ML19225B297

From kanterella
Jump to navigation Jump to search

Notifies of Review of Util 770728 Submittal Re TAC 10042 & 10043,degraded Grid Voltage.Forwards Request for Addl Info
ML19225B297
Person / Time
Site: Point Beach  
Issue date: 06/13/1979
From: Lainas G
Office of Nuclear Reactor Regulation
To: Schwencer A
Office of Nuclear Reactor Regulation
References
TAC-12955, TAC-12956, NUDOCS 7907240479
Download: ML19225B297 (3)


Text

k.

e' pa arc f,.

,S UNITED STATES Q e(( h NUCLEAR REGULATORY COMMISSION 3

3 g'v 4 f

JUN 131979 MEMORANDUM FOR:

A. Schwencer, Chief, Operating Reactors Branch #1, Division of Operating Reactors FROM:

G. Lainas, Chief, Plant Systems Branch, Division of Operating Reactors

SUBJECT:

POINT BEACH, UNITS 2 & 3, REQUEST FOR ADDITIONAL INFORMATION FOR DEGRADED GRIO VOLTAGE (TAC 10042 &

10043)

Plant Name: Point Beach Nuclear Plairc, Unit Nos.1 & 2 Docket No.: 50-266 and 50-301 Responsible Branch: ORB #1 Project Manager:

C. Trammell Reviewing Branch: Plant Systems Branch l

Status: Awaiting Information i

In response to technical assistance request TAC 10042 and 10043, the Plant Systems Branch has reviewed the licensee's submittal of July 28, 1977 and fcund that additional infomation is required in order to complete our review, The attached request for additional.information should be forwarded to the licensee as soon as possible, G, Lainas, Chief i

Plant Systems Branch Division of Operating Reactors

~

Contact:

S. Rhow, X28077 J. Ibarra, LLL Encl osure:

As stated cc w/ enclosure:

See page 2 79og240"9 367 034

ndC-POIR

_2_

cc w/ enclosure:

4 D. Eisenhut R. Vollmer W. Russell B. Grimes C. Trammell G. Lainas D. Tondi P. Shemanski M. Chiramal S. Rhow J. Ibarra, LLL l

i i

a 1

367 035

4 g

REQUEST FOR ADDITIONAL INFORMATION POINT BEACH NUCLEAR PLANT NO.1 and 2 DEGRADED GRID VOLTAGE (TAC 10042 & 10043) 1.

Table 15.3.5-1 (Wisconsin Electric Power Company letter to NRC cated July 2,1977) givc5 as trip set voltage of 3675 volts for degraded voltage condition.

State the time delay associated with this trip setpoint along with tolerances for the time delay and trip voltage in the Technical Specification change.

2.

Describe how the voltaae monitors satisfy the requirements of IEEE 279-1971 (Include sufficient information to enable us to verify compliance with the requirements of the standard).

3.

Table 15.4.1-1 (Wisconsin Electric Poder Company letter to NRC dated July 28,1977) gives channel functional tests to be done every refueling cycle. Give the basis for channel functional tests not to be done monthly as recommended by NRC letter, Table 4.3-2, Engineered Safety Feature Actuation System Instrumentation Sur-veillance Requirements (Safety Evaluation and Statement of Staff Positions Relative to the Emergency Pager Systems for Operating Reactors, dated 6/2/77),

I 367 036

_