ton cask lifting crane were extended out over the spent fuel pool. This extension was done to accommodate construction sequences of

-the pool. However, prior to operation of the plant, the stops associated with the cask handling crane will be located such that the rail extension

' over the fuel pool cannot be utilized by the cask hhndling crane, thereby prohibiting the cask from ever being located over the fuel pool area.

(Reference Pages 86-88 of the transcripts of the May 12, 1983 deposition. )

13. The spent fuel pool design meets GDC 2 and GDC 4. See FSAR Section 3.1. I would note that GDC 2 and GDC 4 do not require consideration of 6

aircraft crashes. Design requirements'for spent fuel pools are given in g

Regulatory Guide 1.13. This Guide does not require consideration of l aircraft crashes.

me 9

~

O l- ,

l l

q

. I, Michael C. Green, of lawful age, being first duly sworn, state that I have

^-

reviewed the foregoing affidavit and that the statements contained therein are true and correct to the best of my knowledge and belief.

/

Michael C. Green STATE OF NORTH CAROLINA , .

County of Mecklenburg Subscribed and sworn to me this 8th day of July,1983.

OmtdidIL.C.

u ban M0 ( M MMU)

Notady I%blic My Commission expires:  %- )-EN

'4 l

\. -

W

$ l- ,

- I MICHAEL CHARLES GREEN  !

PERSONAL: Home Address:

6019-104 Lake Forest Drive Charlotte, NC 28212-

. Telephone: (704) 535-0654 (Home)

~ (704) 373-7119 (Office)

Age: 33 Height: 6'-0" Weight: 205 lbs.

FORl1AL EDUCATION: University of Tennes,ee: BSCE, 1972

{

PROFESSIONAL ACTIVITY: Registered P.E. in North Carolina - #7993 Member ASCE President Elect - N.C. Section of ASCE 1982-1983 Vic.e President - N.C. Section of ASCE .1981 1982 President - Southern Branch of N.C. Section of ASCE 1980-1981

~ ,

Vice President - Southern-Branch of N.C. Section of ASCE 1979-1980 Chairman of Membership Comittee - Southern Branch 1978-1979 Chairman of Seminar on Hydro Electric Pump. Storage - Joint Power Generation Conference - St. Louis 1981

" ADDITIONAL TRAINING:

MANAGEMENT TECHNICAL SEMINARS

1) Various STRUDL/DYNAL Seminars 1) Aberrant Behavior Training
2) Foundation Engineering Seminars 2) Controlling Absenteeism
3) Geotechnical Seminars 3) Effective Interviewing
4) ACI Code Seminars 4) Effective Management'
5) Tornado Missile Impact Seminars 5) tianagement Development (ASCE Structural Convention) 6) .Ad7anced Management Development
6) Engineering Economics Seminars 7) Productivity Seminars
8) Time Management
9) Space Allocation

, 10) Interviewing Techniques WORK EXPERIENCE: (All with Duke Power)

FR0!! T_0 TITLE PROGRAM 6/76 Present Assistant Design' Engineer Oconee Nuclear Station (6/76 to 6/78) Catawba Nuclear Station Supervising Design Engineer Bad Creek Project y .

(6/78 to Present)

In charge of engineering subgroup responsible for the structural analysis and design of various aspects of the Oconee Nuclear Station, Catawba Nuclear Station,

.and the Bad Creek Pumped Storage Facility.

Oconee In responsible charge of the intial analysis and design of the Standby Shutdown Facility. The responsibilities included the preparation of the excavation e, i- ,

WORK EXPERTENCE (CONTINUED)

C FROM H TITLE PROGRAM m 8/76 Present (continued) specification (which included blasting near the operating Reactor Building) as well as the static and dynamic analyses of the structure itself.

Catawba The responsibilities at Catawba included the structural analysis and design of the Auxiliary Building, the Spent Fuel Pool Buildings ~, the New Fuel Buildings, the Diesel Generator Buildings, the Upper Head Injection Buildings, the Auxiliary Service Building as well as various yard structures. Analysis requirements included both static and dynamic considerations, including earthquake, tornado '

missile impacts, pipe wnip and jet impimgements. " Responsibilities at Catawba also included the analysis and design of various internals to the above mentioned buildings; i.e., Spent Fuel Storage Racks, New Fuel Storage Ra.cks, various equipment supports, and miscellaneous platforms, etc...

Duties required by these responsibilities include the _ development of calculations, specifications, and drawings as appropriate. Duties also included vendor contact, interfacing with the NRC regarding the licensing effort as well as the day-to-day interfacing with Construction Department personnel.

Bad Creek The responsibilities of the subgroup regarding the Bad Creek Project center primarily~ on the underground configuration of the intake, tailrace and access tunnels as well as the powerhouse chamber orientation. A " pilot" tunnel was driven to determine characteristics of the r'olk, with the results of these tests being used in the final design of the underground excavation.

Other duties pertaining to Bad Creek included the overall department scheduling, annu-i al cost estimate preparation, and interfacing with the FERC in the licensing efforts.

Supervise from 7 to 14 engineers in this time period.

12/73 6/76 Engineer Associate Catawba Responsit.ie for the analysis and design of specific items pertaining to the Catawba Nuclear Station. Designs included: a) Groundwater drainage system; b)

Frame analyses of the Auxiliary Building; c) Dynamic amplification factor determination from pipe whip transients; d) Miscellaneous equipment supports,

\ stairs, platforms, etc. -

6/72 12/73 Junior Engineer Belews Creek Responsible for various designs relating to the Belews Creek Coal Fired Station including: a) Transformer bases; b) Switchyard bases; c) Conduit Manholes;

__d). Sewage _Trea,tment Structures; e) Fuel Oil Storage Area; f) Miscellaneous

- Equipment Supports.

Y t- .

'. cP N EELATED CORRESPONDECR 'g 4

g#ed  % 74

'~

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION 4 k

g7 g G331 ', Y-

! BEFORE THE ATOMIC SAFETY AND LICENSING B' O kRD -

\y,\ QQ{fS*}-j' i V?%

In the ' Matter of yjpg.A DUKE POWER COMPANY; et al. -

) Docket Nos. 50-413

) 50-414 (Catswba Nuclear Station, )

Units 1 and 2) ) .

' ARGUMENT AND DOCUMENTATION IN SUPPORT OF i MOTION FOR

SUMMARY

. DISPOSITION ON PALMETTO -

ALLIANCE CONTENTION 44/CESG CONTENTION 181 I. The Contention ,

Intervenors' Contention 18/44 questions the adequacy of, and Applicants' potential future compliance with, -Commission regulations regarding fracture

. toughness of the Catawba reactor vessel. It reads as follows:

The license should not issue 8ecause reactor degradation 1

in the form of a much more rapid increase in reference temperature than had been anticipated has occurred at a t number of PWR's including. ' Applicant's Oconee Unit 1.

Until and unless the NRC and the industry can avoid i i reactor embrittlement, Catawba should not be permitted to operate.

This contention was originally rejected by .the Licensing Board "for lack of the requisite specificity" in that, inter alia, "[t]here is no claim that

- components of - the C'atawba reactors do not meet reference temperature i

L Y requirements. " March 5,1982 Licensing Board Order at p. 35.

Subsequently, l

1 l

CESG Contention 18 and Palmetto Alliance Contention 44 (hereinafter i

"Intervenors' Contention 18/44") are identical. By . order of June 20, 1983, l _ .. this_ Licensing Board, ruled that "[s]ince Palmetto Alliance's and CESG's

.. -information about and interest in this -[ contention) are, by Palmetto's own admission, identical, we are, in the interest of more efficient hearing management, consolidating the two intervenors with regard to Contention 44, and 'are designating CESG as lead intervenor on this contention." June

20. Board Order at p.17, i

l 1 L

~

. l 1

( .

after Intervenors provided additional specificity,2 by Order of July 8,1983 (at

p. 12) the Licensing Board admitted this contention. In response to interrogatories , Intervenors make clear that the sole Commission " reference temperature requirement" which Applicants may not meet (and upon which this contention is therefore based) is that set forth in " Appendix H, Section II . C . 3. a re adjusted reference temperature not exceeding 100 F." CESG's Responses to NRC Staff's Second Set of In'terrogatories and Document Production Requests at p. 9 (March 17, 1983) ("Intervenors' March 17 Responses to Staff Interrogatories") .3 Further', in other responses Intervenors state that with regard to other fracture toughness requirements, Intervenors " challenge the sufficiency" of the standards set forth in -

Appendices G and H to 10 CFR Part 50. Id.

