Category:LEGAL TRANSCRIPTS & ORDERS & PLEADINGS
MONTHYEARML20106J8711985-02-15015 February 1985 Notification Concerning Site redress.Near-term Planning for Site Redress Predicated Upon Commencing Redress by May 1985. Certificate of Svc Encl ML20107M9411984-11-0808 November 1984 Response to Motion to Dismiss Proceeding Re Revocation of Lwa.Authorization of Revocation of LWA & That Proceedings Be Dismissed W/O Prejudice Recommended.Certificate of Svc Encl ML20106J7951984-10-30030 October 1984 Response to Applicant 841019 Motion to Dismiss Proceeding. Motion Acceptable Subj to Conditions Set Forth in Redress Plan & NRC .Certificate of Svc Encl ML20093M2611984-10-19019 October 1984 Motion to Dismiss Proceeding.Applicable Conditions of Existing Federal Water Permit & State Water Quality Requirements Will Remain in Effect.Supporting Documentation & Certificate of Svc Encl ML20098F7391984-09-28028 September 1984 Notice of Change of Address & Telephone Number.Certificate of Svc Encl ML20098F9571984-09-28028 September 1984 Notice of Change of Address & Telephone Number.Certificate of Svc Encl.Related Correspondence ML20097G9671984-09-19019 September 1984 Notice of Change of Address & Telephone Number.Certificate of Svc Encl.Related Correspondence ML20087F4701984-03-15015 March 1984 Answer to Applicant Petition for Review of ASLB 840229 Memorandum & Order Re Crbr LWA Proceedings on Site Redress Plan.Intervenors Main Concern Is That Redress Be Rapid & Effective.W/Certificate of Svc ML20086T0141984-03-0505 March 1984 Petition for Review of Appeal Board 840229 Memorandum & Order Readmitting Intervenors to Proceedings.Intervenor Participation Will Protract Proceeding for Project Which Is Terminated.Certificate of Svc Encl ML20080N0471984-02-21021 February 1984 Answer Opposing NRDC & Sierra Club Appeals to ASLB Decisions.Certificate of Svc Encl ML20080C6021984-02-0606 February 1984 Brief in Support of Appeal of ASLB 840120 Order Re NRDC Motion to Intervene ML20080C6121984-02-0606 February 1984 Notice of Appeal of ASLB 840120 Notice Denying NRDC Motion to Intervene ML20080C6411984-02-0606 February 1984 Brief of Intervenors in Support of Appeal of ASLB 840120 Order.Certificate of Svc Encl ML20083J4351984-01-0909 January 1984 Response to NRDC Reply Per ASLB 831228 Order.Contentions Raised in NRDC Motion to Intervene Moot.Motion Should Be Denied.Certificate of Svc Encl ML20083E4231983-12-27027 December 1983 Notice of Project Termination.Certificate of Svc Encl ML20082S4471983-12-12012 December 1983 Request to Reply to Util 831205 & NRC 831208 Responses to NRDC Motion to Intervene ML20082S4541983-12-12012 December 1983 Reply to Util 831205 & NRC 831208 Responses to NRDC Motion to Intervene.Appropriate ASLB Course of Action Is Termination of Proceedings on Grounds of Mootness. Certificate of Svc Encl ML20082Q6841983-12-0909 December 1983 Amended Notice of Appearance in Proceeding.Certificate of Svc Encl ML20082M5271983-12-0505 December 1983 Response Supporting Intervenor 831123 Motion to Terminate Appeal Proceedings,Vacate Partial Initial Decision & Authorize Revocation of Lwa.Certificate of Svc Encl ML20082M5401983-12-0505 December 1983 Response Opposing NRDC 831123 Motion to Intervene.Proceeding Moot Due to Project Cancellation.Cp Partial Initial Decision Should Be Issued.Certificate of Svc Encl ML20082E1261983-11-23023 November 1983 Petition of NRDC for Leave to Intervene & Request for Hearing Re Effect of Crbr Termination on CP Proceedings. Contentions Listed ML20081D7931983-10-31031 October 1983 Confirmation of Info Re Legislative Status Discussed W/Aslb in 831028 Telcon.Certificate of Svc Encl ML20081A5041983-10-25025 October 1983 Supplemental Citations Supporting Thesis That Following Hydrodynamic Core Disruptive Accident,Reactor Vessel Closure Head Is More Susceptible to Failure than Reactor Vessel Head.Certificate of Svc Encl ML20078B9771983-09-26026 September 1983 Response Opposing NRC 830913 Motion for Leave to File Supplemental Affidavit of Lg Hulman.Affiant Revised Testimony Incorrect,Misleading & Irrelevant.Certificate of Svc Encl ML20024F3471983-09-0707 September 1983 Order Rejecting NRC 830902 Proposed Opinion,Findings of Fact & Conclusions of Law in CP Proceeding & Lg Hulman Supplemental Affidavit.Nrc Failed to Follow Correct Form for Proposed Findings.Motion Necessary to Admit Affidavit ML20024F1921983-09-0606 September 1983 Supplemental Affidavit of Lg Hulman Correcting Pages 8,505- 8,509 to Transcript of 830810 Testimony ML20024F2561983-09-0202 September 1983 Reply to Applicant Proposed Opinion,Findings of Fact & Conclusions of Law Recommending Issuance of Cp.Unexecuted Supplemental Affidavit Clarifying & Revising Portions of Hearing Transcript & Certificate of Svc Encl ML20024F1891983-09-0101 September 1983 Motion to Correct 830808-11 Transcript.Certificate of Svc Encl ML20076C9811983-08-22022 August 1983 Motion to Correct Transcript of Aug 1983 CP Evidentiary Hearings.Certificate of Svc Encl ML20076A7871983-08-17017 August 1983 Motion to Reschedule 830929 Oral Argument to 830928. Certificate of Svc Encl ML20077J5051983-08-15015 August 1983 Proposed Initial Decision,Findings of Fact & Conclusions of Law Re Cp.Certificate of Svc Encl ML20024E5021983-08-0909 August 1983 Transcript of 830809 Hearing in Oak Ridge,Tn.Pp 7,934-8,480. Supporting Documentation Encl ML20024D2231983-08-0202 August 1983 Stipulation Re Authenticity of NRC & Applicant Exhibits. Requests ASLB Approval.Certificate of Svc Encl ML20077B6661983-07-22022 July 1983 Response Opposing Intervenor 830518 Exceptions to ASLB 830228 Partial Initial Decision on Lwa.Aslab Should Affirm ASLB Decision.Site Suitability Arguments Incongruous. Certificate of Svc Encl ML20024C7501983-07-11011 July 1983 Pages 53 & 54 to Testimony of Tl King & ET Rumble Re Adequacy of DBA Spectrum ML20024C0621983-07-0808 July 1983 Testimony of Tl King Re ASLB Question 13 on Fuel Sys Fallback Positions.Lists Possible Impacts on Crbr Programmatic Objectives from Implementing NRC Positions. Prof Qualifications Encl ML20024C3641983-07-0808 July 1983 Limited Appearance Statement of TB Cochran Re Issues Raised in CP Proceeding.Discusses Radiological Consequences of Crbr Core Disruptive Accident & Site Suitability.Certificate of Svc Encl ML20024C0431983-07-0808 July 1983 Testimony of Rj Dube Re ASLB Question 10 on Matl Control & Accountability.R&D Activities on Measurement Capabilities for Matl Control & Accounting Unnecessary for Continued Fuel Safeguards.Prof Qualifications Encl ML20024C0381983-07-0808 