ML20039D630

From kanterella
Jump to navigation Jump to search
Forwards Revised Fire Protection Safe Shutdown Analysis Compliance W/10CFR50,App R,Section Iii.G, for Facilities
ML20039D630
Person / Time
Site: Prairie Island  Xcel Energy icon.png
Issue date: 12/18/1981
From: Mayer L
NORTHERN STATES POWER CO.
To:
Office of Nuclear Reactor Regulation
Shared Package
ML20039D631 List:
References
TAC-11094, TAC-11095, NUDOCS 8201050287
Download: ML20039D630 (3)


Text

_ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - -

k Northem States Power Company 414 Nicollet Mall Minneapohs. Minnesota 55401 Telephone (612) 330-5500 December 18, 1981 co o 6

RECENED gg Director 9- -. r Of fice of Nuclear Reactor Regulation Attn: Document Control Desk 2 JAN 4 1982>  :- -

U S Nuclear Regulatory Commission

, { gym m BEmLcitsm;;g

-tp W ahington, DC 20555 *

'3 /

PRAIRIE ISLAND NUCLEAR GENERATING PLANT Co r0 Docket Nos. 50-282 License No. DPR-42 50-306 DPR-60 Fire Protection Safe Shutdown Analysis and Compliance with Section III.G of 10 CFR Part 50, Appendix R, Including Requests for Relief Ref: (a) Letter from L 0 Mayer, NSP, to Director of Nuclear Reactor Regulation, USNRC, March 13, 1981, " Request for Relief from the Requirements of 10 CFR Part 50, Sections 50.48(c)(2), (c)(3), and (c)(3), Schedule for Completion of Appendix R Fire Protection Modifications" The purpose of this letter is to submit for NRC review and approval a revised Fire Protection Safe Shutdown Analysis for our Prairie Island Nuclear Generating Plant. Included in this report are:

1 l

l

1. Description of Necessary Functions and Equipment Required for Placing the Reactors in a Safe Shutdown Condition
2. Analysis Comparing the Existing Safe Shutdown Equipment to the Requirements of Ay , endix R,Section III.G.2
3. Plans and Schedules for Complying with the Requirements of Appendix R, Sect ion III.G.2
4. Requests for Exemption from Certain Requirements of Appendix R,Section III.G.2, where Complaince would be Impractical or Degrade the Overall Safety of the Plant The schedule for completing this report was discussed in reference (a). The report is intended to fully address the requirements of 10 CFR Part 50, Section 50.48(c)(2), (c)(3), and (c)(5) for submitting plans and schedules for meeting the requirements of Appendix R,Section III.G.

- , - . , .,,2,.

DR ADOCK 05000282 PDR sG I

. - _ _ _ _ _ _ l

~,

e- NORTHERN STATES POWER COMPANY Director of NRR December 18, 1981 Page 2' As noted in Section 7 of the attached report, exemptions from certain requirements of Section III.G.2 in a small number of cases where compliance would be impractical or imprudent are requested. An additional deviation from the implementation dates in paragraphs (c)(2) and (c)(3) of Section 50.48 for the installation of new automatic fire suppression equipment

'is also requested. We believe these exemptions are justified based on the arguments presented in our report and for other reasons stated in reference (a). We also believe the deviations we have requested from the requirements of Section III.G.2 and the relief from the implementation schedule specified in Section 50.48 will not be detrimental to public health and safety.

Please contact us if you have any questions related to this request or if we can furnish additional information related to this issue.

=

s

/

L O Mayer, EPE Manager of Nuclear Support Se rvices LOM/DMM/bd cc: Secretary of the Commission (original & 2 copies)

Regional Director, Region III Resident Inspector NRC Project Manager G Charnoff Attachment i

1 -

s a UNITED STATES NUCLEAR REGULATORY COMMISSION t- NORTHERN STATES POWER COMPANY PRAIRIE ISLAND NUCLEAR GENERATING PLANT Pocket No. 50-282 50-306 LETTER DATED DECEMBER 18, 1981 Fire Protection Safe Shutdown Analysis and Compliance with Section III.G. of 10 CFR Part 50, Appendix R, Including Requests for Relief Northern States Power Company, a Minnesota corporation, by this letter dated December 18, 1981 hereby submits a Fire Protection Safe Shutdown Analysis containing plans and schedules for compliance with Section III.G of Appendix R to 10 CFR Part 50. Requests for relief from the requirements of Section 50.48 (c)(2), (c)(3), and (c)(5) are included.

This request contains no restricted or other defense information.

NORTHERN STATES POWER COMPANY By ML 0 May#f Manager of Nuclear Support Services On this / day of ff,de , /9f/ , before me a notary public in and for said County, personally appeared L 0 Mayer, Manager of Nuclear Support Services, and being first duly sworn acknowledged that he is authorized to execute this document on behalf of Northern States Pcwer Company, that he knows the contents thereof and that to the best of his knowledge, information and belief, the statements made in it are true and that it is not interposed for delay, JQ. _ fjk -

pu m e m z -- :. _ - _:__- _.

i:  % BETTY J. DEAN

eq NOTW PUSUC = WNNESof A RAMGEY COUNTY 5, l h (' My Comewssen Empaes 16 1987 i Dec

[

ll

'Mrmn:-:: ::;;;: pr+= *

  • s* * < ** ~ = = r ~ ^

{

I i

L -_ - - - _ _ __--- _

m

  • - y wg,.

D NM $NY n

'b , e ; p Q

PRAIRIEISLAND NUCLEAR (s-C%4

. p.y.z.e :z GENERATING PLANT 7. . 4. '

s. .;* , , , '

Red Wing, Minnesota V,10 s 3 7 .~

pI'.

UNITS 1 AND 2 4,.4Wy

  • . i!,'

f- ..,' ,:.. i ,

- I '_" : , ', k ,' ;

, 4 , i' ~

.' .!i *-

^

l .~

'E#i !BW

,e .

.- r. . ';

I , , ,

Il .i

  • ' + -

MlNNEAPOLISe 17. PAUL ..-

.."t u ttaa ANI "~l

.<;. :. .r '

V .- ,.

i', ,,$re.

7 IRE PROIECTION SAFE SHUTDORN ANALYSIS - -

..eg, COMPLIANCE WITH 10 CFR PART 50, APPENDIX R, SECTION III.G

.. fl..

$, Nj,;. . ,

,p,p ,

hk, I,ld':

. 'ut 2 18, 1981-

.;.,. :;.3.W;;

.: . . -f 4,.C,,h, ./:L NORTHERN STATES 120WER COMPANY MIN' NEAP 01.lS. MINNESOTA D __

' - - - - - - . - - - ___ _ _ _ _ - _ _ _ _ - . .