MONTHYEARML20106J8711985-02-15015 February 1985 Notification Concerning Site redress.Near-term Planning for Site Redress Predicated Upon Commencing Redress by May 1985. Certificate of Svc Encl ML20107M9411984-11-0808 November 1984 Response to Motion to Dismiss Proceeding Re Revocation of Lwa.Authorization of Revocation of LWA & That Proceedings Be Dismissed W/O Prejudice Recommended.Certificate of Svc Encl ML20106J7951984-10-30030 October 1984 Response to Applicant 841019 Motion to Dismiss Proceeding. Motion Acceptable Subj to Conditions Set Forth in Redress Plan & NRC .Certificate of Svc Encl ML20093M2611984-10-19019 October 1984 Motion to Dismiss Proceeding.Applicable Conditions of Existing Federal Water Permit & State Water Quality Requirements Will Remain in Effect.Supporting Documentation & Certificate of Svc Encl ML20098F7391984-09-28028 September 1984 Notice of Change of Address & Telephone Number.Certificate of Svc Encl ML20098F9571984-09-28028 September 1984 Notice of Change of Address & Telephone Number.Certificate of Svc Encl.Related Correspondence ML20097G9671984-09-19019 September 1984 Notice of Change of Address & Telephone Number.Certificate of Svc Encl.Related Correspondence ML20087F4701984-03-15015 March 1984 Answer to Applicant Petition for Review of ASLB 840229 Memorandum & Order Re Crbr LWA Proceedings on Site Redress Plan.Intervenors Main Concern Is That Redress Be Rapid & Effective.W/Certificate of Svc ML20086T0141984-03-0505 March 1984 Petition for Review of Appeal Board 840229 Memorandum & Order Readmitting Intervenors to Proceedings.Intervenor Participation Will Protract Proceeding for Project Which Is Terminated.Certificate of Svc Encl ML20080N0471984-02-21021 February 1984 Answer Opposing NRDC & Sierra Club Appeals to ASLB Decisions.Certificate of Svc Encl ML20080C6021984-02-0606 February 1984 Brief in Support of Appeal of ASLB 840120 Order Re NRDC Motion to Intervene ML20080C6121984-02-0606 February 1984 Notice of Appeal of ASLB 840120 Notice Denying NRDC Motion to Intervene ML20080C6411984-02-0606 February 1984 Brief of Intervenors in Support of Appeal of ASLB 840120 Order.Certificate of Svc Encl ML20083J4351984-01-0909 January 1984 Response to NRDC Reply Per ASLB 831228 Order.Contentions Raised in NRDC Motion to Intervene Moot.Motion Should Be Denied.Certificate of Svc Encl ML20083E4231983-12-27027 December 1983 Notice of Project Termination.Certificate of Svc Encl ML20082S4471983-12-12012 December 1983 Request to Reply to Util 831205 & NRC 831208 Responses to NRDC Motion to Intervene ML20082S4541983-12-12012 December 1983 Reply to Util 831205 & NRC 831208 Responses to NRDC Motion to Intervene.Appropriate ASLB Course of Action Is Termination of Proceedings on Grounds of Mootness. Certificate of Svc Encl ML20082Q6841983-12-0909 December 1983 Amended Notice of Appearance in Proceeding.Certificate of Svc Encl ML20082M5271983-12-0505 December 1983 Response Supporting Intervenor 831123 Motion to Terminate Appeal Proceedings,Vacate Partial Initial Decision & Authorize Revocation of Lwa.Certificate of Svc Encl ML20082M5401983-12-0505 December 1983 Response Opposing NRDC 831123 Motion to Intervene.Proceeding Moot Due to Project Cancellation.Cp Partial Initial Decision Should Be Issued.Certificate of Svc Encl ML20082E1261983-11-23023 November 1983 Petition of NRDC for Leave to Intervene & Request for Hearing Re Effect of Crbr Termination on CP Proceedings. Contentions Listed ML20081D7931983-10-31031 October 1983 Confirmation of Info Re Legislative Status Discussed W/Aslb in 831028 Telcon.Certificate of Svc Encl ML20081A5041983-10-25025 October 1983 Supplemental Citations Supporting Thesis That Following Hydrodynamic Core Disruptive Accident,Reactor Vessel Closure Head Is More Susceptible to Failure than Reactor Vessel Head.Certificate of Svc Encl ML20078B9771983-09-26026 September 1983 Response Opposing NRC 830913 Motion for Leave to File Supplemental Affidavit of Lg Hulman.Affiant Revised Testimony Incorrect,Misleading & Irrelevant.Certificate of Svc Encl ML20024F3471983-09-0707 September 1983 Order Rejecting NRC 830902 Proposed Opinion,Findings of Fact & Conclusions of Law in CP Proceeding & Lg Hulman Supplemental Affidavit.Nrc Failed to Follow Correct Form for Proposed Findings.Motion Necessary to Admit Affidavit ML20024F1921983-09-0606 September 1983 Supplemental Affidavit of Lg Hulman Correcting Pages 8,505- 8,509 to Transcript of 830810 Testimony ML20024F2561983-09-0202 September 1983 Reply to Applicant Proposed Opinion,Findings of Fact & Conclusions of Law Recommending Issuance of Cp.Unexecuted Supplemental Affidavit Clarifying & Revising Portions of Hearing Transcript & Certificate of Svc Encl ML20024F1891983-09-0101 September 1983 Motion to Correct 830808-11 Transcript.Certificate of Svc Encl ML20076C9811983-08-22022 August 1983 Motion to Correct Transcript of Aug 1983 CP Evidentiary Hearings.Certificate of Svc Encl ML20076A7871983-08-17017 August 1983 Motion to Reschedule 830929 Oral Argument to 830928. Certificate of Svc Encl ML20077J5051983-08-15015 August 1983 Proposed Initial Decision,Findings of Fact & Conclusions of Law Re Cp.Certificate of Svc Encl ML20024E5021983-08-0909 August 1983 Transcript of 830809 Hearing in Oak Ridge,Tn.Pp 7,934-8,480. Supporting Documentation Encl ML20024D2231983-08-0202 August 1983 Stipulation Re Authenticity of NRC & Applicant Exhibits. Requests ASLB Approval.Certificate of Svc Encl ML20077B6661983-07-22022 July 1983 Response Opposing Intervenor 830518 Exceptions to ASLB 830228 Partial Initial Decision on Lwa.Aslab Should Affirm ASLB Decision.Site Suitability Arguments Incongruous. Certificate of Svc Encl ML20024C7501983-07-11011 July 1983 Pages 53 & 54 to Testimony of Tl King & ET Rumble Re Adequacy of DBA Spectrum ML20024C0621983-07-0808 July 1983 Testimony of Tl King Re ASLB Question 13 on Fuel Sys Fallback Positions.Lists Possible Impacts on Crbr Programmatic Objectives from Implementing NRC Positions. Prof Qualifications Encl ML20024C3641983-07-0808 July 1983 Limited Appearance Statement of TB Cochran Re Issues Raised in CP Proceeding.Discusses Radiological Consequences of Crbr Core Disruptive Accident & Site Suitability.Certificate of Svc Encl ML20024C0431983-07-0808 July 1983 Testimony of Rj Dube Re ASLB Question 10 on Matl Control & Accountability.R&D Activities on Measurement Capabilities for Matl Control & Accounting Unnecessary for Continued Fuel Safeguards.Prof Qualifications Encl ML20024C0381983-07-0808 July 1983 Testimony of Lg Hulman,Ef Branagan & Dj Perrotti on ASLB Question 9 Re Protective Action Guides.No Rev to Protective Action Guides Necessary for Crbr.If Guides Revised,Nrc Will Consider Applicability at OL Stage.Prof Qualifications Encl ML20024B6671983-07-0808 July 1983 Testimony of Vd Hedges,Jw Anderson & Je Karr Responding to ASLB Areas of Interest 5 & 6.Owners Mgt Organization Described.Westinghouse,Ge,Atomics Intl,S&W & Burns & Roe Are Project Contractors.Certificate of Svc Encl ML20024B6661983-07-0808 July 1983 Testimony of Hw Hibbitts,Ek Sliger & Le Strawbridge Re ASLB Areas of Interest Related to Emergency Planning.Crbr Radioactive Releases Could Contain Sodium Oxides & Hydroxide Aerosols.Prof Qualifications & Certificate of Svc Encl ML20024C0501983-07-0808 July 1983 Testimony of Tl King & RM Stark Re ASLB Question 12 on Items Identified for Resolution at OL Stage.Nrc & Applicants Developing Program & Schedule to Review & Resolve Items,To Minimize Impacts on Final Design & Const ML20024C0241983-07-0808 July 1983 Testimony of Cl Allen,Lw Bell,Hb Holz,Lg Hulman,Jk Long, B Morris,Jj Swift,Cr Bell,Ta Butler,Et Rumble,D Swanson & Tg Theofanous Re Analyses of Core Disruptive Accidents.Prof Qualifications Encl ML20024C0761983-07-0808 July 1983 Testimony of Tl King on ASLB Question 14 Re Operation W/ Leaking Fuel Pins.Sodium Entry Into Fuel Pin May Cause