ML20024D223
| ML20024D223 | |
| Person / Time | |
|---|---|
| Site: | Clinch River |
| Issue date: | 08/02/1983 |
| From: | Edgar G, Luck W, Sherwin Turk ENERGY, DEPT. OF, NRC OFFICE OF THE EXECUTIVE LEGAL DIRECTOR (OELD), PROJECT MANAGEMENT CORP. |
| To: | |
| References | |
| NUDOCS 8308030333 | |
| Download: ML20024D223 (9) | |
Text
_
8/2/83 UNITED STATES OF AMERICA 8
NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD l
In the Matter of
)
- )
UNITED STATES DEPARTMENT OF ENERGY
)
)
PROJECT MANAGEMENT CORPORATION
)
Docket No. 50-537
)
TENNESSEE VALLEY AUTHORITY
)
e (Clinch River Breeder Reactor Plant)
)
P 4
)
1,:/yv ci 5l Aug b
STIPULATION AND REQUEST FOR BOARD APPROVAL OF AUTHENTICITY
\\?
k 4'
AND ADMISSIBILITY OF EXHIBITS
'b
/
g7
~
The Staff of the United States Nuclear Regulatory Commission (NRC Staff), and the United States Department of Energy, and Project Management Corporation, for themselves and on behalf of the Tennessee Valley Authority (the Applicants), hereby stipulate that the NRC Staff's Exhibits listed on Attachment A and the Applicants' Exhibits listed on Attachment B are authentic and are admissible in the above-captioned proceedings.
The NRC Staff and Applicants hereby request the Board's approval of this Stipulation, and request that it be bound into the transcript of the forthcoming August 8 hearing session.
Respectfully submitted, W"
g.
Sherwin E. Turk or g Edgar ' y Counsel for the Attorne for Project anagement Corp.
. b u k,,
BjjB$$0$[o$o$$$$7 William D. Luck PDR G
Attorney for United States uarto:
August 2, 1983 Department of Energy O?)
y
I L
ATTACHMENT A o
NRC STAFF'S LIST OF PROPOSED EXHIBITS Exhibit Description 22 NUREG-0786, " Site Suitability Report in the Matter of Clinch River Breeder Reactor Plant," Revision to March 4,1977 Report (June 1982) [NRC Staff LWA-1 ExhibitNo.1]
23 NUREG-0139, " Final Environmental Statement Related to Construction and Operation of Clinch River Breeder Reactor Plant" (February 1977) [NRCStaff LWA-1 Exhibit No. 7]
24 NUREG-0139, Supplement No.1, " Supplement to Final Environmental Statement Related to Construction and Operation of Clinch River Breeder Reactor Plant,"
Volumes 1and2(October 1982)[NRCStaffLWA-1 ExhibitNo.8]
25 Errata Corrections to NUREG-0139, Supplement No.1 (December 10, 1982) [NRC Staff LWA-1 Exh;ibit No. 19]
26 NUREG-0968, "Safty Evaluation Report Related to the Construction of 'he Clinch River Breeder Reactor t
Plant," Volume 1, Main Report (March 1983) 27 NUREG-0968, " Safety Evaluation Report Related to the Construction of the Clinch River Breeder Reactor Plant," Volume 2, Appendices (March 1983) 28 Errata Sheet for NUREG-0968, Vol.1 Main Report (July 11, 1983) 29 NUREG-0968, Supplement No.1, " Safety Evaluation Report Related to the Construction of the Clinch River Breeder Reactor Plant" (May 1983) 30 NUREG-0968, Supplement No. 2, " Safety Evaluation Report Related to the Construction of the Clinch River Breeder Reactor Plant" (May 1983) 31 Letter from Jesse C. Ebersole, Acting Chairman (ACRS), to Honorable hunzio J. Palladino, Chairman
[O (NRC),
Subject:
"ACRS Report on the Clinch River Breeder Reactor Plant" (April 19,1983) 32 NRC Staff Testimony Concerning Adequacy of the Design Basis Accident Spectrum (With Attachment)
--e g
y c,--
--+-wy-
r.
i
. l Exhibit Description 33
" Comparison of Clinch River Breeder Reactor Design Basis Accidents With Those For Light Water Reactors i
and Liquid-Metal Cooled Fast Reactors," EGG-NTAP-6152 (J. Hanson, Idaho National Engineering Labora-tory) (January 1983) 34 NUREG/CR-3240, "Compariso'n of CRBR Design Basis Events With Those of Foreign LMFBR Plants" (A.
