ML19252A400
From kanterella
Jump to navigation
Jump to search
ML19252A400 | |
Person / Time | |
---|---|
Site: | Saint Lucie ![]() |
Issue date: | 09/09/2019 |
From: | Eaton K Florida Power & Light Co |
To: | Briana Grange, Livergood A Division of Materials and License Renewal, US Dept of Commerce, National Marine Fisheries Service |
Briana Grange 31-415-1042 | |
References | |
Download: ML19252A400 (1) | |
Similar Documents at Saint Lucie | |
---|---|
Category:E-Mail
MONTHYEARML24002A7272023-12-16016 December 2023
[Table view]NRR E-mail Capture - (External_Sender) November 2023 FPL Marine Turtle Removal Monthly Report ML23332A0352023-11-27027 November 2023 Conversion to Improved Technical Specifications Change in Estimated Review Schedule ML23326A0252023-11-20020 November 2023 NRR E-mail Capture - (External_Sender) October 2023 FPL Marine Turtle Removal Monthly Report ML24008A1582023-11-14014 November 2023 NRR E-mail Capture - (External_Sender) Psl Monthly Turtle Report for October 2023 ML23254A2852023-09-11011 September 2023 NRR E-mail Capture - (External_Sender) August 2023 FPL Marine Turtle Removal Monthly Report ML23243A9182023-08-31031 August 2023 NRR E-mail Capture - Re Audit Plan - St. Lucie ITS Conversion LAR - Setpoints ML23243A9862023-08-31031 August 2023 NRR E-mail Capture - Draft RAIs for EP Staff Augmentation Times LAR (L-2022-LLA-0166) ML23228A1482023-08-16016 August 2023 NRR E-mail Capture - Acceptance Review Results - St. Lucie Nuclear Plant, Unit 2 Alternative PSL2-I5-RR-01 (L-2023-LLR-0038) ML23226A0762023-08-14014 August 2023 NRR E-mail Capture - Request for Additional Information - St. Lucie Plant, Units 1 and 2 - Adopt 10 CFR 50.69 (L-2022-LLA-0182) ML23226A0692023-08-12012 August 2023 NRR E-mail Capture - (External_Sender) July 2023 FPL Marine Turtle Removal Monthly Report ML23223A0152023-08-11011 August 2023 NRR E-mail Capture - Acceptance Review Results - St. Lucie Nuclear Plant, Unit 2 Alternative PR-10 (L-2023-LLR-0039) ML23191A1952023-07-10010 July 2023 NRR E-mail Capture - (External_Sender) June 2023 FPL Marine Turtle Removal Monthly Report ML23216A1412023-06-30030 June 2023 August 2023 RP Inspection Document Request ML23248A1292023-06-29029 June 2023 NRR E-mail Capture - St Lucie 50.69 - Additional Audit Questions ML23198A0662023-06-22022 June 2023 NRR E-mail Capture - (External_Sender) Green Turtle Nest on Canal Bank, June 2023 ML23173A1522023-06-22022 June 2023 Request for Additional Information NextEra Fleet Emergency Plan Amendment Request ML23198A0642023-06-12012 June 2023 NRR E-mail Capture - (External_Sender) Loggerhead Nest on Canal Bank, May 2023 ML23163A1732023-06-10010 June 2023 NRR E-mail Capture - (External_Sender) May 2023 FPL Marine Turtle Removal Monthly Report ML23163A1222023-05-30030 May 2023 NRR E-mail Capture - (External_Sender) Nest on Intake Canal Bank ML23137A0942023-05-17017 May 2023 NRR E-mail Capture - Audit Plan - St Lucie Plant, Units 1 and 2 - 10 CFR 50.69 LAR ML23138A0212023-05-17017 May 2023 Telephone Record, Call with Florida Power and Light Regarding Decommissioning Funding Plan Update Dated March 30, 2021 ML23135A0292023-05-12012 May 2023 NRR E-mail Capture - (External_Sender) April 2023 FPL Marine Turtle Removal Monthly Report ML23129A8312023-05-0808 May 2023 NRR E-mail Capture - Audit Plan - St. Lucie ITS Conversion LAR - Setpoints ML23109A1862023-04-19019 April 2023 and Turkey Point Acceptance of Requested Licensing Action Proposed Alternative to Asme Section XI Authorizing Implementation of Asme Code Case N-752-1 ML23198A1592023-04-0707 April 2023 NRR E-mail Capture - (External_Sender) March 2023 FPL Marine Turtle Removal Monthly Report ML23074A2292023-03-15015 March 2023 NRR E-mail Capture - (External_Sender) February 2023 FPL Marine Turtle Removal Monthly Report ML23041A2262023-02-10010 