L-2015-177, Fuel Transition Small Break LOCA Summary Report, ANP-3345NP, Revision 1

From kanterella
Jump to navigation Jump to search

Fuel Transition Small Break LOCA Summary Report, ANP-3345NP, Revision 1
ML15181A291
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 06/30/2015
From:
AREVA
To:
Document Control Desk, Office of Nuclear Reactor Regulation
Shared Package
ML15181A282 List:
References
L-2015-177, TAC MF5494, TAC MF5495 ANP-3345NP, Rev. 1
Download: ML15181A291 (48)


Text

L-2015-177 Attachment 3 St. Lucie Unit 2 Fuel Transition Small Break LOCA Summary Report ANP-3345NP, Revision 1 Next 47 Pages

I-fV1MLF IIU L-JU UL I I 1I ARA AREVA St. Lucie Unit 2 Fuel Transition ANP-3345NP Small Break L.OCA Summary Report Revision 1 June 2015 AREVA Inc.

(c) 2015 AREVA Inc.

%k-AJI ILE V)IR.7I LjutWLAI11t;lI Copyright © 2015 AREVA Inc.

All Rights Reserved

%-,FUI M iJIIZZU LJ1ArUI ý,MA IL AREVA Inc. ANP-3345NP Revision 1 St. Lucie Unit 2 Fuel Transition Small Break LOCA Summary Report Page i Nature of Changes Section(s)

Item or Page(s) Description and Justification 1 Page 3-5 First paragraph proprietary marks have been removed. This paragraph does not contain proprietary information.

2 Section 4 Page numbering for entire section is corrected. Section 4 now starts at page 4-1. The Table of Contents, List of Tables, and List of Figures are also updated accordingly.

k-1U II u iI.ýU I M7ItIII AREVA Inc. ANP-3345NP Revision 1 St. Lucie Unit 2 Fuel Transition Small Break LOCA Summary Report Page ii Contents Pacqe 1.0 INTRO DUCTION ............................................................................................... 1-1 2.0 SUM MARY OF RESULTS ................................................................................. 2-1

3.0 DESCRIPTION

O F ANALYSIS .......................................................................... 3-1 3.1 Description of SBLOCA Event ................................................................ 3-1 3.2 Analytical Models .................................................................................... 3-4 3.3 Plant Description and Summary of Analysis Input Parameters ............................................................................................ 3-6 3.4 SER Com pliance .................................................................................... 3-8 4.0 ANALYTICAL RESULTS ................................................................................... 4-1 4.1 Results for Break Spectrum .................................................................... 4-1 4.2 Discussion of Transient for Lim iting Break .............................................. 4-1 4.3 Attached Piping Sensitivity Study ........................................................... 4-3

5.0 REFERENCES

.................................................................................................. 5-1

AREVA Inc. ANP-3345NP Revision 1 St. Lucie Unit 2 Fuel Transition Small Break LOCA Summary Report Page iii List of Tables Table 3-1 Small break LOCA Development Phases ................................................... 3-9 Table 3-2 System Parameters and Initial Conditions ................................................ 3-10 Table 3-3 HPSI Flow Rate versus RCS Pressure ..................................................... 3-11 Table 3-4 LPSI Flow Rate versus RCS Pressure ...................................................... 3-12 Table 4-1 Summary of SBLOCA Break Spectrum Results .......................................... 4-4 Table 4-2 Sequence of Events for the SBLOCA Break Spectrum ............................... 4-5

.  %..OulILI U11c;U LJUV-,Ul I IC:1 It AREVA Inc. ANP-3345NP Revision 1 St. Lucie Unit 2 Fuel Transition Small Break LOCA Summary Report Page iv List of Figures Figure 3-1 S-RELAP5 SBLOCA Reactor Coolant System Nodalization .................... 3-13 Figure 3-2 S-RELAP5 SBLOCA Secondary System Nodalization ............................ 3-14 Figure 3-3 S-RELAP5 SBLOCA Reactor Vessel Nodalization .................................. 3-15 Figure 3-4 Axial Pow er S hape ................................................................................... 3-16 Figure 4-1 Peak Cladding Temperature versus Break Size (SBLOCA Break S p ectru m ) ............................................................................................... 4 -6 Figure 4-2 Reactor Power - 2.70 inch Break .............................................................. 4-7 Figure 4-3 Primary and Secondary System Pressures - 2.70 inch Break ................... 4-8 Figure 4-4 Break Void Fraction - 2.70 inch Break ....................................................... 4-9 Figure 4-5 Break Mass Flow Rate - 2.70 inch Break ................................................ 4-10 Figure 4-6 Loop Seal Void Fraction - 2.70 inch Break .............................................. 4-11 Figure 4-7 RCS Loop Mass Flow Rate - 2.70 inch Break ......................................... 4-12 Figure 4-8 Main Feedwater Mass Flow Rate - 2.70 inch Break ................................ 4-13 Figure 4-9 Auxiliary Feedwater Mass Flow Rate - 2.70 inch Break .......................... 4-14 Figure 4-10 Steam Generator Total Mass - 2.70 inch Break .................................... 4-15 Figure 4-11 High Pressure Safety Injection Mass Flow Rates - 2.70 inch Break ...... 4-16 Figure 4-12 Low Pressure Safety Injection Mass Flow Rates -2.70 inch Break ...... 4-17 Figure 4-13 Safety Injection Tank Mass Flow Rates- 2.70 inch Break .................... 4-18 Figure 4-14 Reactor Vessel Mass Inventory - 2.70 inch Break ................................. 4-19 Figure 4-15 Hot Assembly Mixture Level - 2.70 inch Break ...................................... 4-20 Figure 4-16 Hot Spot-Cladding Temperature - 2.70 inch Break ................................ 4-21

ILI U11;.;U UVý,Ul I MA IL AREVA Inc. ANP-3345NP Revision 1 St. Lucie Unit 2 Fuel Transition Small Break LOCA Summary Report Page v Nomenclature Acronym Definition ADV Atmospheric dump valve AFAS Auxiliary feedwater actuation signal AFW Auxiliary feedwater AOR Analysis of record AREVA AREVA Inc.