Increased pellet-to-clad Gap Conductance,But Would Not Adversely Affect Fuel Performance.Prof Qualifications Encl ML20024C0221983-07-0808 July 1983 Testimony of RA Becker,Hc Garg,S Hou,Tl King,B Morris,Ce Rossi,R Schemel,Jj Swift,Ak Agrawal,Je Hanson & ET Rumble Re Adequacy of DBA Spectrum.Core Disruptive Accidents May Be Excluded from DBA Spectrum for Crbr.W/Prof Qualifications ML20024B6641983-07-0505 July 1983 Testimony of Lw Deitrich,H Fauske,L Strawbridge & Tw Ball Re Hypothetical Core Disruptive Accident (Hcda) Analyses.Crbr Designed So Hcdas Beyond Dba.Prof Qualifications & Certificate of Svc Encl ML20024A9021983-06-29029 June 1983 Transcript of 830629 Conference in Bethesda,Md.Pp 7,298- 7,354 ML20072F2651983-06-22022 June 1983 Response to Intervenor 830621 Motion to Withdraw Contentions 1,3,9(c),9(f) & 9(g) from Consideration at Jul 1983 CP Hearings.Intervenors Should Be Dismissed as Parties. Certificate of Svc Encl ML20079R2491983-06-21021 June 1983 Motion to Withdraw Contentions 1,3,9(c),9(g) from Consideration at Jul 1983 CP Hearings & Request for Leave to Submit Written Statement on Issues Raised.Limited Resources Prohibit Continued Full Participation ML20079R2631983-06-21021 June 1983 Response Opposing Applicant 830519 & 23 Motions for Summary Disposition of Contentions 9(g),9(c) & 9(f).Motions Moot Since Intervenors Moved to Withdraw Contentions from Consideration 1985-02-15
[Table view] Category:TRANSCRIPTS
MONTHYEARML20024E5021983-08-0909 August 1983 Transcript of 830809 Hearing in Oak Ridge,Tn.Pp 7,934-8,480. Supporting Documentation Encl ML20024C7501983-07-11011 July 1983 Pages 53 & 54 to Testimony of Tl King & ET Rumble Re Adequacy of DBA Spectrum ML20024C3641983-07-0808 July 1983 Limited Appearance Statement of TB Cochran Re Issues Raised in CP Proceeding.Discusses Radiological Consequences of Crbr Core Disruptive Accident & Site Suitability.Certificate of Svc Encl ML20024C0761983-07-0808 July 1983 Testimony of Tl King on ASLB Question 14 Re Operation W/ Leaking Fuel Pins.Sodium Entry Into Fuel Pin May Cause Increased pellet-to-clad Gap Conductance,But Would Not Adversely Affect Fuel Performance.Prof Qualifications Encl ML20024C0241983-07-0808 July 1983 Testimony of Cl Allen,Lw Bell,Hb Holz,Lg Hulman,Jk Long, B Morris,Jj Swift,Cr Bell,Ta Butler,Et Rumble,D Swanson & Tg Theofanous Re Analyses of Core Disruptive Accidents.Prof Qualifications Encl ML20024C0501983-07-0808 July 1983 Testimony of Tl King & RM Stark Re ASLB Question 12 on Items Identified for Resolution at OL Stage.Nrc & Applicants Developing Program & Schedule to Review & Resolve Items,To Minimize Impacts on Final Design & Const ML20024C0221983-07-0808 July 1983 Testimony of RA Becker,Hc Garg,S Hou,Tl King,B Morris,Ce Rossi,R Schemel,Jj Swift,Ak Agrawal,Je Hanson & ET Rumble Re Adequacy of DBA Spectrum.Core Disruptive Accidents May Be Excluded from DBA Spectrum for Crbr.W/Prof Qualifications ML20024B6671983-07-0808 July 1983 Testimony of Vd Hedges,Jw Anderson & Je Karr Responding to ASLB Areas of Interest 5 & 6.Owners Mgt Organization Described.Westinghouse,Ge,Atomics Intl,S&W & Burns & Roe Are Project Contractors.Certificate of Svc Encl ML20024C0381983-07-0808 July 1983 Testimony of Lg Hulman,Ef Branagan & Dj Perrotti on ASLB Question 9 Re Protective Action Guides.No Rev to Protective Action Guides Necessary for Crbr.If Guides Revised,Nrc Will Consider Applicability at OL Stage.Prof Qualifications Encl ML20024C0431983-07-0808 July 1983 Testimony of Rj Dube Re ASLB Question 10 on Matl Control & Accountability.R&D Activities on Measurement Capabilities for Matl Control & Accounting Unnecessary for Continued Fuel Safeguards.Prof Qualifications Encl ML20024C0621983-07-0808 July 1983 Testimony of Tl King Re ASLB Question 13 on Fuel Sys Fallback Positions.Lists Possible Impacts on Crbr Programmatic Objectives from Implementing NRC Positions. Prof Qualifications Encl ML20024B6661983-07-0808 July 1983 Testimony of Hw Hibbitts,Ek Sliger & Le Strawbridge Re ASLB Areas of Interest Related to Emergency Planning.Crbr Radioactive Releases Could Contain Sodium Oxides & Hydroxide Aerosols.Prof Qualifications & Certificate of Svc Encl ML20024B6641983-07-0505 July 1983 Testimony of Lw Deitrich,H Fauske,L Strawbridge & Tw Ball Re Hypothetical Core Disruptive Accident (Hcda) Analyses.Crbr Designed So Hcdas Beyond Dba.Prof Qualifications & Certificate of Svc Encl ML20024A9021983-06-29029 June 1983 Transcript of 830629 Conference in Bethesda,Md.Pp 7,298- 7,354 ML20023C3851983-05-13013 May 1983 Transcript of 830513 Conference in Bethesda,Md.Pp 7,106- 7,279 ML20028F8961983-02-0303 February 1983 Transcript of ACRS Subcommittee on Crbr & Thermal Hydraulics Working Group 830203 Joint Meeting in Washington,Dc Re Plant Thermal Hydraulic Design Issues & Emergency Power Sys. Pp 1-343.Supporting Documentation Encl ML20083N8191983-02-0202 February 1983 Applicant Corrections to 821116-19 Transcripts,Inadvertently Omitted from 830124 List of Transcript Corrections. Certificate of Svc Encl ML20070M6581983-01-24024 January 1983 Proposed Transcript Corrections.Certificate of Svc Encl ML20028C1611983-01-0505 January 1983 Transcript of 830105 Hearing in Bethesda,Md.Pp 6,913-7,105 ML20028B5381982-12-0101 December 1982 Transcript of ACRS Working Group on Structures & Matls for Crbr 821201 Meeting in Bethesda,Md.Pp 1-214.Supporting Documentation Encl ML20069L0331982-11-12012 November 1982 Suppl to TB Cochran Part V Testimony on Contentions 1,2 & 3, Based on Final Suppl to Fes ML20069L0371982-11-12012 November 1982 Testimony of TB Cochran,Part Iv,As Supplemented by New Info in Final Suppl to Fes,Re Contentions 1,2 & 3 on Potential for Severe Accidents at Crbr & Adequacy of NRC & Util Analyses of Accidents ML20069L0451982-11-12012 November 1982 Testimony of TB Cochran,Part Iii,As Supplemented by New Info in Fes Final Suppl,Re Contentions 6(b)(1) & (3) on Adequacy of NRC Analysis of Environ Impacts of Crbr Fuel Cycle. Certificate of Svc Encl ML20066E2831982-11-10010 November 1982 Errata to 821101 Testimony.Certificate of Svc Encl ML20027E2301982-11-0404 November 1982 Unofficial Transcript of 821104 Public Affirmation/ Discussion & Vote in Washington,Dc Re SECY-82-410 on Petition for Delineation of LWA Proceedings for Crbr & SECY-82-440 Re Summer Ol.Pp 1-4 ML20028A7351982-11-0101 November 1982 Testimony of TB Cochran,Part V,Re Contentions 4 & 6(b)(4) on Analysis of Acts of Sabotage,Terrorism or Theft.Nrc & Applicants Substantially Understated Risks to Plant & Overstated Effectiveness of Proposed Safeguards ML20071P0981982-11-0101 November 1982 Testimony of Lj Kripps Re NRDC & Sierra Club Contentions 5a & 7c on Applicant Alternative Siting Analyses.Clinch River Site Is Preferred Site for LMFBR Demonstration Plant. Related Correspondence ML20071P1151982-11-0101 November 1982 Testimony of GL Sherwood,Dc Newton,Wm Hartman & Oo Yarbro Re NRDC Contentions 6.b.1 & 6.b.3 on Adequacy of NRC Analyses of Environ Impacts of Crbr Fuel Cycle.Eis Estimates Conservative.Related Correspondence ML20065T9861982-11-0101 November 1982 Testimony of TB Cochran Re Contentions 1,2 & 3 on Adequacy of NRC & Applicant Analyses of Potential for Severe Accidents.Methodology in Fes App J Crude by Current Stds & App Assumptions Not Supported by Analysis ML20065T9831982-11-0101 November 1982 Testimony of TB Cochran Re Contentions 6(b)(1) & (3) on Adequacy of NRC Analysis of Environ Impacts of Crbr Fuel Cycle.Nrc Analysis Inadequate Due to Failure to Address Uncertainties Associated W/Nrc Estimates ML20071P2571982-11-0101 November 1982 Testimony of J Longenecker,Ca Anderson & Nn Kaushal Re NRDC Contentions 7a & 7b on Inadequate Analyses of Crbr Alternatives.No Alternatives Substantially Better than Crbr. Certificate of Svc Encl.Related Correspondence ML20071P2481982-11-0101 November 1982 Testimony of Ef Penico & Ga Hammond Re NRDC