In short , in the context of unanticipated increases in the reference temperature, by their Contention 18/44, Intervenors seek to litigate in this proceeding not only Applicants' compliance v?ith Section II.C.3.a of Appendix H of 10 CFR Part 50, but also the adequacy of Commission regulations set forth

. in Appendices G and H of 10 CFR Part 50. As set forth more fully below, i

Applicants maintain that with regard to this contention there are no issues of material fact appropriate for resolution in this proceeding, and accordingly, Applicants' motion for summary judgment should be granted.

\ -

, 2 Palmetto Alliance and Carolina Environmental Study Group Responses and Objections to Order Following Prehearing Conference at pp. 25-6 (March 31, 1982).

! -3 These - responses were adopted by Palmetto Alliance in its April 19, 1983 Supplemental Responses to Applicant's and Staff's Interrogatories 6, 7, 8, 16, 27' and 44 at pp. 64 .

c .. ,

2

C

. II.

. Material Facts As to Which There Is No Genuine Issue to Be Heard

~

A. By order of June 20, 1983, this Licensing Board ruled that

"[s]ince Palmetto Alliance's and CESG's information about and interest in this [ contention] are, by Palmetto's own admission, identical, we are, in the interest of more efficient hearing management, consolidating the two intervenors with. regard to Contention 44, and are designating CESG as lead intervenor on this contention . " ,June 20 Board Order at p, 17.

s B. Intervenors' Contention 18/44 was originally rejected by the

- ~

Licensing Board "for lack of the requisi.e specificity" in that, inter alia,

"[t]here is no claim that components of the Catawba reactors do not meet

_. reference temperature requirements . " March 5, 1982 Licensing Board Order at p. 35.

C. In response to interrogatories, Intervenors make clear that the sole Commission " reference temperature requirement" which Applicants may not meet (and upon which this contention is therefore based) is that set forth' in " Appendix H,Section II.C.3.a re adjusted reference temperature not exceeding 100 F."

l D. In response to the direct question whether "you challenge in sufficiency of any standard contained or referenced in Appendices G and H of Part 50," Intervenors respond "yes," and elaborate that they are "

^

dubious about the entire construct [of such standards]. If the standards were really, adequate there would be no need for a surveillance program."

Intervenors' March 17 Responses to Staff Interrogatories at p. 9.

_- E. Intervenors contend that the using " coupon" testing "is simply too unreliable [upon which] to have a substantial technical judgment"

% . . - . . <* 9 l

(Intervenors' Responses to Applicants' June 20 Interrogatories at p. 5),

in direct confdct with Appendices G and H in which the Commission bases

  1. o .

3 l

m,

r C

. ' many of its requirements on such testing (eg,Section III. A and B of Appendix H to 10 CFR Part 50).

F. Intervenors contend that " data obtained from surveillance for reactor vessel fracture toughness cannot be utilized to determine the conditions under which the vessel can be operated safely" (Id. at p. 2),

in direct conflict with, inter alia,Section V of Appendix G.

G. From Intervenors' responses to Applicants' and Staff',s interrogatories, it is clear that 'with one exception, Intervenors do not contend that Applicants do not comply with requirements contained in Appendices G and H of 10 CFR Part 50, or with the regulatory guidance regarding such requirements, e.g. , Intervenors state that (1) they know -

of no provisions of regulatory guidance regarding fracture toughness with which Applicants do not comply (Intervenors' June 20 Responses to Applicants' Interrogatories at p. 1), (2) the information regarding fracture toughness in Applicants' FSA5 "is compatible with and derivative from Appendix G and the related ASME material" (Id. at p. 4), and (3)

Section II . C .3. a of Appendix H is the only provision of 10 CFR 950.55(a), and Appendices G and H of 10 CFR Part 50 with which Applicants do not comply (Intervenors' March 17 Responses to Staff Int,errogatories at p. 9).

H. On May 27,1983, the Commission promulgated amendments to its s requirements for fracture toughness and surveillance of reactor vessels to

" clarify the applicability of these requirements to old and new plants, modify certain requirements as described below, and shorten and simplify j these regulations by more extensively incorporating by reference appropriate national standards." 45 Fed. Reg., 75536 (November 14, i

1980). See also 48 Fed. Regu. 24008 s (May 27, 1983). , ignificantly, S

I 4

1

.a. . - - . - ,

i 0

these amendments of Appendices G and H were " designed to update them after seven years of use" (48 Fed. Reg. at 24008) and included consideration by the Commission of all applicable technical reports and information developed during that seven year period including consideration of any concerns regarding reference temperature increases in existing plants. The amendments do not become effective until July 26, 1983. However, in large m,easure the.y simply continue the previotis practice of incorporating by reference the same ASTM Standards to which Applicants are committed to comply. See Applicants' FSAR at Section 5.3.

I. Intervenors have not raised by affidavit or otherwise special circumstances of a "special safety significance" relating directly to Catawba that make a prima facie showing "th at application of ...

[ Appendices G and H of 10 CFR Part 50] would not serve the purposes for which . . . [they were] adopted,." 10 CFR 92.758.

4 J. Appendix H to 10 CFR Part 50 sets forth the Commission's

! surveillance requirements for reactor vessels . These requirements I

include, inter alia , the installation of surveillance specimen capsules (coupons) inside the reactor vessel (Sections I and II of Appendix H) and periodic withdrawal and testing (Section III of Appendix H) of such coupons to determine the effects of. radiation on the material. Based on the results of such testing, Appendix G to 10 CFR Part 50 provides for l

\

l continued unrestricted operation (Section V of Appendix G) or requires specific actions to correct any potential problems, such as annealing the vessel (Section V.D of Appendix G).

_. _..K. . In the new amendments to Appendices G and H, the Commission has, inter alia, withdrawn Section II.C.3 inits entirety and replaced it with the requirement that specimen e capsule numbers and . associated 5

C withdrawal schedules must be in conformance with the appropriate edition

^'

of the ASTM E-185 Standard.

L. The maximum number of capsules required by the 1982 edition of ASTM E-185, regardless of estimated end-of-life reference temperature, is 5 capsules. See Tables 1 of ASTM E-185 at p. 896 (1982 edition) . As set forth in Applicants' FSAR at Section 5.3.1.6, Applicants have installed sh specimen capsules (one more ' than .the maximum number

. required regardless of the estimated end-of-life reference temperature).

M. The estimated end-of-life reference temperature is 110 F for the Unit 1 pressure vessel and 109 F for the Unit 2 pressure vessel. See Applicants' FSAR at Table 5.3.1-4 (52 F + 58 F = 110 F) and Table .

5.3.1-5 (15 F + 94 F = 109 F), respectively.

N. Contrary to Intervenors' assertion , Section II . C . 3. a of Appendix H to 10 C.F.R. Part 50, providing specimen capsule requirements for plants with estimaled end-of-life reference temperature not exceeding 100 F, was not applicable to the Catawba pressure vessels.

i III. Discussion A. There Is No Genuine Issue to Be Heard Regarding the Adequacy of Appendices G and H of 10 CFR Part 50 Appendices G and H to 10 CFR Part 50 provide the Commission's specific, detailed fracture toughness and surveillance requirements s

regarding reactor I f ressure vessels such as at issue in this contention.

i 38 Fed. Reg. 19012 (July 17, 1973). As the Commission stated when initially publishing its proposed regulations in this area:

-- - - Criterion . 31 of the " General Design Criteria for Nuclear Power Plants" (Appendix A of Part 50) states that the reactor coolant pressure boundary shall be designed with sufficient margin to assure that when stressed under operating, nfaintenance, testing, and 6

e C

. postulated accident conditions (a) the boundary

o. behaves in a nonbrittle manner and (b) the probability of rapidly propagating fracture is minimized. The criterion also requires that the design reflect consideration of service temperatures and other conditions of the boundary material under operating, maintenance, testing, and postulated accident conditions and the uncertainties in

^

determining (a) material properties, (b) the effects of irradiation on material properties , (c) residual, steady-state and transient stresses, and (d) size of flaws .

The proposed amendments Ii.e. , Appendices G and H s of 10 CFR Part'50] would specify minimum fracture toughness requirements needed. to , assure that

, ;.; q Criterion 31 is satisfied and describe methods by

?