BOC Beginning-of-cycle CE Combustion Engineering CEA Control element assembly CFR Code of Federal Regulations CRGT Control rod guide tube DC-HL Downcomer- Hot Leg DC-UH Downcomer - Upper Head ECCS Emergency Core Cooling System EDG Emergency diesel generator EM Evaluation model EOC End-of-cycle EOP Emergency Operating Procedure HPSI High pressure safety injection LHR Linear heat rate LOCA Loss-of-coolant accident LPSI Low pressure safety injection MFW Main feedwater MSIV Main steam isolation valve MSSV Main steam safety valve NRC Nuclear Regulatory- Commission RAI Requested for Additional Information RCP Reactor coolant pump RCS Reactor Coolant System PCT Peak cladding temperature PWR Pressurized water reactor PZR Pressurizer SBLOCA Small break loss-of-coolant accident SER Safety Evaluation Report SG Steam generator SGTP Steam generator tube plugging SI Safety injection SIAS Safety injection actuation signal SIT Safety injection tank

%-oUI IL! UIIU L./JU.ws1UI II L AREVA Inc. ANP-3345NP Revision 1 St. Lucie Unit 2 Fuel Transition Small Break Summary Report ' Paqe 1-1

1.0 INTRODUCTION

The purpose of this report is to summarize the small break loss-of-coolant accident (SBLOCA) analysis performed with AREVA 16x16 HTP fuel with M5 1 cladding for the St. Lucie Unit 2 plant. This document provides input to the License Amendment Request (LAR) in support of the transition to AREVA fuel in St. Lucie Unit 2. The SBLOCA analysis was performed in accordance with AREVA's S-RELAP5 SBLOCA methodology (References 1 and 2) and the additional considerations discussed in Section 3.2.

A complete spectrum of cold leg break sizes was considered, ranging from 2.0-inch diameter (0.022 ft2) to 9.49-inch diameter (0.491ft2 ) range. In addition, a sensitivity study

.was performed to consider attached piping break sensitivity.

The analysis supports plant operation at a core power level of 3029.06 MWt (including measurement uncertainty), a peak linear heat rate (LHR) of 13.0 kW/ft, a radial peaking factor of 1.65 (1.81 including uncertainty and an augmentation factor) and a steam generator tube plugging level of 20% with +/-4% asymmetry.

A bounding total SIT line and check valve loss coefficient value is used in the SBLOCA analysis for each loop, including both major and minor loss components.

M5 is a registered trademark of AREVA Inc.

%_1eU1HL[U11t=;U LJUý..U111U11L AREVA Inc. ANP-3345NP Revision 1 St. Lucie Unit 2 Fuel Transition Small Break Summary Report Paqe 2-1 2.0

SUMMARY

OF RESULTS A SBLOCA break spectrum analysis was performed for St. Lucie Unit 2 to demonstrate that the following acceptance criteria for Emergency Core Cooling Systems (ECCS), as stated in 10 Code of Federal Regulations (CFR) 50.46(b)(1-4) (Reference 3), have been met.

1. The calculated maximum fuel element cladding temperature shall not exceed 2200 0 F.
2. The calculated total oxidation of the cladding shall nowhere exceed 0.17 times the total cladding thickness before oxidation.
3. The calculated total amount of hydrogen generated from the chemical reaction of the cladding with water or steam shall not exceed 0.01 times the hypothetical amount that would be generated if all of the metal in the cladding cylinders surrounding the fuel, excluding the cladding surrounding the plenum volume, were to react.
4. Calculated changes in core geometry shall be such that the core remains amenable to cooling.

The limiting peak cladding temperature (PCT) is 1926°F for a 2.70-inch diameter (0.040 ft 2) cold leg pump discharge break. The total maximum local oxidation is less than 9.0%,

including a pre-transient oxidation of 2.3925% and-transient maximum oxidation of less than 6.0%. The maximum core-wide oxygen generation is less-than 0.2%. The results of the analysis demonstrate the adequacy of the ECCS to support the criteria given in 10 CFR 50.46(b).

In addition to the break spectrum analysis, a sensitivity study was performed to consider a break in an attached pipe. The break in an attached piping sensitivity study was performed with a 10.126-inch diameter (double-ended guillotine) break in the safety injection tank (SIT) line. The PCT calculated for this case was 14510 F. The SIT line break results are non-limiting compared to the break spectrum results.

ILl I~JII~U LJU~UIlI~lIL AREVA Inc. ANP-3345NP Revision 1 St. Lucie Unit 2 Fuel Transition Small Break Summary Report Page 3-1

3.0 DESCRIPTION

OF ANALYSIS Section 3.1 of this report provides a brief description of the postulated SBLOCA event.

Section 3.2 describes the analytical models used in the analysis. Section 3.3 presents a description of the St. Lucie Unit 2 plant and outlines the system parameters used in the SBLOCA analysis. Section 3.4 describes the Safety Evaluation Report (SER) compliance.

3.1 Description of SBLOCA Event The postulated SBLOCA is defined as a break in the Reactor Coolant System (RCS) pressure boundary for which the area is up to approximately 10% of a cold leg pipe area. The most limiting break location is in the cold leg pipe on the discharge side of the reactor coolant pump (RCP). This break location results in the largest amount of inventory loss and the largest fraction of ECCS fluid ejected out through the break. This produces the greatest degree of core uncovery, the longest fuel rod heatup time, and consequently, the greatest challenge to the 10 CFR 50.46(b)(1-4) criteria (Reference 3).

%.J*UIILI UM-lu Ljutý?U[ I R-11 IL AREVA Inc. ANP-3345NP Revision I St. Lucie Unit 2 Fuel Transition Small Break Summary Report Page 3-2 The SBLOCA event is characterized by a slow depressurization of the primary system with a reactor trip occurring on a Low Pressurizer Pressure signal. The safety injection actuation signal (SIAS) occurs when the system has further depressurized. The capacity and shutoff head of the HPSI pumps are important parameters in the SBLOCA

,-ýanalysis. For the limiting break size, the rate of inventory loss from the primary system is such that the HPSI pumps cannot preclude significant core uncovery. The primary system depressurization rate is slow, extending the time required to reach the SIT injection pressure or to recover core liquid level on HPSI flow. This tends to maximize the heatup time of the hot rod which produces the maximum PCT and local cladding oxidation. Core recovery for the limiting break begins when the SI flow that is retained in the RCS exceeds the mass flow rate out the break, followed by injection of SIT flow. For very small break sizes, the primary system pressure does not reach the SIT injection pressure.

