L-2017-117, Submittal of SL2-23 Outage, Owner'S Activity Report, Form OAR-1

From kanterella
Jump to navigation Jump to search
Submittal of SL2-23 Outage, Owner'S Activity Report, Form OAR-1
ML17173A105
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 06/20/2017
From: Snyder M
Florida Power & Light Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
L-2017-117
Download: ML17173A105 (6)


Text

JUN 2 0 2017 L-2017-117 10 CFR 50.36 10 CFR 50.55a U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20.555 Re: St. Lucie Unit 2 Docket No. 50-389 In-Service Inspection Program ISI Fourth Interval - First Period - SL2-23 Refueling Outage Owner's Activity Report (OAR-1)

Enclosed is the St. Lucie Unit 2, SL2-23 outage, Owner's Activity Report, Form OAR-1.

The OAR-1 report is prepared, certified, and submitted upon completion of each refueling outage. The SL2-23 refueling outage ended on March 24, 2017.

Please contact Ken Frehafer at 772-467-77 48 if there are any questions about this submittal.

Sincerely, Michael J Snyder Licensing Manager St. Lucie Plant MJS/KWF Attachment cc: NRC Region II Administrator St. Lucie Plant NRC Senior Resident Inspector Florida Power & Light Company 6501 S. Ocean Drive, Jensen Beach, FL 34957

L-2017-117 Attachment Page 1of5 FORM OAR-1 OWNER'S ACTIVITY REPORT Report Nurrib~r: ISl-P$l,-2~20'!7 Plant

  • St Lucie Nuclear Power Plant Unit 2 6501. South Ocean Drive Jensen Beach, Florida 34957 Commercial Service Date: August 8, 1983 Refueling Outage No.: SL2-23 Current Inspection Interval: ISi-Fourth, IWE-Secohd Current Inspection Period:-!Sl-flrst, IWE.:.Third Edition and Addenda of Section XI applicable to the inspection plans: ISi - 2007 with Addenda through 2008

!WE - 2001 Edition with Addenda through 2003 Date and Rev.lsion of inspection plans: ISi-January 30, 2017, Revision 2, IWE~July 17, 201:5, .Revision 2 Edition and Addenda of Section XI applicable to. repairs and rep!acern,ehts, if different than the inspection plan: Sarne Code Cases Used: N-532-5. N-586-1 N-649 N-706-'1 N-722-1 N-751 N-729-1 & N-770-'.1.

CERTIFICATE OF CONFORMANCE I certify that. (a) the statements made in this report are correct; (b) the examinations and tests meet.the Inspection plan as requ.ired by the ASME Code,Section XI; and (c) the repairlreplacemenf activities and .evaluations supporting the completiop ofSL2..:23 '?)nfbrm to the requirements of Section XL .

Signe~ J,1 /~ fl'-t' :R. i). bJ 1,i Pk.ct Rw;r.i-..-v.l 'i A.Jy Date f.v * /s;. I=;-

Owner or.Owner's Designee, Title 7. -

CERTIFICATE OF INSERVICE lNSPECTION 1, the undersigned, holding a valid commission issued by the National Board of Boiler and Pres~;ure Vessel Inspectors and the State or Province of Georgia and employed by the Hartford Steam Boiler Inspection and Insurance Company*of

  • Connecticut have .inspected the items described in this Owner's ..Activity Report, and state that, to the best of my knowledge and belief, the Owner has performed all activities represented by this report in accordance With the requirements ofSection XL By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concemlng the repair/replacement activities and evaluation described in *this report. Furthermore, neither the inspector nor his employer shall be liable in any manner for ariy person<1I injury or property damage or loss ofany kind arising from I:\'.

or conn.ected \Ni t

  • s *
  • L-2017-117 Attachment Page 2 of 5 FORM OAR-1 OWNER'S ACTIVITY REPORT TABLE 1 ITEMS WITH FLAWS OR REVELANT CONDITIONS THAT REQUIRED EVALUATION FOR CONTINUED SERVICE PSL 2 ..., JS!. 4TH Interval, tst Period - Outcige 23

