ML20088A793

From kanterella
Jump to navigation Jump to search
Affidavit of Wh Owen Reflecting Revised Schedule for Fuel Loading,Testing & Power Ascension Phases
ML20088A793
Person / Time
Site: Catawba  Duke Energy icon.png
Issue date: 04/10/1984
From: Owen W
DUKE POWER CO.
To:
Shared Package
ML20088A789 List:
References
NUDOCS 8404130130
Download: ML20088A793 (2)


Text

__

1 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of )

)

DUKE POWER COMPANY, et al. ) Docket No. 50-413

) 50-414 (Catawba Nuclear Station )

Units 1 and 2) )

AFFIDAVIT OF WARREN H. rN_E_N My name is Warren H. Owen. I am currently employed by the Duke Power Company as Executive Vice President, Engineering and Construction. I am a member of the Board of Directors and of the Executive Committee. In these capacities I am responsible for, among other things, the fuel loading, testing and power ascension phases for the Catawba nuclear units. Schedules have been developed for these phases which take into account Duke Power Company's experience with such activities at its five operating nuclear reactors.

The current-schedule for Catawba Unit I reflects the following:

i Fuel loading May 25, 1984 thru June 7, 1984 Zero power physics testing June 7, 1984 thru August 30, 1984 (pre-critical) 0-5% power testing _ August 31, 1984 thru September 14, 1984 (plantcritical) 5-200% power testing September 14, 1984 thru February 5, 1985 8404130130 840410 PDR ADOCK 03000434 8 PDR I _

~ .

I, Warren H. Owen, of lawful age, being first duly sworn, state that I have reviewed the foregoing affidavit and that the statements contained therein are true and correct to the best of my knowledge and belief.

Warren H. Owen Sworn to and subscribed before me this/d day of April, 1984.

00orne0.buzd77L1s Notary Public Commission Expires 7-/.2 8[

<-