July 1983 Testimony of Lg Hulman,Ef Branagan & Dj Perrotti on ASLB Question 9 Re Protective Action Guides.No Rev to Protective Action Guides Necessary for Crbr.If Guides Revised,Nrc Will Consider Applicability at OL Stage.Prof Qualifications Encl ML20024B6671983-07-0808 July 1983 Testimony of Vd Hedges,Jw Anderson & Je Karr Responding to ASLB Areas of Interest 5 & 6.Owners Mgt Organization Described.Westinghouse,Ge,Atomics Intl,S&W & Burns & Roe Are Project Contractors.Certificate of Svc Encl ML20024B6661983-07-0808 July 1983 Testimony of Hw Hibbitts,Ek Sliger & Le Strawbridge Re ASLB Areas of Interest Related to Emergency Planning.Crbr Radioactive Releases Could Contain Sodium Oxides & Hydroxide Aerosols.Prof Qualifications & Certificate of Svc Encl ML20024C0501983-07-0808 July 1983 Testimony of Tl King & RM Stark Re ASLB Question 12 on Items Identified for Resolution at OL Stage.Nrc & Applicants Developing Program & Schedule to Review & Resolve Items,To Minimize Impacts on Final Design & Const ML20024C0241983-07-0808 July 1983 Testimony of Cl Allen,Lw Bell,Hb Holz,Lg Hulman,Jk Long, B Morris,Jj Swift,Cr Bell,Ta Butler,Et Rumble,D Swanson & Tg Theofanous Re Analyses of Core Disruptive Accidents.Prof Qualifications Encl ML20024C0761983-07-0808 July 1983 Testimony of Tl King on ASLB Question 14 Re Operation W/ Leaking Fuel Pins.Sodium Entry Into Fuel Pin May Cause Increased pellet-to-clad Gap Conductance,But Would Not Adversely Affect Fuel Performance.Prof Qualifications Encl ML20024C0221983-07-0808 July 1983 Testimony of RA Becker,Hc Garg,S Hou,Tl King,B Morris,Ce Rossi,R Schemel,Jj Swift,Ak Agrawal,Je Hanson & ET Rumble Re Adequacy of DBA Spectrum.Core Disruptive Accidents May Be Excluded from DBA Spectrum for Crbr.W/Prof Qualifications ML20024B6641983-07-0505 July 1983 Testimony of Lw Deitrich,H Fauske,L Strawbridge & Tw Ball Re Hypothetical Core Disruptive Accident (Hcda) Analyses.Crbr Designed So Hcdas Beyond Dba.Prof Qualifications & Certificate of Svc Encl ML20024A9021983-06-29029 June 1983 Transcript of 830629 Conference in Bethesda,Md.Pp 7,298- 7,354 ML20072F2651983-06-22022 June 1983 Response to Intervenor 830621 Motion to Withdraw Contentions 1,3,9(c),9(f) & 9(g) from Consideration at Jul 1983 CP Hearings.Intervenors Should Be Dismissed as Parties. Certificate of Svc Encl ML20079R2491983-06-21021 June 1983 Motion to Withdraw Contentions 1,3,9(c),9(g) from Consideration at Jul 1983 CP Hearings & Request for Leave to Submit Written Statement on Issues Raised.Limited Resources Prohibit Continued Full Participation ML20079R2631983-06-21021 June 1983 Response Opposing Applicant 830519 & 23 Motions for Summary Disposition of Contentions 9(g),9(c) & 9(f).Motions Moot Since Intervenors Moved to Withdraw Contentions from Consideration 1985-02-15
[Table view] Category:TRANSCRIPTS
MONTHYEARML20024E5021983-08-0909 August 1983 Transcript of 830809 Hearing in Oak Ridge,Tn.Pp 7,934-8,480. Supporting Documentation Encl ML20024C7501983-07-11011 July 1983 Pages 53 & 54 to Testimony of Tl King & ET Rumble Re Adequacy of DBA Spectrum ML20024C3641983-07-0808 July 1983 Limited Appearance Statement of TB Cochran Re Issues Raised in CP Proceeding.Discusses Radiological Consequences of Crbr Core Disruptive Accident & Site Suitability.Certificate of Svc Encl ML20024C0761983-07-0808 July 1983 Testimony of Tl King on ASLB Question 14 Re Operation W/ Leaking Fuel Pins.Sodium Entry Into Fuel Pin May Cause Increased pellet-to-clad Gap Conductance,But Would Not Adversely Affect Fuel Performance.Prof Qualifications Encl ML20024C0241983-07-0808 July 1983 Testimony of Cl Allen,Lw Bell,Hb Holz,Lg Hulman,Jk Long, B Morris,Jj Swift,Cr Bell,Ta Butler,Et Rumble,D Swanson & Tg Theofanous Re Analyses of Core Disruptive Accidents.Prof Qualifications Encl ML20024C0501983-07-0808 July 1983 Testimony of Tl King & RM Stark Re ASLB Question 12 on Items Identified for Resolution at OL Stage.Nrc & Applicants Developing Program & Schedule to Review & Resolve Items,To Minimize Impacts on Final Design & Const ML20024C0221983-07-0808 July 1983 Testimony of RA Becker,Hc Garg,S Hou,Tl King,B Morris,Ce Rossi,R Schemel,Jj Swift,Ak Agrawal,Je Hanson & ET Rumble Re Adequacy of DBA Spectrum.Core Disruptive Accidents May Be Excluded from DBA Spectrum for Crbr.W/Prof Qualifications ML20024B6671983-07-0808 July 1983 Testimony of Vd Hedges,Jw Anderson & Je Karr Responding to ASLB Areas of Interest 5 & 6.Owners Mgt Organization Described.Westinghouse,Ge,Atomics Intl,S&W & Burns & Roe Are Project Contractors.Certificate of Svc Encl ML20024C0381983-07-0808 July 1983 Testimony of Lg Hulman,Ef Branagan & Dj Perrotti on ASLB Question 9 Re Protective Action Guides.No Rev to Protective Action Guides Necessary for Crbr.If Guides Revised,Nrc Will Consider Applicability at OL Stage.Prof Qualifications Encl ML20024C0431983-07-0808 July 1983 Testimony of Rj Dube Re ASLB Question 10 on Matl Control & Accountability.R&D Activities on Measurement Capabilities for Matl Control & Accounting Unnecessary for Continued Fuel Safeguards.Prof Qualifications Encl ML20024C0621983-07-0808 July 1983 Testimony of Tl King Re ASLB Question 13 on Fuel Sys Fallback Positions.Lists Possible Impacts on Crbr Programmatic Objectives from Implementing NRC Positions. Prof Qualifications Encl ML20024B6661983-07-0808 July 1983 Testimony of Hw Hibbitts,Ek Sliger & Le Strawbridge Re ASLB Areas of Interest Related to Emergency Planning.Crbr Radioactive Releases Could Contain Sodium Oxides & Hydroxide Aerosols.Prof Qualifications & Certificate of Svc Encl ML20024B6641983-07-0505 July 1983 Testimony of Lw Deitrich,H Fauske,L Strawbridge & Tw Ball Re Hypothetical Core Disruptive Accident (Hcda) Analyses.Crbr Designed So Hcdas Beyond Dba.Prof Qualifications & Certificate of Svc Encl ML20024A9021983-06-29029 June 1983 Transcript of 830629 Conference in Bethesda,Md.Pp 7,298- 7,354 ML20023C3851983-05-13013 May 1983 Transcript of 830513 Conference in Bethesda,Md.Pp 7,106- 7,279 ML20028F8961983-02-0303 February 1983 Transcript of ACRS Subcommittee on Crbr & Thermal Hydraulics Working Group 830203 Joint Meeting in Washington,Dc Re Plant Thermal Hydraulic Design Issues & Emergency Power Sys. Pp 1-343.Supporting Documentation Encl ML20083N8191983-02-0202 February 1983 Applicant Corrections to 821116-19 Transcripts,Inadvertently Omitted from 830124 List of Transcript Corrections. Certificate of Svc Encl ML20070M6581983-01-24024 January 1983 Proposed Transcript Corrections.Certificate of Svc Encl ML20028C1611983-01-0505 January 1983 