% which the fracture toughness of reactor coolant

{ pressure boundary materials should be determined.

F [36 Fed. Reg.12697 (July 3,1971).]4

. On May 27, 1983, the Commission promulgated amendments to its N requirements for fracture toughness and surveillance of rector vessels to

" clarify the applicability of these requirements to old and new plants,

'~Q -

modify certain requirements as gescribed below, and shorten and simplify

  1. G.

1.0 these regulations by more extensively incorporating by reference M

T appropriate national standards . " 45 Ped. Reg. 75536 (November 14, i

1980). See' also 48 Fed. Reg. 24008 ( May 27, 1983). Significantly,

.~s QQ 'y, these amendments of Appendices G and H were " designed to update them c, after seven years of use" (48 Ped. Reg. at 24008) and included

% consideration

  • After analyzing public comment , the final regulations regarding fracture A toughness issued by the Commission in 1973 were even more stringent than those proposed:

The margin of safety against brittle fracture will be

-- controlled more quantitatively by these amendments

[ Appendices G and H of 10 C.F.R. Part 50] than by the

~~ - '

proposed rule, particularly with regard to specific guidelines

.~ . for th e' treatment of heatup and cooldown conditions.

Appendices G and H track the language of the ASME Code and have adopted certain of its requirements but also include several key supplemental . requirements. [38 Fed. '

Reg.

. 19012, 19013 (July 17, 1973).]

7 l

~ - . . _ - _ _ - _ _ _ _ _ _ _ _ _ _ - - - _ _ _ - _ _ _ _ _ _

C

~ by the Commission of all applicable technical reports and information developed during that seven year period including consideration of any concerns regarding reference temperature increases in existing plants.5 In short, the Commission has established detailed requirements for licensees regarding fracture toughness and surveillance of reactor pressure vessels. From Intervenors' re,sponse to Applicants' and Staff's interrogatories, it is clear that with sne exception, Intervenors do not

-A

. J- contend that Applicants do not comply with such requirements, or with

q. the regulatory guidance regarding such requirements, %, Intervenors ' '
state that (1) they know no provisions of regulatory guidance regarding

. fracture toughness with which Applicants do not comply (Intervenors'

. June 20 Responses to Applicants' Interrogatories at p. 1), (2) the

. information regarding fracture toughness in Applicants' FSAR "is J compatible with a derivative from Appendix G and the related ASME

. 4 a

material" (Id. at p. 4), and (3)Section II.C.3.a of Appendix H is the Mt only provision of 10 CFR 950.55(a), and Appendices G and H of 10 CFR i

Part 50 with which Applicants do not comply (Intervenors' March 17 L Responses to Staff Interrogatories at p. 9).

e '

~

Rather, Intervenors make it explicitly clear that they contend that

  • the Commission's regulations in this area are inadequate.8 In response to

\ 5 pplicants n'ote that - these amendments do not become effective until July 26, 1983. However, in large measure they simply continue the previous practice of incorporating by reference the same ASTM E Standards to which i

Applicants are committed to comply. See Applicants' FSAR at Section 5.3.

i 6

' In that the recent amendments to such regulations were promulgated on May

_27 ,- 1983, Applicants assume that Intervenors' June 20, 1983 Responses to Applicants' Interrogatories (and pertinent responses to Intervenors' March 17, 1983 Responses to Staff's Interrogatories which were incorporated by reference into Intervenors' June 20 Responses) reflected consideration of such new amendmeht. See Intervenors"' June 20, 1983~

Responses to Applicants' Interrogatories at p. 8, note.

~_

8

a .-

c .

C the direct question whether "you challenge the sufficiency of any standard contained or referenced in Appendices G and H of Part 50,"

Intervenors respond "yes," and elaborate that they are " dubious about the entire construct [of such standards] . If the standards were really adequate there would be no use for a surveillance program . "

Intervenors' March 17 Responses to Staff Interrogatories at p. 9.

' 9. Further, Intervenors contend that th'e using " coupon" testing "is' simply x2$

$m too unreliable [upon which] to base a substantial technical judgment"

cyj (Intervenors' Responses to Applicants' June 20 Interrogatories at p. 5),-

-79

,H in direct conflict with Appendices G and H in which the Commission bases

=.4 c B: many of its requirements on such testing (eg,Section III. A and B of be; Appendix H to 10 CFR Part 50). Intervenors also contend that " data

r. obtained from surveillance for reactor vessel fracture toughness cannot be y utilized to determine the conditions under which the vessel can be
x 4 E#3 operated safely" (I_d. at p. 2), in direct conflict with, inter alia, Section

. .D

($'l V of Appendix G.

6 Applicants maintain that to the extent Intervenors' Contention 18/44

.A.

$$.- 7 attempts to challenge the adequacy of the Commission's regulations, 535 absent a showing of special circumstances , such issues may not be litigated in this forum. 10 CFR 62.758.7 In this regard, Applicants note the Commission's direct admonition regarding attempts to litigate the L -

possibility of reactor vessel rupture (as Intervenors seek here) in view of 1

..Mg the Commission's extensive and detailed requirements set forth in i 7 See, also, Offshore Power Systems (Floating Nuclear Power Plants,

' -ALAB-489, 6 NRC 194, 221 (1978); Metropolitan Edison Co. , et.al. (Three~

  • h .

Mile Island Nuclear Station, Unit No. 2), ALAB-456, 7 NRC 63, 67 (1978);

L <

Pacific Gas and Electric Company (Diablo Canyon Nuclear Power Plant, Units l I and 2), ALAB-410, 5 NRC 1398, 1402 (1977); Union Electric Company (Callaway Plant, Units I and 2). ALAB-347, 4 NRC 216,' 218 (1976).

hN 9 udii _ _. . _ . __ _.

.;. . __ _ __ __m 7 ,

l l

. I

~x C

Appendices G and H of 10 CFR Part 50.

. the subject of pressure vessel intergrity could, in special circumstances, be a proper area of inquiry during a licensing proceeding. The staff contended that protection 'against the consequences. of vessel

' failure need not be required for a particular facility "unless it has been determined that for such facility

"' there are - speical considerations that make it necessary that potential pressure vessel failure be considered" (Staff Brief, supra, at p.10).

ap- - We adopt the new view expressed by the staff as, consistent with the lango' age of the regulation and the f%m.: underlying Statement of Considerations. Where there i$g. are matters raised in a case that, are of "special

  • M 4 - safety significance", supplementary measures in nYA respect to the facility under review are '

an 7* ' appropriate subject of hearing exploration. .5 9 ' '

1;

%M 5 To warrant inquiry, the evidence must be directed

?- to the existence of special considerations involving a particular facility in issue. Licensing Boards, in their discretion , are empowered to exclude contentions or challenges which have no substantial or prima facie basis, or which merely amount to generalized attacks upon the standards presently required by the fegulations.

.m, .

~

[(Emphasis added.) Consolidated Edison Co. of

.F New York (Indian Point Unit No. 2), CL1-72-29, 5

-i NEC 20, 21 (1972). See also Wisconsin Electric

'5~ Power Company (Point Beach Nuclear Power Plant, Unit 2), ALAB-137, 6 AEC 491, 502-3 (1973);

. .?. %, : Cleveland Electric Illuminating Co. (Perry Nuclear M Power Plant, Units 1 and 2), LBP-Al-24,14 NRC 175, 227 (1981).]

.m In sum, in - order for Intervenors to be allowed to challenge Commission regulations regarding fracture toughness of reactor vessels in this p'roceeding they must provide special circumstances -of a "special 3.

_ ~

safety significance" relating ' directly to Catawba. In addition, such special circumstances must be raised by affidavit and must make a prima

~. ---

. e_. facie showing ' "that application of the rule or regulation (or provision j p thereof) would not serve the purposes for which the rule or regulation -

i t

was adopted." 10 CFR $2.758.+ See also Detroit Edis'o n'Co. (Enrico Fermi c 10

' *n. . . . - - . . -...-. . -.. - -...,. _ _ - . -. _ . . - - . . -.

~

t i

t Atomic Power Plant, Unit 2), LBP-78-37, 8 NRC 575, 584-5 (1978). In that Intervenors have not even attempted to raise such special circumstances by affidavit which meet these requirements , they are 9

barred from challenging such regulations in this forum.8 In sum, to the extent that Intervenors' Contention seeks to challenge the sufficiency of Commission regulations in this proceeding, Intervenors' Contention must be rejected. . .