February 2023 NRR E-mail Capture - (External_Sender) January 2023 FPL Marine Turtle Removal Monthly Report ML23065A1142023-02-0101 February 2023 NRR E-mail Capture - (External_Sender) FPL St. Lucie Plant Biological Opinion SERO-2019-03494 - Submittal ML23254A4022023-01-24024 January 2023 RP Inspection_2023-001_Document Request ML23019A0142023-01-18018 January 2023 NRR E-mail Capture - (External_Sender) Regarding St. Lucie Olive Ridley Capture 1/3/2023 ML23006A1882023-01-0606 January 2023 NRR E-mail Capture - (External_Sender) December 2022 FPL Marine Turtle Removal Monthly Report ML23006A1822023-01-0606 January 2023 NRR E-mail Capture - (External_Sender) Psl Smalltooth Sawfish Capture 1/5/23 ML23006A0242023-01-0505 January 2023 NRR E-mail Capture - (External_Sender) Psl Olive Ridley Capture 1323 ML23019A2052022-12-24024 December 2022 Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors - Acceptance Review ML22348A1002022-12-14014 December 2022 NRR E-mail Capture - (External_Sender) November 2022 FPL Marine Turtle Removal Monthly Report ML22325A0682022-11-18018 November 2022 Email from Brian Harris (NRC) to Robert Coffey (FPL) - St. Lucie SLRA RAI Set 4 ML22319A0762022-11-15015 November 2022 NRR E-mail Capture - (External_Sender) October 2022 FPL Marine Turtle Removal Monthly Report ML22285A2222022-10-12012 October 2022 NRR E-mail Capture - (External_Sender) September 2022 FPL Marine Turtle Removal Monthly Report ML22270A1492022-09-26026 September 2022 Email from Brian Harris (NRC) to Robert Coffey (FPL) - St. Lucie SLRA Second Round RAI Letter 2 - Class 1 Fatigue ML22286A1612022-09-16016 September 2022 August 2022 FPL St. Lucie Marine Turtle Removal Report ML22234A1552022-08-22022 August 2022 NRR E-mail Capture - (External_Sender) July 2022 FPL Marine Turtle Removal Monthly Report ML22227A0522022-08-15015 August 2022 NMFS to NRC, Transmittal of Final Biological Opinion for Continued Operation of St. Lucie Nuclear Power Plant ML22217A0022022-08-0404 August 2022 Email from Brian Harris (NRC) to Robert Coffey (FPL) - St. Lucie SLRA Second Round RAI Letter 1) ML22210A0782022-07-22022 July 2022 Stl 2022003 Document Request ML22194A0482022-07-12012 July 2022 NRR E-mail Capture - (External_Sender) June 2022 FPL Marine Turtle Removal Monthly Report ML22193A0862022-07-11011 July 2022 Email - St. Lucie SLRA - Request for Additional Information Set 3 ML22165A2992022-06-14014 June 2022 NRR E-mail Capture - (External_Sender) May 2022 FPL Marine Turtle Removal Monthly Report ML22147A0862022-05-26026 May 2022 Email from Brian Harris (NRC) to Robert Coffey (FPL) - St. Lucie SLRA - RCI Set 1 2023-09-11 Category:Report MONTHYEARL-2023-131, Subsequent License Renewal Application - Second Annual Update2023-09-28028 September 2023
[Table view]Subsequent License Renewal Application - Second Annual Update L-2023-076, In-Service Inspection Program Owner'S Activity Report (OAR-1)2023-07-11011 July 2023 In-Service Inspection Program Owner'S Activity Report (OAR-1) L-2023-028, and Point Beach Units 1 and 2, 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications2023-03-27027 March 2023 and Point Beach Units 1 and 2, 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications L-2023-009, Owner'S Activity Report2023-01-31031 January 2023 Owner'S Activity Report ML22227A0532022-08-15015 August 2022 Biological Opinion for the Continued Operation of St. Lucie Nuclear Power Plant ML22124A0112022-04-30030 April 2022 Scoping Summary Report - Final L-2022-046, Subsequent License Renewal Application Revision - Documents WCAP-18623-P/NP Revision 1 Submittal2022-04-13013 April 2022 Subsequent License Renewal Application Revision - Documents WCAP-18623-P/NP Revision 1 Submittal L-2022-015, Relief Request Number 20 - Request for an Alternative to the Requirements of the ASME