Transcript of 830105 Hearing in Bethesda,Md.Pp 6,913-7,105 ML20028B5381982-12-0101 December 1982 Transcript of ACRS Working Group on Structures & Matls for Crbr 821201 Meeting in Bethesda,Md.Pp 1-214.Supporting Documentation Encl ML20069L0331982-11-12012 November 1982 Suppl to TB Cochran Part V Testimony on Contentions 1,2 & 3, Based on Final Suppl to Fes ML20069L0371982-11-12012 November 1982 Testimony of TB Cochran,Part Iv,As Supplemented by New Info in Final Suppl to Fes,Re Contentions 1,2 & 3 on Potential for Severe Accidents at Crbr & Adequacy of NRC & Util Analyses of Accidents ML20069L0451982-11-12012 November 1982 Testimony of TB Cochran,Part Iii,As Supplemented by New Info in Fes Final Suppl,Re Contentions 6(b)(1) & (3) on Adequacy of NRC Analysis of Environ Impacts of Crbr Fuel Cycle. Certificate of Svc Encl ML20066E2831982-11-10010 November 1982 Errata to 821101 Testimony.Certificate of Svc Encl ML20027E2301982-11-0404 November 1982 Unofficial Transcript of 821104 Public Affirmation/ Discussion & Vote in Washington,Dc Re SECY-82-410 on Petition for Delineation of LWA Proceedings for Crbr & SECY-82-440 Re Summer Ol.Pp 1-4 ML20028A7351982-11-0101 November 1982 Testimony of TB Cochran,Part V,Re Contentions 4 & 6(b)(4) on Analysis of Acts of Sabotage,Terrorism or Theft.Nrc & Applicants Substantially Understated Risks to Plant & Overstated Effectiveness of Proposed Safeguards ML20071P0981982-11-0101 November 1982 Testimony of Lj Kripps Re NRDC & Sierra Club Contentions 5a & 7c on Applicant Alternative Siting Analyses.Clinch River Site Is Preferred Site for LMFBR Demonstration Plant. Related Correspondence ML20071P1151982-11-0101 November 1982 Testimony of GL Sherwood,Dc Newton,Wm Hartman & Oo Yarbro Re NRDC Contentions 6.b.1 & 6.b.3 on Adequacy of NRC Analyses of Environ Impacts of Crbr Fuel Cycle.Eis Estimates Conservative.Related Correspondence ML20065T9861982-11-0101 November 1982 Testimony of TB Cochran Re Contentions 1,2 & 3 on Adequacy of NRC & Applicant Analyses of Potential for Severe Accidents.Methodology in Fes App J Crude by Current Stds & App Assumptions Not Supported by Analysis ML20065T9831982-11-0101 November 1982 Testimony of TB Cochran Re Contentions 6(b)(1) & (3) on Adequacy of NRC Analysis of Environ Impacts of Crbr Fuel Cycle.Nrc Analysis Inadequate Due to Failure to Address Uncertainties Associated W/Nrc Estimates ML20071P2571982-11-0101 November 1982 Testimony of J Longenecker,Ca Anderson & Nn Kaushal Re NRDC Contentions 7a & 7b on Inadequate Analyses of Crbr Alternatives.No Alternatives Substantially Better than Crbr. Certificate of Svc Encl.Related Correspondence ML20071P2481982-11-0101 November 1982 Testimony of Ef Penico & Ga Hammond Re NRDC Contentions 4 & 6.b.4 on Safeguards.Safeguards Adequately Analyzed & Safeguards Sys Developed.Related Correspondence ML20071P1731982-11-0101 November 1982 Testimony of Gh Clare,Le Strawbridge & Lw Deitrich Re NRDC Contentions 2d,2f,2g,2h,3c,3d & 5b on Environ Effects of Crbr Accident Analyses.Related Correspondence ML20071P1431982-11-0101 November 1982 Testimony of AA Weinstein,Rk Disney & Jf Murdock Re NRDC Contention 8 on Costs & Effects of Decommissioning Crbr. Plant Can Be Decommissioned by Prompt Total Dismantlement. Related Correspondence ML20071P1261982-11-0101 November 1982 Testimony of J Preston,Ro Mcclellan,Jw Healy & Rc Thompson Re NRDC Contentions 11b & 11c on Genetic & Cancerous Effects of Plant on Employees.Calculated Somatic Effects for Plant Small.Related Correspondence ML20071P1111982-11-0101 November 1982 Testimony of Hw Hibbitts Re NRDC Contention 5(b) Re Alternative Sites.Risk from Crbr to DOE Facilities in Site Vicinity Low.Related Correspondence ML20065T9881982-10-28028 October 1982 Testimony of Cj Johnson Re NRC Analysis of Environ (Health) Impacts of Crbr & Fuel Cycle.Nrc & Applicant Estimates of Environ Releases & Environ Contamination from Proposed Fuel Cycle Unrealistic.Certificate of Svc Encl ML20027C9821982-10-26026 October 1982 Transcript of ACRS Crbr Thermal Hydraulic Working Group 821026 Meeting in Washington,Dc.Pp 1-278.Supporting Documentation Encl ML20065U0321982-10-13013 October 1982 Transcript of E Branagan 821013 Deposition in Bethesda,Md Re Dose Estimates of Hiroshima & Nagasaki & Health Impacts. Certificate of Svc Encl.Related Correspondence ML20062L0691982-08-16016 August 1982 Testimony of Kz Morgan on Contentions 1 & 2.Requirements of 10CFR100 Not Met.Crbr Site Not Suitable for LMFBR ML20062L0511982-08-16016 August 1982 Testimony of TB Cochran on Contentions 1a,3b & 3d Re Core Disruptive Accidents & DBAs & Contentions 2 & 3c Re Site Suitability Analysis Under 10CFR100 ML20062K3091982-08-16016 August 1982 Testimony of RO Mcclellan,Jw Healy & Rc Thompson on Behalf of Joint Applicants Re NRDC Contention 2e on Calculation of Guideline Value for Radiation Doses from Postulated Release. Prof Qulifications & Certificate of Svc of Encl ML20062K2861982-08-16016 August 1982 Testimony of Nw Brown,Gh Deitrich,Vs Oblock & Le Strawbridge on Behalf of Joint Applicants Re NRDC Contentions 1,2 & 3 on Adequacy of Accident Analyses.Prof Qualifications & Certificate of Svc Encl ML20062L1111982-08-12012 August 1982 Testimony of Jc Cobb on Contention 2 Re Proposed Stds & Guidelines for Pu & Other Alpha Emitting Radionuclides. Toxicity of Pu Underestimated.Certificate of Svc Encl ML20062L0911982-08-11011 August 1982 Testimony of F Von Hippel on Contentions 1 & 2 Re Core Disruptive Accident Probabilities at Crbr ML20062A4891982-08-0202 August 1982 Transcript of 820802 Conference in Bethesda,Md.Pp 685-875 ML20071K9001982-07-29029 July 1982 Oral Comments of Mm Todorovich on 820729 in Washington,Dc Supporting DOE Exemption Request ML20062H2781982-07-29029 July 1982 Transcript of 820729 Oral Presentation on Crbr. Pp.1-213 ML20062B5101982-07-21021 July 1982 Transcript of 820721 Public Meeting in Washington,Dc Re Affirmation of Crbr Order.Pp 1-3 ML20054M7171982-07-0909 July 1982 Transcript of 820709 Public Meeting Re Briefing on Crbr Schedule in Washington,Dc.Pp 1-19 1983-08-09
[Table view] Category:DEPOSITIONS