. PSL 2 - !WE 21)d Interval, 3~d Period - Outage 23 i II I

I E:i..>amlnation I I

  • I Category and Item Description Evaluation bescripticm
  • item Number l

l l

I None None None I It ~

III f

1*

II i I

~

u f:

-~ n

..E!'

li

  • f:

~

~  ;{'

I t f

g tt fi !;~

~

f  :;:

i t

Il I

D i

R i

a

~

~! Iii"

~'

~;

tf' i ~:

I r J

  • 1
  • .~

t*

l

L-2017-117 Attachment FORM OAR-1 OWNER'S ACTIVITY REPORT TABLE2 ABSTRACT REPAIR/REPLACEMENT ACTIVITIES REQUIRED FOR CONTINUED SERVICE PSL 2 ~ ISi 4TH Interval, 1st Period - Outage 23 PSL 2 - IWE 2nd Interval, 3rd Period - Outage 23 Repair./

Code Date Item Description Description ofV\!c>rk Replacement Class Completed Plan Number REPLACE VALVE AND FLANGE 3 HCV-14-88 5/17/2017 SL2-13055 *

  • FASTENERS WELD BUILD UP OF PUMP  !

.INTERNALS TO OBTAIN PROPER 2 LPSI PP 2B FJTFOR NEW STUFFING BOX AND 5/24/2017 SL2-13064 INSTALL COUPLING RETROFIT KIT PER EC275737 REPLACEMENT OFVALVE AND 1 SE-02-3 ADJACENT Pl PING BY WELDING 6113/2017 SL2-13069 WELD BUILDUP ON FLANGES TO 3 CW-10 6/14/2017 SL2-15011 RESTORE THICKNESS REPAIR THROUGH-WALL LEAK BY 3 CW-72 WELDING UTILIZING CODE CASE N- 11/11/20'.15 SL2*'15065 661-2 REPLACE ELBOW FASTENERS 3 CW-72 FOLLOWING INTERNAL 5/312017 Sl2-15065

  • INSPl3CTION

.3 REPLACE VALVE BY FLANGED HCV-21-7A 5/4/2017 Sl2-15066

. CONNECTION REPLACE REL! EF VALVE 2 V2326 5/4/2017 Sl2-16001 INTERNALS PERFORM WELD BUILDUP OF 3 HCV-21-78 VALVE AND PIPE FLANGE 5/24/2017 SL2-16012 SURFACES

  • 3 REPLACE VALVE FLANGE V21208 5/3/2017 SL2-16013 FASTENERS REPLACE SG 28 PRIMARY 1 *sG2B 6/13/2017 SLZ-16014 MANWAY *STUD MACHINE REPLACEMENT STUD 1 SG2B 6/13/2017 Sl2-'.16014 PER VENDOR RECOMMENDATIONS REPLACE PRESSURIZER MANWAY 1 PZR 6/15/2017 SL2-16015 STUDS/NUTS

! INSTALL SEAL WELD FOLLOWING 2 V3495 5/25/2017 SL2-16016 INTERNAL VALVE INSPECTION I

  • REPLACE MAIN STEAM SAFETY 2 V8202 5/3112017 SL2-16017 RELIEF VALVE FASTENERS REPLACE RELIEF VALVE FLANGE 3 V2115. 5/1712017 SL2-16019 FASTENERS
  • REPLACE RELfEF VALVE 2 V2324 5/3112017 SL2-16.020
INTERNALS OF REMOVED VALVE REPLACE RELIEF VALVE 2 V2325 INTERNALS 5/3/2017 SL2-16021

L-2017-117 Attachment Page 4 of s-FORM OAR-1 OWNER'S ACTIVITY REPORT TABLE 2 Code Repair I Item Description Description of Work Date Class Completed Replacement Plan Number REPLACE CHECK VALVE 1 V3527 6/13/2017 Sl2-16022 FASTENERS REPLACE RELIEF VALVE 2 V8203 51~1/2017 SL2-16023 INTERNALS AND FASTENERS