Code for Examination of Reactor Vessel Closure Head Control Element Drive Mechanism (CEDM) Housing 27 Canopy Seal Weld - RAI2022-01-14014 January 2022 Relief Request Number 20 - Request for an Alternative to the Requirements of the ASME Code for Examination of Reactor Vessel Closure Head Control Element Drive Mechanism (CEDM) Housing 27 Canopy Seal Weld - RAI L-2022-011, Relief Request Number 20 - Request for an Alternative to the Requirements of the ASME Code for Examination of Reactor Vessel Closure Head Control Element Drive Mechanism (CEDM) Housing 27 Canopy Seal Weld2022-01-12012 January 2022 Relief Request Number 20 - Request for an Alternative to the Requirements of the ASME Code for Examination of Reactor Vessel Closure Head Control Element Drive Mechanism (CEDM) Housing 27 Canopy Seal Weld ML22010A0942022-01-0404 January 2022 Trp 29 St. Lucie SLRA - Tank Breakout L-2021-178, Report of 10 CFR 50.59 Plant Changes2021-11-0808 November 2021 Report of 10 CFR 50.59 Plant Changes L-2021-142, Westinghouse Report LTR-REA-21-1-NP, Revision 1, St. Lucie Nuclear Plant, Units 1 and 2, Subsequent License Renewal: Unit 1 Reactor Vessel, Vessel Support, and Bioshield Concrete Exposure Data, May 26, 20212021-08-0303 August 2021 Westinghouse Report LTR-REA-21-1-NP, Revision 1, St. Lucie Nuclear Plant, Units 1 and 2, Subsequent License Renewal: Unit 1 Reactor Vessel, Vessel Support, and Bioshield Concrete Exposure Data, May 26, 2021 ML19252A4002019-09-0909 September 2019 FPL to NRC, Notification of Smalltooth Sawfish Capture at St. Lucie L-2019-010, Proposed Alternative for the Use of Encoded Phased Array Ultrasonic Examination Techniques in Lieu of Radiography for Ferritic and Austenitic Welds2019-03-19019 March 2019 Proposed Alternative for the Use of Encoded Phased Array Ultrasonic Examination Techniques in Lieu of Radiography for Ferritic and Austenitic Welds ML18096B3952018-04-0606 April 2018 Exhibit III Estimate of Construction Costs and Exhibit IV Technical Qualifications of Contractors ML18088B1952018-03-29029 March 2018 Hutchinson Island Plant Units 1 and 2 - Chapter 9, Auxiliary Systems and Chapter 10, Steam and Power Conversion System ML18088B1942018-03-29029 March 2018 Hutchinson Island Plant Units 1 and 2 - Chapter 11, Radioactive Waste Management System, Chapter 12, Radiation Protection, and Chapter 13, Conduct of Operations ML18088A0942018-03-29029 March 2018 Unit II Plants ECCS Performance Results L-2017-173, Environmental Protection Plan Report, Unusual or Important Environmental Event - Turtle Mortality - 09/11/2017 Event2017-09-28028 September 2017 Environmental Protection Plan Report, Unusual or Important Environmental Event - Turtle Mortality - 09/11/2017 Event L-2018-081, Kld Engineering, Pc - 2017 Population Update Analysis2017-09-20020 September 2017 Kld Engineering, Pc - 2017 Population Update Analysis L-2017-117, Submittal of SL2-23 Outage, Owner'S Activity Report, Form OAR-12017-06-20020 June 2017 Submittal of SL2-23 Outage, Owner'S Activity Report, Form OAR-1 L-2018-015, Plan of Study 316(b) Implementation2017-04-28028 April 2017 Plan of Study 316(b) Implementation L-2017-015, PWROG-15105-NP PA-MSC-1288 PWR Rv Internals Cold-Work Assessment, Materials Committee.2016-04-30030 April 2016 PWROG-15105-NP PA-MSC-1288 PWR Rv Internals Cold-Work Assessment, Materials Committee. ML16084A6162016-03-24024 March 2016 Submittal of Biological Opinion for the Continued Operation of St. Lucie Nuclear Power Plant, Units 1 and 2 in St. Lucie County, Florida ML16063A0072016-02-26026 February 2016 Participation in Additional Work Under the Support for Applicant Action Items 1, 2, and 7 from the Final Safety Evaluation on MRP-227, Revision 0 PA-MSC-0983 R2 Cafeteria Task 8 and Acceptance Criteria for Measurement Of.. ML15352A0532016-01-0707 January 2016 