MONTHYEARML20024E5021983-08-0909 August 1983 Transcript of 830809 Hearing in Oak Ridge,Tn.Pp 7,934-8,480. Supporting Documentation Encl ML20024C7501983-07-11011 July 1983 Pages 53 & 54 to Testimony of Tl King & ET Rumble Re Adequacy of DBA Spectrum ML20024C3641983-07-0808 July 1983 Limited Appearance Statement of TB Cochran Re Issues Raised in CP Proceeding.Discusses Radiological Consequences of Crbr Core Disruptive Accident & Site Suitability.Certificate of Svc Encl ML20024C0761983-07-0808 July 1983 Testimony of Tl King on ASLB Question 14 Re Operation W/ Leaking Fuel Pins.Sodium Entry Into Fuel Pin May Cause Increased pellet-to-clad Gap Conductance,But Would Not Adversely Affect Fuel Performance.Prof Qualifications Encl ML20024C0241983-07-0808 July 1983 Testimony of Cl Allen,Lw Bell,Hb Holz,Lg Hulman,Jk Long, B Morris,Jj Swift,Cr Bell,Ta Butler,Et Rumble,D Swanson & Tg Theofanous Re Analyses of Core Disruptive Accidents.Prof Qualifications Encl ML20024C0501983-07-0808 July 1983 Testimony of Tl King & RM Stark Re ASLB Question 12 on Items Identified for Resolution at OL Stage.Nrc & Applicants Developing Program & Schedule to Review & Resolve Items,To Minimize Impacts on Final Design & Const ML20024C0221983-07-0808 July 1983 Testimony of RA Becker,Hc Garg,S Hou,Tl King,B Morris,Ce Rossi,R Schemel,Jj Swift,Ak Agrawal,Je Hanson & ET Rumble Re Adequacy of DBA Spectrum.Core Disruptive Accidents May Be Excluded from DBA Spectrum for Crbr.W/Prof Qualifications ML20024B6671983-07-0808 July 1983 Testimony of Vd Hedges,Jw Anderson & Je Karr Responding to ASLB Areas of Interest 5 & 6.Owners Mgt Organization Described.Westinghouse,Ge,Atomics Intl,S&W & Burns & Roe Are Project Contractors.Certificate of Svc Encl ML20024C0381983-07-0808 July 1983 Testimony of Lg Hulman,Ef Branagan & Dj Perrotti on ASLB Question 9 Re Protective Action Guides.No Rev to Protective Action Guides Necessary for Crbr.If Guides Revised,Nrc Will Consider Applicability at OL Stage.Prof Qualifications Encl ML20024C0431983-07-0808 July 1983 Testimony of Rj Dube Re ASLB Question 10 on Matl Control & Accountability.R&D Activities on Measurement Capabilities for Matl Control & Accounting Unnecessary for Continued Fuel Safeguards.Prof Qualifications Encl ML20024C0621983-07-0808 July 1983 Testimony of Tl King Re ASLB Question 13 on Fuel Sys Fallback Positions.Lists Possible Impacts on Crbr Programmatic Objectives from Implementing NRC Positions. Prof Qualifications Encl ML20024B6661983-07-0808 July 1983 Testimony of Hw Hibbitts,Ek Sliger & Le Strawbridge Re ASLB Areas of Interest Related to Emergency Planning.Crbr Radioactive Releases Could Contain Sodium Oxides & Hydroxide Aerosols.Prof Qualifications & Certificate of Svc Encl ML20024B6641983-07-0505 July 1983 Testimony of Lw Deitrich,H Fauske,L Strawbridge & Tw Ball Re Hypothetical Core Disruptive Accident (Hcda) Analyses.Crbr Designed So Hcdas Beyond Dba.Prof Qualifications & Certificate of Svc Encl ML20024A9021983-06-29029 June 1983 Transcript of 830629 Conference in Bethesda,Md.Pp 7,298- 7,354 ML20023C3851983-05-13013 May 1983 Transcript of 830513 Conference in Bethesda,Md.Pp 7,106- 7,279 ML20028F8961983-02-0303 February 1983 Transcript of ACRS Subcommittee on Crbr & Thermal Hydraulics Working Group 830203 Joint Meeting in Washington,Dc Re Plant Thermal Hydraulic Design Issues & Emergency Power Sys. Pp 1-343.Supporting Documentation Encl ML20083N8191983-02-0202 February 1983 Applicant Corrections to 821116-19 Transcripts,Inadvertently Omitted from 830124 List of Transcript Corrections. Certificate of Svc Encl ML20070M6581983-01-24024 January 1983 Proposed Transcript Corrections.Certificate of Svc Encl ML20028C1611983-01-0505 January 1983 Transcript of 830105 Hearing in Bethesda,Md.Pp 6,913-7,105 ML20028B5381982-12-0101 December 1982 Transcript of ACRS Working Group on Structures & Matls for Crbr 821201 Meeting in Bethesda,Md.Pp 1-214.Supporting Documentation Encl ML20069L0331982-11-12012 November 1982 Suppl to TB Cochran Part V Testimony on Contentions 1,2 & 3, Based on Final Suppl to Fes ML20069L0371982-11-12012 November 1982 Testimony of TB Cochran,Part Iv,As Supplemented by New Info in Final Suppl to Fes,Re Contentions 1,2 & 3 on Potential for Severe Accidents at Crbr & Adequacy of NRC & Util Analyses of Accidents ML20069L0451982-11-12012 November 1982 Testimony of TB Cochran,Part Iii,As Supplemented by New Info in Fes Final Suppl,Re Contentions 6(b)(1) & (3) on Adequacy of NRC Analysis of Environ Impacts of Crbr Fuel Cycle. Certificate of Svc Encl ML20066E2831982-11-10010 November 1982 Errata to 821101 Testimony.Certificate of Svc Encl ML20027E2301982-11-0404 November 1982 Unofficial Transcript of 821104 Public Affirmation/ Discussion & Vote in Washington,Dc Re SECY-82-410 on Petition for Delineation of LWA Proceedings for Crbr & SECY-82-440 Re Summer Ol.Pp 1-4 ML20028A7351982-11-0101 November 1982 Testimony of TB Cochran,Part V,Re Contentions 4 & 6(b)(4) on Analysis of Acts of Sabotage,Terrorism or Theft.Nrc & Applicants Substantially Understated Risks to Plant & Overstated Effectiveness of Proposed Safeguards ML20071P0981982-11-0101 November 1982 Testimony of Lj Kripps Re NRDC & Sierra Club Contentions 5a & 7c on Applicant Alternative Siting Analyses.Clinch River Site Is Preferred Site for LMFBR Demonstration Plant. Related Correspondence ML20071P1151982-11-0101 November 1982 Testimony of GL Sherwood,Dc Newton,Wm Hartman & Oo Yarbro Re NRDC Contentions 6.b.1 & 6.b.3 on Adequacy of NRC Analyses of Environ Impacts of Crbr Fuel Cycle.Eis Estimates Conservative.Related Correspondence ML20065T9861982-11-0101 November 1982 Testimony of TB Cochran Re Contentions 1,2 & 3 on Adequacy of NRC & Applicant Analyses of Potential for Severe Accidents.Methodology in Fes App J Crude by Current Stds & App Assumptions Not Supported by Analysis ML20065T9831982-11-0101 November 1982 Testimony of TB Cochran Re Contentions 6(b)(1) & (3) on Adequacy of NRC Analysis of Environ Impacts of Crbr Fuel Cycle.Nrc Analysis Inadequate Due to Failure to Address Uncertainties Associated W/Nrc Estimates ML20071P2571982-11-0101 November 1982 Testimony of J Longenecker,Ca Anderson & Nn Kaushal Re NRDC Contentions 7a & 7b on Inadequate Analyses of Crbr Alternatives.No Alternatives Substantially Better than Crbr. Certificate of Svc Encl.Related Correspondence ML20071P2481982-11-0101 November 1982 Testimony of Ef Penico & Ga Hammond Re NRDC Contentions 4 & 6.b.4 on Safeguards.Safeguards Adequately Analyzed & Safeguards Sys Developed.Related Correspondence ML20071P1731982-11-0101 November 1982 Testimony of Gh Clare,Le Strawbridge & Lw Deitrich Re NRDC Contentions 2d,2f,2g,2h,3c,3d & 5b on Environ Effects of Crbr Accident Analyses.Related Correspondence ML20071P1431982-11-0101 November 1982 Testimony of AA Weinstein,Rk Disney & Jf Murdock Re NRDC Contention 8 on Costs & Effects of Decommissioning Crbr. Plant Can Be Decommissioned by Prompt Total Dismantlement. Related Correspondence