i ss April 16,1931 MDiORANDUM FOR:
S. H. Hanauer, Director, Division of Human Factors Safety R. J. f4attsot:, Director, Division of Systems Integration R. H. Vollner, Director, Division of Engineering D. G. Eisenhut, Director, Division of Licensing B. K. Snycer, Program Director, THI Program Office FROM:
T. E. Purley, Director Division of Safety Technology
SUBJECT:
MAY UPDATE FOR TMI ACTION P: *,N TRACKING SYSTEM The Office of Management and Program Analysis (OMPA) has requested that all NRC offices provide information for the forthcoming update of the TMI Action Plan Tracking System (APTS). This update will require tt.e person with lead responsibility for each item to provide a markup of the current APTS sumary. Copies of the January APTS summary sheets vare recently provided to each NRR Division and Program Office by DS'i.
It is requested that the revised sheets be returned to Paul Norian by April 21, 1981. A neetino to discuss the status of the current update with Harold Denton is expected to be scheduled for April 24, 1981 (2:00 - 3:00 p.m.).
Please note that when an item contains more than one sub-element, these suo-elements should be broken out as distinct line items. Also, the status and flaa items should be verified (see enclosure). Contact Paul Norian (ext. 29457) if you have any cuestions on these items.
.DISTRIE,UTION Central Files Original signed by s
TERA y,schreeder GIB Reading T. Murley c/f W Thomas E. Murley, Director Division of Safety Technology
\\
Enclosure:
As Stated cc: w/enclorure H. Denton O
N d[y Co E. Case f y
/p {7 H. Thompson F. Schroeder C
'//w
-(
nski
'p S104230 j
A H. Levin 5' (N
- 11. Olshinski M \\ 'O 1222E-O Verra H1 A
/ '
D5TMD:GP DS73 l
<,, a p H'. Berkson t DST : IB
! DST:GIB,
" h. / 'jb j.KKniel Fd--l!. FSchgeder AW
-R p'l Vineyard-TEM $ " l, PE!
ian:
. p, Norian.
rm>
.j. na/Z/81 j04//{/R1
[Oa/g/81 04/g81
~ u-r, OFFICIAL RECORD COPY
" > ~ ~ ~
U;,:T E D r.i t,T E s
[
NUC L E /,T. T.E C'J L AT C;'
C O *,' *. l SS I O N j.
i., : n
.w n c. nt g
April if,, 1931 MEMO: ANDUM FOR:
S. H. Hanauer, Director, Division of Human Factors Safety R. J. P,attson, Director, Division of Systems Integraticn R. H. Vollmer, Director, Division of Engineering D. G. Eisenhut, Director, Division of Licensirl B. K. Snyder, Program Director, TMI Program 'ifice FROM:
T. E. Murley, Director Division of Safety Technology
SUBJECT:
MAY UPDATE FOR TMI ACTION PLAN TRACKING SYSTEM The Office of Management and Program Analysis (OMPA) has requested that all NRC offices provide information for the forthcoming update of the TMI Action Plan Tracking System (APTS). This update will require the person with lead responsibility for each item to provide a markup of the current APTS summary.
Copies of the January APTS sumary sheets were recently provided to each NRR Division and Program Office by DST.
It is requested that the revised sheets be returned to Paul Norian by April 21, 1981. A neeting to discuss the status of the current update with Harold Denton is expected to be scheduled for April 24, 1981 (2:00 - 3:00 p.n.).
Please note that when an item contains more than one sub-element, these sub-elements should be broken out as distinct line items.
Also, the status and flag items should be verified (see enclosure).
Contact Paul Norian (ext. 29457) if you have any questions on these items.
i 1
/
n
.ucMm v' Tho$as E. Murley, Director Division of Safety Technology
Enclosure:
As Stated cc: w/ enclosure H. Denton E. Case H. Thompson F. Schroeder K. Kn'el J. Zwolinski R. Capra H. Levin J. 01shinski D. Verrelli H. Ferkson P. Vineyard P. Norian
W Enclosure TMI ACTION PLAN TRACKING SYSTEM STATUS INDICATORS Status indicators are reported in the leit-hand margin below the action item number.
Items within numbered groups are mutually exclusive; it is possible to have 3 status items appearing.
1.
STATUS INACTIVE No work is currently underway in this item.
Further explanation should be provided next to
" current stetus" (i.e., - scheduled to begin in FY P2; no resources have been allocated; etc.)
REQMENT A requirement has been issued and the item is being implemented.
No direct NRC participation is necessary - awaiting industry complete.
COMPLETE All activity on the action item has been finished:
study or report completed; requirement, issuance, and implementation complete.
2.
FLAG RED Trouble with item; serious slip (+ 1 year);
severe resource shortage; tracking problems.
YELLOW Any slip less than 1 year; potential red item.
GREEN Execution and/or implementation are going smoothly.
3.
ACTION COMMISSION -
Indicates Commission review / action is required on the item.
(An explanation of the Commission action must be included wten this appears.)