Contentions 4 & 6.b.4 on Safeguards.Safeguards Adequately Analyzed & Safeguards Sys Developed.Related Correspondence ML20071P1731982-11-0101 November 1982 Testimony of Gh Clare,Le Strawbridge & Lw Deitrich Re NRDC Contentions 2d,2f,2g,2h,3c,3d & 5b on Environ Effects of Crbr Accident Analyses.Related Correspondence ML20071P1431982-11-0101 November 1982 Testimony of AA Weinstein,Rk Disney & Jf Murdock Re NRDC Contention 8 on Costs & Effects of Decommissioning Crbr. Plant Can Be Decommissioned by Prompt Total Dismantlement. Related Correspondence ML20071P1261982-11-0101 November 1982 Testimony of J Preston,Ro Mcclellan,Jw Healy & Rc Thompson Re NRDC Contentions 11b & 11c on Genetic & Cancerous Effects of Plant on Employees.Calculated Somatic Effects for Plant Small.Related Correspondence ML20071P1111982-11-0101 November 1982 Testimony of Hw Hibbitts Re NRDC Contention 5(b) Re Alternative Sites.Risk from Crbr to DOE Facilities in Site Vicinity Low.Related Correspondence ML20065T9881982-10-28028 October 1982 Testimony of Cj Johnson Re NRC Analysis of Environ (Health) Impacts of Crbr & Fuel Cycle.Nrc & Applicant Estimates of Environ Releases & Environ Contamination from Proposed Fuel Cycle Unrealistic.Certificate of Svc Encl ML20027C9821982-10-26026 October 1982 Transcript of ACRS Crbr Thermal Hydraulic Working Group 821026 Meeting in Washington,Dc.Pp 1-278.Supporting Documentation Encl ML20065U0321982-10-13013 October 1982 Transcript of E Branagan 821013 Deposition in Bethesda,Md Re Dose Estimates of Hiroshima & Nagasaki & Health Impacts. Certificate of Svc Encl.Related Correspondence ML20062L0691982-08-16016 August 1982 Testimony of Kz Morgan on Contentions 1 & 2.Requirements of 10CFR100 Not Met.Crbr Site Not Suitable for LMFBR ML20062L0511982-08-16016 August 1982 Testimony of TB Cochran on Contentions 1a,3b & 3d Re Core Disruptive Accidents & DBAs & Contentions 2 & 3c Re Site Suitability Analysis Under 10CFR100 ML20062K3091982-08-16016 August 1982 Testimony of RO Mcclellan,Jw Healy & Rc Thompson on Behalf of Joint Applicants Re NRDC Contention 2e on Calculation of Guideline Value for Radiation Doses from Postulated Release. Prof Qulifications & Certificate of Svc of Encl ML20062K2861982-08-16016 August 1982 Testimony of Nw Brown,Gh Deitrich,Vs Oblock & Le Strawbridge on Behalf of Joint Applicants Re NRDC Contentions 1,2 & 3 on Adequacy of Accident Analyses.Prof Qualifications & Certificate of Svc Encl ML20062L1111982-08-12012 August 1982 Testimony of Jc Cobb on Contention 2 Re Proposed Stds & Guidelines for Pu & Other Alpha Emitting Radionuclides. Toxicity of Pu Underestimated.Certificate of Svc Encl ML20062L0911982-08-11011 August 1982 Testimony of F Von Hippel on Contentions 1 & 2 Re Core Disruptive Accident Probabilities at Crbr ML20062A4891982-08-0202 August 1982 Transcript of 820802 Conference in Bethesda,Md.Pp 685-875 ML20071K9001982-07-29029 July 1982 Oral Comments of Mm Todorovich on 820729 in Washington,Dc Supporting DOE Exemption Request ML20062H2781982-07-29029 July 1982 Transcript of 820729 Oral Presentation on Crbr. Pp.1-213 ML20062B5101982-07-21021 July 1982 Transcript of 820721 Public Meeting in Washington,Dc Re Affirmation of Crbr Order.Pp 1-3 ML20054M7171982-07-0909 July 1982 Transcript of 820709 Public Meeting Re Briefing on Crbr Schedule in Washington,Dc.Pp 1-19 1983-08-09
[Table view] Category:DEPOSITIONS
MONTHYEARML20024E5021983-08-0909 August 1983 Transcript of 830809 Hearing in Oak Ridge,Tn.Pp 7,934-8,480. Supporting Documentation Encl ML20024C7501983-07-11011 July 1983 Pages 53 & 54 to Testimony of Tl King & ET Rumble Re Adequacy of DBA Spectrum ML20024C3641983-07-0808 July 1983 Limited Appearance Statement of TB Cochran Re Issues Raised in CP Proceeding.Discusses Radiological Consequences of Crbr Core Disruptive Accident & Site Suitability.Certificate of Svc Encl ML20024C0761983-07-0808 July 1983 Testimony of Tl King on ASLB Question 14 Re Operation W/ Leaking Fuel Pins.Sodium Entry Into Fuel Pin May Cause Increased pellet-to-clad Gap Conductance,But Would Not Adversely Affect Fuel Performance.Prof Qualifications Encl ML20024C0241983-07-0808 July 1983 Testimony of Cl Allen,Lw Bell,Hb Holz,Lg Hulman,Jk Long, B Morris,Jj Swift,Cr Bell,Ta Butler,Et Rumble,D Swanson & Tg Theofanous Re Analyses of Core Disruptive Accidents.Prof Qualifications Encl ML20024C0501983-07-0808 July 1983 Testimony of Tl King & RM Stark Re ASLB Question 12 on Items Identified for Resolution at OL Stage.Nrc & Applicants Developing Program & Schedule to Review & Resolve Items,To Minimize Impacts on Final Design & Const ML20024C0221983-07-0808 July 1983 Testimony of RA Becker,Hc Garg,S Hou,Tl King,B Morris,Ce Rossi,R Schemel,Jj Swift,Ak Agrawal,Je Hanson & ET Rumble Re Adequacy of DBA Spectrum.Core Disruptive Accidents May Be Excluded from DBA Spectrum for Crbr.W/Prof Qualifications ML20024B6671983-07-0808 July 1983 Testimony of Vd Hedges,Jw Anderson & Je Karr Responding to ASLB Areas of Interest 5 & 6.Owners Mgt Organization Described.Westinghouse,Ge,Atomics Intl,S&W & Burns & Roe Are Project Contractors.Certificate of Svc Encl ML20024C0381983-07-0808 July 1983 Testimony of Lg Hulman,Ef Branagan & Dj Perrotti on ASLB Question 9 Re Protective Action Guides.No Rev to Protective Action Guides Necessary for Crbr.If Guides Revised,Nrc Will Consider Applicability at OL Stage.Prof Qualifications Encl ML20024C0431983-07-0808 July 1983 Testimony of Rj Dube Re ASLB Question 10 on Matl Control & Accountability.R&D Activities on Measurement Capabilities for Matl Control & Accounting Unnecessary for Continued Fuel Safeguards.Prof Qualifications Encl ML20024C0621983-07-0808 July 1983 Testimony of Tl King Re ASLB Question 13 on Fuel Sys Fallback Positions.Lists Possible Impacts on Crbr Programmatic Objectives from Implementing NRC Positions. Prof Qualifications Encl ML20024B6661983-07-0808 July 1983 Testimony of Hw Hibbitts,Ek Sliger & Le Strawbridge Re ASLB Areas of Interest Related to Emergency Planning.Crbr Radioactive Releases Could Contain Sodium Oxides & Hydroxide Aerosols.Prof Qualifications & Certificate of Svc Encl ML20024B6641983-07-0505 July 1983 Testimony of Lw Deitrich,H Fauske,L Strawbridge & Tw Ball Re Hypothetical Core Disruptive Accident (Hcda) Analyses.Crbr Designed So Hcdas Beyond Dba.Prof Qualifications & Certificate of Svc Encl ML20024A9021983-06-29029 June 1983 Transcript of 830629 Conference in Bethesda,Md.Pp 7,298- 7,354 ML20023C3851983-05-13013 May 1983 Transcript of 830513 Conference in Bethesda,Md.Pp 7,106- 7,279 ML20028F8961983-02-0303 February 1983 Transcript of ACRS Subcommittee on Crbr & Thermal Hydraulics Working Group 830203 Joint Meeting in Washington,Dc Re Plant Thermal Hydraulic Design Issues & Emergency Power Sys. Pp 1-343.Supporting Documentation Encl ML20083N8191983-02-0202 February 1983 Applicant Corrections to 821116-19 Transcripts,Inadvertently Omitted from 830124 List of Transcript Corrections. Certificate of Svc Encl ML20070M6581983-01-24024 January 1983 Proposed Transcript Corrections.Certificate of Svc Encl ML20028C1611983-01-0505 January 1983 Transcript of 830105 Hearing in Bethesda,Md.Pp 6,913-7,105 ML20028B5381982-12-0101 December 1982 Transcript of ACRS Working Group on Structures & Matls for Crbr 821201 Meeting in Bethesda,Md.Pp 1-214.Supporting Documentation Encl ML20069L0331982-11-12012 November 1982 Suppl to TB Cochran Part V Testimony on Contentions 1,2 & 3, Based on Final Suppl to Fes ML20069L0371982-11-12012 November 1982 Testimony of TB Cochran,Part Iv,As Supplemented by New Info in Final Suppl to Fes,Re Contentions 1,2 & 3 on Potential for Severe Accidents at Crbr & Adequacy of NRC & Util Analyses of Accidents ML20069L0451982-11-12012 November 1982 Testimony of TB Cochran,Part Iii,As Supplemented by New Info in Fes Final Suppl,Re Contentions 6(b)(1) & (3) on Adequacy of NRC Analysis of Environ Impacts of Crbr