Motion to Correct 830808-11 Transcript.Certificate of Svc Encl
ML20024F189
Person / Time
Site: Clinch River
Issue date: 09/01/1983
From: Sherwin Turk
NRC OFFICE OF THE EXECUTIVE LEGAL DIRECTOR (OELD)
To:
Atomic Safety and Licensing Board Panel
References
NUDOCS 8309090026
Download: ML20024F189 (10)


Text

p s"

i p ' c:

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of UNITED STATES DEPARTMENT OF ENERGY Docket No. 50-537 PROJECT MANAGEMENT CORPORATION

~

TENNESSEE VALLEY AUTHORITY-

)

)

s (Clinch River Breeder Reactor Plant)

)

NRC~ STAFF'S MOTION TO CORRECT THE HEARING TRANSCRIPT s

4 Pursuant'to10C.F.R.52.730(a)and2.750(b),theNRCStaffhereby requests that'the Licensing Board correct the official transcript of the hearing held on August 8-11, 1983, in accordance with the corrections I!D listed in Appendix A attached hereto. As set forth in 10 C.F.R. 5 I

2.750(b), the corrections approved by the Licensing Beard should be 4

included in the record as an appendix thereto.

Respectfully submitted, l.,"

k I s.

x, N

Shemin E. Turk

]

Counsel for NRC Staff 9,

.s Dated at Bethesda, Maryland p

this'Ist day of September, 1983 1

k N

s DIMIC'31TD ORIGINAL 8309090026 830901 v

PDR ADOCK 05000537 Certified By-7\\ 5 T

PDR p

-\\,

- _s,.

~

a s

.\\

.. ~.

c j'

y j,

?

.s

?~ g - {'

Appendix A

^

c, NRC STAFF'S CORRECTIONS TO

/r;'

THE' HEARING _ TRANSCRIPT

$, 6 [ 'h &

. L he Delete Insett

.7')

7757 15 addressed '

address i

/

8025 24'-

14,ind,15.

13, and 14.

/

s

+

'./;,.

yi

/d 'f

/

80,i2 c_ p ~

12(

80-28 83-28

^

y1;,

~

1 8035,', ^

11 request record 1~

V'

/

S119 9

,..the

~ '8144 IO' Dr.

Mr.

~

8147., ',i

16 Dr.

Mr.

Lfes, ' 7 8,' 19 e

"'[connecti$e convective

.; 8148 ' '

8 delay decay 8150 4

,.16 added headed 4

8151

g.

8162 N

20 contained mentioned g,

8163 4

15 21

~'

L J 8163 6

bromine Bromine s

1 P

~

8163 6-13 2.5 8167 15 standard review plan Standard Review Plan, 8167 16' quidelines Guides 8168 11 explicit as explicitly 8169 11 is are 8169 13 previous, we thought

- previously thought, 8169 15 being being in 8170 17 12 10 e

=

-av--

c.

.,-.w--er,-y=,-==%gw -

.vv

--,-.c m,,r.

O s Page t.ine Delete Insert 8171 10 all already 8171 11 NRC the SER 8172 9

G.

J.

8172 19 Section.

Section 8180 14 DR processing.

DRP.

8184 15 state stage 8184 17 than than for 8198 12 conductive convective 8199 5

hidden internal 8199 6

cell 8199 19 was were 8200 13 generators, generators and 8201 3

DPR EBR 8252 16 general general the 8254 6

then when 8254 6

effect affect 8256 10 as prototypic as prototypic of 8256 16 cladding. Now cladding, and 8257 16 has have 8258 7

does do 8261 8

what what the 8261 9

phenomena phenomenon 8261 10 on in 8261 19

out, out, and 8266 13 here

. s Page Line Delete Insert 8443 4

CBA CDA 8444 20 at in 8444 21 disrupted oxygen on disruptive accident 8444 22 steady design volume head design value 8445 5

design the design 8446 6

megajoules megajoules, 8449 2

failure

failure, 8451 6

had had a 8451 15 In In a 8451 16 with 8452 12 reaches regions 8453 7

in on 8453 9

works worths 8453 10 critique criticality 8455 18 has have 8455 22, 23 coincident constant 8456 6

coincident constant 8457 8

core core there 8457 9

it is there are l

l 8458 14 causal casual 8458 22 awarding avoiding 8459 9

It There l

8459 16 volumetically volumetrically i.

8459 17 cnucleates nucleates i

1.

l L

l.

-___m._

b s Page Line Delete Insert 8461 12 valves values 8461 25 isotropic isentropic 8465 6

Nuclear Nuclear Reactor 8468 8

type time 8472 4

.8.5-4 A.5-4 8472 5

lip liver 8472 8

.15 0.015 8472 11

.8 0.8 8472 21 8.5-4 A.5-4 8473 16, 18, 25 admission ignition 8474 3

abiabatic adiabatic 8474 9

admission ignition 8475 3

containment here confinement here 8475 25 propogate propagate 8476 13 are is 8479 1

7 10 8486 23 with with the 8489 5

loop hoop 8490 23 coures course 8496 23 fusil fissile 8496 24 and when 8498 5

flow floor 8499 5

neutronic age neutron leakage 8500 16 statements statement 8502 5

in at

. s Page Line Delete Insert 8502 7

reactor reactors 8502 9

met meteorological 8502 15 CD CDA 8503 5

100.11-A-1.