The SBLOCA event develops in the following distinct phases: (1) subcooled depressurization, (2) loop saturation and loop flow coastdown, (3) loss of loop circulation and reflux mode cooling, (4) loop seal clearing and core refill and (5) long-

ý.evl ILI UIIUU LJULOUI 1 1"11 IL AREVA Inc. ANP-3345NP Revision 1 St. Lucie Unit 2 Fuel Transition Small Break Summary Report Page 3-3 term cooling provided by high and low head safety pump and SIT injections. The SBLOCA development phases are outlined in Table 3-1.

Following the break, the RCS rapidly depressurizes to the saturation pressure of the hot leg fluid. During the initial depressurization phase, reactor trip occurs on low pressurizer pressure, and the turbine is tripped on the reactor trip. The assumption of a loss-of-offsite power concurrent with the reactor SCRAM results in reactor coolant pump trip'.

In the second phase of the transient, the reactor coolant pumps coastdown. In this phase, natural circulation flows are sufficient to provide continuous core heat removal via the steam generators. However, mass continues to be lost to the break during this period.

,-The third phase in the transient is characterized as a period of loop draining that results in the loss of RCS flows. During this period, the core decay heat removal is provided via reflux boiling. The RCS stabilizes at an equilibrium pressure above the steam generator secondary side pressure. The system reaches a quiescent state in which the core decay heat, break flow, steam generator heat removal, and system hydrostatic head balance combine to control the core inventory.

The fourth phase in the transient is characterized by loop seal clearing and core recovery. The RCS inventory continues to decrease. Prior to loop seal clearing, liquid trapped in the reactor coolant pump suction piping can prevent steam from venting via the break. For a small break, the transient develops slowly, and liquid level in the reactor coolant system may descend to the loop seal level prior to establishing a steam vent. The core can become temporarily uncovered in this loop seal clearing process.

Once the loop seal clears, venting of steam through the break causes a rapid RCS depressurization below the secondary pressure and boiling in the core increases. The Tripping the reactor coolant pumps at the time of SCRAM instead of time zero is:

" A small delay relative to the time of loop seal uncovery for the limiting cases.

" Expected to be slightly conservative, due to the additional loss of primary system inventory through the break.

%aLJI iLl tlI;U LjINVLII!l~INI-L AREVA Inc. ANP-3345NP Revision 1 St. Lucie Unit 2 Fuel Transition Small Break Summary Report Page 3-4 depressurization also promotes an increase in ECCS flows and the mass loss through the break decreases substantially as a result of phase change. These occurrences combine to cause either the core to uncover and heat up if ECCS flow is still not sufficient to offset the inventory lost out the break or an increase in RCS liquid inventory, preventing core uncovery, when ECCS flow is greater than the inventory lost out the break.

The last phase of the transient is characterized as a long-term cooling period during which the RCS inventory control is provided by the Emergency Core Cooling System.

Pumped injection continues and the passive SIT injection occurs when the RCS pressure decreases below the SIT tank pressure. Long-term RCS inventory and decay heat removal are successfully controlled in this manner.

3.2 Analytical Models The AREVA S-RELAP5 SBLOCA evaluation model (References 1) for event response of the primary and secondary systems and the hot fuel rod used in the analysis is based on the use of two computer codes. The appropriate conservatisms, as prescribed by Appendix K of 10 CFR 50, are incorporated. This methodology has been reviewed and approved by the NRC to perform SBLOCA analyses. The two AREVA computer codes used in the analysis are:

1. The RODEX2-2A code (References 4 and 5) was used to determine the burnup-dependent initial fuel rod conditions for the system calculations.
2. The S-RELAP5 code was used to predict the thermal-hydraulic response of the primary and secondary sides of the reactor system and the hot rod response.

Lj~I ILl UII*.U LjUL*ImlI I~IIL AREVA Inc. ANP-3345NP Revision 1 St. Lucie Unit 2 Fuel Transition Small Break Summary Report Page 3-5 The appropriate conservatisms, as prescribed by Appendix K of 10 CFR 50, are incorporated into the SBLOCA EM methodology (Reference 1). This methodology has been reviewed and approved by the NRC to perform SBLOCA analyses. However, several modeling differences from the current SBLOCA EM methodology (Reference 1) were included to make the model consistent with the modifications requested in NRC Requests for Additional Information (RAIs).

%'oJVIILI VIUZU LJLJke~l IMIH~L AREVA Inc. ANP-3345NP Revision 1 St. Lucie Unit 2 Fuel Transition Small Break Summary Report Page 3-6 System nodalization details are shown in Figure 3-1 (RCS), Figure 3-2 (Secondary System), and Figure 3-3 (Reactor Vessel).

3.3 Plant Description and Summary of Analysis Input Parameters St. Lucie Unit 2 is a Combustion Engineering (CE)-designed Pressurized Water Reactor (PWR) with two hot legs, four cold legs, and two vertical U-tube steam generators (SGs). The reactor has a core power of 3029.06 MWt (including measurement uncertainty). The reactor vessel contains a downcomer, upper and lower plena, and a reactor.-core containing 217 fuel assemblies. The hot legs connect the reactor vessel with the vertical U-tube steam generators. Main feedwater (MFW) is injected into the downcomer of each SG. There are three AFW pumps, two motor-driven and one turbine-driven. The ECCS contains two HPSI pumps, four SITs, and two low pressure safety injection (LPSI) pumps.

The RCS was nodalized in the S-RELAP5 model with control volumes interconnected by flow paths or "junctions." The model includes four SITs, a pressurizer, and two SGs with both primary and secondary sides modeled. All of the loops were modeled explicitly to provide -an accurate representation of the plant. A SGTP level of 20% in each steam generator was modeled, which bounds an average SGTP level of up to 20% with an asymmetry of +/-4%. Important system parameters and initial conditions used in the analysis are given in Table 3-2.

The heat generation rate in the S-RELAP5 reactor core model was determined from reactor kinetics equations with actinide and decay heat as prescribed by Appendix K of 10 CFR 50.

The analysis assumed loss of offsite power concurrent with reactor SCRAM, which is based on the low pressurizer pressure reactor trip and includes delays for Reactor

V-Pul ILE UIIz;U I.-J"U"aul I B51 IL AREVA Inc. ANP-3345NP Revision 1 St. Lucie Unit 2 Fuel Transition Small Break Summary Report Page 3-7 Protection System (RPS) circulation and control element assembly (CEA) coil delay.