Fuel Cycle. Certificate of Svc Encl ML20066E2831982-11-10010 November 1982 Errata to 821101 Testimony.Certificate of Svc Encl ML20027E2301982-11-0404 November 1982 Unofficial Transcript of 821104 Public Affirmation/ Discussion & Vote in Washington,Dc Re SECY-82-410 on Petition for Delineation of LWA Proceedings for Crbr & SECY-82-440 Re Summer Ol.Pp 1-4 ML20028A7351982-11-0101 November 1982 Testimony of TB Cochran,Part V,Re Contentions 4 & 6(b)(4) on Analysis of Acts of Sabotage,Terrorism or Theft.Nrc & Applicants Substantially Understated Risks to Plant & Overstated Effectiveness of Proposed Safeguards ML20071P0981982-11-0101 November 1982 Testimony of Lj Kripps Re NRDC & Sierra Club Contentions 5a & 7c on Applicant Alternative Siting Analyses.Clinch River Site Is Preferred Site for LMFBR Demonstration Plant. Related Correspondence ML20071P1151982-11-0101 November 1982 Testimony of GL Sherwood,Dc Newton,Wm Hartman & Oo Yarbro Re NRDC Contentions 6.b.1 & 6.b.3 on Adequacy of NRC Analyses of Environ Impacts of Crbr Fuel Cycle.Eis Estimates Conservative.Related Correspondence ML20065T9861982-11-0101 November 1982 Testimony of TB Cochran Re Contentions 1,2 & 3 on Adequacy of NRC & Applicant Analyses of Potential for Severe Accidents.Methodology in Fes App J Crude by Current Stds & App Assumptions Not Supported by Analysis ML20065T9831982-11-0101 November 1982 Testimony of TB Cochran Re Contentions 6(b)(1) & (3) on Adequacy of NRC Analysis of Environ Impacts of Crbr Fuel Cycle.Nrc Analysis Inadequate Due to Failure to Address Uncertainties Associated W/Nrc Estimates ML20071P2571982-11-0101 November 1982 Testimony of J Longenecker,Ca Anderson & Nn Kaushal Re NRDC Contentions 7a & 7b on Inadequate Analyses of Crbr Alternatives.No Alternatives Substantially Better than Crbr. Certificate of Svc Encl.Related Correspondence ML20071P2481982-11-0101 November 1982 Testimony of Ef Penico & Ga Hammond Re NRDC Contentions 4 & 6.b.4 on Safeguards.Safeguards Adequately Analyzed & Safeguards Sys Developed.Related Correspondence ML20071P1731982-11-0101 November 1982 Testimony of Gh Clare,Le Strawbridge & Lw Deitrich Re NRDC Contentions 2d,2f,2g,2h,3c,3d & 5b on Environ Effects of Crbr Accident Analyses.Related Correspondence ML20071P1431982-11-0101 November 1982 Testimony of AA Weinstein,Rk Disney & Jf Murdock Re NRDC Contention 8 on Costs & Effects of Decommissioning Crbr. Plant Can Be Decommissioned by Prompt Total Dismantlement. Related Correspondence ML20071P1261982-11-0101 November 1982 Testimony of J Preston,Ro Mcclellan,Jw Healy & Rc Thompson Re NRDC Contentions 11b & 11c on Genetic & Cancerous Effects of Plant on Employees.Calculated Somatic Effects for Plant Small.Related Correspondence ML20071P1111982-11-0101 November 1982 Testimony of Hw Hibbitts Re NRDC Contention 5(b) Re Alternative Sites.Risk from Crbr to DOE Facilities in Site Vicinity Low.Related Correspondence ML20065T9881982-10-28028 October 1982 Testimony of Cj Johnson Re NRC Analysis of Environ (Health) Impacts of Crbr & Fuel Cycle.Nrc & Applicant Estimates of Environ Releases & Environ Contamination from Proposed Fuel Cycle Unrealistic.Certificate of Svc Encl ML20027C9821982-10-26026 October 1982 Transcript of ACRS Crbr Thermal Hydraulic Working Group 821026 Meeting in Washington,Dc.Pp 1-278.Supporting Documentation Encl ML20065U0321982-10-13013 October 1982 Transcript of E Branagan 821013 Deposition in Bethesda,Md Re Dose Estimates of Hiroshima & Nagasaki & Health Impacts. Certificate of Svc Encl.Related Correspondence ML20062L0691982-08-16016 August 1982 Testimony of Kz Morgan on Contentions 1 & 2.Requirements of 10CFR100 Not Met.Crbr Site Not Suitable for LMFBR ML20062L0511982-08-16016 August 1982 Testimony of TB Cochran on Contentions 1a,3b & 3d Re Core Disruptive Accidents & DBAs & Contentions 2 & 3c Re Site Suitability Analysis Under 10CFR100 ML20062K3091982-08-16016 August 1982 Testimony of RO Mcclellan,Jw Healy & Rc Thompson on Behalf of Joint Applicants Re NRDC Contention 2e on Calculation of Guideline Value for Radiation Doses from Postulated Release. Prof Qulifications & Certificate of Svc of Encl ML20062K2861982-08-16016 August 1982 Testimony of Nw Brown,Gh Deitrich,Vs Oblock & Le Strawbridge on Behalf of Joint Applicants Re NRDC Contentions 1,2 & 3 on Adequacy of Accident Analyses.Prof Qualifications & Certificate of Svc Encl ML20062L1111982-08-12012 August 1982 Testimony of Jc Cobb on Contention 2 Re Proposed Stds & Guidelines for Pu & Other Alpha Emitting Radionuclides. Toxicity of Pu Underestimated.Certificate of Svc Encl ML20062L0911982-08-11011 August 1982 Testimony of F Von Hippel on Contentions 1 & 2 Re Core Disruptive Accident Probabilities at Crbr ML20062A4891982-08-0202 August 1982 Transcript of 820802 Conference in Bethesda,Md.Pp 685-875 ML20071K9001982-07-29029 July 1982 Oral Comments of Mm Todorovich on 820729 in Washington,Dc Supporting DOE Exemption Request ML20062H2781982-07-29029 July 1982 Transcript of 820729 Oral Presentation on Crbr. Pp.1-213 ML20062B5101982-07-21021 July 1982 Transcript of 820721 Public Meeting in Washington,Dc Re Affirmation of Crbr Order.Pp 1-3 ML20054M7171982-07-0909 July 1982 Transcript of 820709 Public Meeting Re Briefing on Crbr Schedule in Washington,Dc.Pp 1-19 1983-08-09
[Table view] Category:NARRATIVE TESTIMONY
MONTHYEARML20024E5021983-08-0909 August 1983 Transcript of 830809 Hearing in Oak Ridge,Tn.Pp 7,934-8,480. Supporting Documentation Encl ML20024C7501983-07-11011 July 1983 Pages 53 & 54 to Testimony of Tl King & ET Rumble Re Adequacy of DBA Spectrum ML20024C3641983-07-0808 July 1983 Limited Appearance Statement of TB Cochran Re Issues Raised in CP Proceeding.Discusses Radiological Consequences of Crbr Core Disruptive Accident & Site Suitability.Certificate of Svc Encl ML20024C0761983-07-0808 July 1983 Testimony of Tl King on ASLB Question 14 Re Operation W/ Leaking Fuel Pins.Sodium Entry Into Fuel Pin May Cause Increased pellet-to-clad Gap Conductance,But Would Not Adversely Affect Fuel Performance.Prof Qualifications Encl ML20024C0241983-07-0808 July 1983 Testimony of Cl Allen,Lw Bell,Hb Holz,Lg Hulman,Jk Long, B Morris,Jj Swift,Cr Bell,Ta Butler,Et Rumble,D Swanson & Tg Theofanous Re Analyses of Core Disruptive Accidents.Prof Qualifications Encl ML20024C0501983-07-0808 July 1983 Testimony of Tl King & RM Stark Re ASLB Question 12 on Items Identified for Resolution at OL Stage.Nrc & Applicants Developing Program & Schedule to Review & Resolve Items,To Minimize Impacts on Final Design & Const ML20024C0221983-07-0808 July 1983 Testimony of RA Becker,Hc Garg,S Hou,Tl King,B Morris,Ce Rossi,R Schemel,Jj Swift,Ak Agrawal,Je Hanson & ET Rumble Re Adequacy of DBA Spectrum.Core Disruptive Accidents May Be Excluded from DBA Spectrum for Crbr.W/Prof Qualifications ML20024B6671983-07-0808 July 1983 Testimony of Vd Hedges,Jw Anderson & Je Karr Responding to ASLB Areas of Interest 5 & 6.Owners Mgt Organization Described.Westinghouse,Ge,Atomics Intl,S&W & Burns & Roe Are Project Contractors.Certificate of Svc Encl ML20024C0381983-07-0808 July 1983 Testimony of Lg Hulman,Ef Branagan & Dj Perrotti on ASLB Question 9 Re Protective Action Guides.No Rev to Protective Action Guides Necessary for Crbr.If Guides Revised,Nrc Will Consider Applicability at OL Stage.Prof Qualifications Encl ML20024C0431983-07-0808 July 1983 Testimony of Rj Dube Re ASLB Question 10 on Matl Control & Accountability.R&D Activities on Measurement Capabilities for Matl Control & Accounting Unnecessary for Continued Fuel Safeguards.Prof Qualifications Encl ML20024C0621983-07-0808 July 1983 Testimony of Tl King Re ASLB Question 13 on Fuel Sys Fallback Positions.Lists Possible Impacts on Crbr Programmatic Objectives from Implementing NRC Positions. Prof Qualifications Encl ML20024B6661983-07-0808 July 1983 Testimony of Hw Hibbitts,Ek Sliger & Le Strawbridge Re ASLB Areas