/

$ There Is No Genuine Issue To Be Heard Regarding Applicants'

'M B.

j Compliance With Section II.C.3.a of Appendix-H to 10 CFR Part 50

.]'

Appendix H to 10 CFR Part 50 sets forth the Commission's surveillance requirements for reactor vessels. These requirements .

7, L

include, inter alia , the installation of su veillance specimen capsules (coupons) inside the reactor vessel (Sections I and II of Appendix H) and w periodic withdrawal and testing (Section III of Appendix H) of such

? coupons 20 to determine the effScts of radiation on the material. Based n-on, inter alia, the results of such testing, Appendix G to 10 CFR Part 50

' ]n ,.

-I d

d w s Applicants note, however, that Intervenors are not without a forum to raise their concerns regarding Commission regulations. Intervenors may always file a petition for rulemaking pursuant to 10 CFR 62.802.

8 Applicants note that to the extent that Intervenors' allegations regarding increases in reference temperature at various utilities is viewed as special s circumstances , such allegations fall far short of the required prima facie showing of an issue of "special safety significance" relating directly to Catawba as required by Commission regulations and as set forth by the Commission in Indian Point, supra. In any event, as previously noted, the 3

recent amendments to these regulations reflect the technical studies performed during the past seven years, to include consideration of increases in reference temperature. Accordingly, such information is mlearly not "special circumstances."

  • 10 As to Intervenors' assertion , as previously noted, that testing of such

! specimens "is simply too unreliable," Applicants maintain that such assertion is a , proscribed attack on Commission regulations. 10 CFR S2.758. See Section A, supra.

,w _..

, w a _. - --. . _ _ _

C

- ' provides for continued unrestricted operation (Section V of Appendix G)

I

~

such as  !

or requires specific actions to correct any potential problems, annealing the vessel (Section V.D of Appendix G).11 In their March 17 Responses to Staff Interrogatories, Intervenors contend that Applicants may not sometime in the future be in compliance

- with Section II.C 3.a of Appendix H to 10 C.F.R. Part 50, which sets forth the number of surveillance capsules required to be installed in a reactor vessel and their withdrawal schedule for testing.12 As previously noted, however, subsequent to this allegation the' Commission promulgated amendments to Appendix H. 48 Fed. Reg. 24008. In such new amendments the Commission has, inter alia, withdrawn Section II.C.3 in ,

its entirety and replaced it with. the requirement that speciment capsule numbers and associated withdrawal schedules must be in conformance with the appropriate edition of the ASTM, E-185 Standard.is As set forth in Applicants' FSAR at Section 5.3.1I67 Applicants have committed to meet i.

such requirements.

I 22 While annealing is not now an option that Applicants anticipate, Staff's December 15, there are no design features which would prohibit annealing.

2 1982 Responses to Palmetto Alliance Interrogatories at p. 99.

12 Significantly,Section II.C.3.a- of Appendix H was applicable to pressure vessels with an estimated end-of-life reference temperature that does not exceed 100 F. Applicants note that their end-of-life estimated reference temperature' is 110 F for the Unit 1 pressure vessel and 109 F for the Unit 2 pressure vessel. See Applicants' FSAR at Table 5.3.1.-4 (52Accordingly, F + 58 F =

\ 110 F) and Table . 5.3.1-5 (15 F + 94 F), respectively.

contrary to Intervenors' assertion,Section II.C.3.a of Appendix H to 10 C.F.R. Part 50 was never applicable to the Catawba pressure vessels.

Thus, Applicants contend that Intervenors' allegations regarding this i

contention were, in any event, factually flawed.

28 Applicants note that the maximum number of capsules required by the 1982

-e'dition "of ASTM

  • E-185, regardless of estimated end-of-life reference temperature, is 5 capsules. See Table 1 of ASTM E-185 at p. 896 (1982 l edition). As set forth in Applicants' FSAR at Section 5.3.1.6, Applicants have installed six specimen capsules (one more than the maximum number required regardless of the ~ estimated ^ end-of-life reference- temperature). .

I 12 .

l l

. ' In sum, Applicants maintain that Commission action in withdrawing Section

~

II . C . 3. a has mooted Intervernors' concern. Further, to the extent Intervenors contend that the amended regulatory scheme regarding specimen capsules is inadequate, Applicants maintain that such constitutes a proscribed challenge to such regulations. 10 C.F.R. 92.758. See Section A, supra.

IV. Conclusion ,. ,

From the foregoing, Applicants ' maintain that there are no material facts subject to resolution regarding Intervenors' Contention 18/44, and that Applicants' Motion for Summary Judgment be granted.

'o l

es ano 4 =a e 4 f f- ,

i 1

13

i tu..s ce: + me-h ,d

  • A-y-

.6 Qww

  • E *,

Y\

C _,,- C.

. . -:: q-r UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION g,

4 ~

Q

~t c -.-C . K 7; BEFORE THE ATOMIC SAFETY AND LICENSING BOARD '

-N i

In the Matter of )

)

DUKE POWER COMPANY, et al.-- ) *

. Docket Nos. 50-413 f

) 50-414 (Catawba Nuclear Station, )

Units 1 and 2) )

ARGUMENT AND DOCUMENTATION IN SUPPORT OF MOTION FOR

SUMMARY

DISPOSITION OF PALBETTO ALLIANCE / CAROLINA ENVIRONMENTAL STUDY GROUP'S DES CONTENTION 17

  • I. The Contention DES Contention 17 states:

The DES is concerned wit environmental impacts .

Presumably these are best repre(sented as the entire range ~

from trivial to serious, in conjunction with the estimates of

, likelihood. The DES averages meteriological conditions in its consideration of accidents, 5.9.4.5. Because atmospheric

[ inversions and quiet air are a very common feature in this region , accident consequences should be calculated for the extreme condition of inversion and very slow air movement.

In the matter of assessing serious accidents, the environmental assumptions are complex and again do not

. appear to consider extreme weather, p. 5-37. The DES, which differs from the CP FES in considering severe accidents, is at fault in not considering the full range of radiological impacts by not considering extreme , but N. frequently encountered, weather conditions.

In admitting this contention, the Board characterized it as follows: " DES-17 contends that the DES does not properly evaluate impacts of design basis and severe accidents because it does not isolate and analyze those impacts assuming extreme weather." [ December 1,1982 Memorandum and Order at p. 21.]

D t- .

~

O 9

II. Material Facts As To Which There Is No Genuine Issue To Be Heard

~

A. DES Contention 17 asserts that the DES is deficient because its analyses of the consequences of design basis accidents and severe accidents do not isolate and specifically address the effects upon radiation dispersion of extreme weather such as inversion and very slow air movement.

B. In order to determine the probable environmenta'. effects of design basis events, the NRC Staff performesi a " realistic" assessment of such events.

(See DES, Section 5.9.4.5(1)) Consistent with ' the purpose of this analysis, the meteorological dispersion conditions assumed in these calculations "are an average value determined by actual site measurements."* (DES, pp. 5-35).

C. The NRC Staff also assessed the environmental effects of severe (Class 9) accidents. (See DES, Section 5.9.5.6(2)) In these calculations , the Staff used the assessment methodology set forth in the Reactor Safety 4

Study (RSS) (NUREG-75/014), as rebaselined in NUREG-0715. Potential

! radiological release consequences were calculated by the consequence I model used in the RSS, as adapted to the Catawba site. Among the site-specific environmental parameters used was the meteorological data, which represents "a full year of consecutive hourly measurements and seasonal variations." (DES, p. 5-37)

To obtain a probability distribution of consequences, these severe y

accident calculations were performed assuming the occurrence of each accident-release sequence at each of 91 different " start" times throughout

'-

  • In its interrogatory responses to CESG, the Staff indicated that this

" realistic" evaluation " utilizes a meteorological parameter such that the l

calculated dose to an individual anywhere on the Exclusion Area Boundary would not be higher more than 50% of the time." NRC Staff.. Responses to i CESG's Discovery and Document Requests, May 10, 1983, at p . 15.

l

i

<- i 4

C a 1-year period. Each separate calculation uses the site-specific hourly n.

meteorological data and seasonal information for the period following each 4

_ " start" time. (DES, p. 5-37) This stratified sampling plan was chosen so l 1

that all seasons and all hours of the day would be represented.

c D. Adverse meteorology has been considered by the Staff in its safety

~

analysis of design basis accidents, which was conducted pursuant to 10

7. w. ._ n ,

C.F.R. Part 100. (DES,, Section 5 9.4.5(l')) The reason that< extremely NId52 poor (near worst case) meteorological conditions are assumed in the p

T77  ;'i.?; Staff's safety analysis is to assure that the plant has been properly F

0$?y'-

j designed and that it can operate safely in compliance with NRC w ,g, g @q requirements.

g, III. Discussion

. DES Contention 17 asserts that the DES is deficient in not considering extreme

c. weather conditions in assessing sthe consequences of design basis and severe 4

g - accidents. As will be demonstrated below, the DES's evaluation of the

. - M..