ML20071P1261982-11-0101 November 1982 Testimony of J Preston,Ro Mcclellan,Jw Healy & Rc Thompson Re NRDC Contentions 11b & 11c on Genetic & Cancerous Effects of Plant on Employees.Calculated Somatic Effects for Plant Small.Related Correspondence ML20071P1111982-11-0101 November 1982 Testimony of Hw Hibbitts Re NRDC Contention 5(b) Re Alternative Sites.Risk from Crbr to DOE Facilities in Site Vicinity Low.Related Correspondence ML20065T9881982-10-28028 October 1982 Testimony of Cj Johnson Re NRC Analysis of Environ (Health) Impacts of Crbr & Fuel Cycle.Nrc & Applicant Estimates of Environ Releases & Environ Contamination from Proposed Fuel Cycle Unrealistic.Certificate of Svc Encl ML20027C9821982-10-26026 October 1982 Transcript of ACRS Crbr Thermal Hydraulic Working Group 821026 Meeting in Washington,Dc.Pp 1-278.Supporting Documentation Encl ML20065U0321982-10-13013 October 1982 Transcript of E Branagan 821013 Deposition in Bethesda,Md Re Dose Estimates of Hiroshima & Nagasaki & Health Impacts. Certificate of Svc Encl.Related Correspondence ML20062L0691982-08-16016 August 1982 Testimony of Kz Morgan on Contentions 1 & 2.Requirements of 10CFR100 Not Met.Crbr Site Not Suitable for LMFBR ML20062L0511982-08-16016 August 1982 Testimony of TB Cochran on Contentions 1a,3b & 3d Re Core Disruptive Accidents & DBAs & Contentions 2 & 3c Re Site Suitability Analysis Under 10CFR100 ML20062K3091982-08-16016 August 1982 Testimony of RO Mcclellan,Jw Healy & Rc Thompson on Behalf of Joint Applicants Re NRDC Contention 2e on Calculation of Guideline Value for Radiation Doses from Postulated Release. Prof Qulifications & Certificate of Svc of Encl ML20062K2861982-08-16016 August 1982 Testimony of Nw Brown,Gh Deitrich,Vs Oblock & Le Strawbridge on Behalf of Joint Applicants Re NRDC Contentions 1,2 & 3 on Adequacy of Accident Analyses.Prof Qualifications & Certificate of Svc Encl ML20062L1111982-08-12012 August 1982 Testimony of Jc Cobb on Contention 2 Re Proposed Stds & Guidelines for Pu & Other Alpha Emitting Radionuclides. Toxicity of Pu Underestimated.Certificate of Svc Encl ML20062L0911982-08-11011 August 1982 Testimony of F Von Hippel on Contentions 1 & 2 Re Core Disruptive Accident Probabilities at Crbr ML20062A4891982-08-0202 August 1982 Transcript of 820802 Conference in Bethesda,Md.Pp 685-875 ML20071K9001982-07-29029 July 1982 Oral Comments of Mm Todorovich on 820729 in Washington,Dc Supporting DOE Exemption Request ML20062H2781982-07-29029 July 1982 Transcript of 820729 Oral Presentation on Crbr. Pp.1-213 ML20062B5101982-07-21021 July 1982 Transcript of 820721 Public Meeting in Washington,Dc Re Affirmation of Crbr Order.Pp 1-3 ML20054M7171982-07-0909 July 1982 Transcript of 820709 Public Meeting Re Briefing on Crbr Schedule in Washington,Dc.Pp 1-19 1983-08-09
[Table view] Category:NARRATIVE TESTIMONY
MONTHYEARML20024E5021983-08-0909 August 1983 Transcript of 830809 Hearing in Oak Ridge,Tn.Pp 7,934-8,480. Supporting Documentation Encl ML20024C7501983-07-11011 July 1983 Pages 53 & 54 to Testimony of Tl King & ET Rumble Re Adequacy of DBA Spectrum ML20024C3641983-07-0808 July 1983 Limited Appearance Statement of TB Cochran Re Issues Raised in CP Proceeding.Discusses Radiological Consequences of Crbr Core Disruptive Accident & Site Suitability.Certificate of Svc Encl ML20024C0761983-07-0808 July 1983 Testimony of Tl King on ASLB Question 14 Re Operation W/ Leaking Fuel Pins.Sodium Entry Into Fuel Pin May Cause Increased pellet-to-clad Gap Conductance,But Would Not Adversely Affect Fuel Performance.Prof Qualifications Encl ML20024C0241983-07-0808 July 1983 Testimony of Cl Allen,Lw Bell,Hb Holz,Lg Hulman,Jk Long, B Morris,Jj Swift,Cr Bell,Ta Butler,Et Rumble,D Swanson & Tg Theofanous Re Analyses of Core Disruptive Accidents.Prof Qualifications Encl ML20024C0501983-07-0808 July 1983 Testimony of Tl King & RM Stark Re ASLB Question 12 on Items Identified for Resolution at OL Stage.Nrc & Applicants Developing Program & Schedule to Review & Resolve Items,To Minimize Impacts on Final Design & Const ML20024C0221983-07-0808 July 1983 Testimony of RA Becker,Hc Garg,S Hou,Tl King,B Morris,Ce Rossi,R Schemel,Jj Swift,Ak Agrawal,Je Hanson & ET Rumble Re Adequacy of DBA Spectrum.Core Disruptive Accidents May Be Excluded from DBA Spectrum for Crbr.W/Prof Qualifications ML20024B6671983-07-0808 July 1983 Testimony of Vd Hedges,Jw Anderson & Je Karr Responding to ASLB Areas of Interest 5 & 6.Owners Mgt Organization Described.Westinghouse,Ge,Atomics Intl,S&W & Burns & Roe Are Project Contractors.Certificate of Svc Encl ML20024C0381983-07-0808 July 1983 Testimony of Lg Hulman,Ef Branagan & Dj Perrotti on ASLB Question 9 Re Protective Action Guides.No Rev to Protective Action Guides Necessary for Crbr.If Guides Revised,Nrc Will Consider Applicability at OL Stage.Prof Qualifications Encl ML20024C0431983-07-0808 July 1983 Testimony of Rj Dube Re ASLB Question 10 on Matl Control & Accountability.R&D Activities on Measurement Capabilities for Matl Control & Accounting Unnecessary for Continued Fuel Safeguards.Prof Qualifications Encl ML20024C0621983-07-0808 July 1983 Testimony of Tl King Re ASLB Question 13 on Fuel Sys Fallback Positions.Lists Possible Impacts on Crbr Programmatic Objectives from Implementing NRC Positions. Prof Qualifications Encl ML20024B6661983-07-0808 July 1983 Testimony of Hw Hibbitts,Ek Sliger & Le Strawbridge Re ASLB Areas of Interest Related to Emergency Planning.Crbr Radioactive Releases Could Contain Sodium Oxides & Hydroxide Aerosols.Prof Qualifications & Certificate of Svc Encl ML20024B6641983-07-0505 July 1983 Testimony of Lw Deitrich,H Fauske,L Strawbridge & Tw Ball Re Hypothetical Core Disruptive Accident (Hcda) Analyses.Crbr Designed So Hcdas Beyond Dba.Prof Qualifications & Certificate of Svc Encl ML20024A9021983-06-29029 June 1983 Transcript of 830629 Conference in Bethesda,Md.Pp 7,298- 7,354 ML20023C3851983-05-13013 May 1983 Transcript of 830513 Conference in Bethesda,Md.Pp 7,106- 7,279 ML20028F8961983-02-0303 February 1983 Transcript of ACRS Subcommittee on Crbr & Thermal Hydraulics Working Group 830203 Joint Meeting in Washington,Dc Re Plant Thermal Hydraulic Design Issues & Emergency Power Sys. Pp 1-343.Supporting Documentation Encl ML20083N8191983-02-0202 February 1983 Applicant Corrections to 821116-19 Transcripts,Inadvertently Omitted from 830124 List of Transcript Corrections. Certificate of Svc Encl ML20070M6581983-01-24024 January 1983 Proposed Transcript Corrections.Certificate of Svc Encl ML20028C1611983-01-0505 January 1983 