Agrawal, Brookhaven National Laboratory) (March 1983) 35 Memorandum from Robert J. Bosnak (Chief, Mechanical Engineering Branch, DE), to J. Nelson Grace (Program Director, Clinch River Breeder Reactor Program Office),Subiect:
" Seismic Margins in Small HTS Piping"(July 12, 1983) (With Attachments) 36 NRC Staff Testimony of Robert J. Dube On Board Question 10, Concerning Material Control and Accountability 37 NRC Staff Testimony of Thomas L. King On Board Question 4, Concerning Natural Convective Circulation 38 NRC Staff Testimony of Thomas L. King and Richard M. Stark On Board Question 12, Concerning Items Identified For Resolution at the Operating Licensing Stage 39 NRC Staff Testimony of Tt: mas L. King On Board Question 13, Concerning Fuel System Fallback Positions (WithAttachment) 40 NRC Staff Testimony of Thomas L. King On Board Question 14, Concerning Operation With Leaking Fuel Pins 41 NRC Staff Testimony Regarding Analyses of Core Disruptive Accidents (With Attachment) 42 NUREG/CR-3224, "An Assessment of CRBR Core Disruptive Accident Energetics" (T. G. Theofanous
[O and C. R. Bell) (March 11,1983) 43 NRC Staff Testimony On Board Question 9 Regarding Protective Action Guides 44 NRC Staff Testimony of John G. Spraul and Algis J.
Ignatonis On Board Question 6 Concerning Quality Assurance
l.a ATTACHMENT B APPENDIX B i
EXHIBIT LIST
\\
I.
Applicants' Exhibits Exhibit Marked No.
. Description For I.D.
Offered Admitted 59 Preliminary Safety Analysis Report (PSAR) Vol.1, Chapter 1 60 PSAR, Vol. 2, Sec. 2.1-2.4 61 PSAR, Vol. 3, Sec. 2.5-2.A i
62 PSAR, Vol. 4, Sec. 2.B-3.1 63 PSAR, Vol. 5, Sec. 3.2-3.A 64 PSAR, Vol. 6, Sec. 4.1 through pg. 4.2-475 65 PSAR, Vol. 7, (pb. 4.2-476 through pg. 4.4-194 66 PSAR, Vol. 8, Sec. 4.1-5.4 67 PSAR, Vol. 9, Sec. 5.5-7.4 68 PSAR, Vol. 10, Sec. 7.5-9.2 69 PSAR, Vol. 11, Sec. 9.3-9.9 70 PSAR, Vol. 12, Sec. 9.10-11.6 71 PSAR, Vol. 13, Sec. 12.0-15.2 72 PSAR, Vol. 14, Sec. 15.3-16.6 73 PSAR, Vol. 15, Sec. 17.0-17.J
. 74 PSAR, Vol. 16, Appendix A -
Appendix J g r.
75 PSAR, Vol. 17, Questions 001.1-001.75 4
,,,c
,,,,,__.,,,,_._,,.._.,m.-
,_.-,_.-..m..
l -
t.
Exhibit Marked No.
Description For I.D.
Offered Admitted 76 PSAR, Vol. 18, Questions 001.76-001.324 77 PSAR, Vol. 19,-Questions 001.325-001.499 78 PSAR, Vol. 20, Questions 001.500-001.704 79 PSAR, Vol. 21, Questions 011-120 80 PSAR, Vol. 22, Questions 130-222 81 PSAR, Vol. 23, Questions 241.1-310.67 82 PSAR, Vol. 24, Questions 321.1-430.7 83 PSAR, Vol. 25, Questions CS 210.1-CS 410.19 84 PSAR, Vol. 26, Questions CS 421.1-CS 721.1 85 PSAR, Vol. 27, Questions CS 760.1-CS 810.16 86 Applicants' Statement of General Information Pursuant to 10 C.F.R. S 50.33 87 Applicants' Testimony Concerning Whether HCDA's should be DBA's 88 WARD-D-0185, " Clinch River Breeder Reactor Plant Integrity of Primary and Intermediate Heat Transport
[O System Piping in Containment,"
September 1977 l
T Exhibit Marked No.