..i FUEL POOL REPLACE FLANGE FASTENERS 3 5/4/2017 SL2-16024 PP2B 2 FCV-25-26 REPLACEVALVEFASTENERS 6/112017 II SL2-16025 1 S!G2A INSTALL TU!3E PLUGS IN 2A SIG 5/18/2017 SL2-16027 REPLACE REUEF VALVE AND

2. V8209 5/4/2017 SL2-16029 FASTENERS

- ATTACH REVISED NAMEPLATE FOLLOWING RE-RATJNG OF

.MC CNTMNTVSL 5/4/2017 SL2-16030 CONTAINMENT VESSEL EXTERNAL PRESSURE REPLACE RELIEF VAf..VE 2 V8212 INTERNALS AND FASTENERS 5/31/2017 SL2*16031 REPLACE RELIEF VALVE 2 V8216 5/3112017 SL2-16032

' INTE:RNALS AND FASTENERS PREFABRICATE REPLACEMENT 3 CW-105 5124/2017 SL2-16035 PIPE ELBOW SPOOL BY WELDING I REPLACE PIPE ELBOW BY 3 CW-105 WELDING AND FLANGED 5/25/2017 SL2-16035 CONNECTION REPLACE GODE SAFETY RELIEF 1 V1200 VALVE INTERNALS AND INLET 5/31/2017 SL2-16036 FASTENERS REPLACE GODE SAFETY RELIEF 1 V1201 VALVE INTERNALS . .... 5/3112017 SL2-16037 3 HCV-14-10 REPLACE VALVE AND FASTENERS 5/4/2017 SL2-t6041 REPLACE VALVE FASTENERS I 2 V3107 :Sl1/2017 Sl2-16042 lNSTALL FLANGES BY WELDING 3 HCV-25..:.3 5117/2017 J SL2~17001 AND BOLTED CONNECTION I 3 HCV-25-4 INSTALL FLANGES BY WELDING 5/24/2017 l SL2-17001 AND BOLTED *CONNECTION I REPLACE PIPE SPOOLS CW-72-4 3 CW-72 AND CW-72-5 BY WELDING AND 5/25/2017 SL2-17002 BOLTED CONNECTIONS

  • TACKWELDSEATRINGTOVALVE
  • 3 1

V08163 V3247 BODY REPLACE VALVE FASTENERS 5/3/2017 5f31/2017 SL2-17003 SL2-17004 II REPLACE VALVE DISC AND  !

1 3

V3526 MV-08~3 FASTENERS

. REPLACE SPRING CAN SUPPORT 5131/2017 6115/2017 SL2-17006 SL2-17011 I

2 CS-2 BY WELDING REPLACE TWO SPRING CAN i 5/i8/2017 I

I SL2-17012 SUPPORTS BYWELDING I I

I i

i

L-2017-117 Attachment Page 5 of 5 FORM OAR-1 OWNER,S ACTIVITY REPORT TABLE2 Code item Description I Description of Work Date Repair I Replacement Cfass Completed Plan Number REPLACE Pf PE SECTION BY 1 CH-147 WELDING FOR LICENSE RENEWAL 5/18/20'[7 SL2-*F019 DESTRUCTIVE TESTING.

REPLACE SOLENOID VALVE SEAL.

2 SE-03-2A WELD FOLLOWING INTERNAL 5/3/2017 SL2-17023 VALVE INSPECTION REPLACE VALVE AND ADJACENT 1 SE-02..:1 PIPING BY WELDJNG 6/1/2017 SL2-17026 REMOVE AND :RE-INSTALL ..

2 CC-2080-25 SECTION OF PIPE SUPPORT BY: 5{18/2017 SL2-17027 WELDING REMOVE AND RE-INSTALL 2 CC-2080-30 SECTION OF PIPE SUPPORT BY 5/17/2017 SL.2-17027 WELDING REPLACE SECTION OF PIPE.

2. CC-2080-33 5/18/2017. SL2-17027 SUPPORT BY WELDING SS-21-18 REPLACE STRAINER FASTENERS SL2:..1JQ29 3 5/4/2017 REPLACE SNUBBER 028 1 028 5131/2017 SL2-17031 l 1 I t I

I I

I