The single failure criterion required by Appendix K of 10 CFR 50 was satisfied by assuming the loss of one emergency diesel generator (EDG). Thus, a single HPSI and LPSI pump were assumed to be available. The charging system is a safety related system and supported by the remaining EDG, therefore flow from the charging system was credited in the analysis. Initiation of the HPSI and LPSI systems was delayed by 30 seconds beyond the time of SIAS. The 30-second delay represents the time required for diesel generator startup and switching. The charging system is delayed 330 seconds following actuation of SIAS.

The HPSI system was modeled to deliver the SI flow symmetrically to all four loops (Table 3-3). The LPSI system was modeled to deliver the total SI flow asymmetrically to the; broken loop (Loop 2B) and one intact loop (Loop 2A) (Table 3-4). The HPSI and LPSI flow are modeled differently, asymmetric verses symmetric, due to the influence the single failure criterion has on the LPSI system. When assuming single failure of an EDG, valves are not opened to allow LPSI flow to Loops 1A and 1B.

The disabling of a motor-driven AFW pump, due to the single failure criterion, leaves one motor-driven pump and the turbine-driven pump available. The initiation of the motor-driven AFW pump was delayed 330 seconds beyond the time of the auxiliary feedwater actuation signal (AFAS) indicating low SG level (4.0% narrow range). The turbine-driven AFW pump was not credited in the analysis. The AFW flow is directed to the SG attached to the broken loop. Although not significant, a sensitivity study performed with AFW directed into the SG attached to the intact loop produced a lower PCT.

The input model included details of both main steam lines from the SGs to the turbine control valve, including the main steam safety valve (MSSV) inlet piping connected to the main steam lines. The MSSVs were set to open at their nominal setpoints plus 3%

tolerance for the first bank and 2% tolerance for the second bank.

The axial power shape for this analysis is shown in Figure 3-4.

k-evi OLE UINJIU LsILI U I.-

I I" HL AREVA Inc. ANP-3345NP Revision 1 St. Lucie Unit 2 Fuel Transition Small Break Summary Report Page 3-8 3.4 SER Compliance A spectrum of cold leg break sizes from 0.022 ft2 (2.0-inch diameter) to 0.491 ft2 (9.49-inch diameter, 10% of cold leg pipe area) was analyzed. This satisfies the limitation placed on EMF-2328 (Reference 1), that the methodology is acceptable for modeling transients where the break flow area is less than or equal to 10% of the cold leg flow area. In addition, to support the operation of St Lucie Unit 2 with M5 cladding, a sensitivity study was performed to consider attached piping break sensitivity. There is no other SER requirement or restriction on EMF-2328 (Reference 1).

ILILJIIt~U LJU~sUIH~HL AREVA Inc. ANP-3345NP Revision 1 St. Lucie Unit 2 Fuel Transition Small Break LOCA Summary Report Pagie 3-9 Table 3-1 Small break LOCA Development Phases (1) (2) (3) (4) (5)

Subcooled Loop Loss of loop Loop seal Long-term SBLOCA depressurization saturation and circulation clearing and cooling Phase >>>> loop flow and reflux core refill coastdown mode cooling _

RCS RCS boils Primary depressurization, saturates, RCS down and flow loop seal clears, core covered and Description reactor trip, flow coasts is interrupted steam is vented cooled by ECCS turbine trip, loss of down by void to break injection offsite power formation subcooled subcooled I saturated / subcooled I Break subcooled liquid saturated superheated saturated liquid Characteristics discharge saturated liquid vapor discharge discharge gdischarge discharge RCS Flow forced flow and coastdown coastdown natural to stagnant steam break flow to pool boiling circulation forced reflux RCS Heat forced convection convection via condensation boiling and boiling and break Removal steam break flow flow generators generators generators, break flow pressure rapid plateaus just depressurization slow RCS Pressure rapid rapid above below secondary secondary depressurization pressure pressure continuous, continuous, ECCS Injection none none initiates potential SIT potential SIT injection injection covered or1 covered or2 Core Level covered covered uncovered uncovered core recovery 1 Depending on the loop seal elevation with respect to the top of the active core.

2 Depending on the break size.

\4JIiLEUIl~L4 LJIJ~LIlIl~HL AREVA Inc. ANP-3345NP Revision 1 St. Lucie Unit 2 Fuel Transition Small Break LOCA Summary Report Paqe 3-10 Table 3-2 System Parameters and Initial Conditions Reactor Power, MWt 3029.06' Peak LHR, kW/ft 13.0 Radial Peaking Factor (1.65 plus uncertainty & augmentation factor) 1.81 RCS Flow Rate, gpm 370000 Pressurizer Pressure, psia 2250 Core Inlet Coolant Temperature, 'F 554 SIT Pressure, psia 499.7 SIT Fluid Temperature, "F 124.5 Average SG Tube Plugging Level, % 20 SG Secondary Pressure, psia 846-849 MFW Temperature, OF 436 AFW Flow Rate per SG, gpm 255 AFW Temperature, OF 110 AFW Delay Time, sec 330 Low SG Level AFAS Setpoint, % 4 HPSI & LPSI Fluid Temperature, OF 104 Charging System Delay Time, sec 330 Reactor Trip - Low Pressurizer Pressure Setpoint, psia 1810 Reactor Trip Delay Time on Low Pressurizer Pressure, sec 1.15 SCRAM'CEA Holding Coil Release Delay Time, sec 0.74 SIAS Activation Setpoint Pressure for Harsh Conditions, psia 1638 HPSI & LPSI Pump Delay Time on SIAS, sec 30 Nominal + 3% (Bank 1 Valves)