of Interest Related to Emergency Planning.Crbr Radioactive Releases Could Contain Sodium Oxides & Hydroxide Aerosols.Prof Qualifications & Certificate of Svc Encl ML20024B6641983-07-0505 July 1983 Testimony of Lw Deitrich,H Fauske,L Strawbridge & Tw Ball Re Hypothetical Core Disruptive Accident (Hcda) Analyses.Crbr Designed So Hcdas Beyond Dba.Prof Qualifications & Certificate of Svc Encl ML20024A9021983-06-29029 June 1983 Transcript of 830629 Conference in Bethesda,Md.Pp 7,298- 7,354 ML20023C3851983-05-13013 May 1983 Transcript of 830513 Conference in Bethesda,Md.Pp 7,106- 7,279 ML20028F8961983-02-0303 February 1983 Transcript of ACRS Subcommittee on Crbr & Thermal Hydraulics Working Group 830203 Joint Meeting in Washington,Dc Re Plant Thermal Hydraulic Design Issues & Emergency Power Sys. Pp 1-343.Supporting Documentation Encl ML20083N8191983-02-0202 February 1983 Applicant Corrections to 821116-19 Transcripts,Inadvertently Omitted from 830124 List of Transcript Corrections. Certificate of Svc Encl ML20070M6581983-01-24024 January 1983 Proposed Transcript Corrections.Certificate of Svc Encl ML20028C1611983-01-0505 January 1983 Transcript of 830105 Hearing in Bethesda,Md.Pp 6,913-7,105 ML20028B5381982-12-0101 December 1982 Transcript of ACRS Working Group on Structures & Matls for Crbr 821201 Meeting in Bethesda,Md.Pp 1-214.Supporting Documentation Encl ML20069L0331982-11-12012 November 1982 Suppl to TB Cochran Part V Testimony on Contentions 1,2 & 3, Based on Final Suppl to Fes ML20069L0371982-11-12012 November 1982 Testimony of TB Cochran,Part Iv,As Supplemented by New Info in Final Suppl to Fes,Re Contentions 1,2 & 3 on Potential for Severe Accidents at Crbr & Adequacy of NRC & Util Analyses of Accidents ML20069L0451982-11-12012 November 1982 Testimony of TB Cochran,Part Iii,As Supplemented by New Info in Fes Final Suppl,Re Contentions 6(b)(1) & (3) on Adequacy of NRC Analysis of Environ Impacts of Crbr Fuel Cycle. Certificate of Svc Encl ML20066E2831982-11-10010 November 1982 Errata to 821101 Testimony.Certificate of Svc Encl ML20027E2301982-11-0404 November 1982 Unofficial Transcript of 821104 Public Affirmation/ Discussion & Vote in Washington,Dc Re SECY-82-410 on Petition for Delineation of LWA Proceedings for Crbr & SECY-82-440 Re Summer Ol.Pp 1-4 ML20028A7351982-11-0101 November 1982 Testimony of TB Cochran,Part V,Re Contentions 4 & 6(b)(4) on Analysis of Acts of Sabotage,Terrorism or Theft.Nrc & Applicants Substantially Understated Risks to Plant & Overstated Effectiveness of Proposed Safeguards ML20071P0981982-11-0101 November 1982 Testimony of Lj Kripps Re NRDC & Sierra Club Contentions 5a & 7c on Applicant Alternative Siting Analyses.Clinch River Site Is Preferred Site for LMFBR Demonstration Plant. Related Correspondence ML20071P1151982-11-0101 November 1982 Testimony of GL Sherwood,Dc Newton,Wm Hartman & Oo Yarbro Re NRDC Contentions 6.b.1 & 6.b.3 on Adequacy of NRC Analyses of Environ Impacts of Crbr Fuel Cycle.Eis Estimates Conservative.Related Correspondence ML20065T9861982-11-0101 November 1982 Testimony of TB Cochran Re Contentions 1,2 & 3 on Adequacy of NRC & Applicant Analyses of Potential for Severe Accidents.Methodology in Fes App J Crude by Current Stds & App Assumptions Not Supported by Analysis ML20065T9831982-11-0101 November 1982 Testimony of TB Cochran Re Contentions 6(b)(1) & (3) on Adequacy of NRC Analysis of Environ Impacts of Crbr Fuel Cycle.Nrc Analysis Inadequate Due to Failure to Address Uncertainties Associated W/Nrc Estimates ML20071P2571982-11-0101 November 1982 Testimony of J Longenecker,Ca Anderson & Nn Kaushal Re NRDC Contentions 7a & 7b on Inadequate Analyses of Crbr Alternatives.No Alternatives Substantially Better than Crbr. Certificate of Svc Encl.Related Correspondence ML20071P2481982-11-0101 November 1982 Testimony of Ef Penico & Ga Hammond Re NRDC Contentions 4 & 6.b.4 on Safeguards.Safeguards Adequately Analyzed & Safeguards Sys Developed.Related Correspondence ML20071P1731982-11-0101 November 1982 Testimony of Gh Clare,Le Strawbridge & Lw Deitrich Re NRDC Contentions 2d,2f,2g,2h,3c,3d & 5b on Environ Effects of Crbr Accident Analyses.Related Correspondence ML20071P1431982-11-0101 November 1982 Testimony of AA Weinstein,Rk Disney & Jf Murdock Re NRDC Contention 8 on Costs & Effects of Decommissioning Crbr. Plant Can Be Decommissioned by Prompt Total Dismantlement. Related Correspondence ML20071P1261982-11-0101 November 1982 Testimony of J Preston,Ro Mcclellan,Jw Healy & Rc Thompson Re NRDC Contentions 11b & 11c on Genetic & Cancerous Effects of Plant on Employees.Calculated Somatic Effects for Plant Small.Related Correspondence ML20071P1111982-11-0101 November 1982 Testimony of Hw Hibbitts Re NRDC Contention 5(b) Re Alternative Sites.Risk from Crbr to DOE Facilities in Site Vicinity Low.Related Correspondence ML20065T9881982-10-28028 October 1982 Testimony of Cj Johnson Re NRC Analysis of Environ (Health) Impacts of Crbr & Fuel Cycle.Nrc & Applicant Estimates of Environ Releases & Environ Contamination from Proposed Fuel Cycle Unrealistic.Certificate of Svc Encl ML20027C9821982-10-26026 October 1982 Transcript of ACRS Crbr Thermal Hydraulic Working Group 821026 Meeting in Washington,Dc.Pp 1-278.Supporting Documentation Encl ML20065U0321982-10-13013 October 1982 Transcript of E Branagan 821013 Deposition in Bethesda,Md Re Dose Estimates of Hiroshima & Nagasaki & Health Impacts. Certificate of Svc Encl.Related Correspondence ML20062L0691982-08-16016 August 1982 Testimony of Kz Morgan on Contentions 1 & 2.Requirements of 10CFR100 Not Met.Crbr Site Not Suitable for LMFBR ML20062L0511982-08-16016 August 1982 Testimony of TB Cochran on Contentions 1a,3b & 3d Re Core Disruptive Accidents & DBAs & Contentions 2 & 3c Re Site Suitability Analysis Under 10CFR100 ML20062K3091982-08-16016 August 1982 Testimony of RO Mcclellan,Jw Healy & Rc Thompson on Behalf of Joint Applicants Re NRDC Contention 2e on Calculation of Guideline Value for Radiation Doses from Postulated Release. Prof Qulifications & Certificate of Svc of Encl ML20062K2861982-08-16016 August 1982 Testimony of Nw Brown,Gh Deitrich,Vs Oblock & Le Strawbridge on Behalf of Joint Applicants Re NRDC Contentions 1,2 & 3 on Adequacy of Accident Analyses.Prof Qualifications & Certificate of Svc Encl ML20062L1111982-08-12012 August 1982 Testimony of Jc Cobb on Contention 2 Re Proposed Stds & Guidelines for Pu & Other Alpha Emitting Radionuclides. Toxicity of Pu Underestimated.Certificate of Svc Encl ML20062L0911982-08-11011 August 1982 Testimony of F Von Hippel on Contentions 1 & 2 Re Core Disruptive Accident Probabilities at Crbr ML20062A4891982-08-0202 August 1982 Transcript of 820802 Conference in Bethesda,Md.Pp 685-875 ML20071K9001982-07-29029 July 1982 Oral Comments of Mm Todorovich on 820729 in Washington,Dc Supporting DOE Exemption Request ML20062H2781982-07-29029 July 1982 Transcript of 820729 Oral Presentation on Crbr. Pp.1-213 ML20062B5101982-07-21021 July 1982 Transcript of 820721 Public Meeting in Washington,Dc Re Affirmation of Crbr Order.Pp 1-3 ML20054M7171982-07-0909 July 1982 Transcript of 820709 Public Meeting Re Briefing on Crbr Schedule in Washington,Dc.Pp 1-19 1983-08-09
[Table view] |
Text
.
UNITED STATES OF AMERICA NUCLEAR REGULATORY COMilSSION BEFORE THE AT_0MIC SAFETY AND LICENSING BOARD In the Matter of
)
UNITED STATES DEPARTMENT OF ENERGY Docket No. 50-537 PROJECT MANAGEMENT CORPORATION TENNESSEE VALLEY AUTHORITY (Clinch River Breeder Reactor Plant)
NRC STAFF TESTIMONY ON BOARD QUESTION 9 REGARDING PROTECTIVE ACTION GUIDES Q1. Please state your names and affiliations..
A1. My name is Lewis G. Hulman.
I am Chief of the Accident Evaluation Branch in the Division of Systens Integration, Office of Nuclear Reactor Regulation at the U.S. Nuclear Regulatory Commission.
My name is Edward F. Branagan, Jr.
I am employed by the U.S.