100,11(a)(1).

8504 4

radiation, radiation."

8505 6

realistically on realisticality 8505 8

that is albeit 8505 16 scenario scenario."

8506 5

statement statements 8506 6

or for 8506 6

in fact, for in fact, for beyond 8508 23 and then 8509 20 Red Reg.

8521 16, 18 feasibly physically 8524 12 accident accidents 8525 7

confinment confinement 8525 8

a the 8528 20 conclusions consequences 8529 2

the any 8529 24 Bell Charles Bell 8532 1

to of 8532 2

suitability scrutability 8532 6

changes personnel changes 8538 16 post-radiation post-irradiation 8543 3, 7 8.4.25 A.4.25

.m...__

. s Page Line Delete Insert 8544 13 CBA CDA 8546 6

A Q

8546 22 8.4.26 A 4.26 8547 6

salt basalt 8547 11-12 the salt basalt 8547 13 8.4.22 A.4.22 8553 3

has had 8553 12 disconnecting disconnection 8554 3

radiation irradiation 8557 14 It says Its in 8558 1

STARK KING 8559 14, 23 license licenses 8559 15 we're we're reviewing 8564 9

opinions pins 8565 5

that 8568 13 Know note 8570 19 Mr.

Dr.

l l

8572 4

National national 8601 10 disease onset licensees' onsite l

r l

8609 20 then than

[

8610 17, 19 suitability suitability accident l

8617 15 Supplemental Supplement 8757 14 two 8768 18 and it as it 8769 1

personal permanent l

h

?

. s Page Line Delete Insert 8776 1

important to safety "important to safety" 8776 20 up done up 8777 22 civil area civil engineering area 8778 4

civil 8779 1

concession concensus 8790 7

NSFS NSSS 8795 14, 24 Project Program 8796 2

project program 8799 21 NRBR CRBR 8875 10 CRBRS CRBR is 8875 24 LFBR's LMFBR's 8876 17 1973 1983 8879 16 to to the 8887 2

setting segment 8880 2

specific scientific 8880 5

traumatic dramatic 8880 15 prevent present

+----e e

m

-v r-e

--w-ewvwry=*--+w---g**r---

vew *-

y v-r

  • N-a w

w--

w

. -. _ ~..

s UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter UNITED STATES DEPARTMENT OF ENERGY Docket No. 50-537 PROJECT MANAGEMENT CORPORATION TENNESSEE VALLEY AUTHORITY (ClinchRiverBreederReactorPlant)

CERTIFICATE OF SERVICE I hereby certify that copies of "NRC STAFF'S MOTION TO CORRECT HEARING TRANSCRIPT" in the above-captioned proceeding have been served on the following by deposit in the United States mail, first class, or, as indicated by an asterisk, through deposit in the Nuclear Regulatory Commission's internal mail system, this 1st day of September, 1983:

Marshall Miller, Esq., Chairman

  • William M. Leech, Jr., Attorney General Administrative Judge William B. Hubbard, Chief Deputy Atomic Safety and-Licensing Board Attorney General U.S. Nuclear Regulatory Commission Michael D. Pearigen, Assistant Attorney Washington, DC 20555 General Michael E. Terry, Esq.

Mr. Gustave A. Linenberger*

450 James Robertson Parkway Administrative Judge Nashville, TN 37219 l

Atomic Safety and Licensing Board U.S. Nuclear Regulatory Commission Lawson McGhee Public Library L

Washington, DC 20555 500 West Church Street l

Knoxville, TN 37902 l

Dr. Cadet H. Hand, Jr., Director Administrative Judge R. Tenny. Johnson Bodega Marine Laboratory Leon Silverstrom University of California Warren E. Bergholz, Jr.

P. O. Box 247 William D. Luck Bodega Bay, CA 94923 U.S. Department of Energy 1000 Independence Ave., S.W.

l William E. Lantrip, Esq.

Room 6-B-256 City Attorney Washington, DC 20585 Municipal Building P. O. Box 1 Project Management Corporation Oak Ridge, TN 37830 P. O. Box U Oak Ridge, TN 37830 f'

-m-w-

.,3

.,.-..a p-

.,r

~-

2 M13eL 4 m d M

<..t.

>s George L. Edgar, Esq.

Director.

Frank K. Peterson, Esq.

Clinch River Breeder Reactor Gregg A. Day, Esq.

. Plant Project Thomas A. Schmutz, Esq.

U.S. Department of Energy Irvin A. Shapell, Esq.

Washington, DC 20585 Morgan, Lewis & Bockius 1800 M Street, N.W.

Atomic Safety and Licensing Appeal Board

  • Washington, DC 20036 U.S. Nuclear Regulatory Commission Washington, DC 20555 Barbara A. Finamore Dr. Thomas B. Cochran Atomic Safety and Licensing Board
  • S. Jacob Scherr U.S. Nuclear Regulatory Comission Natural Resources Defense Washington, DC 20555 Council. Inc.

1725 Eye Street, N.W.

Docketing and Service Section*

Washington, DC 20006 Office of the Secretary U.S. Nuclear Regulatory Comission Manager of Power Washington, DC 20555 Tennesse Valley Authority 819 Power Building Chattanooga, TN ~37401 i'

l l

}

f l

/

Sherwin E. Turk Counsel for NRC Staff I

l l

l t

i i

l l

!e

~.- -

~,.. -

- - -