MSSV Lift Pressures and Tolerances Nominal + 2% (Bank 2 Valves) 1 Includes 0.3% measurement uncertainty

t-JhII"CU Lj 1LOULI I Ir;I I L lk1-dJx E 1U AREVA Inc. ANP-3345NP Revision 1 St. Lucie Unit 2 Fuel Transition Small Break LOCA Summary ReDort Pagie3-11 Table 3-3 HPSI Flow Rate versus RCS Pressure RCS Pressure Loop 1A Loop 1B Loop 2A Loop 2B (psia) (gpm) (gpm) (gpm) (gpm) 1063.1 0.0 0.0 0.0 0.0 1062.6 10.6 10.6 10.6 10.6 1062.0 21.3 21.3 21.3 21.3 1045.8 31.9 31.9 31.9 31.9 1009.7 42.5 42.5 42.5 42.5 954.3 53.1 53.1 53.1 53.1 883.3 63.8 63.8 63.8 63.8 800.7 74.4 74.4 74.4 74.4 708.4 85.0 85.0 85.0 85.0 603.7 95.6 95.6 95.6 95.6 476.6 106.3 106.3 106.3 106.3 307.6 116.9 116.9 116.9 116.9 148.1 124.3 124.3 124.3 124.3 125.5 125.2 125.2 125.2 125.2 117.9 125.5 125.5 125.5 125.5 94.3 126.4 126.4 126.4 126.4 59.9 127.7 127.7 127.7 127.7 12.4 129.3 129.3 129.3 129.3 0.0 129.8 129.8 129.8 129.8

%'-UIIM~ UM;U1 LJUk-LAI I 1IC, IL.

AREVA Inc. ANP-3345NP Revision 1 St. Lucie Unit 2 Fuel Transition Small Break LOCA Summary Report Pace 3-12 Table 3-4 LPSI Flow Rate versus RCS Pressure RCS Cold Leg Intact Loop 1 Intact Loop 2 Intact Loop 3 Broken Loop Pressure 1A 1B 2A 2B (psia) (gpm) (gpm) (gpm) (gpm) 125.5 0.0 0.0 0.0 0.0 117.9 0.0 0.0 240.0 240.0 94.3 0.0 0.0 560.0 560.0 59.9 0.0 0.0 880.0 880.0 12.4 0.0 0.0 1200.0 1200.0 0.0 0.0 0.0 1267.2 1267.2

%AJIV ILl ~Il~

VICU JI-I MIL AREVA Inc. ANP-3345NP Revision 1 St. Lucie Unit 2 Fuel Transition Small Break LOCA Summary Renort Plcw

%-.*V1 M V11CU LJULeUl I Mýl IL AREVA Inc. ANP-3345NP Revision 1 St. Lucie Unit 2 Fuel Transition Small Break LOCA Riimm~rv Re~nnrt Paae Summa Report Paae 3-14 3-14 Figure 3-2 S-RELAP5 SBLOCA Secondary System Nodalization

AREVA Inc. ANP-3345NP Revision 1 St. Lucie Unit 2 Fuel Transition Small Break LOCA Summary Renort Pane 3-15 Figure 3-3 S-RELAP5 SBLOCA Reactor Vessel Nodalization

%-,OJU ILl L1K7,U LJUkwU11I IC;1 L AREVA Inc. ANP-3345NP Revision 1 St. Lucie Unit 2 Fuel Transition Small Break LOCA Summairy Re~nor Paoe Summa Renort Paae 3-16 3-16 Figure 3-4 Axial Power Shape

k~oJI ILI U11qVU LJ~JUkI I IUI IL AREVA Inc. ANP-3345NP Revision 1 St. Lucie Unit 2 Fuel Transition Small Break LOCA Summary Report Pagqe 4-1 4.0 ANALYTICAL RESULTS The analysis results demonstrate the adequacy of the ECCS to support the criteria given in 10 CFR 50.46(b)(1-4) (Reference 3) for St. Lucie Unit 2 operating with AREVA supplied 16x16 HTP fuel with M5 cladding.

Section 4.1 describes the SBLOCA break spectrum for the cold leg break. Section 4.2 describes the event for the limiting break. Section 4.3 describes the sensitivity study for a break in the attached piping.

4.1 Results for Break Spectrum The St. Lucie Unit 2 cold leg pump discharge break spectrum analysis for SBLOCA includes breaks of varying diameter up to 10% of the flow area for the cold leg. The spectrum includes a wide enough range of break sizes from 2.0 inch diameter to 9.49 inch diameters to establish a PCT trend. Additional break sizes are performed with a smaller break interval once the potential limiting break size is determined to confirm the limiting break size.

The results for the break spectrum calculations are presented in Table 4-1. Time sequence evolution for each break size analysis is reported in Table 4-2. Figure 4-1 shows the calculated PCTs as a function of break size. The limiting break size was determined to be a 2.70-inch diameter (0.040-ft2) break.

4.2 Discussion of Transient for Limiting Break The results for the limiting break size (2.70-inch) are shown in Figure 4-2 through Figure 4-16. The following discussion pertains to the limiting case.

The primary pressure decreased immediately after break initiation (Figure 4-3). When the primary pressure reached the low pressurizer pressure trip setpoint at 28 seconds the reactor is tripped (Figure 4-2). Within approximately 1 second after reactor trip, reactor SCRAM occurs, which occurs coincident with the loss of offsite power, causing turbine to trip, RCP trip and MFW pump trip (Figure 4-7 and Figure 4-8). As MFW to the

AREVA Inc. ANP-3345NP Revision 1 St. Lucie Unit 2 Fuel Transition Small Break LOCA Summary Report Page 4-2 SGs is ramped down and steam flow to the main steam isolation valves (MSIVs) are closed, the pressure in the SGs increase for approximately 10 seconds until MSSV inlet reaches the lowest opening pressure setpoint. This provides core heat removal in the early stages of the transient.

The primary system depressurization continues at a relatively fast rate for the first 200 seconds. Significant inventory is lost out the break until the break transitions from expelling liquid to steam at approximately 600 seconds (Figure 4-4 and Figure 4-5).

Around this time, the broken leg loop seal begins to clear and the remaining intact loops remain plugged (Figure 4-6).

Prior to loop seal clearing, the core uncovers below top of active fuel (Figure 4-15).

Since there is no loop flow, a large amount of steam is generated and accumulated in the core by the decay heat power until enough pressure is built to blow the upflow leg of the loop seal in the broken leg at 596 seconds into the transient. This causes an abrupt level drop in the downcomer region and a small core level recovery. As the broken leg clears, the plant then enters a fairly slow boil-off phase where mass is lost out the break, and the primary system continues to empty.