Nuclear Regulatory Commission as a Health Physicist, Radiological l
Assessment Branch, Division of Systems Integration in the Office of Nuclear Reactor Regulation. My involvement with the CRBR safety review has been in the area of developing guidelines for evaluating postulated accidents for CRBR.
My name is Donald J. Perrotti.
I am employed by the U.S. Nuclear Regulatory Commission ("NRC") as an Emergency Preparedness Analyst in the Emergency Preparedness Branch, Division of Emergency Preparedness and Engineering Response, Office of Inspection and I
8307120197 830708 PDRADOCK05000g3
Enforcement. My involvement with the CRBR safety review has been in the area of emergency planning and preparedness.
Q2. Have you prepared statements of your professional qualifications?
A2.
(Panel) Yes. Copies are attached to this testimony.
Q3. What subject matter does this testimony address?
A3.
(Panel) This testimony addresses the concern raised by the Atomic Safety and Licensing Board (" Board") in Board Question 9, which states as follows:
The Staff's attention is directed to the discussion of protective action guidelines (PAGs) at pages 29-30 of the Partial Decision of February 28, 1983. The Staff is requested to address the question of whether a PAG revision for the CRBR should be made, and to explain its answer.
The issue is further defined at pages 29-30 of the Partial Decision of February 28, 1983, as follows:
The Board would like to take note of one other subject which was raised during the hearing of Contention 5(b). This is the subject of the EPA's Protective Action Guidelines and their relationship to possible accidents at the CRBR. The CRBR is, of course, to be loaded with fuel of significantly different isotopic composition than other licensed reactors.
Accidental releases then will be made up of concentrations of l
radioisotopes which are unique to the CRBR type of reactor.
The Staff's witnesses have testified that there is no guidance on bone surface dose for evacuation purposes and that this dose could be controlling though this has not been determined.
These doses seem to come mainly from alpha particle emitters such as plutonium which originate in the reactor fuel.
Applicants' witnesses acknowledged that there is no PAG for bone dose. Therefore, the Board will instruct the parties to this proceeding to address further this question during the upcoming Construction Permit hearings. Specifically, the Board will hear testimony on whether the PAGs currently in use for I
evacuation planning purposes should be revised for use at CRBR l
to take account of those possible radioactive releases unique
O.
to CRBR, especially the actinide elements including plutonium (footnotes omitted).
Q4 What are the Protective Action Guides?
A4.
(Branagan) TheProtectiveActionGuides(PAGs),promulgatedin draft fonn by the Environmental Protection Agency, are described in a document entitled " Manual of Protective Action Guides and Protective Actions for Nuclear Incidents," EPA-520/1-75-001, revised June 1980.
EPA defines PAGs as "the numerical projected doses which act as trigger points to initiate protective action" (M., p.1.3).
PAGs can be developed for three exposure pathways:
(1)exposureto airborne releases; (2) exposure to radionuclides contained in food; and (3) exposure to radioactive materials deposited on the ground.
EPA has developed PAGs for exposure of the general public to air-borne releases for light water reactors (LWRs). PAGs for ground deposition are being drafted by EPA; PAGs for exposure of the public to radionuclides contained in food have been developed by the Food and Drug Adminirtration.
With respect to exposure to airborne releases, EPA recommends that shelter should be sought and evacuation considered at projected whole body doses of 1 to 5 rems, or projected thyroid doses of 5 to 25 rems.
(" Dose"isagenerictermwhichcanmeanabsorbeddose, dose equivalent, or comitted dose equivalent.) Evacuation is considered mandatory, for ourposes of planning, at projected whole l
body dose equivalents greater than or equal to 5 rems or projected i
f thyroid doses greater than or equal to 25 rems. However, EPA states that "under accident conditions, the values are guidance subject to unanticipated conditions and constraints such that considerable judgment may be required for their application" (EPA-520/1-75-001,
- p. 2.2).
QS. What factors does the Staff believe to be appropriate for consideration in determining the adequacy of EPA's current draft PAGs for CRBR?
A5.
(Branagan) Recent information indicates that the EPA plans to develop additional PAGs for other organs and exposure pathways, in which it will consider the following major factors:
1.
No detectable acute effects should occur.
2.
The risk of long-term effects to individuals should be minimal and in line with risks normally acceptable for an emergency.
(
3.
Risk of implementation should be less than the risk associated with the dose saved.
4.
The PAGs should be reasonably implementable considering measurements required and time frames available.
l 5.
The costs associated with implementation should be within l
costs normally acceptable to society to avoid health risks of the same magnitude.
6.
PAG values should be expressed as a range so that expert judgment can be used in the face of unpredictable conditions that may accompany an emergency.
(See"StatusofProtectiveActionGuides,"JoeE.Logsdon,U.S.
Environmental Protection Agency, presented at the " Annual Meeting of i
the Conference of Radiation Control Program Directors, Inc.,"
- Reno, Nevada, May 18,1983.)
'The NRC Staff believes that these factors are appropriate for consideration in determining the adequacy of EPA's current draft PAGs for CRBR.
Q6. Has the Staff determined whether the spectrum of radionuclides that might be released from CRBR in the event of an accident could be different than the spectrum of radionucludes released from an LWR in such an event?
A6.
(Branagan,Hulman) Yes. The Staff has long considered the fact that a higher percentage of transuranics could be released from CRBR, as compared with an LWR. For example, the Site Suitability Report (NUREG-0786, March 1977) analyzed the impact from potential acci-dents at CRBR in which the source term included a percentage of transuranics. Source term assumptions are an integral part of assessments of site parameters and engineered safety feature per-formance for both the CRBR and LWRs, for determinations of site suitability; however, no transuranic assumption has been made for site suitability analyses for LWRs.
For severe accidents (those beyond design bases), the differences between the CRBR and LWRs have also long been recognized with respect to the spectrum of radionuclides that could be released.
l For example, Supplement 1 to the Final Environmental Statement l
l (NUREG-0139, October 1982) indicated a maximum percentage of transuranics released to the environment of 0.35%, while similar l
l 1
l
severe accidents for LWRs would generally be expected to result in smaller releases.
Of course, other fuel configurations than those presently proposed by the Applicants could alter the percentage of transuranics.
Q7. Has the Staff considered whether the quantity and spectrum of radionuclides which might be released in the event of an accident at CRBR warrant a reevaluation of the PAGs for CRBR?
A7.
(Branagan, Hulman) Yes. Since the CRBR is to contain a higher percentage of transuranics as compared with an LWR, the Staff has considered it appropriate to consider whether accident doses to organs other than the whole body and the thyroid would be more limiting, possibly resulting in a revision of the PAGs for CRBR.
- 08. Please describe the methodology employed by the Staff in determining whether the PAGs currently in use for evacuation planning purposes should be revised for use at CRBR?
A8.
(Branagan, Hulman) The Staff developed conservative criteria for determining whether additional PAGs would be necessary for CRBR; these criteria are referred to as " analog PAGs". The Staff then compared dose estimates for " design basis" accidents and "beyond design basis" accidents to the analogs. The objective of this comparison was to determine whether any dose estimates exceeded the
. analogs and, if so, whether those estimates constituted bases for modifying the PAGs for CRBR.
Q9. Please describe the analna PAGs which the Staff developed for CRBR?
A9.
(Branagan,Hulman) The Staff considered conservative analogs to the current PAGs to limit the risk of long-tenn effects and to make it very unlikely that detectable acute effects would occur. To limit the risk of long-term effects, the Staff created analogs by modify-ing the current PAG for mandatory evacuation from a projected dose of 5 rems to the whole body (applicable to LWRs), to indicate a need for evacuetion upon exceeding a dose estimate for an organ that is equal to the whole body dose of 5 rem divided by the appropriate mortality risk weighting factor for the organ of interest. Values for the mortality risk weighting factors utilized by the Staff in developing the analog PAGs are contained in International Comission on Radiological Protection (ICRP) Publication 26, Recomendations of the International Comission on Radiological Protection (January 1977) ("ICRP-26").
In addition, in order to assure that essentially no detectable acute effects would occur, the comitted dose equivalents to the bone surface and the lung from internal exposure were limited by the Staff to one-half of the non-stochastic annual limit specified in ICRP-26 for routine exposure for those organs of workers (i.e.,
one-half of 50 rems).
(A "comitted dose equivalent" is defined as the dose equivalent to organs or tissues that will be received from one year's intake of radioactive material by an individual during
the time period following the intake (e.g., a 50-year period).
The factor of one-half has been included in this analysis to allow for differences in the general population as compared with workers.
It should be noted that this approach is not commonly utilized; however, it has been adopted as a measure of conservatism for this analysis.
It should also be noted that although inhalation of radioactive materials would occur soon after an accident, the doses to the bone and lung from inhalation of transuranics would be spread out over a much longer time period; it is our judgnent that the analog non-stochastic limit of 25 rems is a conservative value for this comparison for the reasons stated above, as well as because it is a once-in-a-lifetime value whereas the ICRP-26 value of 50 rems represents an annual limit. -(The Staff recognizes that ICRP-26 also contains a limit for exposure of the lens of the eye that is lower than this value, however, for internal exposure to transuranics, the lens of the eye is not a target organ).
Table 1 summarizes the PAGs and the analog PAGs.
TABLE 1 Mortality PAG or Analog flon-Organ Risk Factor Analog PAG Stochastic Limit Whole Body 1.0 5(PAG) 5 Thyroid
.03 25(PAG) 25 Lung
.12 40(Analog) 25 Bone Surface
.03 165(Analog) 25 w
d 9.
Q10. Please identify the accident analyses that were considered in assessing these analog PAGs.