= consequences of design basis and severe accidents is consistent with applicable I legal requirements under NEPA. Despite the availability of considerable 4., .Q information from the Staff on disovery*, Intervenors have failed to make any .

c .m. , .

showing that these evaluations are inadequate. They have not addressed the 3- '

L

  • Discovery on DES-17 was conducted by- all of the parties during March, p ' April and May,1983. On March 8,1983, the NRC Staff filed its "First Set Y '

j of Interr' ogatories to Palmetto Alliance and [CESG]." On March 28, CESG responded on behalf of both intervenors. On April 1,1983, CESG filed its A

first and only set of interrogatories relating to DES-17: all of these questions were directed to the Staff The Staff voluntarily responded to the interrogatories (despite the fact that CESG had failed to make the showing

.,  ; required under 10 C.F.R. S2.720(h)(2)(ii)) on May 10, 1983.

!k";' ' Applicants filed their first set of interrogatories on DES 17 on April 18, '

. 1983, to which Intervenors responded on May 2,1983. ("May 2 Responses")

l. Applicants then submitted follow-up interrogatories on May 18. Palmetto Alliance and CESG responded on June 6,1983. (" June 6 Responses") .

l g#a

l 1

C

,_ ' relevant NEPA standard at all. In sum, DES 17 fails to raise any triable issue of fact.

A. The DES's " realistic" evaluation of design basis events is not required to isolate and address the effects of extreme weather such as " inversion and very slow air movement" In the first paragraph of DES 17, Intervenors note that the DES averages meteorological conditions in its , assessnient of design basis events, and contend that since environmental impacts are presumably "best represented as the entire range from trivial to serious," design ,

basis accident consequences "should be calculated for the " extreme condition of inversion and very slow air movement." -

The NRC Staff has performed an assessment of design basis events which is discussed in Section 5.9.4.5 of the DES. This environmental assessment is referred to as a " realist,ig" design basis evaluation in order to contrast it with the more conservative safety evaluation of the same I

design basis events which was performed by the Staff pursuant to 10 i

C.F.R. Part 100. (The latter evaluation is discussed in Section C, infra).

4 The purpose of this " realistic" evaluation was to determine probable or anticipated environmental consequences (in terms of radiation dosage) of v design basis accidents. Hence, the Staff did not calculate accident consequences using extreme or worst-case meteorological conditions. Such would be inconsistent with the intent of the evaluation (i.e. , to determine likely accident consequence).

Rather, the Staff utilized " meteorological dispersion conditions that are an average value determined by actual site measurements . " (DES, p. 5-35) , ,. ,

~.

-.c C

P

~ The NRC Staff's consideration of meteorological factors -in its "

design basis accident evaluation is totally consistent with N standards. l it has been clearly established that the environmental review conducted by the NRC Staff in licensing proceedings "need not ex all theoretical possibilities, whether or not they have been by identified .

a party . " Long

_ Island Lighting Q. (Shoreham Nuclear Power f Station), ALAB-156, 6 AEC 5 .831, 836 (1973). Becau'se the

.!4 comprehensiveness of the review mandated by NEPA is subject to a "

fI of reason," such review need not include "all theoretically possibl environmental effects arising out of an action . " Rather, the Staff's environmental review in the DES /FES "may be limited to effects w shown to have some likelihood of occurring."*

Id. _See also Northern

_ States Power Co . , et al . (Prairie Island Nuclear Generating Plant, Units 1 and 2), ALAB-455, 7 NRC 41, 48 (1978).

6 r Since the basic thrust of agencies' responsibilities under NEPA is I

predict the environmental effect of the proposed action before the a is taken and the effects are fully known, it has been recognized that j;

"[r]easonable forecasting and speculation is thus implicit in NEPA ...

Accordingly, if the NRC Staff "makes a good faith effort" in the environmental review to describe "the reasonably foreseeable

  • environmental impact" of the proposed action, along with the alternativ and their reasonably foreseeable environmental impact, and the irreversible and irretrievable

! commitment of resources which the action involves, it will fully satisfy the statutory requirement. Long Island The NRC interpretation of this aspect of NEPA is directly supported n NRC, 547 F.2d 633, 639 (D.C. Cir.1976). judicial interpret

C-

.a_ Lighting Q. , supra, 6 AEC at 838 [ emphasis added), citing Scientists' Institute for Public Information Inc., v.

AEC, 481 F.2d 1079, 1092 (1973).

Thus, in considering whether or not the NRC Staff's treatment of ext meteorological conditions in the DES satisfies NEPA, the appropriate inquiry is not

-- as the Intervenors would have it -- whether various

_! scenarios involving extremely poor meteorological dispersion conditions

.1 should have been given more emphasis in the DES assessment of a a consequences.

Rather, attention should be focused on whether the

'- - reasonably probable" effects of meteorology have been factored into the Staff's analysis of design basis accidents.

Applying this NEPA standard, it is clear that the Staff's methodology for assessing the environmental effects of design basis events satisfies NEPA's " rule of reason."

4 Moreover, Intervenors have failed to make any showing that the Staff's t design basis accident calculations do not satisfy NEPA.

I Indeed ,

Intervenors appear to have no legal or technical support whatsoever r 2 their assertion that i such accident consequences should be calculated for extreme meteorological conditions.

Their legal basis, according to their discovery responses, is as follows:

P.A. and C.E.S.G. believe

  • - regulations generally requirethat NEPA and implementing that the account of the impact of this licensing NRC take full action.

should include an evaluation of the worst case. Such impact (June 6 Response to Interrogatory 3, p. 9.

See also May 2 Response to Interrogatory 17, pp.17-19).

k Palmetto Alliance and CESG's technical ,

support for their contention a i- .

- relates t,o design basis accidents is equally tenuous.

Their basic premise is that the averaging ' of meteorological conditions is improper because l

n t

~

w average values do not adequately represent the extreme (May 2 Responses to Interrogatories 2, 13, 14, 16; June 6 Reponse to Interrogatory 2).

They offer no basis for this assertion. Moreover, it appears that Intervenors may have misconstrued the purpose of the " realistic" design basis accident calculations.

a B.

" ' The DES's analysis of severe accidents is not required to isolate and address the effects of " extreme , but frequently

, meteorological conditions _ encountered"

. w .

s_ c -

3-11 The second paragraph of DES 17 asserts that-in the DES's assessment of

,'6;_.

" " 1 J,

/

serious accidents, "the environmental assumptions are complex and again .

do not appear to consider extreme weather," and that the DES is deficient .

"in not considering the full range of radiologic impacts by not considering -

extreme, but frequently encountered, weather conditions."

Applicants maintain that the same legal standards which govern the NRC 4

Staff's " realistic" evaluation of design basis accidents apply to its 3 environmental assessment of severe (Class 9) accidents. Under NEPA's

-}-

" rule of reason," the Staff should consider the " reasonably foreseeable"

,3;

. g .,.. _ environmental impacts of severe accidents, not "all theoretically possible a .. , , environmental effects." Thus, contrary to Intervenors' allegations, there is no requirement that worst case meteorological conditions be isolated and factored into the Staff's accident consequence calculations. Rather, A '

" reasonably-foreseeable" weather conditions may be assumed.

In any event, however, it appears that extreme weather conditions were not entirely overlooked in the Staff's severe accident analysis. In its q assessment, the DES uses the methodology . developed in the Reacto I Safety Study (RSS), USNRC Report WASH-1400 (NUREG-75/014), i c i- ,

as {

._ "rebaselined. " In calculating potential release consequences, however, '

.. I Lo ;r. .  ;

t

,_ the RSS model was adapted to the Catawba site. (DES, p. 5-37) Among the ..ite-specific environmental factors used was meteorological information which represents "a full year of consecutive hourly measurements and seasonal variations . " To obtain a probability distribution of severe accident consequences, the NRC Staff's calculations assume the occurrence of each accident-release sequence at each of 91.different " start" times throughout a 1-year period. ' Each calculation, uses the site-specific hourly meteorological data and seasonal information- for the time period following each " start" time . (DES, pp. 5-37) This stratified " sampling .

plan" was chosen so that all seasons and all hours of the day would be .

represented. Thus, to the extent that extreme meteorological conditions such as inversions and quiet. air are common in the area, they should be reflected in these " start" times and, therefore, in the Staff's severe accident calculations. (FES, pp. 9-12h;.