From approximately 1000 to 1400 seconds, the primary side pressure is only slightly higher than the secondary side pressure (Figure 4-3), limiting the primary side heat removal. Broken loop steam generator AFW is. initiated at approximately 936 seconds (Figure 4-9), providing an increasing SG level (Figure 4-10). However, the small pressure difference between the primary and secondary side limits the AFW's ability to remove heat from the primary side. At approximately 1500 seconds, the primary pressure reduces below the secondary side pressure, ending heat removal by the secondary side.

Meanwhile, the HPSI system becomes available at 68 seconds into the transient but does not began to inject water into the primary system cold legs until 664 seconds into the transient (Figure 4-9). However, HPSI flow does not provide sufficient inventory at this time to offset the large amount of RCS inventory lost out the break. As effective

VLJtýULA~lI I 1t=1I L UN~Wi~~

k%_Ji AREVA Inc. ANP-3345NP Revision 1 St. Lucie Unit 2 Fuel Transition Small Break LOCA Summary Report Page 4-3 cooling is lost in the core, and the fuel rods begin to heat up at approximately 1350 seconds (Figure 4-16). Hot rod rupture occurs at 2004 seconds. The fuel continues to heat up until the maximum PCT of 1926°F is reached at 2200 seconds. SIT injection begins just prior to reaching the PCT at 2194 seconds, providing sufficient cooling to turn the PCT over. The PCT occurs at approximately 4 inches below the top of active fuel.

For this break size, although LPSI is available, it did not inject (Figure 4-12) due to the slow primary system depressurization. The continued supply of HPSI supports an increasing reactor vessel inventory (Figure 4-14) through event termination.

In conclusion, the limiting PCT break spectrum case is a 2.70-inch diameter cold leg pump discharge break. The PCT of this case is 1926°F. The maximum local oxidation is less than 6% and the maximum core-wide oxidation is less than 0.2%. The total maximum local oxidation is less than 9%, including a pre-transient oxidation of 2.3925%.

4.3 Attached Piping Sensitivity Study Although breaks in the SIT attached piping are not typically PCT limiting, they do result in reduced ECCS flows available to mitigate the event since one SIT inventory spills to containment, in addition to the reduced SI flow due to single failure assumption.

Therefore, an analysis of the limiting break size and location in an attached piping was performed. For St. Lucie Unit 2, the limiting break location and size for an attached piping is considered a double-ended guillotine break of an SIT line (10.126-inch diameter). The break was located in the SIT line connected to Loop 2B.

The calculated PCT was 1451'F, which is less limiting than the maximum PCT of the break spectrum analysis. The maximum local oxidation thickness is 0.1404% and the maximum core-wide oxidation thickness is 0.0017% which are both less limiting than the maximum obtained in the break spectrum analysis. The minimal HPSI and LPSI flows in the analysis are sufficient to prevent a subsequent heatup after the initial quench from the SIT discharge.

'Lik JIIt:

EIU J U.ALo~ U 11C IIL AREVA Inc. ANP-3345NP Revision 1 St. Lucie Unit 2 Fuel Transition Small Break LOCA n

QImmn ~ r cnn a PIinc AuA Table 4-1 Summary of SBLOCA Break Spectrum Results Break diameter (in) 2.00 2.50 2.60 2.70 2.80 3.00 Break Area (ft) 0.022 0.034 0.037 0.040 0.043 0.049 Peak Clad Temperature (°F) 1587 1726 1814 1926 1896 1823 Time of PCT (sec) 3752 2615 2456 2200 1997 1659 Time of Rupture (sec) -- 2443 2219 2004 1848 1654 Transient Local Maximum Oxidation (%) 1.3586 3.6120 4.3352 5.7788 5.0864 3.5589 Total Local Maximum Oxidation (%)1 3.7511 6.0045 6.7277 8.1713 7.4789 5.9514 Core Wide Oxidation (%) 0.0955 0.1273 0.1382 0.1664 0.1388 0.0903 PCT Elevation (ft) 10.77 11.02 11.02 11.02 11.02 11.02 Break diameter (in) 3.50 4.00 4.50 5.00 6.00 7.00 Break Area (ft 2) 0.067 0.087 0.110 0.136 0.196 0.267 Peak Clad Temperature (°F) 1694 1578 1283 1077 1017 1080 Time of PCT (sec) 1074 802 649 527 145 131 Time of Rupture (sec) 1057 ..........

Transient Local Maximum Oxidation (%) 1.2501 0.3964 0.0683 0.0126 0.0065 0.0116 Total Local Maximum Oxidation (%)1 3.6426 2.7889 2.4608 2.4051 2.3990 2.4041 Core Wide Oxidation (%) 0.0335 0.0121 0.0011 0.0002 0.0001 0.0002 PCT Elevation (ft) 10.77 10.52 10.27 10.27 10.02 10.02 Break diameter (in) 8.00 9.00 9.49 Break Area (ft2) 0.349 0.442 0.491 Peak Clad Temperature (°F) 1459 1469 1520 Time of PCT (sec) 169 148 136 Time of Rupture (sec) ......

Transient Local Maximum Oxidation (%) 0.1539 0.1569 0.1621 Total Local Maximum Oxidation (%)1 2.5464 2.5494 2.5546 Core Wide Oxidation (%) 0.0017 0.0021 0.0026 PCT Elevation (ft) 10.02 10.02 10.02 1 Includes the Pre-transient Oxidation of 2.3925%.

PD PD 90 -J 0 P "1 -*N CP CO) rN P P IQ M It , CD oD 6 6 0b 6 Mo M ýn 6 Break diameter (in) 3r <

CD CD C) C 0 CD CD C) C C 0 C C CD

0. >

F~D C-3 -ý C) 8 8 C) N- 0-1 01 E1 8i W" C01 --4 0 N M 01 01 - - W -4 D " CD N o CN PCT (F) o CO CO C -- -- Co o -N c 0) 0W M -M 0) -4 CD 0

o C) CD CD C C C) Co 0 a) CD D a Co C) Break opens 01

-* -4 0O 0 0O C m `J w w c) Low PZR Pressure Trip

  • ~ O0 (0 ~ O "-,, _ W, IQ M0" CO 0) co co CD *' * * -o -* -' .N N N o o 01 Reactor SCRAM, RCP& CD

) 1 r 01C N -N N Turbine Trip I-i C"

-' -' N C* C -4* -* c* N 01co c0 o'* c'i o, SIASissued F 0

0 -D W -NMO - 4 01 01 1i 0 "1 0I -4W C- C-)