A10.(Hulman) The Staff considered all of the accidents for which dose estimates have been made that have been documented in (1) the FES (NUREG-0139, Februsry 1977), (2) the FES Supplement (October 1982),
(3)theSiteSuitabilityReport(NUREG-0786, Revision, June 1982),
(4) the Safety Evaluation Report (SER) (NUREG-0968, March 1983), and (5) SER Supplement No. 2 (NUREG-0968, Supplement 2, May 1983). The Staff evaluated doses for 38 accidents which ranged in severity from relatively minor events that could occur during the plant lifetime, to events that are very unlikely to occur.
Included are design basis accidents, a site suitability accident, and a CDA which was analyzed in SER Supplement 2 for the purpose of evaluating the effectiveness of the filtered vent system. No specific probabilities have been assigned to the accidents. Dose estimates for all of these accidents were within both the PAGs and the analog PAGs, with the exception of the site suitability accident and the HCDA. The dose estimates for those two accidents, calculated for the low population zone boundary (LPZ) and the exclusion area boundary (EAB), are set forth in Table 2.
[
l l
/
\\
_~
TABLE 2 ACCIDENTS EXCEEDING THE PAGS OR ANALOG PAGS Accident Type Dose Estimate (Rems)
Site Suitability Accident EAB, 0-2 hrs: Whole Body 0.6 (described in the Site Thyroid 12 Suitability Report (NUREG-LungM/
0.4 0783, Revision, June 1982))
Bone 10 LPZ, 30 days: Whole Body 0.3 Thyroid 7
LungN/
0.4 Bone 9
Site Suitability Accident EAB, 0-2 hrs: Whole Body 0.6 (Use of Annulus Filtration Thyroid 12 System) (described in the Bone Surface 31 SER(NUREG-0968, March 1983))
Red Marrow 24 Bone (total) 10 Lung 0.4 Liver 1
LPZ, 30 days: Whole Body 0.3 Thyroid 7
Bone Surface 27 Red Marrow 2
Bone (total) 9 Lung 0.4 Liver 1
U ole Body 8
HCDA (Controlled CDA, LPZ, 30 days:
Wh analogoustoCDAClass1)
Thyroid 192 (described in SER Lung 8
Supplement 2 (NUREG-0968, Livegf 2
May 1983))
Bone-8
-1/
This estimate is based upon ICRP-2, which does not differentiate between bone surface and bone marrow. However, the analysis from NUREG-0968 for the same accident does provide bone surface and bone marrow doses.
-2/
Bone surface dose estimates based upon ICRP-26 may be made indirectly from bone dose estimates (using ICRP-2 estimators) by simply multiplying these bone doses by a factor of 4.
-3/
No EAB (0-2 hr) doses are estimated for the HCDA because no l
appreciable releases would be expected during that initial period.
y v,
--v-,,
r+o.,
A review of Table 2 indicates that an HCDA would exceed the EPA's PAGs (thyroid dose) but would not exceed the analog PAGs; for this accident, then, the EPA's PAGs are adequate for emergency planning purposes. Also, a review of Table 2 indicates that a site suitability.:
accident would exceed the analog non-stochastic limit (bone surface dose), but would not exceed the EPA's PAGs; however, the Staff believes that the EPA's PAGs are adequate for emergency planning purposes for this accident, because for the site suitability acci-dent, the Staft utilized two assumptions that result in conservative bone surface dose estimates. These are as follows:
(1)conserva-tive meteorol.ogy (about a 1-in-20 chance that the assumed dispersion conditions will be realized); and (2) continuous occupancy at the EAB (for the first two hours) and at the LPZ (for 30 days) without any type of prntective action such as sheltering. Comparing the magnitude of the site suitability accident bone surface dose esti-mates (31 rem) with the analog non-stochastic limit (25 rem), and considering the conservative meteorology and occupancy assumptions utilized, the Staff concludes that even if such an HCDA were to occur, it is unlikely that the analog non-stochastic limit would be exceeded. Therefore, the Staff judges that the EPA's PAGs are adequate for emergency planning purposes, for such an HCDA.
Q11. Has the Staff also considered doses from CDAs other than the HCDA referred to above?
All. (Hulman) Yes. As indicated in response to Question 10 above, in the Supplement to the FES (NUREG-0139, Supplement 1, October 1982)
the Staff considered doses from four classes of CDAs (including a Class 1 CDA). As part of judging environmental risks for the FES Supplement, the Staff estimated and reported the health and economic risks associated with the four CDA classes. An intermediate step in the computation of such risks was the assessment of radiological I
doses. Since the four classes of CDAs constitute events with I
consequences which could be worse than were reported in Table 2 above, the Staff has undertaken to calculate specific dose computa-tions that are useful in assessing the adequacy of the PAGs as a l
function of distance from the plant.
For the four classes of CDAs, the Staff analyzed three permutations of the accident sequences presented in FES Supplement No. 1, TableJ-2(Vol.2,p.J-8). The three permutations considered were as foilows:
i 1.
Analysis of the four CDA classes listed in Table J-2 of the FES Supplement:
2.
Analysis of the four CDA classes listed in Table J-2 of i
the FES Supplement, except that the CDA Class 4 event was modified by decreasing the probability of occurrence from 10-7 per reactor year to 10-8 per reactor year, to test the sensitivity of recent conclusions relating to a lower energetics likelihood; and 3.
Analysis of 'the four CDA classes listed in Table J-2 of the FES Supplement, except that CDA class 1, 2 and 4 events were modified by reducing by a factor of 3 the i
., ~,. - -,,,,-
.,. ~.
release fractions for certain categories of radioactive material (Ba-Sr, Ru and La), also to test the sensitivity of recent conclusions relating to a lower energetics likelihood.
Q12. Please describe the nature of the analysis performed in this regard.
A12. (Hulman) For the CDA permutations described in response to Question 10 above, computations of accident consequences in the form of conditional probability of dose estimates as a function of distance were undertaken.
By conditional probability we mean that, given a CDA, an assessment was made of the likelihood of doses occurring at different distances from the plant. We then assessed the analog PAGs at different distances. This assessment indicated (1) that close to the plant, such severe accidents were likely to produce doses in excess of both the EPA's PAGs and the analog PAGs; (2) that further away, the ratio of whole body doses divided by organ doses would be unlikely to exceed the mortality risk factors used to establish the analog PAGs; and (3) the likelihood of life threatening doses from such accidents at the CRBR would be equal to or less than the risks for a comparably rated LWR.
Q13. In your conditional probability analyses, were bone surface dose l
l estimates made?
A13. (Hulman) Not directly.
Early fatality risk estimates were made, however, for which bone marrow doses are the dominant cause of fatal l
doses. That is, the assumptions used in the CRAC code for i
l t
I
estimating early fatality risks are dominated by doses to the bone marrow'.
Further, since bone marrow doses can be influenced significantly by differences in transuranic dose contributions, if the early fatality risks for the CRBR were estimated to be higher than for an LWR of comparable rating, a judgement could be made that even though the likelihood of such accidents might be different, the early risks for CRBR could be higher than for an LWR; such was not the case. These calculations provide additional assurance that the EPA's PAGs are adequate for emergency planning purposes at CRBR.
Q14. Has the Staff reached a conclusion as to whether the bone surface dose for an HCDA is expected to be controlling for evacuation pur-poses at CRBR?
A14. (Hulman) Yes; as indicated in response to Questions 10 and 11 above, the Staff has concluded that bone surface doses are not expected to be controlling for evacuation purposes in the event of an HCDA at CRBR.
Q15. Will the Applicants be required to utilize the analog PAGs developed by the Staff?
A15. (Branagan, Hulman) No. The analog PAGs were developed on a conservative basis solely to determine whether the EPA's PAGs l
require modification for CRBR. Having detennined that no changes to 1
the EPA's PAGs are necessary, the analog PACS are moot.
l l
l
Q16. Has the EPA indicated that it is considering the possibility of issuing new protective action guidelines?
A16. (Branagan) Based upon telephone conversations I have had with EPA representatives, I understand that EPA is considering issuance of a revision to the PAGs, possibly this Fall.
Q17. What impact would EPA's issuance of revised PAGs have on CRBR?
A17.(Branagan,Hulman,Perrotti) While we have concluded that no revision of the PAGs for CRBR is necessary, if revised PAGs are published, the Staff will review the revi, sed-PAGs for applicability to CRBR at the operating license stage of review.
Q18. In the event that the EPA's PAGs are revised or design modifications are made by Applicants following the issuance of a construction permit (but before an operating license is issued), could the appropriateness of the then current PAGs for CRBR effectively be reexamined at the operating license (0L) stage?
A18.(Perrotti,Hulman) Yes. As set forth in NUREG-0654/ FEMA-REP-1, Revision 1, " Criteria for Preparation and Evaluation of Radiological Emergency Response Plans and Preparedness in Support of Nuclear Power Plants," among the items to be required at the OL stage is a specification of projected doses in accordance with the EPA's recom-mended PAGs (NUREG-0654, Criterion J-7 at p. 60).
If the EPA's PAGs are revised before issuance of an OL for CRBR, the Staff's OL review could effectively consider the appropriateness of the revised PAGs for CRBR. Similarly, in the event that design modifications are made
16 -
by the Applicants, the appropriateness of the PAGs for CRBR can effectively be reviewed at the OL stage.
o
- ~. -
.o LEWIS G. HULMAN PROFESSIONAL QUALIFICATIONS I am presently Chief of the Accident' Evaluation Branch, Division of Systems Integration, in the Office of Nuclear Reactor Regulation.
I was formerly the Chief of Systems Interaction Branch and Chief of the Hydrology-Meteorology Branch, both in the Office-of Nuclear Reactor Regulation.