, Applying the " rule of reason," Applicants submit that the Staff's severe accident calculations gave ample consideration to the potential effects of extreme meteorology.

To the extent that such effects were deemed to be

" reasonably foreseeable," they were factored into the Staff's analysis.

Additional emphasis upon worst case. weather conditions is not required by NEPA.

t -

Moreover, here again Intervenors have made no showing in their discovery responses as to why the DES's severe accident calculations were improper or insufficient. Even after they had been provided with

~-

ext'snsiv'e informa;io'n by the Staff in discovery on the basis for its severe  !

accident calculat:ons, Intervenors were unable even to confirm whether 4 t- g they contended t. sat the methodology used in the DES's severe accident analysis entirely f ailed to consider extreme weather, that it merely failed l

l

C to consider it sufficiently, and why the treatment of adverse meteorology 4

therein was inadequate. Rather , they merely stated that their examination of the information provided to them by the Staff was

" incomplete . " (June 6 Response to followup interrogatory 12, p. 9) (This information had been available to Intervenors since May 10, 1983).

Intervenors' responses as to what additional . consideration sholild be given p .. to extreme weather in calculating severe accident radiation doses were s

sq equally unenlightening.

- t Intervenors simply asserted that the Staff should

~

" evaluate specifically the worst meteorological case reflected in the three

. years of observations for the site." (May 2 Response to Interrogatory 24, p. 19). No basis was given for this assertion in the May 2 Responses; in their follow up responses Intervenors indicated that their basis is " common sense and personal experience." (June 6 Response to interrogatory 14, p. 10). Nos could Intervenors indicate precisely the legal authority which they contend requires the NRC Staff to consider extreme meteorological conditions in calculating the radiation doses associated with severe accidents, merely stating (without specific citations

~'

4 or explanation) that " general NEPA authority" and the Commission's Policy Statement on severe accidents require such consideration of worst case impacts. (June 6 Response to followup interrogatory 13, p.10).

E '

In response- to Applicants' followup interrogatory which sought to ascertain their reasons for refusing to accept the Staff's assumption of the " low probability" of a design basis or severe accident, and its

_. _. assumption that the " resultant risk [of accidents) is exceedingly small,"

Intervenors merely reiterated word for word portions of DES Contentions l 1 and 22. The Board rejected these portions of DES il and 22 for lack of i

C

~

specificity and bases in its December 1,1982 Memorandum and Order (pp.

8-11).*

In sum, Intervenors' discovery responses relating to severe accidents are characterized by the same vagueness, unresponsiveness and failure to specify any specific deficiencies in the DES found in their discovery responses focusing on the Staff's design basis accident calculati,ons ,

j although they were provided with relevant Staff documents and information through discovery. They have failed to' provide any specific technical bases for their disagreement with the methodologies employed,

. and ,have similarly failed to address applicable legal standards. In sum, Intervenors have not raised any triable issue of fact in DES 17.

~

C. Extreme Methodology is Considered in the Staff's Safety Analysis of Design Basis Accidents J

Lest the Board believe that the pot'ential effects of adverse meteorological conditions on accident consequences have not been adequately considered t

I by the Staff, Applicants note that extreme weather has appropriately been considered by the Staff in its safety analyses of Catawba. The adequacy n

j of such safety analyses is, of course, entirely beyond the scope of this contention. If Intervenors had wished to raise concerns with the Staff's s

! '

  • In particular, the Board noted that the language in question cites no specific shortcomings in mtthodology or in the details of the calculations.

Intervenors' reference to Brown's Ferry and Fermi were ruled to be beyond t

the scope of this proceeding. With respect to its critique of the Reactor Safety Study (WASH-1400), the Board specifically rejected Intervenors' assertion that the use of WASH-1400 for risk analysis in licensing is inappropriate, stating that "the discriminatory use of WASH-1400 is not contrary to Commisssion policy," and that any shortcomings in the. original L_ study "are taken into account in the Staff's DES analysis in various ways, i

including updated ("rebaselined") results for relevant risks." December 1, 1982, Order at pp. 8-9.

+ i. ,

_ 10 -

a 1

1

. l l

A safety evaluation, they had ample opportunity to do so; but that time is l 1

now past.

In the interest of clarifying this issue, however, Applicants will briefly explain how the Staff's safety analysis considers extreme meteorology. As noted in Section 5.9.4.5 of the DES, the Staff, pursuant to 10 C.F.R. 1,.3 Part 100, evaluated the same design basis events which were thd subject

y:p ,

. ,'~

of its " realistic" environmental review. This assessment is performed in order to estimate the potential upper limits of individual exposure, rather than the most probable radiation doses calculated in the " realistic" assessment. An evaluation of regional and local climatological information,.

including extremes of climate and severe weather occurrences that may affect the design and siting of a nuclear plant, is required to ensure that the plant can be designed and operated within the requirements of NRC 4

regulations . Information concerning the atmospheric diffusion

.d characteristics of a nuclear power plant site is required for a i determination that radioactive effluents from postulated accidental ur,: .a

- releases, as well as routine operational releases, are within Commission f, a guidelines. The section of the Catawba SER that deals with meteorology (SER Section 15) was prepared in accordance with the review procedures described in the Standard Review Plan (SRP).

t -

In making these calculations, much more conservative assumptions were made to.the course taken by the accident and the prevailing conditions.

l i' (See SER, Chapter 15) These assumptions include near worst-case

_- meteorological dispersion conditions (a " design weather condition") which produce " calculated doses at the EAB [ Exclusion Area Boundary) that c e ,

would not be exceeded more than 5% of the time because of other

- +_ ~

4 c_

, meteorological conditions at the site." (FES, pp. 9-12).

  • In other words, the meteorological dispersion conditions at the site would be more favorable than the " design weather condition" used in these calculations at least 95% of the time.

Thus to the extent that extreme weather conditions such as inversion and very slow air movement are common in the area,

- they were represented in the severity of the " design weather

& condition" selected, and will produce .' higher calculated radiation doses.

The methodology used by tlie Staff in performing this safety analysis is

""i

% consistent with Reg. Guide 1.145, Reg. Guide 1.170, and the Standard gj Reveiw Plan Series (NUREG-75/087).

[

(g Intervenors' objection to the Staff's ~ sa fety evaluation of design basis accidents (which as noted., is beyond the scope of the contention) also stems from the fact that this analysis allegedly fails to emphasize sufficiently the effect of extreme' weather conditions. (May 2 Response to interrogatory 19, p. 18). Other than this allegation , Intervenors' dI

,f." discovery responses provided almost no information . When asked to I

?

xd explain whether they agreed that the Staff had considered extreme sta

$ meteorological conditions in performing its safety analysis, Intervenors 1;j replied (despite the availability of information in discovery) that they did

'~

not know.

(June 6 Response to followup interrogatory 6, p. 9). When

! t asked whether the Staff had made its calculations available, they stated 2

that it had made information available, but that "our examination of this J;

information is incomplete." (June 6 Response to followup interrogatory 9,  !

p. 9).

Similarly, when asked to explain the basis for their assertion that y ,~ . Ne staff's safet'y analysis places insufficient emphasis upon extreme

weather when the calculations in question are not set forth in the DES, s s. .

Intervenors merely reiterated unresponsive statements to the effect that '

~'

...i.

C 2.

" average values do not adequately represent the extreme . " (June 6 Response to followup interrogatory 11, p. 9). Here again, Intervenors have failed to raise any genuine issue of fact as to the Staff's safety

~

evaluation. Accordingly, even if this topic was the subject of the contention, which it is not, Intervenors' development of the issue has been so defective as to warrant summary disposition. '

/

D. Conclusion

  • - As demonstrated above, NEPA does not require the consideration of

[ .5. .