Transcript of 830105 Hearing in Bethesda,Md.Pp 6,913-7,105 ML20028B5381982-12-0101 December 1982 Transcript of ACRS Working Group on Structures & Matls for Crbr 821201 Meeting in Bethesda,Md.Pp 1-214.Supporting Documentation Encl ML20069L0331982-11-12012 November 1982 Suppl to TB Cochran Part V Testimony on Contentions 1,2 & 3, Based on Final Suppl to Fes ML20069L0371982-11-12012 November 1982 Testimony of TB Cochran,Part Iv,As Supplemented by New Info in Final Suppl to Fes,Re Contentions 1,2 & 3 on Potential for Severe Accidents at Crbr & Adequacy of NRC & Util Analyses of Accidents ML20069L0451982-11-12012 November 1982 Testimony of TB Cochran,Part Iii,As Supplemented by New Info in Fes Final Suppl,Re Contentions 6(b)(1) & (3) on Adequacy of NRC Analysis of Environ Impacts of Crbr Fuel Cycle. Certificate of Svc Encl ML20066E2831982-11-10010 November 1982 Errata to 821101 Testimony.Certificate of Svc Encl ML20027E2301982-11-0404 November 1982 Unofficial Transcript of 821104 Public Affirmation/ Discussion & Vote in Washington,Dc Re SECY-82-410 on Petition for Delineation of LWA Proceedings for Crbr & SECY-82-440 Re Summer Ol.Pp 1-4 ML20028A7351982-11-0101 November 1982 Testimony of TB Cochran,Part V,Re Contentions 4 & 6(b)(4) on Analysis of Acts of Sabotage,Terrorism or Theft.Nrc & Applicants Substantially Understated Risks to Plant & Overstated Effectiveness of Proposed Safeguards ML20071P0981982-11-0101 November 1982 Testimony of Lj Kripps Re NRDC & Sierra Club Contentions 5a & 7c on Applicant Alternative Siting Analyses.Clinch River Site Is Preferred Site for LMFBR Demonstration Plant. Related Correspondence ML20071P1151982-11-0101 November 1982 Testimony of GL Sherwood,Dc Newton,Wm Hartman & Oo Yarbro Re NRDC Contentions 6.b.1 & 6.b.3 on Adequacy of NRC Analyses of Environ Impacts of Crbr Fuel Cycle.Eis Estimates Conservative.Related Correspondence ML20065T9861982-11-0101 November 1982 Testimony of TB Cochran Re Contentions 1,2 & 3 on Adequacy of NRC & Applicant Analyses of Potential for Severe Accidents.Methodology in Fes App J Crude by Current Stds & App Assumptions Not Supported by Analysis ML20065T9831982-11-0101 November 1982 Testimony of TB Cochran Re Contentions 6(b)(1) & (3) on Adequacy of NRC Analysis of Environ Impacts of Crbr Fuel Cycle.Nrc Analysis Inadequate Due to Failure to Address Uncertainties Associated W/Nrc Estimates ML20071P2571982-11-0101 November 1982 Testimony of J Longenecker,Ca Anderson & Nn Kaushal Re NRDC Contentions 7a & 7b on Inadequate Analyses of Crbr Alternatives.No Alternatives Substantially Better than Crbr. Certificate of Svc Encl.Related Correspondence ML20071P2481982-11-0101 November 1982 Testimony of Ef Penico & Ga Hammond Re NRDC Contentions 4 & 6.b.4 on Safeguards.Safeguards Adequately Analyzed & Safeguards Sys Developed.Related Correspondence ML20071P1731982-11-0101 November 1982 Testimony of Gh Clare,Le Strawbridge & Lw Deitrich Re NRDC Contentions 2d,2f,2g,2h,3c,3d & 5b on Environ Effects of Crbr Accident Analyses.Related Correspondence ML20071P1431982-11-0101 November 1982 Testimony of AA Weinstein,Rk Disney & Jf Murdock Re NRDC Contention 8 on Costs & Effects of Decommissioning Crbr. Plant Can Be Decommissioned by Prompt Total Dismantlement. Related Correspondence ML20071P1261982-11-0101 November 1982 Testimony of J Preston,Ro Mcclellan,Jw Healy & Rc Thompson Re NRDC Contentions 11b & 11c on Genetic & Cancerous Effects of Plant on Employees.Calculated Somatic Effects for Plant Small.Related Correspondence ML20071P1111982-11-0101 November 1982 Testimony of Hw Hibbitts Re NRDC Contention 5(b) Re Alternative Sites.Risk from Crbr to DOE Facilities in Site Vicinity Low.Related Correspondence ML20065T9881982-10-28028 October 1982 Testimony of Cj Johnson Re NRC Analysis of Environ (Health) Impacts of Crbr & Fuel Cycle.Nrc & Applicant Estimates of Environ Releases & Environ Contamination from Proposed Fuel Cycle Unrealistic.Certificate of Svc Encl ML20027C9821982-10-26026 October 1982 Transcript of ACRS Crbr Thermal Hydraulic Working Group 821026 Meeting in Washington,Dc.Pp 1-278.Supporting Documentation Encl ML20065U0321982-10-13013 October 1982 Transcript of E Branagan 821013 Deposition in Bethesda,Md Re Dose Estimates of Hiroshima & Nagasaki & Health Impacts. Certificate of Svc Encl.Related Correspondence ML20062L0691982-08-16016 August 1982 Testimony of Kz Morgan on Contentions 1 & 2.Requirements of 10CFR100 Not Met.Crbr Site Not Suitable for LMFBR ML20062L0511982-08-16016 August 1982 Testimony of TB Cochran on Contentions 1a,3b & 3d Re Core Disruptive Accidents & DBAs & Contentions 2 & 3c Re Site Suitability Analysis Under 10CFR100 ML20062K3091982-08-16016 August 1982 Testimony of RO Mcclellan,Jw Healy & Rc Thompson on Behalf of Joint Applicants Re NRDC Contention 2e on Calculation of Guideline Value for Radiation Doses from Postulated Release. Prof Qulifications & Certificate of Svc of Encl ML20062K2861982-08-16016 August 1982 Testimony of Nw Brown,Gh Deitrich,Vs Oblock & Le Strawbridge on Behalf of Joint Applicants Re NRDC Contentions 1,2 & 3 on Adequacy of Accident Analyses.Prof Qualifications & Certificate of Svc Encl ML20062L1111982-08-12012 August 1982 Testimony of Jc Cobb on Contention 2 Re Proposed Stds & Guidelines for Pu & Other Alpha Emitting Radionuclides. Toxicity of Pu Underestimated.Certificate of Svc Encl ML20062L0911982-08-11011 August 1982 Testimony of F Von Hippel on Contentions 1 & 2 Re Core Disruptive Accident Probabilities at Crbr ML20062A4891982-08-0202 August 1982 Transcript of 820802 Conference in Bethesda,Md.Pp 685-875 ML20071K9001982-07-29029 July 1982 Oral Comments of Mm Todorovich on 820729 in Washington,Dc Supporting DOE Exemption Request ML20062H2781982-07-29029 July 1982 Transcript of 820729 Oral Presentation on Crbr. Pp.1-213 ML20062B5101982-07-21021 July 1982 Transcript of 820721 Public Meeting in Washington,Dc Re Affirmation of Crbr Order.Pp 1-3 ML20054M7171982-07-0909 July 1982 Transcript of 820709 Public Meeting Re Briefing on Crbr Schedule in Washington,Dc.Pp 1-19 1983-08-09
[Table view] |
Text
_
TED CORRESO 000KETED USHRC
'82 NOV -1 P3:38 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION
)
In the Matter of
)
)
UNITED STATES DEPARTMENT OF ENERGY
)
)
PROJECT MANAGEMENT CORPORATION
) Docket No. 50-537
)
TENNESSEE VALLEY AU'IBORITY
)
)
(Clinch River Breeder Reactor Plant)
)
APPLICANT'S DIRECT TEST MONY CONCERNING NRDC CONTENTION 5(b)
Dated:
November 1, 1982
/ 5'o3 8211020336 821101 PDR ADOCK 05000537 PDR
-.. ~ _ _. _. _ -. _ _ _,
l O
. Q.l.