My formal education consists of study in Engineering at the University of Iowa where I received a BS in 1958, and an MS in Engineering Mechanics and Hydraulics in 1967.
In addition, I have taken post-graduate courses at the University of Nebraska, MIT, Colorado State University, and the University of California, and numerous management, technical and computer utilization courses sponsored by the government.
My employment with NRC (formerly AEC) dates from February 1971 with both the Office of Nuclear Reactor Regulation and the fonner Office of Reactor Standards, and for consultation on siting of materials utilization facilities. Assignments were made on both safety and 1
environmental matters. My responsibilities in the licensing review of l
nuclear facilities were in the areas of site analysis, flood vulnerability, water supply, surface and groundwater acceptability of i
effluents, severe meteorologic events and diffusion analyses.
In addition, I participated in the development of the technical bases for safety guides and standards, and research identification and analysis in these areas of interest.
From March 1980 tirough mid-April 1981 I was employed in private industry as a Vice President with Tetra Tech, Inc. in Pasadena, California. During this period I was responsible for business development, and for managing several contracts involving various engine'ering studies in water, including several contracts for government l
and industry. Of note were studies of a nuclear power plant in Yugoslavia for the International Atomic Energy Agency, flood protection in the Dominican Republic, a refinery intake design in Indonesia, and hurricane risk assessments in Texas, North Carolina, Florida, and New Jersey.
From 1968 to 1971, I was a Hydraulic Engineer with the Corps of l
Engineers' Hydrologic Engineering Center in Davis, California.
I worked in special hydrologic engineering projects with most Corps' offices, t
participated as an instructor in training courses, and conducted i
research. Special projects work included water supply systems analysis for the Panama Canal, plann'ing hydrologic engineering studies for water l
resource development near Fairbanks, Alaska, regional water supply and flood control studies for the northeastern U.S., hydropower and water supply studies for a dam in the northeast, and flood control studies in l
Mississippi.
l From 1963 to 1968, I was a Supervisory Hydraulic Engineer with the Philadelphia District, Corps of Engineers. As Assistant Chief of the Hydraulics Branch, I was responsible for design aspects of multi-purpose
A 2
dams, navigation projects, coastal engineering development and special
~
studies on modeling of dams, inlets, water supply, and shoaling, salt water intrusion, and the effects of dredging.
I acted as advisor to the District Engineer, Philadelphia, on drought problems in the 1960's and represented him in technical meetings of the Delaware River Basin Commission - chaired interagency committee which evaluated the effects of the drought.
From 1958 to 1963 I was a Hydraulic Engineer with the Omaha District of the Corps of Engineers.
I was responsible for the hydraulic design of flood control channels, hydraulic design of structures for large dams and several flood control projects.
I also received training in hydrologic engineering, structural engineering, sedimentation, river training studies and design, and water resource project formulation.
I have published in journals of the American Society of Civil Engineers, the American Water Works Association, the Journal of Marine Geodesy, the j
National Society of Professional Engineers, the American Geophysical Union, and in internal technical papers and seminar proceedings of the Corps of Engineers, the AEC, and the NRC.
I am a registered Professional Engineer in the States of Nebraska and I am a member of the American Society of Civil Engineers, California.
the American Meteorological Society, and the American Geophysical Union.
t I
l e
L
4 EDWARD F. BRANAGAN, JR.
OFFICE OF NUCLEAR REACTOR REGULATION PROFESSIONAL QUALIFICATIONS From April 1979 to the present, I have been employed in the Radiological Assessment Branch in the Office of Nuclear Reactor Regulation of the U.S. Nuclear Regulatory Commission (NRC).
As a Health Physicist with the Radiological Assess-ment Branch, I am responsible for evaluating the environmental radiological impacts resulting from the operation of nuclear power reactors.
In particular, I am responsible for evaluating radioecological models and health effect models for use in reactor licensing.
In addition to my duties involving the evaluation of radiological impacts from nuclear reactors, my duties in the Radiological Assessment Branch have included the following:
(1) I managed and was the principal author of a report entitled
" Staff Review of 'Radioecological Assessment of the Wyh1 Nuclear Power Plant'"
(NUREG-0668); (2) I served as a technical contact on an NRC contract with Argonne National Laboratory involving development of a computer program to calculate healtheffectsfromradiation;(3)IservedastheprojectmanageronanNRC contract with Idaho National Eiigineering Laboratory involving estimated and measured concentrations of radionuclides in the environment; (4) I served as the project manager on an NRC contract with Lawrence Livermore Laboratory con-cerning a literature review of values for parameters in terrestrial radionuclide transport models; and (5) I served as the project manager on an NRC contract with Dak Ridge National Laboratory concerning a statistical analysis of dose estimates via food pathways.
From 1976 to April 1979, I was employed by the NRC's Office of Nuclear Materials Safety and Safeguards, where I was involved in project management and technical work.
I served as the project manager for the NRC in connection with the NRC's estimation of radiation doses from radon-222 and radium-226 releases from uran-ium mills, in coordination with Dak Ridge National Laboratory which served as the NRC contractor. As part of my work on NRC's Generic Environmental Impact Statement on Uranium Milling (GEIS), I estimated health effects from uranium i
mill tailings.
Upon publication of the GEIS, I presented a paper entitled
" Health Effects of Uranium Mining and Milling for Commercial Nuclear Power" at a Conference on Health Implications of New Energy Technologies.
I received a B. A. in Physics from Catholic University in 1969, a M. A. in Science Teaching from Catholic University in 1970, and a Ph.D. in Radiation Biophysics from Kansas University in 1976. While completing my course work for my Ph.D.,
I was an instructor of Radiation Technology at Haskell Junior College in Lawrence, Kansas. My doctoral research work was in the area of DNA base damage, and was supported by a U.S. Public Health Service traineeship; my doctoral dissertation was entitled " Nuclear Magnetic Resonance Spectroscopy of Gamma-Irradiated DNA Bases."
I am a member of the Health Physics Society.
l
~
......._....._;__.. _.c.m.=
?
~
DONALD J. PERROTTI 0FFICE OF INSPECTION AND ENFORCEMENT STATEMENT OF PROFESSIONAL QUALIFICATIONS I am employed as an Emergency Preparedness Analyst in the Emergency Preparedness Branch, Division of Emergency Preparedness and Engineering Response Office of Inspection and Enforcement, U. S. Nuclear Regulatory I have responsibility for the review and evaluation of Comission.
radiological emergency plans submitted by reactor applicants and licensees to assure that proposed plans meet the regulatory requirements and guidance i
I also function as a Team Leader and Team Member on of the Comission.
Emergency Preparedness Appraisal Teams engaged in the onsite inspection I observe of the implementation phase of licensee emergency programs.
nuclear power plant emergency drills and exercises involving State and local government response agencies and participate in interagency critiques.
i l
From December 1976 to October 1980 I was employed at the NRC's Region II I was the lead Office of Inspection and Enforcement in Atlanta, Georgia.
l inspector for Region II emergency. planning inspections at nuclear power My responsibilities included planning, reactors and fuel facilities.
conducting and documenting inspections of licensees' emergency plans and procedures, emergency facilities and equipment, emergency training, tests From April and drills, and coordination with offsite support agencies.
1977 to August 1978, I assisted my imediate supervisor who served as Chairman of the Federal Regional Advisory Comittee (RAC) in the review of State Radiological Emergency Plans. During October 1978 I assisted During October 1978 in the review of State Radiological Emergency Plans.
I assisted in the review and approval of emergency plans for two nuclear During the period of March - August,1979, I participated 1
fuel facilities'.
in the Comission's coverage of environmental monitoring programs at Three Mile Island, where I served as Emergency Monitoring Team Leader; in that capacity, I was responsible for coordination with State and Federal agencies engaged in measurement and evaluation of environmental radioactivity levels in the vicinity of the TMI nuclear plant.
From 1973, to 1976 I was employed at Florida Power and Light Company's
!t My duties Turkey Point Nuclear Power Plant, as Health Physics instructor.
included radiation safety training of plant personnel (general employees and technicians), special project reports such as providing background material for management comment on proposed changes to the Code of Federal Regulations, and maintaining radiation exposure records for plant personnel.
l As a member of From 1953 to 1973, I served in the United States Army.
1961-1973, I per-the U.S. Army Engineer Reactors Group during the period formed a variety of jobs with varying degrees of responsibility as rank Among my more responsible jobs were shift and experience were gained.
heilth physics technician at the PM-3A Naval nuclear power plant in McMurdo, Antarctica (1965-1966), Senior Health Physics / Process Chemistry t
instructor at Ft. Belvoir, Virginia (1966-1972), and Project Officer for SM-1 Army nuclear power plant (1972-1973).
t i
i 1
,---w------.-a,--,.-w.no
-e,,
ss,
-, ~ - -, - -
--e-
_._._ _...-__ _ w. #,..,.. m --
I received an Associate of Arts Degree from the New York State Regents, Albany, NY, in 1973.
In addition, I attended Army service schools including Special Nuclear Weapons Disposal and the 52-week Nuclear Power Plant Operators course.
I have completed the following U.S. Public Health Service courses:
Basic Radiological Health Radionuclide Analysis by Gamma Spectroscopy Environmental Radiation Surveillince Analysis of Radionuclides in Water Occupational Radiation Protection Chemical Analysis for Water Quality Statistical Methods - Quality Control in the Laboratory Operational Aspects of Radiation Surveillance Reactor Hazards Evaluation I attended the " Radiological Emergency Response Operations" course at the Nevada Test Site and the " Planning for Nuclear Emergencies" course at Harvard University.
I am and have been a member of the Health Physics Society since 1974.