"C- adverse meteorology in the Staff's accident calculations in the manner in which Intervenors contend that this factor should be considered. The.

effect of extreme meteorology has been factored into the Staff's safety analysis, which insures. that Catawba is designed and can be operated safely. Intervenors have presented no viable legal or technical arguments

. - . which question this analysis 1-or, indeed, which raise any substantive

.u . .

e questions as to the DES's assessment of design basis and severe f, : ~,

^

accidents. Clearly, no genuine issue of material fact has been raised.

.i

.. , Applicants accordingly submit that nothing remains of this contention to

'p (f -

'9f warrant its consideration at a hearing, and urge that their Motion for Summary Disposition on DES 17 be granted.

.n

v. -

9 h $* 4 *

.v? ' ~'

_ n. , Q:. . z , .

_...- t UNITED STATES OF AMERICA ,

^- NUCLEAR REGULATORY COMMISSION - -

-Q W --

BEFORE THE ATOMIC SAFETY AND LICENSING BOARD .., ~

In the Matter of )

) J DUKE POWER COMPANY, et al. -

) Docket Nos. 50-413 - -

) 50-414 (Catawba Nuclear Station, )

Units 1 and 2) )

/

ARGUMENT AND DOCUMENTATION IN SUPPORT OF MOTION FOR

SUMMARY

DISPOSITION OF PALMETTO ALLIANCE / CAROLINA ENVIRONMENTAL STUDY GROUP DES CONTENTION 19 I. The Contention Palmetto Alliance /CESG joint Contention DES 19 reads as follows:

Failure to evaluate the environmental costs of operation of Catawba as a storage facility for spent fuel from other Duke facilities compromises the validity of the favorable cost-benefit balance ~ struck atsthe construction permit phase of this proceeding. Since the CP stage hearing, Duke Power has considerably expanded the Catawba spent

! fuel pool capacity and provided for denser storage of irradiated fuel. FSAR Table 1.2.3-1. Applicants intend I to use Catawba for storage. of irradiated fuel from the McGuire and Oconee nuclear facilities of Duke Power Company. FSAR 9.1.2.4; OL Application, pp. 11-12.

The Board in its Memorandum and Order of February 25,1983 at pp. 8-9 admitted this contention stating: .

The - Board understands in admitting it that the primary focus of DES 19 would be on the environmental effects of l

  • routine r'eleases from such transshipped fuel during normal  !

operations at Catawba. Although the contention literally extends to environmental effects of severe accidents, there would be no reason to consider such effects unless it were i first shown that severe accidents are credible in the spent l fuel pool designed for Catawba.

o b  %


w y-- , - , - - ,c- -

e, -m, -r- --

C II. Material Facts As To Which There Is No Genuine Issue To Be Heard g A. Intervenors are principally concerned with the health effects from large accidential releases of radiation and the economic costs to society caused by such accidents. Intervenors' Responses to Applicants' interrogatories, May 2,1983 at p.12.

-, B. The accidents raised by Intervenors are of a low probability.

FS AR Sections 2.2.3.1.3.a , 8. 2, 8.3, 9.1. 2, 9.1. 2.3.

/

'T: C. Intervenors are also coricerned with the environmental impacts

'3 ,

'J 73 ,7 associated with the large Catawba spent fuel pools. - Intervenors' Responses to y

s .. .

T follow-up interrogatories, May 23,1983 at pp. 7-8.

D. Intervenors do not maintain that there is any fundamental difference between Catawba spent fuel and Oconee/McGuire spent fuel in terms 7i# of heat load and radioactivity. Id.

E. Intervenors do not contend that the DES and the FES fail to evaluate the possible environmsnt la effects associated with the storage of Catawba spent fuel at Catawba. Intervenors' Responses to Applicants'

'I '

interrogatories, May 2,1983 at p.11.

i

., F. The environmental analysis contained in the FES takes into G:;

j %- account impacts from exposures to routine releases resulting from spent fuel s w.

V from Catawba and the spent fuel from Oconee and McGuire that may be stored at Catawba. FES Section 5.9.3.1.2.

G. The FES recognizes that the five year old spent fuel from 3 -

Oconee and McGuire stored at Catawba will not cause any. detrimental environmental impact because the Catawba spent fuel pool has been designed to s.,

prevent the escape of the more radioactive Catawba spent fuel. FES Section 9 at 9-f2, 9-13. '

7

+ i- ,

2

C H.

The FES references NUREG-0575, which states that storage o!

spent fuel has an insignificant impact upon the environment. FES Section 9 al) 9-7, 9-8.

I.

Applicants' witness A. L. Snow confirms the insignificant impac0 which spent fuel stored at Catawba (both Catawba and Oconee and McGuirG spent fuel) will have on the environment.. Affidavit of A. L. Snow.

, III. Discussion - -

i yj. Contrary to the Board's limitation of. the_ . contention to environmental 4 effects of routine releases , Intervenors' discovery responses reflect 'their concern to be with accidents. See Intervenors' Responses, May 2,1983 at,p.

12, wherein Intervenors stated:

Palmetto and CESG are principally concerned with the health and effects from large accidental releases of radiation the economic costs to society caused by accidents. such 7

. .; - See also Intervenors' Responses t@ Applicants' Follow-up Interrogatories, June 6,1983 at pp. 5-6, wherein Intervenors stated:

-t i

1.

, ,. ,", ;. 10CFR 51.23(c) requires that "the impact statement TM. shall take account of economic, socioeconomic, and 5 s ', possible cumulative impacts and such other fuel cycle imports as may reasonably appear significant." Any reasonable person would conclude that an accident in the handling and' storage of spent fuel casks, or a loss of onsite/offsite power resulting in breakdown of the cooling trains, would raise the likelihood of a V significant impact on the environment. Because such abcidents, which would likely entail pool water boil off and possibly criticality, are made more likely by the <

increased number of fuel assemblies to be stored at Catawba (see Palmetto Alliance contention 16) an environmental statement conforming to NEPA guidelines must consider the environmental costs of operating Catawba as a storage facility for spent fuel

- from other Duke facilities.

2. Such an analysis would evaluate: impact of the

' doubling of the filel pool capacity and iesultant increased heat load and radiation inventory from 3

m.

C

~

Oconee and McGuire spent fuels; loss of fuel pool t a-cooling due to loss of on-site and/or offsite power; '

cask drop damage and possible criticality incidents from crushed fuel assemblies; accidents involving mishandling of casks including inadvertant unshielded removal ofand accident; cask lids; the probability of cask drop crashes. external threats such as aircraft 3.

Palmetto Alliance and CESG's contentions go beyond whether or not routine releases of radiation from Oco~ nee and McGuire fuels have been considered.

Intervenors' focus upon accidents is beyond the scope of thd admitted

^ , contention.

Further, they have made no showing that the accidents they

P, reference are credible.1 Under such circumstances there is nothing to support the contention and it should be dismissed.

In addition, Intervenors' concern, .

as expressed in interrogatory

~ responses, is unrelated to the incremental environmental impact associated with routine releases from Oconee and McGuire spent fuel stored at Catawba of course, is the subject of the contention). See Intervenors' Responses to 4

Applicants' Follow-up Interrogatories on DES Contentions 11, 17 and 19

'l June 6,1983 at p. 7-8 wherein Intervenors state:

I P.A. and C.E.S.G.

do not contend that there is any fundamental difference between Catawba spent fuel and

~ .

-r

,y 2 The record reflects that the accidents underlying Intervenors' concern are

, all extremely remote.

See FSAR Section 2.2.3.1.3 which reflects the probability Sections 8.2, 8.3 whichaccident to be approximately 10-7; see FSAR of an aircraft discuss on-site (NUREG/CR-3226 at p. 25 reflects that the and off-site power sources s diesel generator.s and off-site power is 10~7); probability of the loss of the discusses Catawba's compliance, see FSAR Section 9.1.2 which ANSI-N210-1976 for criticality p'urposes , with is less than which standard requires a 95% confidence level that the keff 0.95; see FSAR Section 9.1.2.3 which reflects that it is physically impossible for a spent fuel cask to drop into the spent fuel pool.

I It should also be noted that when asked if they had " performed any analy lV which demonstr' Intervenors ate the credibility of the severe accident (s) referenced" responded "No." Intervenors' Responses to Applicants' Interrogatories, May 2,1983 at p.13.

, i. , -

4 -

-t

1 1

1 r

' Oconee/McGuire spent fuel such that one results in a

, greater heat load than the other. l Applicants seem to attribute to P.A. an d C . E . S . G . the view that the origin of the spent fuel has an effect on how dangerous to the environment it is, or how likely it is to escape into the environment. It is obvious from our previous statements and responses that P. A. and C.E.S.G.

do not make such an absurd contention.