Staff Assessment of Information Provided Pursuant to Title 10 of the Code of Federal Regulations Part 50, Section 50.54(f) Seismic Hazard Revaluations for Recommendation 2.1 of the Near-Term Task Force Review of Insights L-2015-297, Status of Required Actions for EA-12-049 Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events, and Submittal of Site FLEX Final Integrated Plan2015-12-10010 December 2015 Status of Required Actions for EA-12-049 Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events, and Submittal of Site FLEX Final Integrated Plan L-2015-300, ANP-3352NP, Revision 1, Transition License Amendment Request, Technical Report.2015-11-30030 November 2015 ANP-3352NP, Revision 1, Transition License Amendment Request, Technical Report. ML15314A1602015-10-29029 October 2015 St. Lucie, Units 1 and 2 - License Renewal Commitment, Submittal of Pressurizer Surge Line Welds Inspection Program L-2015-221, Report of 10 CFR 50.59 Plant Changes2015-10-16016 October 2015 Report of 10 CFR 50.59 Plant Changes ML15240A1542015-09-0808 September 2015 Staff Observations of Sump Strainer Head Loss Testing at Alden Laboratory for Generic Safety Issue 191 L-2015-206, ANP-3428NP, Revision 0, St. Lucie Unit 2 Fuel Transition: Response to SNPB-RAI-1, Attachment 4 to L-2015-2062015-07-31031 July 2015 ANP-3428NP, Revision 0, St. Lucie Unit 2 Fuel Transition: Response to SNPB-RAI-1, Attachment 4 to L-2015-206 L-2015-177, Fuel Transition Small Break LOCA Summary Report, ANP-3345NP, Revision 12015-06-30030 June 2015 Fuel Transition Small Break LOCA Summary Report, ANP-3345NP, Revision 1 L-2015-143, Status of Required Actions for EA-12-049 Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events2015-05-14014 May 2015 Status of Required Actions for EA-12-049 Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events L-2015-272, 1301103.401, Revision 0, Flaw Tolerance Evaluation of St. Lucie Surge Line Welds Using ASME Code Section XI, Appendix L, May 20152015-05-0808 May 2015 1301103.401, Revision 0, Flaw Tolerance Evaluation of St. Lucie Surge Line Welds Using ASME Code Section XI, Appendix L, May 2015 L-2016-052, TN-5696-00-02, Revision 0, Technical Note Assessment of Laboratory PWSCC Crack Growth Rate Data Compiled for Alloys 690, 52, and 152 with Regard to Factors of Improvement (Foi) Versus Alloys 600 and 182.2015-03-31031 March 2015 TN-5696-00-02, Revision 0, Technical Note Assessment of Laboratory PWSCC Crack Growth Rate Data Compiled for Alloys 690, 52, and 152 with Regard to Factors of Improvement (Foi) Versus Alloys 600 and 182. L-2015-091, ANP-3396NP, Revision 0, Fuel Transition Supplemental Information to Support the LAR2015-03-31031 March 2015 ANP-3396NP, Revision 0, Fuel Transition Supplemental Information to Support the LAR L-2015-093, Acceptance Criteria for Emergency Core Cooling Systems for Light Water Nuclear Power Reactors 10 CFR 50.46 Annual Report2015-03-24024 March 2015 Acceptance Criteria for Emergency Core Cooling Systems for Light Water Nuclear Power Reactors 10 CFR 50.46 Annual Report ML15083A2642015-03-10010 March 2015 St. Lucie, Units 1 and 2 - Submittal of Revision 0 to FPL-072-PR-002, Flooding Hazards Reevaluation Report L-2015-048, St. Lucie, Units 1 and 2 - Submittal of Revision 0 to FPL-072-PR-002, Flooding Hazards Reevaluation Report2015-03-10010 March 2015 St. Lucie, Units 1 and 2 - Submittal of Revision 0 to FPL-072-PR-002, Flooding Hazards Reevaluation Report L-2015-048, to FPL-072-PR-002, Flooding Hazards Reevaluation Report for St. Lucie Nuclear Power Plant Units 1 & 2. Cover Page to Page 1092015-02-0606 February 2015 to FPL-072-PR-002, Flooding Hazards Reevaluation Report for St. Lucie Nuclear Power Plant Units 1 & 2. Cover Page to Page 109 L-2015-048, to FPL-072-PR-002, Flooding Hazards Reevaluation Report for St. Lucie