Please state your names and affiliations.
A.I.
My name is H. Wayne Bibbitts.
I am Chief, Safety and Environmental Branch, Public Safety Division, Clinch River Breeder Reactor Plant Project Office.
Q.2.
Have you prepared statements of your professional qualifications?
A.2.
Yes.
A copy is attached in this testimony.
Q.3.
What subject matter does this testimony address?
A.3.
NRDC Contention 5b) alleges the following:
Neither Applicants nor Staf f have established that the site selected f or the CRBR provides adequate protection for public health and safety, the environment, national security, and national energy supplies; and an alternative site would be preferable for the following reasons:
b)
Since the gaseous diffusion plant, other proposed energy fuel cycle facilities, the Y-12 plant and c'
the Oak Ridge National Laboratory are in close proximity to the site an accident at the CRBR could result in the long term evacuation of those facilities.
Long term evacuation of those facilities would result in unacceptable risks to the national security and the national energy supply.
Q.4.
Would you describe the f acilities in the vicinity 1
. of the CRBRP?
A.4.
The major facilities in the vicinity of the CRBRP are as follows:
Oak Ridae Cameous Diffusion Plant. ORCDP - This
~
facility's primary role is to enrich uranium for commercial power reactors.
In addition, development work is conducted on advanced isotope separation technologies.
Development of these technologies is also intended for meeting future enriched uranium requirements for power reactors.
ORGDP's plant population of approximately 4400 is about evenly split between these two functions.
+.
Y-12 P1 nt - This is a major facility within the A
Depardment of Energy's nuclear weapons production complex.
The plant produces components and subassemblies in support of the production of nuclear weapons delivered by DOE to the Department of Defense.
The plant also produces components used in the nuclear weapons
(
development and testing programs carried out by the three DOE nuclear weapons design laboratories.
The plant population is about 7300, including about 1200 ORNL employees, who work primarily in biological and f usion research, and corporate staff.
i
)
4-Oak Ridge National Laboratorv, ORNL - ORNL is a multif unctional research and development facility located about 4-5 miles from CRBRP whose basic mission is the discovery of new knowledge, both basic and applied, in all areas related to energy.
To accomplish this mission the laboratory conducts research in many fields of modern science and technology.
The Laboratory's facilities consist of nuclear reactors, chemical pilot plants, research laboratories, radioisotope production laboratories, and support facilities.
About 4200 employees work at the ORNL site.
Since ORNL is a research and development, ra ther l
l than a., production, facility, its temporary loss would not significantly impact national security or national energy supply.
No "other" proposed f uel cycle facilities have been identified in the vicinity of the site which are significantly related to national energy supply or national security.
Q.5.
In general terms, what analyses were perf ormed and what conclusions were drawn concerning the impact of accidents on these facilities?
A.5.
In order to assess the impact of design basis accidents on DOE facility operations, the e.
y.-
5-...---
I l
i
. Applicants first conducted an assessment of the effects on these facilities using site suitability source term (SSST) radiation dose calculations.
As previously shown in Applicants' testimony concerning NRDC Contentions 1, 2, and 3, dated August 16, 1982, the consequences of the SSST release are more severe than the consequences of any design basis accident (DBA) involving a release of fuel and fission products f rom the core to the containment.
The SSST thus provides a reasonable bound on the effects of CRBRP accidents upon the facilities of interest.
il This assessment, which is discussed more fully below, shows that neither national energy supply nor national security would be adversely af fected by CRBRP accidents.
In order to provide an additional measure of the risks of CRBRP accidents on the facilities in r
question, the Applicants also calculated dose and ground deposition data at the three DOE Oak Ridge plant locations assuming a hypothetical core disruptive accident (BCDA), as well as the SSST.
The BCDA chosen for evaluation was BCDA Case 2 as I
described in Applicants' Exhibit 1, Section 5.3.
Applicants' testimony concerning NRDC Contentions l
2d), f), g), h), 3c) and 3d) (Environmental Effects) and 5b) provides the rationale for selection of this case and shows that the consequences associated with this case provide a reasonable representation of the risks of CRBRP accidents that are beyond the design base upon the DOE facilities in question.
Q.6.
What meteorological data were used and what assumptions were made in perf orming these calculations?
A.6.
Both sets of calculations used meterological data that were collected and reduced in accordance with NRC regulatory guides.
The SSST utilized secto specific 54 meteorology and the BCDA 50%
(X/Q values that are exceeded no more than 5% and 50% of the total time).
For both SSST and HCDA cases, almost all of the release of fission products occurs during the first few days.
For r
the BCDA case an additional small quantity of core particulates (plutonium dominating) is projected to be released over an approximately six-month period under the calculational assumption that containment venting and purging is continuous.
Q.7.
Based on the assessments performed, what is the
. effect of an accident on the ORGDP for the SSST release?
A.7.
Due to their close proximity (about 2.5-3.5 miles) to CRBRP, nonessential personnel at the ORGDP would likely be evacuated should an SSST release occur.
About 65 persons are projected to remain onsite to provide security, emergency support, and operational capability to continue production operations.
Should it be desired, the enrichment cascade can be placed in an operational standby condition in less than one hour.
This condition would involve recycling the
~
gaseous uranium within the process equipment with f
no uranium being fed into or withdrawn from the cascade.
Those personnel remaining onsite would receive I
radiation doses much less than DOE occupational standards.
Actual doses would be lower than those shown (Table 1) due to such factors as time of occupancy, the use of respiratory protection, possible use of potassium iodide as a thyroid blocking agent and reduced exposure rates to personnel working indoors.
. TABLE 1 Estimated Doses and Deposition at ORGDP Due to Site Suitability Source Term Releasel rem (4 - DOE Annual Occupational Standard)2 i
Red Whole Bone Bone Esdy Lung Surface Thvroid Liver Marrow Inhalation.021(.42).39(2.6) 1.3(8.7)
.51(3.4).78(5.2)
.098(2.0)
Immersion
.041(.82).036(.24)
.064(.43).044(.29).031(.21).059(1.2)
Ground Con-tamination.034(.68)
(total deposition 54 uCi/m2}
(plutonium deposition 7.7 x 10-3 uCi m )
/ 2
~
g s
c Residual contamination (Table 1) would be l
sufficiently low to require only limited 1
A 7-day release period is assumed for purposes of establishing ground contamination levels including radionuclide decay.