Description For I.D.
Offered Admitted 89 Applicants' Testimony Concerning HCDA Analysis 90 CRBRP-3, Volume 1, " Hypothetical Core Disruptive Accident Considera-tions in CRBRP; Energetics and Structural Margin Beyond the Design Basis," Rev. 4, March 1982 91 CRBRP-3, Volume 2, " Hypothetical Core Disruptive Accident Considera-tions in CRBRP, Assessment of Thermal Margin Beyond the Design Base," Rev. 6, June 1983 92 ANL/ RAS 83-11; An Assessment of the Unprotected LOF Accident at EOC-4 in the CRBRP Heterogeneous Core Design 93 GEFR-00523; An Assessment of HCDA Energetics in the CRBRP Heterogeneous Reactor Core
~
94 Applicants' Testimony Concerning
. Board Areas of Interest Related to Emergency Planning 95 Applicants' Response to Board Areas of Interest 5 and 6 i
l i
l m
a.
UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD
)
In the Matter of
)
)
UNITED STATES DEPARTMENT OF ENERGY
)
)
PROJECT MANAGEMENT CORPORATION
)
Docket No. 50-537
)
TENNESSEE VALLEY AUTHORITY
)
)
(Clinch River Breeder Reactor Plant)
)
)
CERTIFICATE OF SERVICE Service has been effected on this date by personal delivery or first-class mail to the following:
Marshall E. Miller, Esquire Chairman Atomic Safety & Licensing Board U. S. Nuclear Regulatory Commission East-West Towers 4350 East-West Highway Bethesda, Maryland 20814 (2 copies by hand)
Dr. Cadet H. Hand, Jr.
. Director i
Bodega Marine Laboratory University of California West Side Road Bodega Bay, California 94923 (Air Express)
Mr. Gustave A. Linenberger Atomic Safety & Licensing Board U. S. Nuclear Regulatory Commission East-West Towers 4350 East-West Highway Bethesda, Maryland 20814 (by hand)
Stuart Treby, Esq.
Sherwin E. Turk, Esq.
Elaine I. Chan, Esq.
Geary S. Mizuno, Esq.
Office of Executive Legal Director U. S. Nuclear Regulatory Commission Maryland National Bank Building 7735 Old Georgetown Road Bethesda, Maryland 20014 (2 copies by hand)
- Atomic Safety & Licensing Appeal Board U. S. Nuclear Regulatory Commission Washington, D. C.
20555
- Atomic Safety & Licensing Board Panel U. S. Nuclear Regulatory Commission Washington, D. C.
20555
- Docketing & Service Section Office of the Secretary U. S. Nuclear Regulatory Commission Washington, D. C.
20555 (original, 3 copies, and return copy) l William M. Leech, Jr., Attorney General William B. Hubbard, Chief Deputy Attorney General Michael'D, Pearigen, Assistant Attorney General State of Tennessee Office of the Attorney General 450 James Robertson Parkway Nashville, Tennessee 37219 Oak Ridge Pub.lic Library l
Civic Center l
Oak Ridge, Tennessee 37830 f
, Herbert S. Sanger, Jr., Esquire Lewis E. Wallace, Esquire W. Walter LaRoche, Esquire James F. Burger, Esquire Edward J. Vigluicci, Esquire Office of the General Counsel Tennessee Valley Authority 400 West Summit Hill Drive Knoxville, Tennessee 37902 (2 copies) j l
l f
9
Lawson McGhee Public Library 500 West Church Street Knoxville, Tennessee 37902 William E. Lantrip, Esquire Attorney for the City of Oak Ridge Municipal Building Post Office Box 1 Oak Ridge, Tennessee 37830 Leon Silverstrom, Esquire William D. Luck, Esquire U. S. Department of Energy 1000 Independence Avenue, S.W.
Room 6B-256--Forrestal Building Washington, D. C.
20585 (2 copies by hand)
Commissioner James Cotham Tennessee Department of Economic and Community Development Andrew Jackson Building, Suite 10007 Nashville, Tennessee 37219 f
hf J
W Georp y~. Edg~ar Atto Key for Project Management Corporation l
l DATED:
August 2, 1983
- /
Denotes hand delivery to 1717 "H" Street, N.W., Washington, D.C.
l I
l
. _, _ _