Nuclear Power Plant Units 1 & 2. Table 2-1 Through Figure 4-92015-02-0606 February 2015 to FPL-072-PR-002, Flooding Hazards Reevaluation Report for St. Lucie Nuclear Power Plant Units 1 & 2. Table 2-1 Through Figure 4-9 L-2015-048, to FPL-072-PR-002, Flooding Hazards Reevaluation Report for St. Lucie Nuclear Power Plant Units 1 & 2. Figure 4-10 Through the End2015-02-0606 February 2015 to FPL-072-PR-002, Flooding Hazards Reevaluation Report for St. Lucie Nuclear Power Plant Units 1 & 2. Figure 4-10 Through the End ML15083A2652015-02-0606 February 2015 to FPL-072-PR-002, Flooding Hazards Reevaluation Report for St. Lucie Nuclear Power Plant Units 1 & 2. Table 2-1 Through Figure 4-9 ML15083A2662015-02-0606 February 2015 to FPL-072-PR-002, Flooding Hazards Reevaluation Report for St. Lucie Nuclear Power Plant Units 1 & 2. Figure 4-10 Through the End L-2014-366, ANP-3352NP, Revision 0, St. Luice, Unit 2, Fuel Transition License Amendment Request, Technical Report2014-12-31031 December 2014 ANP-3352NP, Revision 0, St. Luice, Unit 2, Fuel Transition License Amendment Request, Technical Report ML14338A5552014-12-0404 December 2014 NRC-2013-TN3079-NRC 2014 St. Lucie License Renewal ML14338A5542014-12-0404 December 2014 NRC-2013- TN2986-NRC 2014 St. Lucie L-2014-125, Report of 10 CFR 50.59 Plant Changes2014-05-0606 May 2014 Report of 10 CFR 50.59 Plant Changes ML13360A2022013-12-12012 December 2013 EPA Echo Report Martin County, Fl 2023-09-28 Category:Miscellaneous MONTHYEARL-2023-131, Subsequent License Renewal Application - Second Annual Update2023-09-28028 September 2023
[Table view]Subsequent License Renewal Application - Second Annual Update L-2023-076, In-Service Inspection Program Owner'S Activity Report (OAR-1)2023-07-11011 July 2023 In-Service Inspection Program Owner'S Activity Report (OAR-1) L-2023-028, and Point Beach Units 1 and 2, 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications2023-03-27027 March 2023 and Point Beach Units 1 and 2, 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications L-2023-009, Owner'S Activity Report2023-01-31031 January 2023 Owner'S Activity Report ML22227A0532022-08-15015 August 2022 Biological Opinion for the Continued Operation of St. Lucie Nuclear Power Plant ML22124A0112022-04-30030 April 2022 Scoping Summary Report - Final ML22010A0942022-01-0404 January 2022 Trp 29 St. Lucie SLRA - Tank Breakout L-2021-178, Report of 10 CFR 50.59 Plant Changes2021-11-0808 November 2021 Report of 10 CFR 50.59 Plant Changes ML19252A4002019-09-0909 September 2019 FPL to NRC, Notification of Smalltooth Sawfish Capture at St. Lucie L-2017-173, Environmental Protection Plan Report, Unusual or Important Environmental Event - Turtle Mortality - 09/11/2017 Event2017-09-28028 September 2017 Environmental Protection Plan Report, Unusual or Important Environmental Event - Turtle Mortality - 09/11/2017 Event L-2017-117, Submittal of SL2-23 Outage, Owner'S Activity Report, Form OAR-12017-06-20020 June 2017 Submittal of SL2-23 Outage, Owner'S Activity Report, Form OAR-1 ML15352A0532016-01-0707 January 2016 Staff Assessment of Information Provided Pursuant to Title 10 of the Code of Federal Regulations Part 50, Section 50.54(f) Seismic Hazard Revaluations for Recommendation 2.1 of the Near-Term Task Force Review of Insights L-2015-297, Status of Required Actions for EA-12-049 Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events, and Submittal of Site FLEX Final Integrated Plan2015-12-10010 December 2015 Status of Required Actions for EA-12-049 Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events, and Submittal of Site FLEX Final Integrated Plan ML15314A1602015-10-29029 October 2015 St. Lucie, Units 1 and 2 - License Renewal Commitment, Submittal of Pressurizer Surge Line Welds Inspection Program L-2015-221, Report