Rather, Intervenors' concern is with the size of the spent fuel pool. !

/

Id. , at p. 6-7 wherein In ervenors s~ tate

~ ' '

<.,, When Duke Power doubles the amount.of spent fuel to be handled and stored at Catawba we believe that sometning more than the NRC Staff's cursory treatment of this issue is reg'cired by NEPA, as implemented in 10 CFR 51.

The DES /FES evaluation is deficient because it does not adequately address the environmental risks associated with storing a much larger number of spent fuel assemblies.

s o' If Intervenors desired to pursue s their concern that spent fuel pools of the si:

a yy.y .

of Catawba have an environmental impact that must be evaluated they shou

.i have raised a general spent fuel pool contention; they did not. Rathe:

Intervenors (as well as this Board) limited the contention to the allegt 3

y environmental impact associated with the storage of Oconee and McGuire sper Qh, fuel at Catawba. So postured, Intervenors should be expected to hat

,y provided information concerning the specific environmental impact associate 1.;.y w tw-a with the storage of Oconee and McGuire spent fuel at Catawba; they did not w Rather Intervenors simply raise the prospect of potential accidents. Se

~

Intervenors' Responses to Applicants' Interrogatories , May 2, 1983 at g

[C. ~

m; 10-11. Such failure to raise a geniune issue of material fact (which is totall 7 ,. - I 7 ., ;-- ~ inconsistent with the case law set forth in the attached Motion for Summag g,-* Disposition),

,3 . ,

coupled with the misplaced focus of their concerns, (i.e.

accidents) warrants dismissal of 1,ntervenors DES Contention 19.

uc,

~W w-r a ~~

5 r .,./'

There is yet another reason which cEmpels dismissal of this contention.

+- To explain, Intervenors assert that the incremental environmental impact associated with the storage of Oconee and McGuire spent fuel at Catawba must be evaluated. However, Intervenors do not contend that there is a relevant difference between Catawba spent fuel and Oconee and McGuire spent fuel.

Rather, they allege that storage of Oconee and McGuire spent fuel will result in a greater inventory at Catawba. See Intervenors' Responses to Applicants' Follow-up Interrogatories, June 6',1983 at 1 5 7 wherein it is stated:

We are contending that if Catawba receives spent fuel from Oconee and McGuire as well as its own spent fuel, this will result in an expanded heat load and radiation inventory.

However, the spent fuel pools of Catawba could be filled entirely with Catawba spent fuel only. In response to a question asking if they " contend that the DES and the FES fail to evaluate the possible environmental effects associated with the storage of Catawba spent fuel at Catawba" Intervenors responded "No . " See Intervenors' Responses togpplicants' Interrogatories, May 2,1983 at p.11. Accordingly, if the Catawba spent fuel pools could be fillad with spent' fuel from Catawba only (which spent fuel Intervenors acknowledge is no different from Oconee and McGuire spent fuel) then Intervenors' concern with the Catawba spent fuel pool being filled up with Oconee and McGuire spent fuel must be viewed as being enveloped by the environmental evaluation of the storage of Catawba spent fuel. In this regard, Intervenors have stated that they" do not contest the environmental evaluation conducted on the storage of Catawba spent fuel. Therefore, nothing remains to be litigated. .

In any event, the environmental impact of spent fuel (be it all Catawba or s otherwise) has been considered by the NRC Staff. See FES 65.9.3.1.2 which states:

The environmental analysis in Section 5.9 and Appendix D takes into account impact.g from exposures to,. routine 6

I _

~

l 1

C l

releases resulting from spent fuel from Catawba and the '

. spent fuel from Oconee and McGuire that may be stored at Catawba.

I The FES further states "[f]or more information on the environmental impacts of spent fuel storage and handling (from the normal operations and accidents) se NUREG-0575". I_d . Portions of NUREG-0575 are cited in the FES. Of importance is FES Section 9 at 9-7, 9-8, wherein it is stated:

~ , The storage of spent fuel in water pools is a well

  • ~ established technology, and under the static conditions of 1, storage represents a low environmental impact and low potential risk to the health and safety -of the public. It

- M makes little difference whether spent fuel is stored at a nuclear power plant or in an independent away-from-reactor facility designed for this purpose. This

. conclusion is based on existing water pool storage technology (NUREG-0575, p. ES-10).

The storage of LWR cpent fuels in water pools has an insignificant impact on the environment, whether at AR (at reactor] or AFR [away-from-reactor] sites. Primarily this is because the physical form of the material, sintered ceramic oxide fuel pellets hermetically sealed in Zircaloy cladding tubes. Zircaby is a zirconium-tin alloy which

, 4,,'

was developed for nuclear power applications because of its high resistance to water corrosion in addition to its favorable nuclear properties . Even in cases where defective tubes expose the fuel material to the water l environment, there is little attack on the ceramic fuel 3.,3 (NUREG-0575, p. ES-12).

.gr nW The technology of water pool storage is well developed; radioactivity levels are routinely maintained about 5 x 10 4 pCi/ml. Maintenance of this purity requires treatment (filtration and ion . exchange) of the pool water.

.J .".,[, '

~

1

" ~' Radioactive waste that is generated is readily confined and represents little potential hazard to the health and safety of the public (NUREG-0575, p. ES-12).

y -

There may be small quantities of Kr-85 released to the environment from defective fuel elements . However, for

? ' the fuel involved (fuel at least one year after discharge),

experience has shown this to be not detectable beycnd the

t.. .

immediate environs of a storage pool (NUREG-0575, p.

. ._ _ _ _ . . . E S-12.) .

.x.

Jg% There will be no significant discharge of radioactive liquid effluents from a spent fuel storage operation as wastes will be in solid form (NUREG-0575, p. ES-12). e ,

ssht. :f us n .

  • 1 k

See the Affidavit of A. L. Snow which corroborates the findings of

=-

NUREG-0575.

Specifically, Mr. Snow explains why the environmental impacts associated with the storage of Oconee and McGuire spent fuel at Catawba are insignificant.

Lastly, with respect to Oconee and McGuire spent fuel stored at Catawba, the FES reflects that:

Once the 5-year-old spent fuel from ' the Oconee and /

McGuire nuclear power stations' is in the Catawba spent fuel pool, it will not cause any detrimental environmental impacts because the spent fuel pool has been designed to prevent the escape of the more radioactive Catawba spent fuel. Therefore, the validity of the favorable cost-benefit balance struck at the construction permit phase has not been compromised. [FES at 9-12, 9-13]

Intervenors fail to provide any facts which questions the NRC staff's conclusions regarding Catawba, or those contained in NUCEG-0575. As such, Intervenors have failed to demonstrate the existence of a geniune issue of material fact, contrary to the requirements of law.

n On the basis of the above discussion it cannot be said that the environmental impacts associated with the storage of Oconee and McGuire spent i

fuel at Catawba were disregarded. Environmental impacts were addressed and were found to be insignificant.

That the FES does not contain volumunous reference to this matter does not render its treatment deficient. Rather, once an

  • expert body such as the NRC concludes than an impact is insignificant it is not required to provide exhaustive documentation on the subject. See Izaak Walton League ' Of America v.

Marsh , 655 F.2d 346, 377 (D.C. Cir. 1981) wherein the court stated:

"Particularly in light of the fact that reviewing courts should not resolve conflicting scientific opinions, we cannot

- conclude that the Corps' determination that the physical effects would be minor lacked a substantial basis. And given the Corps' conclusion that the physical effects would be minor, its decision not to conduct a major biological study was clearly justified. NEPA does not require federal

~

8

(

l .

C.

agencies to

. examine every possible consequence. environmental Detailed analysis is required only where impacts are likley.

~ . United States, 510 F.2d 796, 799 (D.C. Cir.1975)." Carolina IV. _ Conclusion

' In summary, given the thrust of Intervenors' concerns (accidents) , given their admission that for purposes

. between Oconee, of this contention there is no difference McGuire and Catawba spent fuel and given the FES' recognition that the contribution of the spent fuel pool (from Catawba s kk pent

'"W E* EN fuel as well as Oconee and McGuire spent fuel contributions) to the routine'

pg Nj release is insignificant, nothing remains of this contention which s warra

- being entertained at Bf/ an adjudicatory hearing. Accordingly, this contention

'y

.cA should be summarily disposed.