Source terms were for a 30-day release.
Doses are 50-year dose commitments.
2 DOE 5480.1 Chapter XI.
These percentages are Jhown for reference purposes only.
1
.-.y
,,o_. _ _ _., _. _ _ _. - - -,.,,, - _
. decontaminaticn of selected plant areas.
The major constitutents of deposited radionuclides are the shortlived I-131 (half-life = 8.5 days) and Np-239 (half-life = 2.3 days).
Transuranics are well below l-the EPA proposed screening level guideline for l
restricted versus unrestricted land surfaces (0.2 uCi m2}3,
/
0 8.
What is the ef fect of an accident at the Y-12 facility for the SSST release?
A.8.
The Y-12 Plant is located f urther from the CRBRP (about 9-11 miles) than the ORGDP (about 2.5-3.5 miles), so that calculated SSST doses and deposition are much lower at Y-12 (Table 2) than those at the
~
[
ORGDP site.
As a result, evacuation of the plant site would not be likely, but simply an available option.
Should evacuation of non-essential personnel be instituted, about 250 workers would remain onsite.
This Y-12 Plant work force is necessary to maintain security and utility requirements.
In contrast to the situation at the ORGDP where only a few people can keep the enrichment cascade operating, any need for large scale evacuation would shut down production operations during the short time duration of the 3
EPA-520/5-77-016, September 1977.
. release.
The small radiation doses and the limited radionuclide deposition, however, show that this
- would not be requis;ed.
Should evacuation be instituted, it would be for a short term and curtailment of operations would not significantly impact production schedules.
l l
l
. TABLE 2 Estimated Doses and Deposition at the Y-12 Plant Due to Site Suitability Source Term Release tem (% DOE Annual Occupational Standard)
Red Whole Bone Bone Endy igng Surface Thvroid Liver Marrow i
Inhalation
.0013(.025).024(.16)
.08(.53).031(.21).048(.32).006(.12)
Immersion
.0025
.0022
.0039
.0027
.0019
.0036
(.0 5)
(.015)
(.026)
(.018)
(.013)
(.072)
Ground Con-1; tunindkion
.0021(.042)
(total deposition 3.3 uCi/m2)
(plutonium deposition 4.7 x 10-4 uCi/m2) l 1
I Q.9.
Based on the assessments perf ormed, what would be the 1
effects' of an BCDA on the Y-12 plant and the ORGDP during the period of initial release of radiation?
A.9.
Due to the greater consequences of the HCDA relative to the SSST it is assumed that nonessential personnel
I~
from both the ORGDP and Y-12 Plant would not be expected to work for the first few days.
The
~
essential personnel operating condition described earlier for these plants would be in effect.
Due to I
the higher radiation exposure levels at the Y-12 Plant (versus the SSST case) protective measures such as those described for the ORGDP might be implemented by those personnel remaining onsite and radiation doses actually received would be smaller than those calculated.
Calculated radiation doses and radionuclide deposition (Table 3) from the initial HCDA release would not greatly exceed those i
calculated for the SSST case.
Thus, the conclusions l
previously. drawn (i.e., no significant effects upon Y-12 or ORGDP production) for the SSST case would also apply to the BCDA during the period of initial release.
f
TABLE 3 Estimated Doses and Deposition Due to Hypothetical Core 4
Disruptive Accident - Presodium Boildry Phase rem (4 DOE Annual Occupational Standard) l Red Whole Bone Bone Endy Imag Surface Thyroid Liver Marrow Inhalation 2.5mi
.019(.38)
.49(3.3)
.18(1.2) 7.0(47)
.13(.87)
.028(.56)
(ORGDP) 9.0mi
.0035(.07)
.091(.61)
.033(.22) 1.3(8.7).025(.17).0052(.10)
(Y-12)
Immersion 2.5mi
.086(1.7)
.07(.47)
.13(.87)
.091(.61).065(.43)
.13(2.6)
(ORGDP) 4 A 7-day release period is assumed for purposes of establishing ground contamination levels including radionuclide decay.
Source terms used were for a 30-day release.
Doses are 50-year dose commitments.
. 9.0mi
.016(.32) 013(.087).025(.17).017(.11).012(.08)
.024(.48)
(Y-12)
(
Ground Contamination 2.5mi
.026(.52)
(total deposition 47 uCi/m2)
(ORGDP)
(plutonium deposition 1.8 x 10-3 uC1 m )
/ 2 9.0mi
.0049(.098) (total deposition 8.7 uCi m )
/ 2 (Y-12)
(plutonium deposition 3.4 x 10-4 uCij,2)
Q.10.
What would be the long term effects of an HCDA on the ORGDP and the Y-12 Plant?
A.10.
Radiation doses and radionuclide deposition (Table 4) l at the ORGDP and the Y-12 Plant are calculated to be low.
Production levels at each site should be unaffected by the postulated long term release due the HCDA.
l
y, w----w--
+--,--r-eee--
-r.c-w'
. TABLE 4 Estimated Doses and Deposition at the ORGDP Due to Hypothetical Core Disruptive Accident Release 5
Post Boildry Phase rem (% DOE Annual Occupational Standard)
Bone Red Inhalation Lung Surface Liver Marrow 2.5mi(ORGDP)
.0021(.014)
.029(.19)
.0059(.039)
.0023(.046) 9.0mi(Y-12)
.00036(.0024).0049(.032)
.00096(.0064).00037(.0074)
Ground Deposition (plutonium) 2.5mi(ORGDP) 3.7 x 10-4 uCi,2 f
9.0mi(Y-12) 6.1 x 10-5 uCi/m2 Q.ll.
Will there be any significant impact on national energy ' supply in the event production were curtailed at ORDGP during the HCDA release?
l l
5 The release period is 6 months.
Doses are 50-year dose commitments.
L
. A.ll.
In the unlikely event that it were decided to curtail production activities at the ORGDP during the
- release, the impact on national energy supply is not projected to be significant.
In the time frame of CRBRP operation, it is projected that the ORGDP will represent about 18% of the US enrichment capacity while demand is not expected to be high enough to require the use of that capacity.
Present plans call for utilization of the much more energy efficient Gas Centrif uge Enrichment Plant, GCEP, which is being built in Portsmouth, Ohio to eventually replace gaseous diffusion capacity.
Q.12.
What is your conclusion regarding Contention 5b)?
A.12.
The rish from the CRBRP to the DOE f acilities in the vicinity of the site is low, long term evacuation is unlikely, and the Applicants' conclusion concerning either the suitability of the Clinch River Site or the environmental effects of accidents are not affected by the presence of these facilities.
9 l
l
STATEMENT OF QUALIFICATIONS Names H. Wayne Bibbitts Education:
B. A. Physics 1963, University of South Florida 1
M. S. Physics 1966, Vanderbilt University (AEC Health Physics Fellowship)
Work Experience:
May 1982 to present - Chief, Safety and Environmental Branch, Public Safety Division, CRBRP/PO, U.S. DOE, Oak Ridge, TN October 1980 to May 1982 - Emergency Preparedness Director, Safety and Environmental Control Division, Oak Ridge l
Operations Office, U.S. DOE August 1970 to October 1980 -
Environmental Health Physicist, Safety and Environmental Control Division, ORO, USAEC/ERDA/ DOE
l June 1968 to August 1970 - Occupational Health Physicist, Safety and Environmental Control Division, ORO, USAEC September 1965 to June 1968 - Occupational Health Physicist, Oak Ridge National Laboratory, Union Carbide Corporation--Nuclear Division e
e F
I I
_.,