of 10 CFR 50.59 Plant Changes2015-10-16016 October 2015 Report of 10 CFR 50.59 Plant Changes ML15240A1542015-09-0808 September 2015 Staff Observations of Sump Strainer Head Loss Testing at Alden Laboratory for Generic Safety Issue 191 L-2015-143, Status of Required Actions for EA-12-049 Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events2015-05-14014 May 2015 Status of Required Actions for EA-12-049 Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events ML15083A2642015-03-10010 March 2015 St. Lucie, Units 1 and 2 - Submittal of Revision 0 to FPL-072-PR-002, Flooding Hazards Reevaluation Report L-2015-048, St. Lucie, Units 1 and 2 - Submittal of Revision 0 to FPL-072-PR-002, Flooding Hazards Reevaluation Report2015-03-10010 March 2015 St. Lucie, Units 1 and 2 - Submittal of Revision 0 to FPL-072-PR-002, Flooding Hazards Reevaluation Report ML14338A5552014-12-0404 December 2014 NRC-2013-TN3079-NRC 2014 St. Lucie License Renewal ML14338A5542014-12-0404 December 2014 NRC-2013- TN2986-NRC 2014 St. Lucie L-2014-125, Report of 10 CFR 50.59 Plant Changes2014-05-0606 May 2014 Report of 10 CFR 50.59 Plant Changes ML13360A2022013-12-12012 December 2013 EPA Echo Report Martin County, Fl L-2013-193, Transition to 10 CFR 50.48(c) - NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants (2001 Edition) Acceptance Review Clarification Response2013-06-14014 June 2013 Transition to 10 CFR 50.48(c) - NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants (2001 Edition) Acceptance Review Clarification Response L-2013-175, Report of 10 CFR 50.59 Plant Changes2013-05-23023 May 2013 Report of 10 CFR 50.59 Plant Changes L-2012-437, Standardization of Senior Reactor Operator Fuel Handling Duties2012-12-27027 December 2012 Standardization of Senior Reactor Operator Fuel Handling Duties L-2012-105, Response to Nuclear Performance and Code Review Branch Request for Additional Information Identified During an Audit of Analyses Supporting the Extended Power Uprate License Amendment Request2012-03-15015 March 2012 Response to Nuclear Performance and Code Review Branch Request for Additional Information Identified During an Audit of Analyses Supporting the Extended Power Uprate License Amendment Request ML1026405722010-09-14014 September 2010 E-mail St. Lucie Capture Summary Update for January Through August 2010 ML1019304172010-05-0606 May 2010 Tritium Database Report ML1012704392010-05-0505 May 2010 Y020100187 - List of Historical Leaks and Spills at U.S. Commercial Nuclear Power Plants L-2010-059, Florida Dept of Environmental Protection - Wastewater Application Form 2CS - Permit to Discharge Process Wastewater from New or Existing Industrial Wastewater Facilities to Surface Water2010-03-18018 March 2010 Florida Dept of Environmental Protection - Wastewater Application Form 2CS - Permit to Discharge Process Wastewater from New or Existing Industrial Wastewater Facilities to Surface Water ML1008304422010-03-18018 March 2010 Florida Dept of Environmental Protection - Wastewater Application Form 2CS - Permit to Discharge Process Wastewater from New or Existing Industrial Wastewater Facilities to Surface Water L-2009-101, Report of 10 CFR 50.59 Plant Changes, for the Period of May 28, 2007 Through November 21, 20082009-04-22022 April 2009 Report of 10 CFR 50.59 Plant Changes, for the Period of May 28, 2007 Through November 21, 2008 L-2008-261, Technical Specification Special Report Inoperable Containment Sump Wide Range Level Channel B2008-12-16016 December 2008 Technical Specification Special Report Inoperable Containment Sump Wide Range Level Channel B ML0807010172008-03-10010 March 2008 EPRI Reports (St. Lucie Pressurizer Nozzle DM Weld Examination Project Internal Office Report) L-2008-030, Supplemental Response to NRC Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors2008-02-27027 