Nt. Cr- 01- -N 01 N o0)Ma) - C (C- HPSIavailable

.p, - .1h.N p, -N M1 0 M) M 0W -.4 -4 CD LSPC3 vial 0C 0 -4 -01 N, 01 CO W W

-W- N C) -4 C 0" ( ) -4 -4 CD M1 C Co)oN N)

  • -* W CD 0) .N" HPSlFlowBegins

-~0) N N 01 - -N 4 N 0 CD NO' LPSI Flow Begins h

CD *C CO CD CD Motor driven AFW on, (D

0) C) a) N CD C) Initial 010 (3 I I I I C)f 1 I I  ; I I Lo ps a 1Ace r 0O 01 C' Loop seal IB clears 0

.0) 01-4 -1 I I l l0CD,0 . o£1 oI CD 3 01 C0 - 0 0) Loop seal 2B clears CD 01 0O -, N). 0W (n CA CN > ~ CD 01 01 01 01 C). 1 W 0D CD

0. -- 01 o CD C 0, C. 01 oW C3 N)I -i D Loop seal 2A clears Lle2cas jW ~

C) CD 010 -3 No 01 C) -N 01 a) 01 C, IO 0i-~

01 01 o-' - ' N N C~, -- 01 01 M

" -.4 -4 p St NC) C) 01 CD N 03 01 - C N 01 a) -"NO Break uncovers CO 0 0 o 0 r" 1 4h -N 0 N N O N W.C, 01 0) 01 - ) N N ) N C N, 1C)N -' -N (D01 MD " -4 C) EC5010 CD NCDD W013 .-00r SIT injection begins

-'-'NC)0 01 CD - 'N NC) Minimum RVmass 4C.) 0) CM C1 -4 N N 01 01 4N 4%)

0 0) WNN0 occurs C0 M C N N Hot Rod rupture occurs 4-I 4 01 -N CD C)

-' ~ ~ 10 ~ C

~

1-'4-

) 0

~ 'D

-' K 4' -'-

PCT occurs 3)CO -D - N3 CD 01 01CN

-'N 4 N (D 4 CD ) 8,)

4o 01 C N 0) 01 N CYi ._ 0() Time of core uncovery 013 C) 0 13 - 01 N. 3) N 0) 0) 0) . 3 0)

Non-condens. gas at the break

%-OJl ILEf UIIZLU LJLJA.UI I MAI IL AREVA Inc. ANP-3345NP Revision 1 St. Lucie Unit 2 Fuel Transition Small Break LOCA Summary Report Pagie 4-6 Figure 4-1 Peak Cladding Temperature versus Break Size (SBLOCA Break Spectrum)

%1/4,UIILI UJIICU LU~t..Ul.A I I;I IL AREVA Inc. ANP-3345NP Revision 1 St. Lucie Unit 2 Fuel Transition Small Break LOCA Summary Report Page 4-7 Figure 4-2 Reactor Power - 2.70 inch Break 4000.0 ,

3000.0 *

- Reactor Power J 2000.0 1000.0 0.0

k.,oI ILI uileu UUUUI IeMN IL AREVA Inc. ANP-3345NP Revision 1 St. Lucie Unit 2 Fuel Transition Small Break LOCA Summary Report Page 4-8 Figure 4-3 Primary and Secondary System Pressures - 2.70 inch Break 2500,0 2250.0 2000.0 1750.0 i ead RV Upper Hi I

SSG-1 SG-2 1500.0 1250.0 0~

1000.0 0 O *A*,** U ~ ~ AA ~-~A~

750.0 500.0 - -

250.0 0.0 0.0 1000.0 2000.0 3000.0 4000.0 5000.0 Time (s)

%,,oUI LL UII;U LJUULII I IZiIL AREVA Inc. ANP-3345NP Revision 1 St. Lucie Unit 2 Fuel Transition Small Break LOCA Summarv Renort Page 4-9 Summa ReDort Figure 4-4 Break Void Fraction - 2.70 inch Break 1.0 - W -- V Fratio 0.8[

SVoid Fraction 0.6 LL I

0.4 0.2 0.0 1000.0 2000.0 3000.0 4000.0 5000.0 Time (s)

k'-Jl IIILUIIt.U LJ.,Uf11CII;11L AREVA Inc. ANP-3345NP Revision 1 St. Lucie Unit 2 Fuel Transition Small Break LOCA Summary ReDort Paae 4-10 Figure 4-5 Break Mass Flow Rate - 2.70 inch Break 1000.0 F 800.0

-- Break Flow 600.0 4 II cr 0T U-400.0

ý-AýWj-20

)0.0 J 0.0 1000.0 2000.0 3000.0 4000.0 5000.0 Time (s)

OI ILI UJII5U LJUt-LII I V=1 IL AREVA Inc. ANP-3345NP Revision 1 St. Lucie Unit 2 Fuel Transition Small Break LOCA

.iJmmqrv Rpnnrt Paa; 4-11 Figure 4-6 Loop Seal Void Fraction - 2.70 inch Break d

4444...44-4-4-4-4 --- 4 0.8

-- Loop 1A Loop 1B C Loop 2A 0 0.6 U -4 Loop 2B - boken 0

~0.4 0.2 'i 0.0 1000.0 2000.0 3000.0 4000.0 5000.0 Time (s)

%..AJI ILI U11ieU ~L);UlJ I IMI IL AREVA Inc. ANP-3345NP Revision 1 St. Lucie Unit 2 Fuel Transition Small Break LOCA Summary Report Page 4-12 Figure 4-7 RCS Loop Mass Flow Rate - 2.70 inch Break 10000.0 Loop 1A 5000.0 -*Loop 1B A Loop 2A KD --A Loop 28 - broken QU

'U II 0.0 1727,7' 7 0-191-d-0-h

-I ol 4

-5000.0 -

0.0 1000.0 2000.0 3000.0 4000.0 5000.0 Time (s)

k-s.UI ILI Ufft=U L-JULUUI I 1t1ý IL AREVA Inc. ANP-3345NP Revision 1 St. Lucie Unit 2 Fuel Transition Small Break LOCA Summary Reoort Paae 4-13 Figure 4-8 Main Feedwater Mass Flow Rate - 2.70 inch Break 3000.0 Loop 1 2000.0 =4 Loop 2- broken 0