February 2008 Supplemental Response to NRC Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors NOC-AE-07002231, Request for Relaxation of Requirements from Revision 1 of Order EA-03-009 Establishing Interim Inspection Requirements for Reactor Pressure Vessel Head Penetrations (Relief Request RR-ENG-2-46)2007-11-0707 November 2007 Request for Relaxation of Requirements from Revision 1 of Order EA-03-009 Establishing Interim Inspection Requirements for Reactor Pressure Vessel Head Penetrations (Relief Request RR-ENG-2-46) L-2007-167, Report of 10 CFR 50.59 Plant Changes During the Period of December 19, 2005 Through May 27, 20072007-10-29029 October 2007 Report of 10 CFR 50.59 Plant Changes During the Period of December 19, 2005 Through May 27, 2007 L-2007-168, Technical Specifications Bases Control Program Periodic Report of Bases Changes TS 6.8.4.j.42007-10-29029 October 2007 Technical Specifications Bases Control Program Periodic Report of Bases Changes TS 6.8.4.j.4 L-2007-137, Technical Specification Special Report, Inoperable Containment Sump Wide Range Level Channel B2007-08-31031 August 2007 Technical Specification Special Report, Inoperable Containment Sump Wide Range Level Channel B L-2007-029, Semi-Annual Fitness-For-Duty Program Performance Data for the Six-Month Period Ending December 31, 20062007-02-26026 February 2007 Semi-Annual Fitness-For-Duty Program Performance Data for the Six-Month Period Ending December 31, 2006 L-2007-020, Annual Summary of Commitment Changes Implemented Without Prior NRC Notification for Calendar Year 20062007-02-0606 February 2007 Annual Summary of Commitment Changes Implemented Without Prior NRC Notification for Calendar Year 2006 L-2006-078, Proposed License Amendment, Containment Spray Nozzle Surveillance Change2006-10-19019 October 2006 Proposed License Amendment, Containment Spray Nozzle Surveillance Change L-2006-217, Day Post Outage Steam Generator Report Technical Specification 4.4.5.5.c2006-09-20020 September 2006 Day Post Outage Steam Generator Report Technical Specification 4.4.5.5.c L-2006-152, NRC Order EA-03-009 - Reactor Vessel Head and Vessel Head Penetration Nozzle Inspection Results SL2-162006-08-10010 August 2006 NRC Order EA-03-009 - Reactor Vessel Head and Vessel Head Penetration Nozzle Inspection Results SL2-16 L-2006-180, Sation; St. Lucie, Units 1 and 2 and Turkey Point, Units 3 and 4 - Groundwater Questionnaire2006-07-31031 July 2006 Sation; St. Lucie, Units 1 and 2 and Turkey Point, Units 3 and 4 - Groundwater Questionnaire L-2006-167, Environmental Protection Plan Report Responses to FDEP Comments on FPL Proposal for Information Collection Clean Water Act Section 316(b)2006-07-0606 July 2006 Environmental Protection Plan Report Responses to FDEP Comments on FPL Proposal for Information Collection Clean Water Act Section 316(b) L-2006-139, Report of 10 CFR 50.59 Plant Changes2006-06-16016 June 2006 Report of 10 CFR 50.59 Plant Changes L-2006-063, Technical Specification Special Report, Radwaste Building Exhaust System, Plant Ventilation Stack Particulate Iodine and Noble Gas (Sping) Radiation - Out of Service2006-02-22022 February 2006 Technical Specification Special Report, Radwaste Building Exhaust System, Plant Ventilation Stack Particulate Iodine and Noble Gas (Sping) Radiation - Out of Service L-2006-043, Responses to NRC Requests for Additional Information on WCAP-16208-P, Rev. 0, NDE Inspection Length for CE Steam Generator Tubesheet Region Explosive Expansions.2006-01-23023 January 2006 Responses to NRC Requests for Additional Information on WCAP-16208-P, Rev. 0, NDE Inspection Length for CE Steam Generator Tubesheet Region Explosive Expansions. 2023-09-28 |
Text
Retrieved from "https://kanterella.com/w/index.php?title=ML19252A400&oldid=1893332"