02 1000.0 0.00.0L * ~ -~~U*U~4U-4-4U ~ * * -U-~*~** - ~ 4U-~-~---- ~4~U~444S~K 5000.0 2000.0 3000.0 4000.0 1000.0 2000.0 3000.0 4000.0 5000.0 Time (s)

k..AJ IIILUII:;U LJUkoU1.UI II L AREVA Inc. ANP-3345NP Revision 1 St. Lucie Unit 2 Fuel Transition Small Break LOCA Summary Report Page 4-14 Figure 4-9 Auxiliary Feedwater Mass Flow Rate - 2.70 inch Break 40.0 Loop 1

.Loop 2 - broken 30.0 o: 20-0

.L 10 0 -

10.0 4*1 0w 1aO *- -- 0 0Nf 41 0.0 1000.0 2000.0 3000.0 4000.0 5000.0 Time (s)

k-OJUI ILI UIIZ;U LýJkU~lI I IZ;I IL AREVA Inc. ANP-3345NP Revision 1 St. Lucie Unit 2 Fuel Transition Small Break LOCA Paae 4-15 Summarv ReDort Paae 4-15 Figure 4-10 Steam Generator Total Mass - 2.70 inch Break 250000.0

-4

--- Loop 1

..... +Loop 2- broken -

./

.0 4

9*'

150000.0 4

A 4

100000.0 --

0.0 1000.0 2000.0 3000.0 4000.0 5000.0 Time (s)

%-FUJI ILI UIULUL.I IIIL AREVA Inc. ANP-3345NP Revision 1 St. Lucie Unit 2 Fuel Transition Small Break LOCA Summary Report Paqe 4-16 Figure 4-11 High Pressure Safety Injection Mass Flow Rates - 2.70 inch Break 20.0 F - -

15.0

-~-'Loop IA

... *Loop1B U, ALoop 2A

/ ------, Loop 2B - broken co-10.0 /

5.0 0.0 1000.0 2000.0 3000.0 4000.0 5000.0 Time (s)

ý%U. L-Pit...,U I IB[I IL k-oU I IL UIIý'

AREVA Inc. ANP-3345NP Revision 1 St. Lucie Unit 2 Fuel Transition Small Break LOCA 5*aimm~rv R*_nrw Paae 4-17 Figure 4-12 Low Pressure Safety Injection Mass Flow Rates - 2.70 inch Break 1.0r 0.5 1

  • Loop 1A

- Loop 1B Loop 2A

- Loop 2B - broken Cc00 u ~ ~4*4M~~

LL

-0.5

-1.0 L .. ..

0.0 1000.0 2000.0 3000.0 4000.0 5000.0 Time (s)

UI I L ) '.-I,-

%-I, , L-1U kULI I I C;I I L AREVA Inc. ANP-3345NP Revision 1 St. Lucie Unit 2 Fuel Transition Small Break LOCA Summary Report Paae 4-18 Figure 4-13 Safety Injection Tank Mass Flow Rates - 2.70 inch Break 50 1 .0....

100.0 I

-- Loop IA

--. Loop 1B

&Loop 2A

-- Loop 28 - t ken cc 50.0 3.

0 LL 0.0

  • U mm - -~ ~ ~~-U -I ~

ki,

-50.0 L 4000,0 5000.0 0.0 1000.0 2000m0 3000.0 Time (s)

AREVA Inc. ANP-3345NP Revision 1 Small Break LOCA St. Lucie Unit 2 Fuel Transition Summary Report Page 4-19 Figure 4-14 Reactor Vessel Mass Inventory - 2.70 inch Break 20000.0O

-u Mass 150000.0 RN

~u~u 1

.0 U

U

\,

8 mU 100000.0 U

'a, 1 m~

50000.0 -

1000.0 3000.0 0.0 2000.0 4000.0 5000.0 Time (s)

\..JILI -,-' - -U LU~kUl I ItZl IL AREVA Inc. ANP-3345NP Revision 1 St. Lucie Unit 2 Fuel Transition Small Break LOCA Summzqrv Rinnrt Paae 4-20 Figure 4-15 Hot Assembly Mixture Level - 2.70 inch Break 12.0 K .... .... ....- - _

10.0

" 8.0 k t --. Mixture Level 6.0 i

4.0 L. -5 0.0 1000.0 2000.0 3000.0 4000.0 500.0 Time (s)

\~UI III uiir~u U'U~LJI I I1~I .1 AREVA Inc. ANP-3345NP Revision 1 St. Lucie Unit 2 Fuel Transition Small Break LOCA Summary Report Page 4-21 Figure 4-16 Hot Spot Cladding Temperature - 2.70 inch Break 2000.0 r

1500.0 /7 a 1

-a - hot rod node 45 @11.02 ft N

V 1000.0 4 U

-u I- 11 U ~-. i-U-u~U~-a~U-~U a a 500.0 'U U U U-U U ~ U U UW U U 0.0 -50 0.0 1000.0 2000.0 3000.0 4000.0 5000.0 Time (s)

%-AUl ILI UIIUU L)JU~.LAI I It.I IL AREVA Inc. ANP-3345NP Revision I St. Lucie Unit 2 Fuel Transition Small Break LOCA Summary Report Page 5-1

5.0 REFERENCES

1. AREVA Inc. Document EMF-2328(P)(A) Revision 0, PWR Small Break LOCA Evaluation Model, S-RELAP5 Based, March 2001.
2. AREVA Inc. Document BAW-10240(P)(A) Revision 0, Incorporation of M5 Properties in Framatome ANP Approved Methods, May 2004.
3. Code of Federal-Regulations, Title 10, Part 50, Section 46, Acceptance Criteria ForEmergency Core Cooling Systems For Light-Water Nuclear Power Reactors, January 2010.
4. AREVA Inc. Topical Report XN-NF-81-58(P)(A) Revision 2, Supplements 1 and 2, RODEX2 FUEL Thermal-Mechanical Response Evaluation Model, Exxon Nuclear Company, March 1984.
5. AREVA Inc. Topical Report ANF-81-58(P)(A) Revision 2, Supplements 3 and 4, RODEX2 FUEL Thermal-Mechanical Response Evaluation Model, Advanced Nuclear Fuels Corporation, June 1990.
6. Code of Federal Regulations, Title 10, Part 50, Appendix K, ECCS Evaluation Models, March 2000.